IDOT Jobs

All dates · 878 jobs · $2,122,483,000 Sign up free
★ My Jobs

Filtered by: District: District 4 Clear all

878 jobs · $2,122,483,000 estimated

ExcelCSV
Let date Contract / PPS County / Division Highway Description Estimate Status Added Low bidder
Jul 31, 2020 68F93 HenryDistrict 4 Pavement patching on EB I-74 entrance and exit ramps at IL 17 near Woodull in Henry County. — Executed Nov 26 New G. M. Sipes Construction, Inc. $106,730 ·
Jul 31, 2020 89719 MercerDistrict 4 Replace the bridge carrying _CH 16 over Snake Creek, at the western edge of Seaton — Executed Nov 26 New Brandt Construction Co. $747,127 ·
Jul 31, 2020 89735 TazewellDistrict 4 Reconstruct the intersection of Camp Street and River Road in East Peoria. — Executed Nov 26 New Otto Baum Company, Inc. $1,295,159 ·
Jul 31, 2020 89768 TazewellDistrict 4 Construct a shared-use path along North Main Street from Cruger Road to Easy Street in Washington. — Executed Nov 26 New Gensini Excavating, Inc. $240,310 ·
Jul 31, 2020 89770 TazewellDistrict 4 Construction of sidewalks and ADA Ramps at various locations in Pekin. — Executed Nov 26 New Otto Baum Company, Inc. $203,635 ·
Sep 18, 2020 68741 PutnamDistrict 4 Superstructure replacement on S This project is 550 feet long and consists of superstructure replacement on S.N. 078-0032, which carries IL Route 71 over Coffee Creek, 5.1 miles west of IL Route 89 in Putnam County. — Executed Nov 26 New D. Construction, Inc. $962,942 ·
Sep 18, 2020 68F57 VariousDistrict 4 Upgrade guardrail terminal end sections, Texas Turndowns, along various routes throughout the district in various counties. — Executed Nov 26 New COLLINS & HERMANN, INC. $1,165,296 ·
Nov 6, 2020 68897 StarkDistrict 4 Replacement of structure carrying IL 78 over Walnut Creek (S.N. 088-0012 existing, S.N. 088-2503 proposed) 0.8 miles North of West Jersey in Stark County. — Executed Nov 26 New Stark Excavating, Inc. $1,632,505 ·
Nov 6, 2020 68D95 WarrenDistrict 4 Replacement of Structure Nos. 094-0025 (New S.N. 094-0053) and 094-0026 (New Structure No. 094-0054) carrying US 34/1 L 110 over 120 Street (TR 162) in Warren County. — Executed Nov 26 New White Construction LLC $5,194,500 ·
Nov 6, 2020 68E60 PeoriaDistrict 4 Building Demo at 1229 Kickapoo Creek Road in Peoria. — Executed Nov 26 New Illinois Civil Contractors, Inc. $45,885 ·
Nov 6, 2020 68F98 TazewellWoodfordDistrict 4 Culvert lining at various locations along US 24 in Tazewell and Woodford Counties. — Executed Nov 26 New Phoenix Corporation of the Quad Cities $217,465 ·
Nov 6, 2020 68G04 VariousDistrict 4 Replacement of existing CCTV cameras with high definition CCTV cameras at various locations in District Four. — Executed Nov 26 New H & H Electric Co. $258,043 ·
Nov 6, 2020 68G05 PeoriaTazewellDistrict 4 Replacement of existing video detection systems at various locations in Peoria various locations in Peoria and Tazewell Counties in District Four. — Executed Nov 26 New Oberlander Electric Co. $406,250 ·
Nov 6, 2020 89745 PeoriaDistrict 4 Replace the bridge carrying CH 29D over Jubilee Creek, 2.7 miles east of Brimfield — Executed Nov 26 New Stark Excavating, Inc. $1,296,220 ·
Nov 6, 2020 89754 WoodfordDistrict 4 Remove and replace guardrail and terminals at various locations in Woodford County. — Executed Nov 26 New Midwest Fence Corporation $625,958 ·
Nov 6, 2020 89766 PeoriaDistrict 4 Reconstruction of Western Ave, from Adams Street to Lincoln Avenue and a portion of IL 8, from Lincoln Avenue to Howett St in Peoria. — Executed Nov 26 New R. A. Cullinan and Son, a div of UCM, Inc. $12,585,868 ·
Nov 6, 2020 89769 TazewellDistrict 4 Sidewalk construction algon the north side of Bobolink Drive, from Elgin Street to Eagle Avenue, and along the east side of Eagle Avenue from Bobolink Drive to the north entrance to Central Intermediate School in Washington. — Executed Nov 26 New Stark Excavating, Inc. $207,461 ·
Jan 15, 2021 68F54 TazewellDistrict 4 Bridge painting, bridge deck scarification and overlay, joint replacement, bearing replacement, slopewall repa This project is 5.5 miles long and the structure repair work consists of bridge painting, bridge deck scarification and overlay, joint replacement, bearing replacement, slopewall repair, substructure repair, and other related work on various structures on 1-74 from 0.8 miles east of Morton Ave. to the Woodford County line. — Executed Nov 26 New Stark Excavating, Inc. $4,871,748 ·
Jan 15, 2021 68F63 MarshallMasonTazewellDistrict 4 Bridge washing of eight (8) bridges over the Illinois River in Marshall, Tazewell and Mason counties. — Executed Nov 26 New Interstate Maintenance, Incorporated $239,996 ·
Jan 15, 2021 68F97 PeoriaDistrict 4 Landscaping along 1-74 from Ellis Street in Peoria to the Illinois River in Peoria County. — Executed Nov 26 New JIMAX Landscape LLC $225,732 ·
Jan 15, 2021 68F99 KnoxDistrict 4 Replace two steel girders on Bridge S.N. 048-0065 carrying Farnham Street over US Route 34, just west of the 1-74 interchange in Galesburg for a total length of 0.11 mile. — Executed Nov 26 New White Construction LLC $206,222 ·
Jan 15, 2021 68G07 FultonPeoriaWarrenDistrict 4 Tree removal and other collateral work located along US 24 at Copperas Creek near Banner in Fulton County, alo This project consists of tree removal and other collateral work located along US 24 at Copperas Creek near Banner in Fulton County, along US 67 north of Monmouth in Warren County, and along IL 40 between Northmoor Road and Mt. Hawley in Peoria County. — Executed Nov 26 New Homer Tree Service, Inc. $146,325 ·
Jan 15, 2021 68G08 VariousDistrict 4 District-wide weed spraying (off road) in various counties on various routes. — Rejected Nov 26 New The Daltons Inc. $111,920 ·
Jan 15, 2021 89720 TazewellDistrict 4 Replace the bridge carrying CH 14 over Dry Creek, 2.3 miles east of Green Valley. — Executed Nov 26 New Illinois Civil Contractors, Inc. $559,587 ·
Jan 15, 2021 89759 McDonoughDistrict 4 Replace the bridge carrying CH 5 over the North Fork of Lamoine River, 4.3 miles east of IL 110/US 67. — Executed Nov 26 New Brandt Construction Co. $725,982 ·
Mar 5, 2021 68636 WarrenDistrict 4 Widening and resurfacing on US Route 67 from just west of Tom's Creek on US 67/IL 135 to just south of 270th Avenue/CH 3 in Warren County. Net length= 4.5 miles. — Executed Nov 26 New McCarthy Improvement Company $11,758,158 ·
Mar 5, 2021 68F12 PeoriaDistrict 4 Overlay on IL 29 (Fourth Street) from Senachwine Creek to Truitt Avenue in Chillicothe with ADA ramp construction. Length =0.94 mile. — Executed Nov 26 New Advanced Asphalt Company $1,042,379 ·
Mar 5, 2021 68F67 HendersonDistrict 4 0.15 mile, Bridge Preservation, Bridge deck overlay and bridge joint replace/repair at Structure No. 036-0042 carrying IL Route 94 over Fall Creek, 4.3 miles north of IL Route 164. — Executed Nov 26 New Brandt Construction Co. $506,959 ·
Mar 5, 2021 68F69 TazewellDistrict 4 0.89 mile, resurfacing of Main Street (IL 1 16/US 150) from North of 1-74 to South Highview Road in East Peoria, Tazewell County. — Executed Nov 26 New R. A. Cullinan and Son, a div of UCM, Inc. $1,449,784 ·
Mar 5, 2021 68F96 VariousDistrict 4 Guardrail repairs caused by motorists (MCHD) and cable guardrail repairs (high- tension cable barrier) at various location in District Four. — Executed Nov 26 New Northern Contracting, Inc. $656,698 ·
Mar 5, 2021 68G02 VariousDistrict 4 Bridge painting at various locations in various counties. — Executed Nov 26 New Civil Coatings and Construction Inc. $1,394,916 ·
Mar 5, 2021 68G06 VariousDistrict 4 Installation of dilemma zone detection and LED lighting at various signalized intersections in District Four. — Executed Nov 26 New Oberlander Electric Co. $404,469 ·
Mar 5, 2021 89475 KnoxDistrict 4 Replace the bridge carrying CH 8 over Brush Creek, 5 miles east of Abingdon. — Executed Nov 26 New Curnyn Construction Co. $1,168,725 ·
Mar 5, 2021 89765 FultonDistrict 4 Processing modified soil, HMA resurfacing, aggregate shoulders, box culvert extension, and the construction of a box culvert, located on CH2 from CH 14 to Airport Road. — Executed Nov 26 New Gunther Construction, a div of UCM, Inc. $2,983,349 ·
Mar 5, 2021 89788 McDonoughDistrict 4 Resurface CH 24 from CH 19 to CH 8. — Executed Nov 26 New Gunther Construction, a div of UCM, Inc. $1,083,880 ·
Apr 23, 2021 68F68 VariousDistrict 4 Bridge deck sealing at various structures throughout District Four. — Executed Nov 26 New All States Painting, Inc. $189,900 ·
Apr 23, 2021 68F76 VariousDistrict 4 Crack and joint sealing at various locations in Knox, Peoria, and Tazewell Counties. — Executed Nov 26 New Denler, Inc. $500,279 ·
Apr 23, 2021 68F95 VariousDistrict 4 Pavement markings on various routes in various counties throughout District Four. — Executed Nov 26 New Varsity Striping & Construction Co. $300,626 ·
Apr 23, 2021 68G09 MarshallDistrict 4 Rout and seal along Interstate 39 from 2 mile south of IL Route 17 to LaSalle County line and IL Route 18 from IL Route 29 in Henry to the Illinois River. — Executed Nov 26 New Freehill Asphalt, Inc. $239,675 ·
Apr 23, 2021 68G18 PeoriaDistrict 4 Longitudinal joint repair and partial depth patching along US 150 (War Memorial Drive) from West of Brandywine Drive to IL 29 (Adams St) in Peoria. — Executed Nov 26 New R. A. Cullinan and Son, a div of UCM, Inc. $515,084 ·
Apr 23, 2021 68G19 VariousDistrict 4 Installation of new traffic signal cabinets, traffic signal controllers, communications equipment, and video detection systems at various locations in District Four. — Executed Nov 26 New Laser Electric, Inc. $434,861 ·
Apr 23, 2021 68G20 MarshallMcLeanWoodfordDistrict 4 Installation of communications duct, communications vaults, and fiber optic cable along Interstate 39 from the Interstate 55 interchange to Illinois Route 17 in District Four. — Executed Nov 26 New Gerstner Electric, Inc. $1,837,876 ·
Apr 23, 2021 68G21 PeoriaTazewellDistrict 4 Installation of new traffic signal cabinets, traffic signal controllers, communications equipment, and video detection systems at various locations in District Four. — Executed Nov 26 New Laser Electric, Inc. $482,887 ·
Apr 23, 2021 68G22 WoodfordDistrict 4 Removal of existing high mast towers and installation of new lighting system at Interstate 39 at the Minonk interchange and replacement of light towers at Interstate 74 Mackinaw Dells rest areas. — Executed Nov 26 New Laser Electric, Inc. $279,781 ·
Apr 23, 2021 68G23 TazewellDistrict 4 Installation of overhead light poles, luminaires, flashing beacons, signs, pavement markings, rumble strips on IL Route 9 in Woodford County. — Executed Nov 26 New Laser Electric, Inc. $122,483 ·
Apr 23, 2021 68G24 VariousDistrict 4 Electrical maintenance contract (maintenance and repair 04 traffic signals, overhead lighting, and ITS facilities). — Executed Nov 26 New Laser Electric, Inc. $649,929 ·
Apr 23, 2021 89723 PeoriaDistrict 4 Construction of Rock Island Trail Extension within the City of Peoria, along Park Avenue, from NE Perry Avenue to the old railroad crossing, and along the former Peoria and Peoria Heights railroad bed from Park Avenue to Harvard Avenue, including rehabilitation of the abandoned railroad bridge over War Memorial Drive. — Executed Nov 26 New Illinois Civil Contractors, Inc. $1,793,566 ·
Apr 23, 2021 89777 FultonDistrict 4 Replace the culvert carrying CH 15 over an unnamed tributary located 0.4 mile west of CH 38. — Executed Nov 26 New Phoenix Corporation of the Quad Cities $125,253 ·
Apr 23, 2021 89783 MercerDistrict 4 Full Depth Reclamation, bituminous surface treatment, aggregate shoulders and guardrail replacement on CH 9 from the north village limits of Joy to 110th Street. — Executed Nov 26 New Brandt Construction Co. $882,001 ·
Apr 23, 2021 89799 FultonDistrict 4 Remove and replace guardrail at various locations in Fulton County. — Rejected Nov 26 New Midwest Fence Corporation $872,639 ·
Jun 11, 2021 46569 VariousDistrict 4 Removing damaged raised reflective pavement markers and perplacing them with new raised reflective pavement markers within the limits shown in the plans. — Executed Nov 26 New P & P Construction Co. $395,933 ·
Jun 11, 2021 46570 VariousDistrict 4 Placing epoxy and modified urethane pavement marking lines, letters and symbols, and the removal of existing pavement markings within the limits specified on each individual work order. — Executed Nov 26 New ROADSAFE TRAFFIC SYSTEMS, INC. $1,481,081 ·
Jun 11, 2021 46926 PeoriaDistrict 4 Removal of the three 36-inch diameter culverts and replacing them witha 54-inch diameter culvert, and other drainage and signage work at Jubilee College State Park in Peoria County. — Executed Nov 26 New Stark Excavating, Inc. $272,935 ·
Jun 11, 2021 46929 McDonoughDistrict 4 The slope failure repairs and pavement repairs of Argyle Park road and parking area, pavement markings, and al These proposed improvements consist of the slope failure repairs and pavement repairs of Argyle Park road and parking area, pavement markings, and all other necessary work to complete the project within the Argyle Lake State Park in McDonough County. net length 280' (0.053 mi.). — Executed Nov 26 New Brandt Construction Co. $531,591 ·
Jun 11, 2021 68503 HendersonDistrict 4 Carman Road from 0.5 mile North of 750N to IL Route 96 and IL Route 96 from East of Carman Road to West of Benton Street in Lomax. 5. 75 miles of resurfacing and other collateral work in Henderson County. — Executed Nov 26 New Gunther Construction, a div of UCM, Inc. $4,479,557 ·
Jun 11, 2021 68C45 PeoriaDistrict 4 Resurfacing and bridge deck overlays and repairs to various structures on Interstate 474 from Interstate 474 to the Illinois River in Peoria County. — Executed Nov 26 New Advanced Asphalt Company $20,960,049 ·
Jun 11, 2021 68C58 PeoriaDistrict 4 Superstructure replacement to S.N. 072-0076 carrying Maher Road over 1-74 (S.N. 072-0076) near Brimfield in Peoria County. — Executed Nov 26 New Stark Excavating, Inc. $3,514,647 ·
Jun 11, 2021 68D34 FultonDistrict 4 Replacement of existing S.N. 029-0001 carrying US 24/IL 9 over Copperas Creek, and associated roadway work. at the east end of Banner. — Executed Nov 26 New Stark Excavating, Inc. $9,110,397 ·
Jun 11, 2021 68E48 PeoriaDistrict 4 Crossover construction to maintain traffic, superstructure replacement, and other minor substructure repairs o This project is approximately 0.6 mile in length and consist of crossover construction to maintain traffic, superstructure replacement, and other minor substructure repairs on S.N. 072-0008, located 1.0 mile West of Mapleton in Peoria County. — Executed Nov 26 New Otto Baum Company, Inc. $1,675,118 ·
Jun 11, 2021 68E52 PeoriaDistrict 4 Bridge Rehabilitation to six (6) structures at the I-74/I-474/IL 6 interchange in Peoria. — Executed Nov 26 New Stark Excavating, Inc. $4,067,495 ·
Jun 11, 2021 68E82 PeoriaDistrict 4 0.17 mile. Sidewalk replacement, railing repairs, and miscellaneous drainage improvements along US Route 150 (War Memorial Drive) from Grand Avenue to Harvard Avenue in Peoria. — Executed Nov 26 New Otto Baum Company, Inc. $208,725 ·
Jun 11, 2021 68G01 WarrenDistrict 4 Patching and pavement repairs to US Route 67 from North of the Roseville Bypass to Roseville South of the Roseville Bypass. — Executed Nov 26 New Gunther Construction, a div of UCM, Inc. $557,276 ·
Jun 11, 2021 68G03 PeoriaDistrict 4 Bridge deck waterproofing and deck overlay to Structure No. 072-0134 carrying US 24 over Kickapoo Creek near Bartonville in Peoria County. — Executed Nov 26 New R. A. Cullinan and Son, a div of UCM, Inc. $406,194 ·
Jun 11, 2021 68G12 VariousDistrict 4 Distressed tree removal at various locations within District Four. — Rejected Nov 26 New Homer Tree Service, Inc. $262,247 ·
Jun 11, 2021 68G13 PeoriaDistrict 4 This project is approximately 0.06 mile in length, consisting of slope repair and drainage improvements along IL Route 40, between North Mt. Hawley Road and Northmoor Road in Peoria. — Executed Nov 26 New Phoenix Corporation of the Quad Cities $437,836 ·
Jun 11, 2021 68G14 FultonDistrict 4 Pavement patching on IL 9 from Big Creek to Avenue A in Canton. — Executed Nov 26 New R. A. Cullinan and Son, a div of UCM, Inc. $456,015 ·
Jun 11, 2021 68G15 PeoriaDistrict 4 Slope stabilization and landscaping along WB Interstate 74 between Ellis Street and North Street in Peoria County. — Executed Nov 26 New Central Landscaping, LP $245,433 ·
Jun 11, 2021 68G16 McDonoughDistrict 4 Resurfacing on US Route 67, North of Industry from 2.2 miles South of US Route 136 to Grindstone Creek in McDonough County. — Executed Nov 26 New Gunther Construction, a div of UCM, Inc. $2,984,173 ·
Jun 11, 2021 68G17 MarshallWoodfordDistrict 4 Class A and B patching on 1-39 from 1 mile North of IL Route 116 to 2 miles South of IL Route 17 and ramps at the Minonk Interchange. — Executed Nov 26 New Kinney Contractors, Inc. $377,733 ·
Jun 11, 2021 68G25 TazewellWoodfordDistrict 4 Patching on IL Route 116 from IL Route 26 to East of Lourdes Road in Germantown Hills. — Executed Nov 26 New Kinney Contractors, Inc. $615,751 ·
Jun 11, 2021 68G26 TazewellDistrict 4 Patching on US 24/US 150 from the East end of the McClugage Bridge to East of Hollands Grove Road in Tazewell County. — Executed Nov 26 New R. A. Cullinan and Son, a div of UCM, Inc. $671,702 ·
Jun 11, 2021 68G54 PeoriaDistrict 4 Traffic signal mast arm replacement at various locations throughout Peoria County. — Executed Nov 26 New Oberlander Electric Co. $565,500 ·
Jun 11, 2021 68G55 KnoxDistrict 4 1.2 miles of patching on US 150 (Henderson Street) from Home Boulevard to West North Street in Galesburg in Knox County. — Executed Nov 26 New G. M. Sipes Construction, Inc. $72,146 ·
Jun 11, 2021 68G56 TazewellDistrict 4 Highway lighting improvements along WB I-74 between I-474 and I-155 and US 24/BUS 24 interchange near Washington in Tazewell County. — Executed Nov 26 New Bodine Electric of Decatur $218,685 ·
Jun 11, 2021 89681 TazewellDistrict 4 Realignment, pavement reconstruction, culvert extensions, culverts and pavement markings on Allentown Road from 1000 feet east of Court Street and extending 1,000 feet into the city of Pekin. — Executed Nov 26 New Otto Baum Company, Inc. $617,543 ·
Jun 11, 2021 89725 TazewellDistrict 4 Construction of a PCC multi-use path and drainage items along Centennial Drive from Spring Creek Road to IL 8 in Washington. — Rejected Nov 26 New Knapp Concrete Contractors, Inc. $388,163 ·
Jun 11, 2021 89785 PeoriaDistrict 4 Sidewalk construction on Allen Road from 0.6 mile north of Wilhelm Rd. to Whilhelm Rd. and on Orange Prairie Road from Landens Way to War Memorial Drive in Peoria — Executed Nov 26 New Otto Baum Company, Inc. $109,223 ·
Jun 11, 2021 89801 PeoriaDistrict 4 Rehabilitate the bridge carrying Truitt Road over Hollow Creek. Remove and replace superstructure, backwalls at the abutments and repair piers. — Executed Nov 26 New Stark Excavating, Inc. $827,258 ·
Jun 11, 2021 89808 HendersonDistrict 4 HMA removal and rubbilization of the PCC base on Roseville Road from CH 9 to IL 116. — Executed Nov 26 New Brandt Construction Co. $128,910 ·
Jul 30, 2021 68799 PeoriaDistrict 4 Removal and replacement of the existing structure carrying IL Route 8 over BNSF Railway (Existing S.N. 072-0049; Proposed S.N. 072-0248) at Edwards on a realigned IL Route 8. The project length is 0.68 mile. — Executed Nov 26 New White Construction LLC $12,957,193 ·
Jul 30, 2021 68F71 WarrenDistrict 4 Bridge joint replace/repair on Structure No. 094-0016 carrying IL 94/IL 135 over Henderson Creek, approximately 2.0 miles North of Little York in Warren County. — Executed Nov 26 New Civil Constructors, Inc. d/b/a/ Helm Civil $434,766 ·
Jul 30, 2021 68F78 MercerDistrict 4 Bridge joint replace/repair, bridge painting, bridge repair to S.N. 066-0007 carrying Illinois Route 94 over Camp Creek, approximately 5 miles North of Aledo in Mercer County. — Executed Nov 26 New Civil Constructors, Inc. d/b/a/ Helm Civil $429,504 ·
Jul 30, 2021 89784 TazewellDistrict 4 Resurfacing on Parkway Drive from Lick Creek to Willow Street in Pekin. — Executed Nov 26 New R. A. Cullinan and Son, a div of UCM, Inc. $1,195,692 ·
Jul 30, 2021 89786 PeoriaDistrict 4 Construction of sidewalks and ADA ramps on the south side of West Knolls Road from North University Drive to 0.15 mile east of Allen Road in Peoria. — Executed Nov 26 New Illinois Civil Contractors, Inc. $234,082 ·
Jul 30, 2021 89791 KnoxDistrict 4 Resurfacing, patching and ADA ramps on Henderson Road from the County Fairground entrance to Poplar Street in Knoxville. — Executed Nov 26 New Gunther Construction, a div of UCM, Inc. $275,374 ·
Jul 30, 2021 89807 PutnamDistrict 4 Resurfacing, aggregate shoulders, and guardrail on CH 11 from IL 89 to the LaSalle County line. — Executed Nov 26 New Advanced Asphalt Company $753,023 ·
Sep 17, 2021 68D17 WoodfordDistrict 4 Box culvert replacements on US 150 (S.N. 102-1005; S.N. 102-2503 (new)), 0.9 mile East of Mackinaw River and (S.N. 102-1004; S.N. 102-2030 (new)), 0.16 mile East of CR 1825E. — Executed Nov 26 New Phoenix Corporation of the Quad Cities $2,337,434 ·
Sep 17, 2021 68G62 FultonDistrict 4 Intersection improvement with flashing lights and lighting upgrades in Fulton County. — Executed Nov 26 New Illinois Civil Contractors, Inc. $723,553 ·
Sep 17, 2021 68G63 WoodfordDistrict 4 New shoulders along US 150 from County Road 1250E, West of Goodfield to the McLean County Line. — Executed Nov 26 New Rowe Construction, a div of UCM, Inc. $3,018,142 ·
Sep 17, 2021 89795 FultonDistrict 4 Replace the bridge carrying CH 2 over Coal Creek, 4.25 miles south of London Mills. — Executed Nov 26 New Stark Excavating, Inc. $1,359,595 ·
Nov 5, 2021 68E12 FultonDistrict 4 Culvert replacement with slope repair on IL Route 97, 1.0 mile North of Cuba, Fulton County. — Executed Nov 26 New Phoenix Corporation of the Quad Cities $311,555 ·
Nov 5, 2021 68F74 PeoriaDistrict 4 Bridge deck overlay and bridge joint replace/repair on IL 8 structures; S.N. 072-0164 over Nixon Run Creek; S.N. 072-0165 over Warsaw Creek and S.N. 072-0166 over Kickapo Creek Tributary. — Executed Nov 26 New Stark Excavating, Inc. $993,747 ·
Nov 5, 2021 68G57 MarshallWoodfordDistrict 4 Bridge painting at various locations in Marshall and Woodford Counties on Structure Nos.: 062-0085, 062-0049, 062-0053, 062-0054, 062-0055, 102-048, 102-0050 and 102-0051. — Executed Nov 26 New Eagle Painting & Maintenance Company, Inc. $1,487,500 ·
Nov 5, 2021 68G64 TazewellDistrict 4 Remove and replace existing high mast light tower, luminaires and concrete foundation on Riverfront Drive Spur, e ast of W ashinton Street in East Peoria. — Executed Nov 26 New Oberlander Electric Co. $127,380 ·
Nov 5, 2021 89721 TazewellDistrict 4 Replace the bridge carrying Furrow Road over Lost Creek, one half mile east of Pekin. — Executed Nov 26 New Stark Excavating, Inc. $1,138,863 ·
Nov 5, 2021 89727 TazewellDistrict 4 Resurfacing, HMA shoulders, concrete curb, drainage improvements and pavement markings on Broadway Road from Veterans Drive to Springfield Road. — Executed Nov 26 New R. A. Cullinan and Son, a div of UCM, Inc. $4,998,272 ·
Nov 5, 2021 89811 PeoriaDistrict 4 Replace the bridge carrying CH 23R over the west fork of Kickapoo Creek, located southeast of Elmwood. — Executed Nov 26 New Stark Excavating, Inc. $1,996,313 ·
Jan 21, 2022 68755 KnoxDistrict 4 Replace bridge 048-0017 carrying IL 8 over Hickory Creek, 0.7 mile east of IL 97. — Executed Nov 26 New Stark Excavating, Inc. $1,526,949 ·
Jan 21, 2022 68D73 TazewellDistrict 4 Resurfacing on IL-9 from East Chestnut St. in Tremont to just West of the Prairie Creek Bridge (S.N. 090-0061). — Executed Nov 26 New R. A. Cullinan and Son, a div of UCM, Inc. $1,282,674 ·
Jan 21, 2022 68F11 TazewellDistrict 4 This pavement patching and HMA overlay project is located on Interstate 74 from 0.8 miles East of Morton to the Woodford Co. line. Project length is 6.42 miles. — Executed Nov 26 New R. A. Cullinan and Son, a div of UCM, Inc. $11,367,686 ·
201–300 of 878‹ PrevNext ›

Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.