Bid tab 68H57

Let Apr 28, 2023 · District 4 · Peoria Sign up free

‹ Apr 2023 results

D4 ITS SYSTEM 2023-2

Let date
Friday, April 28, 2023
Contract
68H57 · job page
District
District 4
County
Peoria
Highway
Limits
Installation of fiber optic cable within existing conduit along US 150 (War Memorial Drive) from IL 29 interchange to Koerner/Trigger Road in Peoria.

Bidders 2

#ContractorTotal bidvs estimatevs low
EEEngineer's estimate—
1 Oberlander Electric Co. Low bidder $437,500
2 Laser Electric, Inc. $478,076 +9.3%

Bid tab: unit prices 10 items

ExcelCSV
SeqBid codeDescriptionQtyUnitEstimate #1 Oberlander Elec…#2 Laser Electric,…
1X1400240 FOCC 96F SNGL MODE59,143FOOT $5.25 $5.00
2X7010216 TRAF CONT & PROT SPL1L SUM $13,136.25 $29,727.88
3X8710050 FO ETN DROP REPEAT SW12EACH $1,650.00 $1,370.60
4X8710101 ETHERNET MNG SWITCH9EACH $1,550.00 $2,103.95
5X8710103 ETHERNET SWITCH2EACH $1,700.00 $1,932.48
6X8710314 FIBER OPT SPL-LATERAL10EACH $2,550.00 $4,874.20
767100100 MOBILIZATION1L SUM $17,000.00 $15,000.00
881028350 UNDRGRD C PVC 259FOOT $17.00 $89.26
981400720 DBL HANDHOLE PCC9EACH $3,205.00 $4,217.97
1087900200 DRILL EX HANDHOLE9EACH $485.00 $712.85