IDOT Jobs

All dates · 878 jobs · $2,122,483,000 Sign up free
★ My Jobs

Filtered by: District: District 4 Clear all

878 jobs · $2,122,483,000 estimated

ExcelCSV
Let date Contract / PPS County / Division Highway Description Estimate Status Added Low bidder
Feb 27, 2026 68K57 MarshallDistrict 4 Clearing and disposing the existing silt in and around Structure No. 062-2001, installing stone dumped riprap at both ends of the box culvert, grading to drain at both ends, and all related collateral work necessary to complete the project on Illinois Route 40 (FAP 646) over Mud Run, 1.38 miles south of Illinois Route 17 in Marshall County. — Executed Nov 25 New Gillan Construction LLC $21,865 ·
Feb 27, 2026 68K58 HendersonDistrict 4 Replace expansion joints, patch parapets, fill slopewall voids on SN 036-0009 on Illinois Route 96 over Dugout Creek east of Lomax, Illinois in Henderson County. — Executed Nov 25 New Laverdiere Construction, Inc. $393,005 ·
Feb 27, 2026 68K59 McDonoughDistrict 4 Re-applying bituminous material binder to the existing aggregate slopewalls at Structure Nos. 055-0052 and 055-0053, Illinois Rte 336 over the BNSF Railroad. — Executed Nov 25 New Brandt Construction Co. $128,795 ·
Feb 27, 2026 68K62 VariousDistrict 4 Cleaning and painting structural steel of eleven existing bridges throughout District 4. — Executed Nov 25 New Venus Painting Co. $1,975,015 ·
Feb 27, 2026 68K91 VariousDistrict 4 Districtwide repairs to guardrail and cable guardrail caused by motorists (MCHD). — Executed Nov 25 New Northern Contracting, Inc. $800,027 ·
Apr 24, 2026 68H43 VariousDistrict 4 Bridge deck sealing at various locations within District 4. — Executed Nov 25 New All States Painting, Inc. $269,552 ·
Apr 24, 2026 68J16 TazewellDistrict 4 Bridge joint replace and repair, bridge deck overlay, slope wall repair at SN 090-0152 carrying IL 40 ramp to I-74 WB in East Peoria in Tazewell County. — Executed Nov 25 New Stark Excavating, Inc. $478,751 ·
Apr 24, 2026 68J47 VariousDistrict 4 Crack and joint sealing on various routes in various couties in District 4. — Executed Nov 25 New Denler, Inc. $830,029 ·
Apr 24, 2026 68J60 TazewellDistrict 4 5.86 miles of CIR and design overlay of IL 122 from 2.1 miles east of Hopedale to the McLean County line. — Executed Nov 25 New R. A. Cullinan and Son, a div of UCM, Inc. $8,241,332 ·
Apr 24, 2026 68J88 PeoriaDistrict 4 3.49 miles of resurfacing of IL 8 (W. Southport Rd) from 0.7 mile east of Taylor Rd to I-474 in Peoria County. — Executed Nov 25 New Advanced Asphalt Company $1,996,962 ·
Apr 24, 2026 68J89 PeoriaDistrict 4 6.5 miles of resurfacing and cold in-place recycling on IL 8 from Texas Rd to Taylor Rd in Peoria County. — Executed Nov 25 New Advanced Asphalt Company $4,472,093 ·
Apr 24, 2026 68J95 MarshallDistrict 4 8.4 miles of CIR and design overlay of IL 17 from the eastern city limits of Lacon to IL 89. — Executed Nov 25 New Advanced Asphalt Company $9,352,996 ·
Apr 24, 2026 68K12 TazewellDistrict 4 5.656 gross miles of microsurfacing on I-474/US 24 from the Illinois River to I-74 in Tazewell County. — Executed Nov 25 New Beniach Construction Co., Inc. $2,076,981 ·
Apr 24, 2026 68K17 FultonDistrict 4 9.93 miles of 3P resurfacing on US Route 24 from Izaack Walton Road to North of Rut Road in Fulton County. — Executed Nov 25 New Illinois Valley Paving, a div of UCM, Inc. $10,922,962 ·
Apr 24, 2026 68K20 StarkDistrict 4 6.45 miles of resurfacing from the southern city limit of Bradford to the west leg of IL 17. Milling and resurfacing and minor drainage improvements at the IL 40 Camp Grove Rest Area located 0.6 mile north of the west leg of IL 17 are also included. — Executed Nov 25 New Advanced Asphalt Company $2,839,793 ·
Apr 24, 2026 68K22 WoodfordDistrict 4 Bridge repairs on IL 26, south of IL 17:SN 102-0067 over Snag Creek, SN 102-0064 over Dry Creek, SN 102-0063 over Richland Creek, SN 102-0066 over Partridge Creek, SN 102-0065 over Balock Creek in Woodford County. — Executed Nov 25 New Stark Excavating, Inc. $2,172,735 ·
Apr 24, 2026 68K23 KnoxDistrict 4 5.84 miles of 3P resurfacing on US 34 in Knox County from 0.4 mile west of Interstate 74 to Knox Road 900E. — Executed Nov 25 New Gunther Construction, a div of UCM, Inc. $11,296,811 ·
Apr 24, 2026 68K33 MercerDistrict 4 5.93 mile SMART project consisting of resurfacing, replacing guardrail, patching, and all related collateral work along Keithsburg Rd from just north of Main St in Keithsburg to just south of Illinois Route 17 in Mercer County. — Executed Nov 25 New Valley Construction Co. $1,862,714 ·
Apr 24, 2026 68K54 VariousDistrict 4 Pavement marking throughout District 4. — Executed Nov 25 New Varsity Striping & Construction Co. $523,767 ·
Apr 24, 2026 68K86 HendersonWarrenDistrict 4 Removal and replacement of various installations of guardrail in District 4 along Illinois Route 116 (FAP 665), Illinois Route 135 (FAP 546), and Illinois Routes 94/116 (FAP 534) at various locations in Henderson and Warren Counties. — Executed Nov 25 New COLLINS & HERMANN, INC. $879,375 ·
Apr 24, 2026 68K87 TazewellDistrict 4 Fence removal and replacement around Operations Yard in Morton. — Executed Nov 25 New CSD Environmental Services, Inc. $173,612 ·
Apr 24, 2026 68K89 MarshallPutnamDistrict 4 8.9 miles of partial and full depth patching on Illinois Route 29 (FAP 318) beginning at the intersection of Illinois Route 29 and Illinois Route 18 in Marshall County to the northern border of Putnam County. — Executed Nov 25 New G. M. Sipes Construction, Inc. $883,425 ·
Apr 24, 2026 68L05 TazewellDistrict 4 Building demolition at 600 Main St (Parcel No. 4ABL011) in East Peoria, Tazewell County. — Executed Nov 25 New JIMAX Landscape LLC $72,493 ·
Apr 24, 2026 89844 McDonoughDistrict 4 Replace the bridge carrying Berlin Road over Camp Creek, 0.4 mile north of Bellingham Road. — Executed Nov 25 New County Contractors, Inc. $2,420,262 ·
Apr 24, 2026 89871 HendersonDistrict 4 Construct a three-span PPC deck beam structure to carry CH 15 over Lone Tree Ditch. Includes; HMA approach, and guardrail. — Executed Nov 25 New County Contractors, Inc. $1,814,953 ·
Apr 24, 2026 89898 TazewellDistrict 4 Resurfacing on Broadway Road from Springfield Road to the I-55 Interchange. — Executed Nov 25 New R. A. Cullinan and Son, a div of UCM, Inc. $2,149,810 ·
Jun 12, 2026 46678 VariousDistrict 4 Installation of pavement marking on various routes in various counties throughout District 4. — Executed Nov 25 New ROADSAFE TRAFFIC SYSTEMS, INC. $3,083,382 ·
Jun 12, 2026 46679 VariousDistrict 4 Replaecment of raised reflective pavement markers on various routes in various counties throughout District 4. — Executed Nov 25 New Precision Pavement Markings Inc. $1,560,696 ·
Jun 12, 2026 46918 MarshallWoodfordDistrict 4 Reconstruction of SFWA roads with a Bituminous Surface Treatment_with Fog Seal Surface, the excavation and reconstruction at sinkhole locations in the Woodford State Fish and Wildlife Area (SFWA). Placement of a Bituminous Surface Treatment with Fog Seal Surface on the parking lot and camp road are proposed at the Marshall SFWA. Other necessary work at the two locations is included. 0.9 mile gross length. — Executed Nov 25 New Phoenix Corporation of the Quad Cities $923,507 ·
Jun 12, 2026 68C93 PeoriaDistrict 4 Resurfacing IL 6 from north of IL 29 to IL 40 (Knoxville Ave) in Peoria in Peoria County. 2.94 miles gross length. — Executed Nov 25 New Advanced Asphalt Company $10,996,119 ·
Jun 12, 2026 68J15 TazewellDistrict 4 Bridge deck overlay, joint replacement/repairs and bridge approach roadway improvements at S.N. 090-0124 carrying WB BUS 24 over US 24 near_Washington and resurface BUS 24 from US 24 to IL 8 in Tazewell County. 1.430 miles gross length. — Executed Nov 25 New R. A. Cullinan and Son, a div of UCM, Inc. $5,373,982 ·
Jun 12, 2026 68J31 TazewellDistrict 4 Resurface IL 98 from IL 29 to 0.2 mile East of Parkway Drive in Tazewell County. 1.3551 miles gross length. — Executed Nov 25 New R. A. Cullinan and Son, a div of UCM, Inc. $3,191,255 ·
Jun 12, 2026 68J50 WarrenDistrict 4 Resurfacing 20th St from US 34 to North St in Kirkwood and on North St from 20th St to US 34 in Kirkwood in Warren County. 1.823 gross miles. — Executed Nov 25 New Brandt Construction Co. $1,613,831 ·
Jun 12, 2026 68J56 PeoriaDistrict 4 Resurface IL 116 (W. Harmon Highway, W. Lincoln Ave.) from Kickapoo Creek to Griswold St. in Peoria. 1.00 mile gross length. — Executed Nov 25 New R. A. Cullinan and Son, a div of UCM, Inc. $2,771,058 ·
Jun 12, 2026 68J59 TazewellDistrict 4 Resurfacing McMullen Rd and IL 122 from west of I-155 to 2.1 miles east of Hopedale, including cold-in-place recycling in Tazewell County. 5.086 miles gross length. — Executed Nov 25 New R. A. Cullinan and Son, a div of UCM, Inc. $9,263,926 ·
Jun 12, 2026 68J61 KnoxDistrict 4 6.17 miles patching and resurfacing of I-74 from 0.3 miles west of E Main Street in Galesburg to east of the IL 97 interchange; 0.40 miles of patching and resurfacing of E Main Street from 0.2 miles east of Michigan Avenue to_0.1 mile east of Soangetaha Road; and 1.19 miles of patching and resurfacing of US 150/IL 97 from 0.2 miles_east of I-74 westbound ramps to 0.1 miles west of Junction IL 97 south on IL 97. — Rejected Nov 25 New
Jun 12, 2026 68J70 WoodfordDistrict 4 9 miles of patching, CIR, resurfacing, guardrail replacedment, and ADA ramps on IL 117 from south of Raymond St to the US 150 intersection and on US 150 from west of the IL 117 intersection to the McLean County Line. — Executed Nov 25 New Advanced Asphalt Company $8,498,702 ·
Jun 12, 2026 68J72 MarshallDistrict 4 Resurfacing IL 89 from the Putnam County line to IL 17, South of Varna in Marshall County. 5.527 miles gross length. — Executed Nov 25 New Advanced Asphalt Company $5,423,600 ·
Jun 12, 2026 68K14 HendersonDistrict 4 Resurfacing IL 94 from IL 116 to 300N in Henderson County. 5.737 miles gross length. — Rejected Nov 25 New
Jun 12, 2026 68K18 TazewellDistrict 4 Resurfacing US 24/IL 29 (Main St) from north of Wesley Rd to south of Poplar St in Creve Coeur in Tazewell County. 1.31 miles gross length. — Executed Nov 25 New R. A. Cullinan and Son, a div of UCM, Inc. $3,147,460 ·
Jun 12, 2026 68K19 McDonoughDistrict 4 Resurfacing US 136 from 0.1 miles westof TR 226 to 0.1 miles west of CH 18, west of Macomb in McDonough County. 1.276 gross miles. — Executed Nov 25 New Gunther Construction, a div of UCM, Inc. $4,415,604 ·
Jun 12, 2026 68K21 WarrenDistrict 4 Resurfacing BUS 67 from 0.5 mi. S. of 90th Ave., N. of Roseville to 0.4 mi. S. of 60th Ave., S. of Roseville. 2.79 miles gross length. — Executed Nov 25 New Gunther Construction, a div of UCM, Inc. $1,549,883 ·
Jun 12, 2026 68K85 PeoriaTazewellWarrenDistrict 4 Replacement of traffic signal heads and vehicle detection at various locations in Peoria, East Peoria, Washington, and Monmouth in Peoria, Tazewell, and Warren Counties. — Executed Nov 25 New Oberlander Electric Co. $790,676 ·
Jun 12, 2026 68K90 FultonDistrict 4 Partial depth HMA patching on US 24 and resurfacing (1,000 ft) rest area roadway in Fulton County. 0.402 mile total gross length. — Executed Nov 25 New R. A. Cullinan and Son, a div of UCM, Inc. $693,984 ·
Jun 12, 2026 68K93 PeoriaTazewellDistrict 4 Relocation of high mast light towers to new foundations on I-74 in Peoria and Tazewell Counties. — Executed Nov 25 New Oberlander Electric Co. $1,451,503 ·
Jun 12, 2026 68K96 TazewellDistrict 4 Partial and full depth HMA patching on Morton Ave from north of Clark St to Jackson St (US 150) in Morton. 0.205 mile gross length. — Executed Nov 25 New R. A. Cullinan and Son, a div of UCM, Inc. $649,043 ·
Jun 12, 2026 68K98 StarkDistrict 4 Partial and full depth patching on IL 93 from IL 91 (S) to IL 40 in Stark County. 9.54 miles gross length. — Executed Nov 25 New Advanced Asphalt Company $376,414 ·
Jun 12, 2026 89864 MercerDistrict 4 Removal and replacement of sidewalk along SW 6th St. from west of College Ave. (IL 94) to west of SW 9th Ave. in the city of Aledo. — Executed Nov 25 New Phoenix Corporation of the Quad Cities $180,475 ·
Jun 12, 2026 89892 MercerDistrict 4 Cape seal with pavement markings on CH 2 and bituminous surface treatment on CH 9 and CH 16 in Mercer County. — Executed Nov 25 New A. C. Pavement Striping Co. $1,647,297 ·
Jul 31, 2026 68K27 TazewellWoodfordDistrict 4 Milling and resurfacing IL 26 from Spring Bay to NCL to IL Rte 116 in Tazewell and Woodford Counties. Approximately 6.87 miles gross length. — Executed Nov 25 New Advanced Asphalt Company $1,822,642 ·
Jul 31, 2026 68L01 PeoriaDistrict 4 HMA patching and resurfacing of the intersection at_ IL91/Alta Rd in Peoria. Approximately 0.303 miles gross length. — Executed Nov 25 New R. A. Cullinan and Son, a div of UCM, Inc. $892,489 ·
Jul 31, 2026 68L02 PeoriaDistrict 4 HMA patching on IL 8/IL 78 from Il 8 to Main St in Elmwood. Approximately 0.53 miles gross length. — Executed Nov 25 New Advanced Asphalt Company $253,825 ·
Jul 31, 2026 68L03 FultonKnoxDistrict 4 HMA patching on IL 97 from Littlers Creek to IL 116. Approximately 2.92 miles gross length. — Executed Nov 25 New Brandt Construction Co. $630,038 ·
Sep 18, 2026 68E86 PeoriaDistrict 4 Bridge replacement to SN 072-0123 at Closen Rd over I-474 in Bellevue. — Executed Nov 25 New Stark Excavating, Inc. $4,389,144 ·
Sep 18, 2026 68H60 TazewellDistrict 4 Converting the existing two-way stop controlled condition to all-way stop control with red-flashing beacons, stop ahead signs with dual flashing beacons, lighting upgrades, widening the radii at the intersection, construction of 4-foot wide Hot-Mix Asphalt shoulder along the curve radii with 2-foot aggregate wedge shoulders, new pavement marking, removing and replacing an 18-inch pipe culvert and related collateral work necessary to complete the project. This project is located at the intersecti — Executed Nov 25 New Otto Baum Company, Inc. $649,800 ·
Sep 18, 2026 68K53 VariousDistrict 4 128.7 miles of placing, grading and compacting an aggregate shoulder wedge level with adjacent hot-mix asphalt (HMA) pavement or shoulder on various route routes in various counties throughout the western section of District 4. — Executed Nov 25 New
Sep 18, 2026 68L11 VariousDistrict 4 100 miles of placing, grading, and compacting an aggregate shoulder wedge level with adjacent hot-mix asphalt (HMA) pavement or shoulder consistent with the locations and details in the plans; on various routes in various counties in the eastern section of District 4. — Executed Nov 25 New J.C. Dillon, Inc. $563,520 ·
— 4-00018-0100 4000180100 District 4 IL-6 Initial Construction - Pa Interchange (New) At Proposed Pioneer Pkwy Ext in Peoria $70,000,000 Planned Nov 25 New
— 4-00027-0200 4000270200 District 4 MeadowsUS-150 Rehabilitation - Pavement Designed Overlay 0.1 Mi W of Veterans Dr in East Peoria to E of Detroit Ave in Morton $7,400,000 Planned Nov 25 New
— 4-00028-0100 4000280100 District 4 I-74 Rehabilitation - Bridges Bridge New Deck, Bridge Superstructure Rehab At Kickapoo-Edwards Rd Intchg (Overhead) $5,500,000 Planned Nov 25 New
— 4-00067-0200 4000670200 District 4 Main StUS-150US-150 D Rehabilitation - Pavement Designed Overlay, ADA Improvements Academy St to Chambers St in Galesburg $11,000,000 Planned Nov 25 New
— 4-00080-0000 4000800000 District 4 Adams St Reconstruction - Bridges Bridge Replacement Over BNSF RR & UP RR at Peoria WCL $59,500,000 Planned Nov 25 New
— 4-00100-0800 4001000800 District 4 IL-116 Reconstruction - Bridges Bridge Replacement Spoon River at London Mills WCL $21,600,000 Planned Nov 25 New
— 4-00100-0900 4001000900 District 4 IL-116 Rehabilitation - Bridges Culvert Rehabilitation Swegle Creek E of CH 2 in London Mills $1,200,000 Planned Nov 25 New
— 4-00102-0300 4001020300 District 4 IL-110IL-164US-34 Rehabilitation - Pavement Designed Overlay E of 11th St in Monmouth to W of Cameron Rd $14,000,000 Planned Nov 25 New
— 4-00102-0320 4001020320 District 4 IL-110IL-164US-34 Reconstruction - Bridges Culvert Replacement Cedar Creek Trib 0.3 mi E of 11th St in Monmouth $6,000,000 Planned Nov 25 New
— 4-00111-0200 4001110200 District 4 US-136 Rehabilitation - Pavement Designed Overlay McDonough Co Line to Vermont Rd (CH 13) E of Table Grove $8,000,000 Planned Nov 25 New
— 4-00121-0100 4001210100 District 4 Old Ill 121 Reconstruction - Bridges Bridge Replacement Mackinaw River $12,000,000 Planned Nov 25 New
— 4-00124-0500 4001240500 District 4 IL-26 Reconstruction - Bridges Bridge Replacement Ditch 4.8 Mi S of ILL 71 $1,700,000 Planned Nov 25 New
— 4-00127-0400 4001270400 District 4 IL-96 Rehabilitation - Pavement Designed Overlay W of Benton St in Lomax to Oak St in Dallas City $6,000,000 Planned Nov 25 New
— 4-00129-0100 4001290100 District 4 IL-110US-34 Rehabilitation - Pavement Designed Overlay, Shoulder Reconstruction, Underdrains 0.2 mi W of US 150 to 0.4 mi W of I-74 in Galesburg $15,000,000 Planned Nov 25 New
— 4-00129-0104 4001290104 District 4 US-34 Maintenance - Pavements Ramp Repair, Shoulder Reconstruction, Underdrains Intchgs at US 150 (Henderson St) & Seminary St In Galesburg $4,000,000 Planned Nov 25 New
— 4-00132-0200 4001320200 District 4 IL-9 Rehabilitation - Pavement Designed Overlay Prairie Creek to McLean Co Line $15,000,000 Planned Nov 25 New
— 4-00151-0300 4001510300 District 4 IL-18 Reconstruction - Bridges Bridge Replacement Illinois River Bridge at Henry $108,000,000 Planned Nov 25 New
— 4-00151-0305 4001510305 District 4 IL-18 Reconstruction - Bridges Utility Adjustment Illinois River Bridge at Henry $1,000,000 Planned Nov 25 New
— 4-00158-0300 4001580300 District 4 IL-135 Reconstruction - Bridges Bridge Replacement David's Creek 0.5 Mi S of Little York $1,200,000 Planned Nov 25 New
— 4-00170-0300 4001700300 District 4 IL-8 Reconstruction - Bridges Bridge Replacement At Kickapoo Creek Trib 1.5 Mi E of Edwards $2,000,000 Planned Nov 25 New
— 4-00177-0000 4001770000 District 4 IL-9 Reconstruction - Bridges Bridge Replacement Spoon River 1 Mi S of Blyton $19,800,000 Planned Nov 25 New
— 4-00222-0000 4002220000 District 4 IL-116IL-117 Rehabilitation - Pavement Designed Overlay N 7th St in Roanoke to ILL 116 (E) $7,500,000 Planned Nov 25 New
— 4-00222-0200 4002220200 District 4 IL-117US-150 Rehabilitation - Pavement Designed Overlay US 150: I-74 to ILL 117; ILL 117: N of Raymond St to US 150 $5,000,000 Planned Nov 25 New
— 4-00222-0600 4002220600 District 4 US-24 Rehabilitation - Pavement Designed Overlay CH 7 to CR 2600E at El Paso WCL $7,200,000 Planned Nov 25 New
— 4-00222-0800 4002220800 District 4 IL-251 Rehabilitation - Pavement Designed Overlay ILL 116 (W) to El Paso NCL $6,000,000 Planned Nov 25 New
— 4-00222-1000 4002221000 District 4 IL-251US-24 Rehabilitation - Pavement Designed Overlay, ADA Improvements US 24: CR 2600E to McLean Co Line; ILL 251: NCL to SCL of El Paso $15,000,000 Planned Nov 25 New
— 4-00222-1400 4002221400 District 4 US-24 Rehabilitation - Pavement Designed Overlay, ADA Improvements 0.3 mi E of US 24 BUS to Eureka ECL $15,000,000 Planned Nov 25 New
— 4-00328-0200 4003280200 District 4 IL-9 Reconstruction - Bridges Bridge Replacement Lost Grove Creek 4 mi W of Fiatt $3,500,000 Planned Nov 25 New
— 4-00331-0100 4003310100 District 4 IL-122 Reconstruction - Bridges Bridge Replacement over IC RR Spur in Delavan $4,000,000 Planned Nov 25 New
— 4-00332-0000 4003320000 District 4 US-150 Reconstruction - Bridges Bridge Replacement At Spoon River 0.7 mi e of CH 11 $13,300,000 Planned Nov 25 New
— 4-00332-0400 4003320400 District 4 IL-6 Rehabilitation - Bridges Bridge Superstructure Replace Over Charter Oak Rd in Peoria $3,000,000 Planned Nov 25 New
— 4-00485-0100 4004850100 District 4 CH-2Sherrard Rd Rehabilitation - Pavement Designed Overlay, Cold In-Place Recycling US 67 to 5th Ave in Sherrard $4,200,000 Planned Nov 25 New
— 4-00495-0800 4004950800 District 4 IL-110US-34US-67 Safety Intersection Improvement At Main St in Monmouth $1,500,000 Planned Nov 25 New
— 4-00551-0500 4005510500 District 4 IL-41 Rehabilitation - Pavement Designed Overlay ILL 116 to Avon SCL $23,000,000 Planned Nov 25 New
— 4-01024-0100 4010240100 District 4 IL-94Old Us 34 Reconstruction - Bridges Bridge Replacement Old US 34: at Old Tom Creek 0.6 Mi E of Church St; ILL 94: at Honey Creek 1.3 Mi N of CR 400N & at Henderson Overflow 0.3 Mi S of TR 29 $5,280,000 Planned Nov 25 New
— 4-01024-0200 4010240200 District 4 IL-17IL-29IL-40 Reconstruction - Bridges Bridge Replacement ILL 29: at Trib Illinois River 0.6 Mi S of Hopewell Dr; ILL 40: at Camp Creek 0.1 Mi N of ILL 17(E); TR 101A: at W Branch Panther Creek W of ILL 116/117 $2,220,000 Planned Nov 25 New
— 4-01081-0000 4010810000 District 4 1500n Reconstruction - Bridges Bridge Replacement S Henderson Creek 0.3 Mi E of ILL 94 $5,000,000 Planned Nov 25 New
— 4-02024-2700 4020242700 District 4 IL-29 Preservation - Pavements Crack & Joint Sealing Senachwine Creek to N of Truitt Ave in Chillicothe $75,000 Planned Nov 25 New
— 4-02024-2701 4020242701 District 4 IL-17IL-180 Rehabilitation - Pavement Standard Overlay 6th St in Galva to 0.1 mi S of ILL 17(E) $4,500,000 Planned Nov 25 New
— 4-02024-2707 4020242707 District 4 IL-116US-150US-24 Preservation - Pavements Crack & Joint Sealing N of I-74 to S of Highview Rd $110,000 Planned Nov 25 New
— 4-02024-2708 4020242708 District 4 I-74 Preservation - Pavements Crack & Joint Sealing W of Kickapoo / Edwards Rd to 0.7 mi E of I-474 $300,000 Planned Nov 25 New
— 4-02024-2709 4020242709 District 4 IL-100US-24 Preservation - Pavements Crack & Joint Sealing Ave F in Lewistown to N of Rut Rd $110,000 Planned Nov 25 New
— 4-02024-2710 4020242710 District 4 IL-116 Preservation - Pavements Crack & Joint Sealing TR 154 (115th St) to Knox Co Line $160,000 Planned Nov 25 New
601–700 of 878‹ PrevNext ›

Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.