| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Apr 24, 2020 | 99641 | HamiltonDistrict 9 | Soil cement base with an A-3 bituminous surface treatment on CH 6 from 800 North Road to Dale Road. | — | Executed | Mt. Carmel Stabilization Group, Inc. $600,471 · | ||
| Apr 24, 2020 | 99642 | WilliamsonDistrict 9 | Resurfacing Crenshaw Road from Skyline Road to Pease Road. | — | Executed | Samron Midwest Contracting, Inc. $834,637 · | ||
| Jun 12, 2020 | 78709 | JacksonDistrict 9 | Intersection improvements, pavement widening, HMA resurfacing and a multi-use path on IL 13 from just east of Veterans Parkway to the Williamson County line. | — | Executed | E. T. Simonds Construction Company $4,691,711 · | ||
| Jun 12, 2020 | 78717 | SalineDistrict 9 | Reconstruction of ADA ramps at 7 locations along IL 34 (Main Street) and along Old IL 13 (Polar Steet) in Harrisburg. | — | Executed | Samron Midwest Contracting, Inc. $161,701 · | ||
| Jun 12, 2020 | 78730 | JohnsonDistrict 9 | Combination of joint reconstruction, partial depth patching, structure repair, HMA overlay and substructure repairs on 4 structures in Johnson County (SN 044-0011, 044-0025, 044-0027 and 044-0054). | — | Executed | Samron Midwest Contracting, Inc. $634,655 · | ||
| Jun 12, 2020 | 78733 | JeffersonPerryDistrict 9 | Bridge repairs including deck/approach patching, shallow strip seals, substructure repairs, waterproofing and bituminous overlay on SN 041-0046 carrying IL 142 over ICRR in Jefferson County and SN 073-0023 carrying IL 152 over Beaucoup Creek in Perry County. | — | Executed | Samron Midwest Contracting, Inc. $408,447 · | ||
| Jun 12, 2020 | 78746 | VariousDistrict 9 | Electrical repair and/or replacement on various routes in various counties of District 9. | — | Executed | F. W. Electric, Inc. $51,261 · | ||
| Jun 12, 2020 | 78747 | VariousDistrict 9 | Repairing or replacing damaged guardrail, barrier terminals, impact attenuators, cable median barrier and fence on a work order basis throughout District 9. | — | Executed | COLLINS & HERMANN, INC. $874,519 · | ||
| Jun 12, 2020 | 78753 | JeffersonDistrict 9 | Bridge deck microsilica concrete overlay, approach slab replacements, joint reconstruction, bearing replacements, backwall replacements, slope wall repairs and floor drain extensions on SN 041-0060 carrying I-64 westbound (2nd level structure) over I-57 southbound at the north tri-level, north of Vernon. | — | Executed | E. T. Simonds Construction Company $648,215 · | ||
| Jun 12, 2020 | 78758 | PulaskiWilliamsonDistrict 9 | Bearing removal and replacement, joint reconstruction, plating beam ends, diaphragm removal and replacement, concrete overlay and deck patching on SN SN 100-0057 over I-57 in Williamson County and bearing removal and replacement on SN 077-0028(31) over I-57 in Pulaski County. | — | Executed | Samron Midwest Contracting, Inc. $498,769 · | ||
| Jun 12, 2020 | 78794 | AlexanderDistrict 9 | Major bridge preventative maintenance on SN 002-0002 carrying I-57 over Golden Lilly Road (TR 163B), 0.3 miles south of the Pulaski County line. | — | Executed | Samron Midwest Contracting, Inc. $695,276 · | ||
| Jun 12, 2020 | 78795 | AlexanderDistrict 9 | Pier repairs on SN 002-0005 carrying US 60/62 over the Mississippi River. | — | Executed | Samron Midwest Contracting, Inc. $73,736 · | ||
| Jun 12, 2020 | 78800 | JeffersonDistrict 9 | 3000' of pavement, shoulder, curb and gutter removal; PCC pavement (jointed); PCC shoulders; combination concrete curb and gutter; and pavement striping. | — | Executed | Samron Midwest Contracting, Inc. $608,452 · | ||
| Jun 12, 2020 | 99600 | SalineDistrict 9 | Removal of a three-span precast prestressed concrete deck beam bridge, construction of 148 feet of reinforced concrete culvert pipe, construction of 300 feet of roadway embankment (using 22,392 cu. yd. of furnished excavation) and hot-mix asphalt pavement with aggregate base, placing riprap for erosion control, seeding all distrubed areas and miscellaneous items necessary to complete the improvement. | — | Executed | E. T. Simonds Construction Company $403,665 · | ||
| Jun 12, 2020 | 99615 | JeffersonDistrict 9 | Replace the bridge carrying TR 1A over East Creek, 1.5 miles east of Boyd. | — | Executed | Dees, Inc. $210,784 · | ||
| Jun 12, 2020 | 99627 | AlexanderDistrict 9 | Replace the bridge carrying TR 89A over Miller Creek, 3.7 miles southeast of Thebes. | — | Executed | E. T. Simonds Construction Company $171,025 · | ||
| Jun 12, 2020 | 99638 | JohnsonDistrict 9 | Resurfacing Goreville Road from I-57 southbound ramp to IL 37. | — | Executed | E. T. Simonds Construction Company $850,071 · | ||
| Jun 12, 2020 | 99644 | WhiteDistrict 9 | Replace the bridge carrying TR 380 over Crooked Creek, one half mile north of Garnerville. | — | Executed | Samron Midwest Contracting, Inc. $211,296 · | ||
| Jun 12, 2020 | 99645 | HamiltonDistrict 9 | Construct a 20'- 22' wide bituminous service treatment on various county highways. | — | Executed | Illini Asphalt Corporation $267,972 · | ||
| Jun 12, 2020 | 99647 | PerryDistrict 9 | Resufacing South Walnut Street from Randolph Street to Kaskaskia Street in Pinckneyville. | — | Executed | Samron Midwest Contracting, Inc. $138,420 · | ||
| Jun 12, 2020 | 99649 | SalineDistrict 9 | Resurfacing Mill Street from Town Park Road to Oak Street. | — | Executed | E. T. Simonds Construction Company $412,963 · | ||
| Jul 31, 2020 | 78600 | JeffersonDistrict 9 | 4.2 miles of patching, milling, HMA surface, HMA shoulders and guardrail on I-57 from north of the northern tri-level in Jefferson County to 2 miles south of the Dix interchange. | — | Executed | Southern Illinois Asphalt Co., Inc. $5,210,684 · | ||
| Jul 31, 2020 | 78701 | UnionDistrict 9 | Construction of additional truck parking lot adjacent to the existing lots at both the northbound and southbound Trail of Tears Rest Area on I-57, north of IL 146. | — | Executed | E. T. Simonds Construction Company $1,625,206 · | ||
| Jul 31, 2020 | 78731 | JeffersonDistrict 9 | 1.3 miles of ADA ramp modifications, flashing left turn arrows, mast arm improvements to properly locate signal heads, controller upgrades and interconnect upgrades due to signal spacing on IL 15 from east of 44th Street to west of 25th Street in Mt. Vernon. | — | Executed | Brown Electric, Inc. $1,546,370 · | ||
| Jul 31, 2020 | 78735 | VariousDistrict 9 | Crack sealing on various routes throughout various counties of District 9. | — | Executed | Complete Asphalt Service Co. $131,653 · | ||
| Jul 31, 2020 | 78763 | WhiteDistrict 9 | 8.2 miles of patching and resurfacing on US 45 from IL 14 to IL 1; including sidewalk ramps in Norris City. | — | Executed | E. T. Simonds Construction Company $2,326,867 · | ||
| Jul 31, 2020 | 78769 | FranklinDistrict 9 | 1.8 miles of HMA surface removal, HMA resurfacing, patching and ADA ramp h reconstruction on IL 149 in West Frankfort, from IL 37 to the east corp limits near Horrell Street. | — | Executed | E. T. Simonds Construction Company $1,443,396 · | ||
| Jul 31, 2020 | 78782 | GallatinDistrict 9 | 1.2 miles of pavement patching, milling, HMA binder and surface, HMA shoulders and curb ramp / sidewalk modifications on Main Street from IL 1 to Murphy Murphy Street in Ridgway. | — | Executed | E. T. Simonds Construction Company $518,040 · | ||
| Jul 31, 2020 | 78783 | JacksonDistrict 9 | 4 miles of patching, milling, HMA binder and surfacing, HMA shoulders and spot drainage improvements on Old IL 13 from just west of Tower Road in Carbondale to just east of IL 127 in Murphysboro. | — | Executed | E. T. Simonds Construction Company $1,137,153 · | ||
| Jul 31, 2020 | 78784 | JacksonDistrict 9 | 0.52 miles of resurfacing and patching on IL 13 westbound in Carbondale, sidewalk ramp update at Lewis Lane and the addition of a new bike lane. | — | Executed | Samron Midwest Contracting, Inc. $443,394 · | ||
| Jul 31, 2020 | 78787 | WilliamsonDistrict 9 | 5.8 miles of resurfacing on I-57 from Herrin Road to Old IL 13 in Marion. | — | Executed | Southern Illinois Asphalt Co., Inc. $4,925,290 · | ||
| Jul 31, 2020 | 78796 | MassacDistrict 9 | Removal and replacement of HMA overlay at various locations, partial depth patching, cleaning of deck drains and removal of debris from the shoulders on I-24 at SN 064-0035 over the Ohio River. | — | Executed | E. T. Simonds Construction Company $614,135 · | ||
| Jul 31, 2020 | 78797 | VariousDistrict 9 | Bridge deck concrete sealing at various structures in Gallatin, Hardin, Pope, Saline and Williamson Counties. | — | Executed | All States Painting, Inc. $194,376 · | ||
| Jul 31, 2020 | 78807 | JeffersonDistrict 9 | 11 miles of patching, partial depth removal and partial depth patching on I-64 from the Washington County line to I-57 / I-64 Tri-level north of Mt. Vernon. | — | Executed | G. M. Sipes Construction, Inc. $450,914 · | ||
| Jul 31, 2020 | 78808 | AlexanderPulaskiDistrict 9 | Pavement patching on I-57 from mile marker 1 to mile marker 8. | — | Executed | Kinney Contractors, Inc. $399,525 · | ||
| Jul 31, 2020 | 99639 | JacksonDistrict 9 | Reconstruct the intersection of Chautaugua Street at McLafferty Road/Briarwood Drive in Carbondale to a roundabout with multi-use path and pavement markings. | — | Executed | Samron Midwest Contracting, Inc. $736,354 · | ||
| Jul 31, 2020 | 99646 | UnionDistrict 9 | Replace the bridge carrying TR 164 over a tributary to Big Creek, 4 miles southeast of Anna. | — | Executed | Samron Midwest Contracting, Inc. $238,472 · | ||
| Jul 31, 2020 | 99648 | MassacDistrict 9 | Resurfacing New Columbia Road from the Johnson County line to Teague Hill Road. | — | Executed | Southern Illinois Asphalt Co., Inc. $326,340 · | ||
| Jul 31, 2020 | 99652 | WhiteDistrict 9 | Resurfacing Epworth Road from E 1100 N Road to E 650 N Road. | — | Executed | E. T. Simonds Construction Company $1,625,901 · | ||
| Jul 31, 2020 | 99653 | JeffersonDistrict 9 | Resurfacing CH 8 from IL 15 to 5th Street in Bluford. | — | Executed | Southern Illinois Asphalt Co., Inc. $351,312 · | ||
| Sep 18, 2020 | 46454 | JeffersonJohnsonDistrict 9 | Repairing or replacing damaged or deteriorated overhead sign structures, overhead sign structure components and supports at various locations in Jefferson and Johnson Counties. | — | Executed | COLLINS & HERMANN, INC. $733,275 · | ||
| Sep 18, 2020 | 46922 | MassacDistrict 9 | HMA resurfacing of roadway and parking areas, striping of parking areas, sign replacement, aggregate resurfacing of camp sites, HMA paving of existing camp sites, parking lot and sidewalk construction and site lighting at Fort Massac State Park (IDNR) in Metropolis. | — | Executed | E. T. Simonds Construction Company $470,696 · | ||
| Sep 18, 2020 | 78799 | MassacPulaskiDistrict 9 | 9 miles of HMA surface removal, HMA surface course, pavement patching and ADA curb ramp improvements on IL 169 from IL 37 to US 45. | — | Executed | Southern Illinois Asphalt Co., Inc. $1,284,417 · | ||
| Sep 18, 2020 | 78822 | WilliamsonDistrict 9 | High friction surface treatment on the northbound I-57 entrance Ramp A and Ramp A-R; Ramp A begins at IL 13 and continues to The Hill Avenue overpass; Ramp A-R begins at IL 13 and ends where it merges into Ramp A. | — | Executed | E. T. Simonds Construction Company $379,353 · | ||
| Nov 6, 2020 | 78481 | FranklinDistrict 9 | 0.64 miles of PCC replacement, HMA resurfacing, new curb and gutter and inlets; sidewalk and multi-use path will be replaced and/or constructed the length of the project on IL 149 in West Frankfort. | — | Executed | Samron Midwest Contracting, Inc. $2,556,842 · | ||
| Nov 6, 2020 | 78505 | UnionDistrict 9 | Removal of SN 091-0047 and construction of a new west ramp to connect IL 127 with CH 8 (Chestnut Street) in Alto Pass. | — | Executed | Sierra Bravo Contractors, LLC $361,879 · | ||
| Nov 6, 2020 | 78547 | JacksonDistrict 9 | Complete replacement of SN 039-0046 on Bluegrass Lane (off IL 151 south of Ava) over Spring Creek. | — | Executed | Samron Midwest Contracting, Inc. $393,333 · | ||
| Nov 6, 2020 | 78768 | WilliamsonDistrict 9 | Substructure repairs, joint reconstruction, parapet repairs and bridge deck microsilica concrete overlay on SN 100-0039 carrying IL 148 over I-57, 0.6 miles west of IL 37. | — | Executed | Samron Midwest Contracting, Inc. $748,970 · | ||
| Nov 6, 2020 | 78780 | JacksonDistrict 9 | 4.2 miles of resurfacing, excavating and patching on US 51 from US 51 south of Carbondale to west of Makanda. | — | Executed | E. T. Simonds Construction Company $1,224,873 · | ||
| Nov 6, 2020 | 78803 | UnionDistrict 9 | Demolition of buildings off of IL 146, 3 miles east of Ware near SN 091-0056. | — | Executed | Samron Midwest Contracting, Inc. $28,246 · | ||
| Nov 6, 2020 | 78806 | JacksonDistrict 9 | Pavement patching at the intersection of IL 13 and Watson Road. | — | Executed | Kinney Contractors, Inc. $118,436 · | ||
| Nov 6, 2020 | 78816 | JacksonPerryDistrict 9 | Parapet repairs on SN 039-0069 on Old IL 13 over Mud Creek, 2 miles east of IL 127 and on SN 073-0033 on US 51 over ICG Railroad in DuQuoin. | — | Executed | Samron Midwest Contracting, Inc. $196,810 · | ||
| Jan 15, 2021 | 78328 | WhiteDistrict 9 | Replacing the existing single span, closed abutment bridge with a new triple opening, cast-in-place reinforced concrete box culvert on IL 1, 2.75 miles north of Norris City. | — | Executed | E. T. Simonds Construction Company $673,811 · | ||
| Jan 15, 2021 | 78606 | MassacDistrict 9 | Patching, resurfacing and bridge repairs on I-24 from the Johnson County line to the Ohio River Bridge. | — | Executed | E. T. Simonds Construction Company $23,498,738 · | ||
| Jan 15, 2021 | 78785 | PulaskiDistrict 9 | 16 miles of pavement patching, milling, surfacing, shoulder repair and ADA ramp improvements on Old US 51 from 2.1 miles south of the Union County line to IL 37 just north of Cairo. | — | Executed | E. T. Simonds Construction Company $5,002,433 · | ||
| Jan 15, 2021 | 78802 | MassacDistrict 9 | 4.6 miles of patching, HMA and PCC removal, HMA surfacing, median/curb repair, ADA ramps and signal upgrades on US 45 from 10th Street / Ferry Street to just east of Belgrade Road and on IL 145 from US 45 to approximately 900' north of US 45. | — | Executed | E. T. Simonds Construction Company $3,997,326 · | ||
| Jan 15, 2021 | 78805 | HamiltonDistrict 9 | Removal and replacement of a box culvert (SN 033-7024) carrying IL 142 over a ditch, 0.1 miles north of Main Street in Broughton. | — | Executed | Samron Midwest Contracting, Inc. $86,710 · | ||
| Jan 15, 2021 | 78815 | WhiteDistrict 9 | Bridge deck repairs on SN 097-0040 carrying I-64 over Pond Creek, 0.25 miles east of Wayne; SN 097-0042 and 097-0043 carrying I-64 over Tributary to Randolph Ditch, 11.5 miles west of IL 1; and SN 097-0046 and 097-0047 carrying I-64 over Randolph Drainage Ditch, 9.5 miles west of IL 1. | — | Executed | E. T. Simonds Construction Company $858,527 · | ||
| Jan 15, 2021 | 78817 | WilliamsonDistrict 9 | Replacing a gabion wing wall on SN 100-5002 at the intersection of Herrin Road and Collins Road near Johnston City. | — | Executed | K. D. Crain and Sons, Inc. $13,690 · | ||
| Jan 15, 2021 | 78821 | AlexanderDistrict 9 | Bridge deck overlay on SN 002-0032 on IL 3 over Sexton Creek, west of Gale. | — | Executed | E. T. Simonds Construction Company $156,645 · | ||
| Jan 15, 2021 | 99656 | SalineDistrict 9 | Resurfacing Liberty Road from Barnett Street to US 45. | — | Executed | E. T. Simonds Construction Company $411,217 · | ||
| Mar 5, 2021 | 78336 | FranklinDistrict 9 | Removal and replacement of a box culvert (SN 028-7029) carrying IL 34 over a drainage ditch, 5.5 miles east of IL 37 in Benton. | — | Executed | Sierra Bravo Contractors, LLC $137,877 · | ||
| Mar 5, 2021 | 78501 | SalineDistrict 9 | Replacement of box culvert carrying US 45 over a stream and replacement of a single span bridge with a double box culvert carrying Feazel Road, off of US 45, over Pankey Branch. This project is located near Harrisburg. | — | Executed | Samron Midwest Contracting, Inc. $896,261 · | ||
| Mar 5, 2021 | 78760 | SalineDistrict 9 | 12.8 miles of pavement patching and resurfacing on US 45 from IL 145 in Harrisburg to the Williamson County line in Stonefort. | — | Executed | Southern Illinois Asphalt Co., Inc. $4,208,512 · | ||
| Mar 5, 2021 | 78804 | HamiltonJeffersonDistrict 9 | Bridge deck overlay and joint repair on SN 041-0040 and bridge deck overlays on SN 041-0041, 041-0042 and 033-0012; all on IL 142 in Jefferson and Hamilton Counties. | — | Executed | Samron Midwest Contracting, Inc. $514,157 · | ||
| Mar 5, 2021 | 78836 | VariousDistrict 9 | Cleaning and painting of portions of 16 structures in various counties of District 9. | — | Executed | Venus Painting Co. $1,653,760 · | ||
| Mar 5, 2021 | 78858 | VariousDistrict 9 | Weed spraying for Johnson grass along I-57 at various locations in various counties. | — | Executed | Endrizzi Contracting, Inc $98,315 · | ||
| Mar 5, 2021 | 78859 | VariousDistrict 9 | Weed spraying for broadleaf weeds along I-57 at various locations in various counties. | — | Executed | ALLEN CHASE ENTERPRISES INC. $77,059 · | ||
| Mar 5, 2021 | 99651 | JacksonDistrict 9 | Resurfacing and pavement markings on Brick Plant Road, from Randolph County line to IL 4. | — | Executed | E. T. Simonds Construction Company $570,281 · | ||
| Mar 5, 2021 | 99654 | WilliamsonDistrict 9 | Construct a multi-use path, a three-sided concrete structure and traffic signal improvements. Project begins at the southwest corner of IL 13 and Greenbriar Road to an existing path at John A Logan Community College. | — | Executed | Samron Midwest Contracting, Inc. $827,594 · | ||
| Mar 5, 2021 | 99657 | PopeDistrict 9 | Resurface New Liberty Road from the Massac County line to 0.1 mile northeast of New Liberty Road. | — | Executed | Southern Illinois Asphalt Co., Inc. $393,571 · | ||
| Mar 5, 2021 | 99658 | PopeDistrict 9 | Resurface Eddyville Blacktop from Ragen Road south for 1.0 mile. | — | Executed | Southern Illinois Asphalt Co., Inc. $254,976 · | ||
| Mar 5, 2021 | 99659 | WilliamsonDistrict 9 | Intersection improvements including replacement of sidewalks, enhancement of crosswalks and warning signs on Monroe Street from North 20th Street to North 16th Street in the City of Herrin. | — | Executed | Samron Midwest Contracting, Inc. $73,890 · | ||
| Apr 23, 2021 | 78151 | SalineDistrict 9 | Replacing the existing single span, closed abutment bridge with a new long span open abutment steel beam bridge with reinforced concrete deck on IL 142, 3 miles north of Eldorado. (SN 083-0032) | — | Executed | E. T. Simonds Construction Company $1,121,486 · | ||
| Apr 23, 2021 | 78622 | HamiltonDistrict 9 | Removal and replacement of a box culvert (SN 033-2000) carrying IL 242 over an unnamed stream, 3.5 miles north of McLeansboro. | — | Executed | Sierra Bravo Contractors, LLC $145,664 · | ||
| Apr 23, 2021 | 78681 | JohnsonDistrict 9 | Replacing the existing 3-span deck beam bridge (SN 044-0053) with a new 3-span bridge carrying IL 146 over Little Cache Creek in Vienna. | — | Executed | Samron Midwest Contracting, Inc. $2,288,172 · | ||
| Apr 23, 2021 | 78819 | FranklinDistrict 9 | 6 miles of pcc pavement, milling, surfacing, HMA shoulders, aggregate shoulders and patching on IL 148 from one mile south of IL 154 to IL 14. | — | Executed | Samron Midwest Contracting, Inc. $1,928,223 · | ||
| Apr 23, 2021 | 78820 | JacksonDistrict 9 | 3.7 miles of patching, surface removal, surfacing and ADA ramp improvements on 14th and 11th Streets in Murphysboro. | — | Executed | Samron Midwest Contracting, Inc. $1,216,661 · | ||
| Apr 23, 2021 | 78837 | MassacDistrict 9 | Removing and replacing PCC pavement, ADA ramp improvements and pavement marking at the intersection of US 45 / Ferry Street and 10th Street in Metropolis. | — | Executed | Samron Midwest Contracting, Inc. $183,441 · | ||
| Apr 23, 2021 | 78839 | WhiteDistrict 9 | 1.9 miles of patching, surface removal, surfacing, raised pavement markers and ADA ramp improvements on IL 1 northeast of Locust Street to Commerce Street in Carmi. | — | Executed | E. T. Simonds Construction Company $1,614,480 · | ||
| Apr 23, 2021 | 78840 | JeffersonDistrict 9 | 0.9 miles of patching, milling and resurfacing on IL 15 from west of Sparrow Lane (west of I-57) to west of Davidson Avenue. | — | Executed | Samron Midwest Contracting, Inc. $719,781 · | ||
| Apr 23, 2021 | 78851 | JacksonDistrict 9 | Pavement patching on North 6th Street from IL 13/127 to Lucier Street in Murphysboro. | — | Executed | E. T. Simonds Construction Company $117,195 · | ||
| Apr 23, 2021 | 78853 | JacksonDistrict 9 | Pavement patching at the intersection of IL 13 and Streigel Road in Carbondale. | — | Executed | E. T. Simonds Construction Company $153,128 · | ||
| Apr 23, 2021 | 78860 | AlexanderDistrict 9 | Bridge preventative maintenance on SN 002-0001 carrying I-57 northbound over Golden Lilly Road (TR 163B), 0.3 miles south of the Pulaski County line. | — | Executed | Samron Midwest Contracting, Inc. $853,555 · | ||
| Jun 11, 2021 | 46578 | VariousDistrict 9 | Repairing various widths and various types of pavement markings on a work order basis throughout District 9. | — | Executed | ROADSAFE TRAFFIC SYSTEMS, INC. $798,480 · | ||
| Jun 11, 2021 | 78612 | JacksonDistrict 9 | Removal and reconstruction of concrete pavement, ADA ramp improvements and minor signal modifications on IL 149/127 at the intersections of IL 149 (Walnut Street) and IL 127 (5th Street). | — | Executed | E. T. Simonds Construction Company $538,623 · | ||
| Jun 11, 2021 | 78660 | JacksonDistrict 9 | Conversion of 2 intersections to Restricted Crossing U-Turn intersections: 1) IL 13/127 and Ava Road; 2) IL 13/127 and Grange Hall Road. | — | Executed | Samron Midwest Contracting, Inc. $5,732,354 · | ||
| Jun 11, 2021 | 78680 | SalineDistrict 9 | Replacing the existing two-span deck beam bridge with a new triple opening, cast in place box culvert on IL 34/145, approximately 0.5 miles south of Harrisburg. (SN 083-0017) | — | Executed | E. T. Simonds Construction Company $1,135,942 · | ||
| Jun 11, 2021 | 78684 | JeffersonDistrict 9 | Replacing the 3-span bridge with a new triple, cast in place box culvert on IL 37, 1.2 miles south of IL 148. (SN 041-0031) | — | Executed | E. T. Simonds Construction Company $781,564 · | ||
| Jun 11, 2021 | 78788 | SalineDistrict 9 | Construction of a RCUT intersection at the intersection of IL 13 and Carrier Mills Road and resurfacing IL 13 from the Williamson County line to West Poplar Street in Harrisburg. | — | Executed | Southern Illinois Asphalt Co., Inc. $6,632,826 · | ||
| Jun 11, 2021 | 78810 | HamiltonDistrict 9 | 10.9 miles of HMA surface removal, HMA surfacing, pavement patching and ADA ramp improvements on IL 14 from Marshall Avenue in McLeansboro to the Franklin County line and IL 142 from Golf Course Road to Randolph Street (IL 14) in McLeansboro. | — | Executed | E. T. Simonds Construction Company $3,937,445 · | ||
| Jun 11, 2021 | 78812 | FranklinWilliamsonDistrict 9 | Retrofitting ADA ramps, relocating and installing pedestrian push buttons and signal heads at the intersection of IL 149 and Jefferson Street in West Frankfort and the intersections of IL 37 and 4th Street, Broadway Boulevard, and 8th Street in Johnston City. | — | Executed | Samron Midwest Contracting, Inc. $192,459 · | ||
| Jun 11, 2021 | 78842 | GallatinDistrict 9 | 0.42 miles of patching at the intersection of IL 13 and IL 1. | — | Executed | E. T. Simonds Construction Company $261,336 · | ||
| Jun 11, 2021 | 78846 | AlexanderJeffersonDistrict 9 | Replacing diaphragms on SN 041-0039 carrying IL 37 over Southern Railroad, 3 miles south of Dix and plating floor beams on SN 002-0009 on Old IL 3 over Sexton Creek in Gale. | — | Executed | E. T. Simonds Construction Company $141,043 · | ||
| Jun 11, 2021 | 78847 | WhiteDistrict 9 | Installation of weigh-in-motion system on I-64 in the westbound lanes, 2 miles west of IL 1. | — | Executed | E. T. Simonds Construction Company $559,660 · | ||
| Jun 11, 2021 | 78852 | PulaskiDistrict 9 | Milling, resurfacing, guardrail and drainage work on IL 37 from Feather Trail to 0.2 miles south of Mounds Road. | — | Executed | Southern Illinois Asphalt Co., Inc. $1,726,369 · | ||
| Jun 11, 2021 | 78854 | JeffersonDistrict 9 | Patching on IL 15 in Mount Vernon from Zachery Street to 44th Street, I-57 NB and SB exit ramps at IL 15, and I-57 at MM 83 in the SB driving lane. | — | Executed | Kinney Contractors, Inc. $181,863 · | ||
| Jun 11, 2021 | 78855 | PulaskiDistrict 9 | Replace the existing pipe culvert with a 36- pipe culvert on IL 37 just south of the Johnson County line, near Goines Lane. | — | Executed | Piney Creek Construction & Repair $41,631 · | ||
| Jun 11, 2021 | 78856 | PerrySalineDistrict 9 | Signal and highway lighting upgrades at the intersection of IL 154 and IL 150 in Perry County and the intersection of US 45 and Old IL 13 in Saline County. | — | Executed | Wissehr Electric, Inc. $86,998 · | ||
| Jun 11, 2021 | 78867 | VariousDistrict 9 | Electrical repair and/or replacement on various routes in various counties in District 9. | — | Executed | Brown Electric, Inc. $109,307 · |
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.