IDOT Jobs

All dates · 878 jobs · $2,122,483,000 Sign up free
★ My Jobs

Filtered by: District: District 4 Clear all

878 jobs · $2,122,483,000 estimated

ExcelCSV
Let date Contract / PPS County / Division Highway Description Estimate Status Added Low bidder
Jan 21, 2022 68G59 PeoriaDistrict 4 Landscaping along 1-74 from Ellis Street in Peoria to the Illinois River. — Executed Nov 26 New Central Landscaping, LP $279,293 ·
Jan 21, 2022 68G75 PeoriaTazewellDistrict 4 Repair and replace traffic signals, overhead lighting, and ITS facilities at various locations in East Peoria, Peoria, Pekin and Peoria County. — Executed Nov 26 New Oberlander Electric Co. $301,890 ·
Jan 21, 2022 68G76 StarkDistrict 4 Tree removal along IL 17/91 over the Spoon River (SN 088-0002) in Stark County. — Executed Nov 26 New CSD Environmental Services, Inc. $54,996 ·
Jan 21, 2022 89787 TazewellDistrict 4 Reconstruction and widening of Courtland Street to a 5-lane section from Walton Avenue to Main Street in Morton. — Executed Nov 26 New Gensini Excavating, Inc. $2,572,414 ·
Mar 11, 2022 68F32 TazewellDistrict 4 Drainage improvenments along the East fore slope of US 24/IL 29 South of Ravine St This project will be .10 miles long and will consist of drainage improvenments along the East fore slope of US 24/IL 29 South of Ravine St. in the city of East Peoria. — Executed Nov 26 New Stark Excavating, Inc. $79,890 ·
Mar 11, 2022 68F73 KnoxDistrict 4 Bridge deck overlay, bridge joint replace//repair, bridge repair to SN 048-0009 and -0010 carrying over East Main Street in Galesburg. — Executed Nov 26 New Brandt Construction Co. $1,167,000 ·
Mar 11, 2022 68F75 TazewellDistrict 4 Bridge joint replace/repair, bridge deck repairs, bridge repair on S.N. 090-0136 on Townline Road over 1-155, 3 miles South of IL Route 9. — Executed Nov 26 New Stark Excavating, Inc. $357,062 ·
Mar 11, 2022 68F77 PutnamDistrict 4 Chip seal A-2 with fog seal on IL 26 South of IL 71 to IL 18. — Executed Nov 26 New Advanced Asphalt Company and Pavement Maintenance Services, Inc. JV $1,334,347 ·
Mar 11, 2022 68G28 PeoriaTazewellDistrict 4 Crack and Joint Sealing on US 24/IL 9 from N of Pfeiffer Rd in Bartonville to 0.16 mi SW of IL 9 (E.) and on IL 29 from Margaret Drive in Creve Coeur to N of LaSalle BLVD in Marquette Heights. — Executed Nov 26 New Denler, Inc. $214,975 ·
Mar 11, 2022 68G29 HendersonMcDonoughDistrict 4 Crack and joint sealing on US 34 from PD Creek to West end of Biggsville Bypass and on IL 9 from Hancock CL to W of US 67. — Executed Nov 26 New Freehill Asphalt, Inc. $260,027 ·
Mar 11, 2022 68G58 MarshallMasonTazewellDistrict 4 Bridge washing of nine (9) bridges over the Illinois River in Tazewell, Mason, and Marshall Counties. — Executed Nov 26 New Interstate Maintenance, Incorporated $219,300 ·
Mar 11, 2022 68G60 VariousDistrict 4 Guardrail repairs caused by motorists (MCHD) and cable guardrail repairs (High tension cable barrier) at various locations in District 4. — Executed Nov 26 New Northern Contracting, Inc. $700,397 ·
Mar 11, 2022 68G61 VariousDistrict 4 Districtwide pavement markings. — Executed Nov 26 New Varsity Striping & Construction Co. $235,350 ·
Mar 11, 2022 68G68 TazewellDistrict 4 Bridge repairs to SN 090-0104 Springfield Rd; 090-0105 Cole St; 090-0119 EB Ramp to WB I-74 (replace rocker bearings, misc. structural steel and substructure repairs). — Executed Nov 26 New Stark Excavating, Inc. $294,240 ·
Mar 11, 2022 68G70 McDonoughDistrict 4 This project is 0.26 miles in length. It is located at the structure carrying IL 41 over KJRY Railway and BNSF Railway (SN 055-0008), 2.8 miles South of Bushnell. Work includes bridge repair (structural repairs) and shoulder repair. — Executed Nov 26 New County Contractors, Inc. $110,055 ·
Apr 29, 2022 68A36 WarrenDistrict 4 Resurfacing on US 67 from N of jct US 34 to N of 901h Avenue, North of Roseville, including bridge deck overlays to SN 094-0045 and 094-0046 over S Henderson Creek and SN 094-0035 and 094-0042 over Picayune Creek. — Executed Nov 26 New Gunther Construction, a div of UCM, Inc. $20,211,670 ·
Apr 29, 2022 68F44 MercerDistrict 4 Resurfacing IL 17 from 1st Street in New Boston to Bryant Rd in Mercer County. Total Length 5.4 miles. — Executed Nov 26 New Brandt Construction Co. $3,999,605 ·
Apr 29, 2022 68F87 MarshallWoodfordDistrict 4 Resurface I-39 from 1 mile N of IL 116 to 2 miles S of IL 17. — Executed Nov 26 New Advanced Asphalt Company $25,968,870 ·
Apr 29, 2022 68G30 WoodfordDistrict 4 Cape Seal on Il 116/117 from IL 117(N) to 1-39. — Executed Nov 26 New Beniach Construction Co., Inc. $692,608 ·
Apr 29, 2022 68G31 McDonoughDistrict 4 Cape Seal on US 67/IL 11 O from IL 9 to N of IL 336. — Executed Nov 26 New A. C. Pavement Striping Co. $734,321 ·
Apr 29, 2022 68G32 MercerDistrict 4 Microsurfacing (1-Pass) on IL 17 from E of IL 94(N) in Aledo to 2201h St. — Executed Nov 26 New Microsurfacing Contractors, LLC, a Division of Byrne and Jones Holding Company $278,305 ·
Apr 29, 2022 68G33 HendersonWarrenDistrict 4 Chip seal A-1 and fog coat on IL 116 from 950 N near Media to US 67. — Executed Nov 26 New DMS Contracting, Inc. $656,824 ·
Apr 29, 2022 68G34 PeoriaDistrict 4 Microsurfacing (1-pass)on IL 116 from IL 78(N) in Farmington to Eden Road. — Executed Nov 26 New Microsurfacing Contractors, LLC, a Division of Byrne and Jones Holding Company $553,862 ·
Apr 29, 2022 68G50 TazewellDistrict 4 Bridge deck sealing at various locations in Tazewell County. — Executed Nov 26 New All States Painting, Inc. $293,000 ·
Apr 29, 2022 68G73 TazewellDistrict 4 Lighting upgrades at IL 29/1-474 interchange in Creve Coeur, I-155/IL 98 and I-155/Queenwood Rd. interchanges in Morton. — Executed Nov 26 New Bodine Electric of Decatur $248,640 ·
Apr 29, 2022 68G74 VariousDistrict 4 Traffic signal mast arm replacement at various locations in Peoria, Tazewell, and McDonough Counties. — Executed Nov 26 New Oberlander Electric Co. $598,683 ·
Apr 29, 2022 68G77 KnoxWoodfordDistrict 4 Installation of truck parking information management systems (TPIMS) at the Spoon River and Mackinaw Dells (EB and WB) rest areas. — Executed Nov 26 New Laser Electric, Inc. $179,815 ·
Apr 29, 2022 68G78 WoodfordDistrict 4 Bridge Painting on structures carrying Roanoke Road (SN 102-0054) and TR 605 (SN 102-0057) over 1-39. — Executed Nov 26 New Three Star Painting, Inc. $500,000 ·
Apr 29, 2022 68G88 McDonoughDistrict 4 Intersection improvement at IL 336/IL 11 0 and E 600th St near Colchester. — Executed Nov 26 New Gunther Construction, a div of UCM, Inc. $539,236 ·
Apr 29, 2022 89789 PeoriaDistrict 4 Full Depth pavement removal, PCC Pavement, Curb and Gutter, Pipe Underdrains, Storm Sewer, HMA Multi-Use Path, PCC Sidewalks, Pavement Markings, and Landscaping on Gleen Avenue between Sheridan Road and Knoxville Avenue (IL-140) . — Executed Nov 26 New Otto Baum Company, Inc. $5,288,286 ·
Apr 29, 2022 89790 MercerDistrict 4 Cold-in-place recycling, aggregate shoulders and pipe underdrains on CH 9 from the Rock Island Countly line to 0.4 mile south of 155th Avenue. — Executed Nov 26 New Langman Construction, Inc. $1,160,989 ·
Apr 29, 2022 89819 KnoxDistrict 4 Rehabilitate the structure carrying CH 10 over the BNSF Rail Yard located east of Henderson Street in Galesburg. — Executed Nov 26 New Brandt Construction Co. $5,031,097 ·
Jun 17, 2022 46600 VariousDistrict 4 Placing preformed plastic, epoxy and modified urethane pavment markings, letters and symbols, and the removal This work shall consist of placing preformed plastic, epoxy and modified urethane pavment markings, letters and symbols, and the removal of existing pavement markings within the limits specified on each individual work order. — Executed Nov 26 New ROADSAFE TRAFFIC SYSTEMS, INC. $1,589,417 ·
Jun 17, 2022 46601 VariousDistrict 4 Removing damaged raised reflective pavement markers and replacing them with new raised reflective pavement mar This work shall consist of removing damaged raised reflective pavement markers and replacing them with new raised reflective pavement markers or lenses within the limits shown in the plans. — Executed Nov 26 New P & P Construction Co. $391,605 ·
Jun 17, 2022 68G43 McDonoughWarrenDistrict 4 Bridge deck overlay, bridge approach roadway and bridge repair to SN 094-0037, SN SN 094-0038 over Big Negro Creek, SN 094-0039, SN 094-0040 over Swan Creek, SN 055-0031, SN 055-0032 over East Fork Crooked Creek. Total Length = 0.39 miles. — Executed Nov 26 New Freesen, a div of UCM, Inc. $2,042,711 ·
Jun 17, 2022 68G65 WoodfordDistrict 4 Bridge repairs on SN 102-0034, including bearing replacement at abutments and some substructure repair along w This project consists of bridge repairs on SN 102-0034, including bearing replacement at abutments and some substructure repair along with other related collateral work necessary to complete the project as shown in the plans and as described herein. Structure carrying TR 134 over 1-74. — Executed Nov 26 New Stark Excavating, Inc. $157,836 ·
Jun 17, 2022 68G69 PeoriaDistrict 4 Bridge repairs on SN 072-0148, including the replacement of the existing expansion joints with strip seals and This project consists of bridge repairs on SN 072-0148, including the replacement of the existing expansion joints with strip seals and plating all beam ends at both abutments along with other related work necessary to complete the project as shown in the plans and as described herein. Structure carrying Mossville Rd. over IL 6. — Executed Nov 26 New Stark Excavating, Inc. $278,003 ·
Jun 17, 2022 68G72 PeoriaDistrict 4 Patching on IL 6 from US 150 to I-74. — Executed Nov 26 New Kinney Contractors, Inc. $627,541 ·
Jun 17, 2022 68G89 VariousDistrict 4 Weed spraying (off road) in various counties on various routes. — Executed Nov 26 New The Daltons Inc. $138,418 ·
Jun 17, 2022 68G90 VariousDistrict 4 Lighting, traffic signals, and ITS upgrades at various locations within District 4. — Executed Nov 26 New Laser Electric, Inc. $266,565 ·
Jun 17, 2022 68G92 KnoxDistrict 4 1.90 miles of HMA patching at the I-74 interchange from CR 1925 N. — Executed Nov 26 New Gunther Construction, a div of UCM, Inc. $208,605 ·
Jun 17, 2022 68G93 WarrenDistrict 4 6.22 miles of HMA patching from 20th Street to US 67. — Executed Nov 26 New Gunther Construction, a div of UCM, Inc. $435,978 ·
Jun 17, 2022 68G94 KnoxDistrict 4 1.15 miles of Class B Patching from Swing Blvd to Main Street in Galesburg, IL. — Executed Nov 26 New G. M. Sipes Construction, Inc. $169,342 ·
Jun 17, 2022 68G95 KnoxDistrict 4 9.62 miles of PCC Patching from US 150/IL 97 Interchange to the Spoon River Rest Area. — Executed Nov 26 New G. M. Sipes Construction, Inc. $289,794 ·
Jun 17, 2022 68G96 KnoxDistrict 4 0.87 miles of HMA Patching from US 150/IL 97 Interchange with I-74 to CH 17/CR 1290N. — Executed Nov 26 New Gunther Construction, a div of UCM, Inc. $165,743 ·
Jun 17, 2022 68G97 KnoxDistrict 4 1.34 miles of HMA Patching from Allens Ave to Michigan Ave in Galesburg, IL. — Executed Nov 26 New Brandt Construction Co. $496,110 ·
Jun 17, 2022 68G98 KnoxDistrict 4 2.45 miles of PCC Patching from I-74/US 34 Interchange to US 150/US 34 Interchange. — Executed Nov 26 New G. M. Sipes Construction, Inc. $193,563 ·
Jun 17, 2022 68G99 MercerDistrict 4 4.02 miles of HMA Patching from US 67 to 5th Ave in Sherrard, IL. — Executed Nov 26 New Langman Construction, Inc. $188,376 ·
Jun 17, 2022 68H03 McDonoughDistrict 4 17.20 miles of HMA Patching from McDonough County Line to US 67. — Rejected Nov 26 New Gunther Construction, a div of UCM, Inc. $359,699 ·
Jun 17, 2022 68H04 TazewellWoodfordDistrict 4 2.9 miles of median removal and manhole/inlet repairs. — Executed Nov 26 New Phoenix Corporation of the Quad Cities $155,327 ·
Jun 17, 2022 68H05 TazewellDistrict 4 HMA Patching on Business US 24 in Washington (2.65 miles); HMA Patching on IL 122 West of Minier (2.00 miles). — Executed Nov 26 New R. A. Cullinan and Son, a div of UCM, Inc. $579,057 ·
Jun 17, 2022 68H06 McDonoughDistrict 4 Pollinator habitat restoration and preservation (seeding and weeding) along Macomb NW Bypass from US 136 to US 67. — Executed Nov 26 New Nettle Creek Nursery, Inc. $65,040 ·
Jun 17, 2022 89760 WarrenDistrict 4 Replace the bridge carrying CH 4 over Henderson Creek, 5.4 miles southeast of Alexis. — Executed Nov 26 New County Contractors, Inc. $2,275,756 ·
Jun 17, 2022 89812 WoodfordDistrict 4 HMA Pavement widening, resurfacing and PCC pavement on CH 13 from US 24 north for 0.13 mile. — Executed Nov 26 New Rowe Construction, a div of UCM, Inc. $614,969 ·
Jun 17, 2022 89813 MarshallDistrict 4 Replace the bridge carrying Camp Grove Road over Senachwine Creek, 1.2 miles west of Yankee Lane. — Executed Nov 26 New Curnyn Construction Co. $1,262,966 ·
Jul 15, 2022 68G71 WarrenDistrict 4 Bridge preservation to SN 094-0028 carrying Cameron Rd over US 34 (bridge deck waterproofing and deck overlay, bridge joint replacement/repair, misc repairs) and related collateral work. — Executed Nov 26 New Brandt Construction Co. $1,033,550 ·
Jul 15, 2022 68H07 PeoriaDistrict 4 Transverse and longitudinal partial-depth patching along IL 29 from North of Gardner Ln. to North of Lorentz Ave. in Peoria County. Total length is 2.45 miles. — Executed Nov 26 New R. A. Cullinan and Son, a div of UCM, Inc. $1,141,394 ·
Jul 15, 2022 68H10 PeoriaDistrict 4 1360 feet of PCC TY B Pavement Patching from Martin to Moss Avenue in Peoria. — Executed Nov 26 New G. M. Sipes Construction, Inc. $579,888 ·
Aug 5, 2022 68H09 PeoriaDistrict 4 Mill and resurface parking area and install parking striping at the Peoria West storage yard (6500 W. Highway 150, Edwards, IL., 2.5 Miles west of Peoria ou US 150). — Executed Nov 26 New R. A. Cullinan and Son, a div of UCM, Inc. $204,296 ·
Aug 5, 2022 68H12 TazewellDistrict 4 The installation of new traffic signals, pavement markings, ADA ramp, curb and gutter, riprap, median reconstr This profect consists of the installation of new traffic signals, pavement markings, ADA ramp, curb and gutter, riprap, median reconstruction, and all related collateral work necessary to complete the improvements on this project. Located at the intersection of VFW Rd. and 14th St. in Pekin, Tazewell Co. — Executed Nov 26 New Otto Baum Company, Inc. $649,720 ·
Sep 23, 2022 68698 StarkDistrict 4 Replacement of the structure carrying IL 17/ IL 91 over the Spoon River SN 088-0002 (existing; SN 088-0030 (proposed)Ù, 0.6 miles West of Wyoming in Stark County. The project is 2887 feet (0.55 mile) in length. The project also includes roadway profile adjustments, regrading of sideslopes, and construction of the stream barbs. — Rejected Nov 26 New ICC Group Inc. $13,207,000 ·
Sep 23, 2022 68884 PeoriaDistrict 4 909.3 FT., Bridge Replacements on I-474 over IL 116 (Plank Rd.) in Bellevue. — Executed Nov 26 New Stark Excavating, Inc. $11,025,102 ·
Sep 23, 2022 68H08 KnoxDistrict 4 Mill and resurface parking lot at the Knoxville Storage Yard, South of I-74 (exit 51) on CH 9 (1393 Knox Hwy). — Executed Nov 26 New Illinois Civil Contractors, Inc. $436,864 ·
Sep 23, 2022 68H17 VariousDistrict 4 Installation of traffic signal cabinets and equipment, CCTV cameras, and network communications equipment at various locations within District 4. — Executed Nov 26 New Oberlander Electric Co. $470,200 ·
Sep 23, 2022 68H18 VariousDistrict 4 Installation of battery backup systems, CCTV cameras, ITS components and wireless radio communications equipment at various locations within District 4. — Executed Nov 26 New Laser Electric, Inc. $455,836 ·
Nov 18, 2022 68E32 PeoriaDistrict 4 The culvert rehabilitation of SN 072-2008, a double 10' x 10' box culvert, at Big Hollow Creek on US 150 (War Project consists of the culvert rehabilitation of SN 072-2008, a double 10' x 10' box culvert, at Big Hollow Creek on US 150 (War Memorial) in Peoria. — Executed Nov 26 New Phoenix Corporation of the Quad Cities $329,174 ·
Nov 18, 2022 68E43 WarrenDistrict 4 Replacing a double steel plate arch culvert with a double 12'x12' precast concrete box culvert carrying US 34 This project is located just west of Galesburg and consists of replacing a double steel plate arch culvert with a double 12'x12' precast concrete box culvert carrying US 34 over the South branch of Cedar Creek. — Executed Nov 26 New Laverdiere Construction, Inc. $2,344,285 ·
Nov 18, 2022 68F08 MarshallDistrict 4 Bridge painting and rehabilitation to S.N. 062-0003 carrying IL 17 over the Illinois River in Lacon. — Executed Nov 26 New White Construction LLC $10,094,556 ·
Nov 18, 2022 68F38 PeoriaTazewellDistrict 4 Bridge Rehabilitation with bridge deck overlay, beam repairs, beam additions, navigation and roadway lighting, traffic signal improvements, drainage improvements, full depth pavement removal and replacement, sidewalk removals, multi-use path construction and related collateral work. Bob Michel Bridge (SN 090-0122) in Peoria and Tazewell Counties on IL 40 (William Kumpf Blvd.) over the Illinois River and Washington Street. — Executed Nov 26 New ICC Group Inc. $24,657,000 ·
Nov 18, 2022 68F51 MarshallDistrict 4 Shoulder, foreslope repair, replace guardrail and culvert extensions on IL 17, 1.5 mi. W. Sparland, Sta. 463+00. — Executed Nov 26 New Phoenix Corporation of the Quad Cities $567,199 ·
Nov 18, 2022 89796 FultonDistrict 4 Replace the bridge carrying CH 2 over Otter Creek, 4 miles north of Astoria. — Executed Nov 26 New Stark Excavating, Inc. $2,199,397 ·
Jan 20, 2023 68E42 TazewellDistrict 4 0.47 miles, Bridge Replacement on I-155 over Indian Creek near Hopedale. — Executed Nov 26 New Stark Excavating, Inc. $8,247,342 ·
Jan 20, 2023 68G91 KnoxDistrict 4 Bridge Preservation on S.N. 048-0080 over Spoon River, S .N. 048-0085 and S.N. 048-0086 over Cadwell Creek (2 locations) and S .N. 048-0089 over Branch of Brandywine creek. — Executed Nov 26 New Path Construction Company, Inc. $1,898,891 ·
Jan 20, 2023 68H37 VariousDistrict 4 Tree removal at various locations within District 4. — Executed Nov 26 New Mosley Construction 1, LLC $93,770 ·
Jan 20, 2023 89817 WoodfordDistrict 4 Resurface Santa Fe Trail from IL 26/Spring Bay Road to Ch 19/Lourdes Road. — Executed Nov 26 New Advanced Asphalt Company $952,797 ·
Jan 20, 2023 89821 PeoriaDistrict 4 Rehabilitate the bridge carrying CH 23R over Timber Creek, 0.7 mile north of IL 8. — Executed Nov 26 New Stark Excavating, Inc. $727,272 ·
Jan 20, 2023 89822 PeoriaDistrict 4 Replace existing box culvert on Graham Chapel Road at a Tributary of West Fork over Kickapoo Creek, 0.6 mile west of Stone School Road. — Executed Nov 26 New Illinois Civil Contractors, Inc. $1,333,481 ·
Jan 20, 2023 89826 PeoriaDistrict 4 PCC pavement reconstruction, PCC Shoulders, curb and gutter, storm sewer replacement, traffic signal installation and lighting on Old Galena Road from IL 29 north to Neal Lane with a 0.26 mile omission north of IL 29 to south of Engine Drive. — Executed Nov 26 New Stark Excavating, Inc. $4,982,316 ·
Mar 10, 2023 68G35 StarkDistrict 4 Microsurfacing (1-Pass) on IL 91 from IL 93 to IL 17. — Executed Nov 26 New A. C. Pavement Striping Co. $559,696 ·
Mar 10, 2023 68G40 PeoriaDistrict 4 The project includes bridge deck overlay and scour mitigation to SN 072-0162 carrying IL 8 over Walnut Creek, East of IL 78. The project improvement length is 0.058 miles. — Executed Nov 26 New Otto Baum Company, Inc. $523,800 ·
Mar 10, 2023 68G41 HendersonDistrict 4 The project includes bridge repairs and bridge deck overlays to S.N. 036-0044 over Camp Creek and S.N. 036-0045 over Weaver Creek, including bridge joint replacement on S.N. 036-0045. Project length is 0.106 mile. — Executed Nov 26 New Brandt Construction Co. $1,365,000 ·
Mar 10, 2023 68H00 PeoriaDistrict 4 I-74 in the City of Peoria. — Active Nov 26 New Endrizzi Contracting, Inc $309,583 ·
Mar 10, 2023 68H01 VariousDistrict 4 Removal and replacement of guardrail damaged by motorists throughout District 4. — Executed Nov 26 New
Mar 10, 2023 68H02 VariousDistrict 4 District-wide pavement markings. — Executed Nov 26 New Varsity Striping & Construction Co. $386,166 ·
Mar 10, 2023 68H16 TazewellDistrict 4 Replace expansion joints and partial depth deck patching to S.N. 090-0063 carrying IL 9 over Mackinaw River. — Executed Nov 26 New Otto Baum Company, Inc. $371,800 ·
Mar 10, 2023 68H21 PeoriaTazewellDistrict 4 Crack and joint sealing at various locations along 1-74 and 1-474 in Peoria and Tazewell Counties. — Executed Nov 26 New Complete Asphalt Service Co. $224,649 ·
Mar 10, 2023 68H30 VariousDistrict 4 Bridge Washing of 10 Bridges In District 4. — Executed Nov 26 New M & M Concrete, Inc. $808,750 ·
Mar 10, 2023 68H56 PeoriaDistrict 4 Replace traffic signal mast arm at IL 8/ IL 116 (MacArthur Hwy.) and Washington St. in Peoria. — Rejected Nov 26 New Laser Electric, Inc. $369,353 ·
Mar 10, 2023 68H59 VariousDistrict 4 Electrical maintenance contract (maintenance and repair D4 traffic signals, overhead lighting and ITS facilities). — Executed Nov 26 New Laser Electric, Inc. $1,152,909 ·
Mar 10, 2023 89752 StarkDistrict 4 Replace existing structure carrying North Valley Road over Camp Run Creek with a 3-span flange beam bridge with HMA approaches, 0.3 mile southeast of Wyoming. — Executed Nov 26 New Stark Excavating, Inc. $1,938,063 ·
Apr 28, 2023 68666 PutnamDistrict 4 Replace structures carrying IL 89 over Clear Creek ESN 078-0025 (PSN 078-2011) and Clear Creek Tributary ESN 078-0024 (PSN 078-2012)Ù, 1.4 and 2.8 miles north of IL 18 in Putnam County. — Executed Nov 26 New D. Construction, Inc. $2,648,383 ·
Apr 28, 2023 68E54 FultonDistrict 4 Headwall removal and replacement, culvert ext., and slope repair at 3 locations along IL 41 from S of Avon to N of Capp Rd. — Executed Nov 26 New Phoenix Corporation of the Quad Cities $938,577 ·
Apr 28, 2023 68F26 PeoriaDistrict 4 Shoulder reconstruction and slope stabilization along US 24, 0.7 mile North of IL 9 in Peoria County. — Executed Nov 26 New Otto Baum Company, Inc. $323,800 ·
Apr 28, 2023 68F79 PeoriaDistrict 4 1.3 miles of resurfacing with ADA improvements on IL 29 from N. of Truitt Avenue to S. of Cloverdale Road. — Executed Nov 26 New R. A. Cullinan and Son, a div of UCM, Inc. $2,972,756 ·
Apr 28, 2023 68G37 HendersonDistrict 4 Microsurface (1-Pass) on US 34 along Biggsville Bypass. — Executed Nov 26 New Beniach Construction Co., Inc. $1,103,878 ·
Apr 28, 2023 68G38 StarkDistrict 4 Bridge deck overlay to 088-0021 and 088-0022-0022 carrying IL 93 over West and East Fork Spoon River west of Bradford. — Executed Nov 26 New Stark Excavating, Inc. $1,059,779 ·
Apr 28, 2023 68G52 VariousDistrict 4 Bridge deck sealing at various locations within District 4. — Executed Nov 26 New M & M Concrete, Inc. $209,244 ·
Apr 28, 2023 68H13 TazewellDistrict 4 Centerline joint repair on IL 8/US 150 (Washington/Camp Streets) from east of Main Street to east of Rosedale Street in East Peoria in Tazewell County. — Executed Nov 26 New Microsurfacing Contractors, LLC, a Division of Byrne and Jones Holding Company $355,408 ·
Apr 28, 2023 68H57 PeoriaDistrict 4 Installation of fiber optic cable within existing conduit along US 150 (War Memorial Drive) from IL 29 interchange to Koerner/Trigger Road in Peoria. — Executed Nov 26 New Oberlander Electric Co. $437,500 ·
Apr 28, 2023 89805 TazewellDistrict 4 Roadway extension of Freedom Parkway from east of IL 8 to Cummings Lane in Washington. — Executed Nov 26 New R. A. Cullinan and Son, a div of UCM, Inc. $6,595,005 ·
301–400 of 878‹ PrevNext ›

Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.