| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Jan 21, 2022 | 68G59 | PeoriaDistrict 4 | Landscaping along 1-74 from Ellis Street in Peoria to the Illinois River. | — | Executed | Central Landscaping, LP $279,293 · | ||
| Jan 21, 2022 | 68G75 | PeoriaTazewellDistrict 4 | Repair and replace traffic signals, overhead lighting, and ITS facilities at various locations in East Peoria, Peoria, Pekin and Peoria County. | — | Executed | Oberlander Electric Co. $301,890 · | ||
| Jan 21, 2022 | 68G76 | StarkDistrict 4 | Tree removal along IL 17/91 over the Spoon River (SN 088-0002) in Stark County. | — | Executed | CSD Environmental Services, Inc. $54,996 · | ||
| Jan 21, 2022 | 89787 | TazewellDistrict 4 | Reconstruction and widening of Courtland Street to a 5-lane section from Walton Avenue to Main Street in Morton. | — | Executed | Gensini Excavating, Inc. $2,572,414 · | ||
| Mar 11, 2022 | 68F32 | TazewellDistrict 4 | Drainage improvenments along the East fore slope of US 24/IL 29 South of Ravine St This project will be .10 miles long and will consist of drainage improvenments along the East fore slope of US 24/IL 29 South of Ravine St. in the city of East Peoria. | — | Executed | Stark Excavating, Inc. $79,890 · | ||
| Mar 11, 2022 | 68F73 | KnoxDistrict 4 | Bridge deck overlay, bridge joint replace//repair, bridge repair to SN 048-0009 and -0010 carrying over East Main Street in Galesburg. | — | Executed | Brandt Construction Co. $1,167,000 · | ||
| Mar 11, 2022 | 68F75 | TazewellDistrict 4 | Bridge joint replace/repair, bridge deck repairs, bridge repair on S.N. 090-0136 on Townline Road over 1-155, 3 miles South of IL Route 9. | — | Executed | Stark Excavating, Inc. $357,062 · | ||
| Mar 11, 2022 | 68F77 | PutnamDistrict 4 | Chip seal A-2 with fog seal on IL 26 South of IL 71 to IL 18. | — | Executed | Advanced Asphalt Company and Pavement Maintenance Services, Inc. JV $1,334,347 · | ||
| Mar 11, 2022 | 68G28 | PeoriaTazewellDistrict 4 | Crack and Joint Sealing on US 24/IL 9 from N of Pfeiffer Rd in Bartonville to 0.16 mi SW of IL 9 (E.) and on IL 29 from Margaret Drive in Creve Coeur to N of LaSalle BLVD in Marquette Heights. | — | Executed | Denler, Inc. $214,975 · | ||
| Mar 11, 2022 | 68G29 | HendersonMcDonoughDistrict 4 | Crack and joint sealing on US 34 from PD Creek to West end of Biggsville Bypass and on IL 9 from Hancock CL to W of US 67. | — | Executed | Freehill Asphalt, Inc. $260,027 · | ||
| Mar 11, 2022 | 68G58 | MarshallMasonTazewellDistrict 4 | Bridge washing of nine (9) bridges over the Illinois River in Tazewell, Mason, and Marshall Counties. | — | Executed | Interstate Maintenance, Incorporated $219,300 · | ||
| Mar 11, 2022 | 68G60 | VariousDistrict 4 | Guardrail repairs caused by motorists (MCHD) and cable guardrail repairs (High tension cable barrier) at various locations in District 4. | — | Executed | Northern Contracting, Inc. $700,397 · | ||
| Mar 11, 2022 | 68G61 | VariousDistrict 4 | Districtwide pavement markings. | — | Executed | Varsity Striping & Construction Co. $235,350 · | ||
| Mar 11, 2022 | 68G68 | TazewellDistrict 4 | Bridge repairs to SN 090-0104 Springfield Rd; 090-0105 Cole St; 090-0119 EB Ramp to WB I-74 (replace rocker bearings, misc. structural steel and substructure repairs). | — | Executed | Stark Excavating, Inc. $294,240 · | ||
| Mar 11, 2022 | 68G70 | McDonoughDistrict 4 | This project is 0.26 miles in length. It is located at the structure carrying IL 41 over KJRY Railway and BNSF Railway (SN 055-0008), 2.8 miles South of Bushnell. Work includes bridge repair (structural repairs) and shoulder repair. | — | Executed | County Contractors, Inc. $110,055 · | ||
| Apr 29, 2022 | 68A36 | WarrenDistrict 4 | Resurfacing on US 67 from N of jct US 34 to N of 901h Avenue, North of Roseville, including bridge deck overlays to SN 094-0045 and 094-0046 over S Henderson Creek and SN 094-0035 and 094-0042 over Picayune Creek. | — | Executed | Gunther Construction, a div of UCM, Inc. $20,211,670 · | ||
| Apr 29, 2022 | 68F44 | MercerDistrict 4 | Resurfacing IL 17 from 1st Street in New Boston to Bryant Rd in Mercer County. Total Length 5.4 miles. | — | Executed | Brandt Construction Co. $3,999,605 · | ||
| Apr 29, 2022 | 68F87 | MarshallWoodfordDistrict 4 | Resurface I-39 from 1 mile N of IL 116 to 2 miles S of IL 17. | — | Executed | Advanced Asphalt Company $25,968,870 · | ||
| Apr 29, 2022 | 68G30 | WoodfordDistrict 4 | Cape Seal on Il 116/117 from IL 117(N) to 1-39. | — | Executed | Beniach Construction Co., Inc. $692,608 · | ||
| Apr 29, 2022 | 68G31 | McDonoughDistrict 4 | Cape Seal on US 67/IL 11 O from IL 9 to N of IL 336. | — | Executed | A. C. Pavement Striping Co. $734,321 · | ||
| Apr 29, 2022 | 68G32 | MercerDistrict 4 | Microsurfacing (1-Pass) on IL 17 from E of IL 94(N) in Aledo to 2201h St. | — | Executed | Microsurfacing Contractors, LLC, a Division of Byrne and Jones Holding Company $278,305 · | ||
| Apr 29, 2022 | 68G33 | HendersonWarrenDistrict 4 | Chip seal A-1 and fog coat on IL 116 from 950 N near Media to US 67. | — | Executed | DMS Contracting, Inc. $656,824 · | ||
| Apr 29, 2022 | 68G34 | PeoriaDistrict 4 | Microsurfacing (1-pass)on IL 116 from IL 78(N) in Farmington to Eden Road. | — | Executed | Microsurfacing Contractors, LLC, a Division of Byrne and Jones Holding Company $553,862 · | ||
| Apr 29, 2022 | 68G50 | TazewellDistrict 4 | Bridge deck sealing at various locations in Tazewell County. | — | Executed | All States Painting, Inc. $293,000 · | ||
| Apr 29, 2022 | 68G73 | TazewellDistrict 4 | Lighting upgrades at IL 29/1-474 interchange in Creve Coeur, I-155/IL 98 and I-155/Queenwood Rd. interchanges in Morton. | — | Executed | Bodine Electric of Decatur $248,640 · | ||
| Apr 29, 2022 | 68G74 | VariousDistrict 4 | Traffic signal mast arm replacement at various locations in Peoria, Tazewell, and McDonough Counties. | — | Executed | Oberlander Electric Co. $598,683 · | ||
| Apr 29, 2022 | 68G77 | KnoxWoodfordDistrict 4 | Installation of truck parking information management systems (TPIMS) at the Spoon River and Mackinaw Dells (EB and WB) rest areas. | — | Executed | Laser Electric, Inc. $179,815 · | ||
| Apr 29, 2022 | 68G78 | WoodfordDistrict 4 | Bridge Painting on structures carrying Roanoke Road (SN 102-0054) and TR 605 (SN 102-0057) over 1-39. | — | Executed | Three Star Painting, Inc. $500,000 · | ||
| Apr 29, 2022 | 68G88 | McDonoughDistrict 4 | Intersection improvement at IL 336/IL 11 0 and E 600th St near Colchester. | — | Executed | Gunther Construction, a div of UCM, Inc. $539,236 · | ||
| Apr 29, 2022 | 89789 | PeoriaDistrict 4 | Full Depth pavement removal, PCC Pavement, Curb and Gutter, Pipe Underdrains, Storm Sewer, HMA Multi-Use Path, PCC Sidewalks, Pavement Markings, and Landscaping on Gleen Avenue between Sheridan Road and Knoxville Avenue (IL-140) . | — | Executed | Otto Baum Company, Inc. $5,288,286 · | ||
| Apr 29, 2022 | 89790 | MercerDistrict 4 | Cold-in-place recycling, aggregate shoulders and pipe underdrains on CH 9 from the Rock Island Countly line to 0.4 mile south of 155th Avenue. | — | Executed | Langman Construction, Inc. $1,160,989 · | ||
| Apr 29, 2022 | 89819 | KnoxDistrict 4 | Rehabilitate the structure carrying CH 10 over the BNSF Rail Yard located east of Henderson Street in Galesburg. | — | Executed | Brandt Construction Co. $5,031,097 · | ||
| Jun 17, 2022 | 46600 | VariousDistrict 4 | Placing preformed plastic, epoxy and modified urethane pavment markings, letters and symbols, and the removal This work shall consist of placing preformed plastic, epoxy and modified urethane pavment markings, letters and symbols, and the removal of existing pavement markings within the limits specified on each individual work order. | — | Executed | ROADSAFE TRAFFIC SYSTEMS, INC. $1,589,417 · | ||
| Jun 17, 2022 | 46601 | VariousDistrict 4 | Removing damaged raised reflective pavement markers and replacing them with new raised reflective pavement mar This work shall consist of removing damaged raised reflective pavement markers and replacing them with new raised reflective pavement markers or lenses within the limits shown in the plans. | — | Executed | P & P Construction Co. $391,605 · | ||
| Jun 17, 2022 | 68G43 | McDonoughWarrenDistrict 4 | Bridge deck overlay, bridge approach roadway and bridge repair to SN 094-0037, SN SN 094-0038 over Big Negro Creek, SN 094-0039, SN 094-0040 over Swan Creek, SN 055-0031, SN 055-0032 over East Fork Crooked Creek. Total Length = 0.39 miles. | — | Executed | Freesen, a div of UCM, Inc. $2,042,711 · | ||
| Jun 17, 2022 | 68G65 | WoodfordDistrict 4 | Bridge repairs on SN 102-0034, including bearing replacement at abutments and some substructure repair along w This project consists of bridge repairs on SN 102-0034, including bearing replacement at abutments and some substructure repair along with other related collateral work necessary to complete the project as shown in the plans and as described herein. Structure carrying TR 134 over 1-74. | — | Executed | Stark Excavating, Inc. $157,836 · | ||
| Jun 17, 2022 | 68G69 | PeoriaDistrict 4 | Bridge repairs on SN 072-0148, including the replacement of the existing expansion joints with strip seals and This project consists of bridge repairs on SN 072-0148, including the replacement of the existing expansion joints with strip seals and plating all beam ends at both abutments along with other related work necessary to complete the project as shown in the plans and as described herein. Structure carrying Mossville Rd. over IL 6. | — | Executed | Stark Excavating, Inc. $278,003 · | ||
| Jun 17, 2022 | 68G72 | PeoriaDistrict 4 | Patching on IL 6 from US 150 to I-74. | — | Executed | Kinney Contractors, Inc. $627,541 · | ||
| Jun 17, 2022 | 68G89 | VariousDistrict 4 | Weed spraying (off road) in various counties on various routes. | — | Executed | The Daltons Inc. $138,418 · | ||
| Jun 17, 2022 | 68G90 | VariousDistrict 4 | Lighting, traffic signals, and ITS upgrades at various locations within District 4. | — | Executed | Laser Electric, Inc. $266,565 · | ||
| Jun 17, 2022 | 68G92 | KnoxDistrict 4 | 1.90 miles of HMA patching at the I-74 interchange from CR 1925 N. | — | Executed | Gunther Construction, a div of UCM, Inc. $208,605 · | ||
| Jun 17, 2022 | 68G93 | WarrenDistrict 4 | 6.22 miles of HMA patching from 20th Street to US 67. | — | Executed | Gunther Construction, a div of UCM, Inc. $435,978 · | ||
| Jun 17, 2022 | 68G94 | KnoxDistrict 4 | 1.15 miles of Class B Patching from Swing Blvd to Main Street in Galesburg, IL. | — | Executed | G. M. Sipes Construction, Inc. $169,342 · | ||
| Jun 17, 2022 | 68G95 | KnoxDistrict 4 | 9.62 miles of PCC Patching from US 150/IL 97 Interchange to the Spoon River Rest Area. | — | Executed | G. M. Sipes Construction, Inc. $289,794 · | ||
| Jun 17, 2022 | 68G96 | KnoxDistrict 4 | 0.87 miles of HMA Patching from US 150/IL 97 Interchange with I-74 to CH 17/CR 1290N. | — | Executed | Gunther Construction, a div of UCM, Inc. $165,743 · | ||
| Jun 17, 2022 | 68G97 | KnoxDistrict 4 | 1.34 miles of HMA Patching from Allens Ave to Michigan Ave in Galesburg, IL. | — | Executed | Brandt Construction Co. $496,110 · | ||
| Jun 17, 2022 | 68G98 | KnoxDistrict 4 | 2.45 miles of PCC Patching from I-74/US 34 Interchange to US 150/US 34 Interchange. | — | Executed | G. M. Sipes Construction, Inc. $193,563 · | ||
| Jun 17, 2022 | 68G99 | MercerDistrict 4 | 4.02 miles of HMA Patching from US 67 to 5th Ave in Sherrard, IL. | — | Executed | Langman Construction, Inc. $188,376 · | ||
| Jun 17, 2022 | 68H03 | McDonoughDistrict 4 | 17.20 miles of HMA Patching from McDonough County Line to US 67. | — | Rejected | Gunther Construction, a div of UCM, Inc. $359,699 · | ||
| Jun 17, 2022 | 68H04 | TazewellWoodfordDistrict 4 | 2.9 miles of median removal and manhole/inlet repairs. | — | Executed | Phoenix Corporation of the Quad Cities $155,327 · | ||
| Jun 17, 2022 | 68H05 | TazewellDistrict 4 | HMA Patching on Business US 24 in Washington (2.65 miles); HMA Patching on IL 122 West of Minier (2.00 miles). | — | Executed | R. A. Cullinan and Son, a div of UCM, Inc. $579,057 · | ||
| Jun 17, 2022 | 68H06 | McDonoughDistrict 4 | Pollinator habitat restoration and preservation (seeding and weeding) along Macomb NW Bypass from US 136 to US 67. | — | Executed | Nettle Creek Nursery, Inc. $65,040 · | ||
| Jun 17, 2022 | 89760 | WarrenDistrict 4 | Replace the bridge carrying CH 4 over Henderson Creek, 5.4 miles southeast of Alexis. | — | Executed | County Contractors, Inc. $2,275,756 · | ||
| Jun 17, 2022 | 89812 | WoodfordDistrict 4 | HMA Pavement widening, resurfacing and PCC pavement on CH 13 from US 24 north for 0.13 mile. | — | Executed | Rowe Construction, a div of UCM, Inc. $614,969 · | ||
| Jun 17, 2022 | 89813 | MarshallDistrict 4 | Replace the bridge carrying Camp Grove Road over Senachwine Creek, 1.2 miles west of Yankee Lane. | — | Executed | Curnyn Construction Co. $1,262,966 · | ||
| Jul 15, 2022 | 68G71 | WarrenDistrict 4 | Bridge preservation to SN 094-0028 carrying Cameron Rd over US 34 (bridge deck waterproofing and deck overlay, bridge joint replacement/repair, misc repairs) and related collateral work. | — | Executed | Brandt Construction Co. $1,033,550 · | ||
| Jul 15, 2022 | 68H07 | PeoriaDistrict 4 | Transverse and longitudinal partial-depth patching along IL 29 from North of Gardner Ln. to North of Lorentz Ave. in Peoria County. Total length is 2.45 miles. | — | Executed | R. A. Cullinan and Son, a div of UCM, Inc. $1,141,394 · | ||
| Jul 15, 2022 | 68H10 | PeoriaDistrict 4 | 1360 feet of PCC TY B Pavement Patching from Martin to Moss Avenue in Peoria. | — | Executed | G. M. Sipes Construction, Inc. $579,888 · | ||
| Aug 5, 2022 | 68H09 | PeoriaDistrict 4 | Mill and resurface parking area and install parking striping at the Peoria West storage yard (6500 W. Highway 150, Edwards, IL., 2.5 Miles west of Peoria ou US 150). | — | Executed | R. A. Cullinan and Son, a div of UCM, Inc. $204,296 · | ||
| Aug 5, 2022 | 68H12 | TazewellDistrict 4 | The installation of new traffic signals, pavement markings, ADA ramp, curb and gutter, riprap, median reconstr This profect consists of the installation of new traffic signals, pavement markings, ADA ramp, curb and gutter, riprap, median reconstruction, and all related collateral work necessary to complete the improvements on this project. Located at the intersection of VFW Rd. and 14th St. in Pekin, Tazewell Co. | — | Executed | Otto Baum Company, Inc. $649,720 · | ||
| Sep 23, 2022 | 68698 | StarkDistrict 4 | Replacement of the structure carrying IL 17/ IL 91 over the Spoon River SN 088-0002 (existing; SN 088-0030 (proposed)Ù, 0.6 miles West of Wyoming in Stark County. The project is 2887 feet (0.55 mile) in length. The project also includes roadway profile adjustments, regrading of sideslopes, and construction of the stream barbs. | — | Rejected | ICC Group Inc. $13,207,000 · | ||
| Sep 23, 2022 | 68884 | PeoriaDistrict 4 | 909.3 FT., Bridge Replacements on I-474 over IL 116 (Plank Rd.) in Bellevue. | — | Executed | Stark Excavating, Inc. $11,025,102 · | ||
| Sep 23, 2022 | 68H08 | KnoxDistrict 4 | Mill and resurface parking lot at the Knoxville Storage Yard, South of I-74 (exit 51) on CH 9 (1393 Knox Hwy). | — | Executed | Illinois Civil Contractors, Inc. $436,864 · | ||
| Sep 23, 2022 | 68H17 | VariousDistrict 4 | Installation of traffic signal cabinets and equipment, CCTV cameras, and network communications equipment at various locations within District 4. | — | Executed | Oberlander Electric Co. $470,200 · | ||
| Sep 23, 2022 | 68H18 | VariousDistrict 4 | Installation of battery backup systems, CCTV cameras, ITS components and wireless radio communications equipment at various locations within District 4. | — | Executed | Laser Electric, Inc. $455,836 · | ||
| Nov 18, 2022 | 68E32 | PeoriaDistrict 4 | The culvert rehabilitation of SN 072-2008, a double 10' x 10' box culvert, at Big Hollow Creek on US 150 (War Project consists of the culvert rehabilitation of SN 072-2008, a double 10' x 10' box culvert, at Big Hollow Creek on US 150 (War Memorial) in Peoria. | — | Executed | Phoenix Corporation of the Quad Cities $329,174 · | ||
| Nov 18, 2022 | 68E43 | WarrenDistrict 4 | Replacing a double steel plate arch culvert with a double 12'x12' precast concrete box culvert carrying US 34 This project is located just west of Galesburg and consists of replacing a double steel plate arch culvert with a double 12'x12' precast concrete box culvert carrying US 34 over the South branch of Cedar Creek. | — | Executed | Laverdiere Construction, Inc. $2,344,285 · | ||
| Nov 18, 2022 | 68F08 | MarshallDistrict 4 | Bridge painting and rehabilitation to S.N. 062-0003 carrying IL 17 over the Illinois River in Lacon. | — | Executed | White Construction LLC $10,094,556 · | ||
| Nov 18, 2022 | 68F38 | PeoriaTazewellDistrict 4 | Bridge Rehabilitation with bridge deck overlay, beam repairs, beam additions, navigation and roadway lighting, traffic signal improvements, drainage improvements, full depth pavement removal and replacement, sidewalk removals, multi-use path construction and related collateral work. Bob Michel Bridge (SN 090-0122) in Peoria and Tazewell Counties on IL 40 (William Kumpf Blvd.) over the Illinois River and Washington Street. | — | Executed | ICC Group Inc. $24,657,000 · | ||
| Nov 18, 2022 | 68F51 | MarshallDistrict 4 | Shoulder, foreslope repair, replace guardrail and culvert extensions on IL 17, 1.5 mi. W. Sparland, Sta. 463+00. | — | Executed | Phoenix Corporation of the Quad Cities $567,199 · | ||
| Nov 18, 2022 | 89796 | FultonDistrict 4 | Replace the bridge carrying CH 2 over Otter Creek, 4 miles north of Astoria. | — | Executed | Stark Excavating, Inc. $2,199,397 · | ||
| Jan 20, 2023 | 68E42 | TazewellDistrict 4 | 0.47 miles, Bridge Replacement on I-155 over Indian Creek near Hopedale. | — | Executed | Stark Excavating, Inc. $8,247,342 · | ||
| Jan 20, 2023 | 68G91 | KnoxDistrict 4 | Bridge Preservation on S.N. 048-0080 over Spoon River, S .N. 048-0085 and S.N. 048-0086 over Cadwell Creek (2 locations) and S .N. 048-0089 over Branch of Brandywine creek. | — | Executed | Path Construction Company, Inc. $1,898,891 · | ||
| Jan 20, 2023 | 68H37 | VariousDistrict 4 | Tree removal at various locations within District 4. | — | Executed | Mosley Construction 1, LLC $93,770 · | ||
| Jan 20, 2023 | 89817 | WoodfordDistrict 4 | Resurface Santa Fe Trail from IL 26/Spring Bay Road to Ch 19/Lourdes Road. | — | Executed | Advanced Asphalt Company $952,797 · | ||
| Jan 20, 2023 | 89821 | PeoriaDistrict 4 | Rehabilitate the bridge carrying CH 23R over Timber Creek, 0.7 mile north of IL 8. | — | Executed | Stark Excavating, Inc. $727,272 · | ||
| Jan 20, 2023 | 89822 | PeoriaDistrict 4 | Replace existing box culvert on Graham Chapel Road at a Tributary of West Fork over Kickapoo Creek, 0.6 mile west of Stone School Road. | — | Executed | Illinois Civil Contractors, Inc. $1,333,481 · | ||
| Jan 20, 2023 | 89826 | PeoriaDistrict 4 | PCC pavement reconstruction, PCC Shoulders, curb and gutter, storm sewer replacement, traffic signal installation and lighting on Old Galena Road from IL 29 north to Neal Lane with a 0.26 mile omission north of IL 29 to south of Engine Drive. | — | Executed | Stark Excavating, Inc. $4,982,316 · | ||
| Mar 10, 2023 | 68G35 | StarkDistrict 4 | Microsurfacing (1-Pass) on IL 91 from IL 93 to IL 17. | — | Executed | A. C. Pavement Striping Co. $559,696 · | ||
| Mar 10, 2023 | 68G40 | PeoriaDistrict 4 | The project includes bridge deck overlay and scour mitigation to SN 072-0162 carrying IL 8 over Walnut Creek, East of IL 78. The project improvement length is 0.058 miles. | — | Executed | Otto Baum Company, Inc. $523,800 · | ||
| Mar 10, 2023 | 68G41 | HendersonDistrict 4 | The project includes bridge repairs and bridge deck overlays to S.N. 036-0044 over Camp Creek and S.N. 036-0045 over Weaver Creek, including bridge joint replacement on S.N. 036-0045. Project length is 0.106 mile. | — | Executed | Brandt Construction Co. $1,365,000 · | ||
| Mar 10, 2023 | 68H00 | PeoriaDistrict 4 | I-74 in the City of Peoria. | — | Active | Endrizzi Contracting, Inc $309,583 · | ||
| Mar 10, 2023 | 68H01 | VariousDistrict 4 | Removal and replacement of guardrail damaged by motorists throughout District 4. | — | Executed | |||
| Mar 10, 2023 | 68H02 | VariousDistrict 4 | District-wide pavement markings. | — | Executed | Varsity Striping & Construction Co. $386,166 · | ||
| Mar 10, 2023 | 68H16 | TazewellDistrict 4 | Replace expansion joints and partial depth deck patching to S.N. 090-0063 carrying IL 9 over Mackinaw River. | — | Executed | Otto Baum Company, Inc. $371,800 · | ||
| Mar 10, 2023 | 68H21 | PeoriaTazewellDistrict 4 | Crack and joint sealing at various locations along 1-74 and 1-474 in Peoria and Tazewell Counties. | — | Executed | Complete Asphalt Service Co. $224,649 · | ||
| Mar 10, 2023 | 68H30 | VariousDistrict 4 | Bridge Washing of 10 Bridges In District 4. | — | Executed | M & M Concrete, Inc. $808,750 · | ||
| Mar 10, 2023 | 68H56 | PeoriaDistrict 4 | Replace traffic signal mast arm at IL 8/ IL 116 (MacArthur Hwy.) and Washington St. in Peoria. | — | Rejected | Laser Electric, Inc. $369,353 · | ||
| Mar 10, 2023 | 68H59 | VariousDistrict 4 | Electrical maintenance contract (maintenance and repair D4 traffic signals, overhead lighting and ITS facilities). | — | Executed | Laser Electric, Inc. $1,152,909 · | ||
| Mar 10, 2023 | 89752 | StarkDistrict 4 | Replace existing structure carrying North Valley Road over Camp Run Creek with a 3-span flange beam bridge with HMA approaches, 0.3 mile southeast of Wyoming. | — | Executed | Stark Excavating, Inc. $1,938,063 · | ||
| Apr 28, 2023 | 68666 | PutnamDistrict 4 | Replace structures carrying IL 89 over Clear Creek ESN 078-0025 (PSN 078-2011) and Clear Creek Tributary ESN 078-0024 (PSN 078-2012)Ù, 1.4 and 2.8 miles north of IL 18 in Putnam County. | — | Executed | D. Construction, Inc. $2,648,383 · | ||
| Apr 28, 2023 | 68E54 | FultonDistrict 4 | Headwall removal and replacement, culvert ext., and slope repair at 3 locations along IL 41 from S of Avon to N of Capp Rd. | — | Executed | Phoenix Corporation of the Quad Cities $938,577 · | ||
| Apr 28, 2023 | 68F26 | PeoriaDistrict 4 | Shoulder reconstruction and slope stabilization along US 24, 0.7 mile North of IL 9 in Peoria County. | — | Executed | Otto Baum Company, Inc. $323,800 · | ||
| Apr 28, 2023 | 68F79 | PeoriaDistrict 4 | 1.3 miles of resurfacing with ADA improvements on IL 29 from N. of Truitt Avenue to S. of Cloverdale Road. | — | Executed | R. A. Cullinan and Son, a div of UCM, Inc. $2,972,756 · | ||
| Apr 28, 2023 | 68G37 | HendersonDistrict 4 | Microsurface (1-Pass) on US 34 along Biggsville Bypass. | — | Executed | Beniach Construction Co., Inc. $1,103,878 · | ||
| Apr 28, 2023 | 68G38 | StarkDistrict 4 | Bridge deck overlay to 088-0021 and 088-0022-0022 carrying IL 93 over West and East Fork Spoon River west of Bradford. | — | Executed | Stark Excavating, Inc. $1,059,779 · | ||
| Apr 28, 2023 | 68G52 | VariousDistrict 4 | Bridge deck sealing at various locations within District 4. | — | Executed | M & M Concrete, Inc. $209,244 · | ||
| Apr 28, 2023 | 68H13 | TazewellDistrict 4 | Centerline joint repair on IL 8/US 150 (Washington/Camp Streets) from east of Main Street to east of Rosedale Street in East Peoria in Tazewell County. | — | Executed | Microsurfacing Contractors, LLC, a Division of Byrne and Jones Holding Company $355,408 · | ||
| Apr 28, 2023 | 68H57 | PeoriaDistrict 4 | Installation of fiber optic cable within existing conduit along US 150 (War Memorial Drive) from IL 29 interchange to Koerner/Trigger Road in Peoria. | — | Executed | Oberlander Electric Co. $437,500 · | ||
| Apr 28, 2023 | 89805 | TazewellDistrict 4 | Roadway extension of Freedom Parkway from east of IL 8 to Cummings Lane in Washington. | — | Executed | R. A. Cullinan and Son, a div of UCM, Inc. $6,595,005 · |
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.