Filtered by: District: District 4 Clear all
| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Jul 31, 2020 | 68F93 | HenryDistrict 4 | Pavement patching on EB I-74 entrance and exit ramps at IL 17 near Woodull in Henry County. | — | Executed | G. M. Sipes Construction, Inc. $106,730 · | ||
| Jul 31, 2020 | 89719 | MercerDistrict 4 | Replace the bridge carrying _CH 16 over Snake Creek, at the western edge of Seaton | — | Executed | Brandt Construction Co. $747,127 · | ||
| Jul 31, 2020 | 89735 | TazewellDistrict 4 | Reconstruct the intersection of Camp Street and River Road in East Peoria. | — | Executed | Otto Baum Company, Inc. $1,295,159 · | ||
| Jul 31, 2020 | 89768 | TazewellDistrict 4 | Construct a shared-use path along North Main Street from Cruger Road to Easy Street in Washington. | — | Executed | Gensini Excavating, Inc. $240,310 · | ||
| Jul 31, 2020 | 89770 | TazewellDistrict 4 | Construction of sidewalks and ADA Ramps at various locations in Pekin. | — | Executed | Otto Baum Company, Inc. $203,635 · | ||
| Sep 18, 2020 | 68741 | PutnamDistrict 4 | Superstructure replacement on S This project is 550 feet long and consists of superstructure replacement on S.N. 078-0032, which carries IL Route 71 over Coffee Creek, 5.1 miles west of IL Route 89 in Putnam County. | — | Executed | D. Construction, Inc. $962,942 · | ||
| Sep 18, 2020 | 68F57 | VariousDistrict 4 | Upgrade guardrail terminal end sections, Texas Turndowns, along various routes throughout the district in various counties. | — | Executed | COLLINS & HERMANN, INC. $1,165,296 · | ||
| Nov 6, 2020 | 68897 | StarkDistrict 4 | Replacement of structure carrying IL 78 over Walnut Creek (S.N. 088-0012 existing, S.N. 088-2503 proposed) 0.8 miles North of West Jersey in Stark County. | — | Executed | Stark Excavating, Inc. $1,632,505 · | ||
| Nov 6, 2020 | 68D95 | WarrenDistrict 4 | Replacement of Structure Nos. 094-0025 (New S.N. 094-0053) and 094-0026 (New Structure No. 094-0054) carrying US 34/1 L 110 over 120 Street (TR 162) in Warren County. | — | Executed | White Construction LLC $5,194,500 · | ||
| Nov 6, 2020 | 68E60 | PeoriaDistrict 4 | Building Demo at 1229 Kickapoo Creek Road in Peoria. | — | Executed | Illinois Civil Contractors, Inc. $45,885 · | ||
| Nov 6, 2020 | 68F98 | TazewellWoodfordDistrict 4 | Culvert lining at various locations along US 24 in Tazewell and Woodford Counties. | — | Executed | Phoenix Corporation of the Quad Cities $217,465 · | ||
| Nov 6, 2020 | 68G04 | VariousDistrict 4 | Replacement of existing CCTV cameras with high definition CCTV cameras at various locations in District Four. | — | Executed | H & H Electric Co. $258,043 · | ||
| Nov 6, 2020 | 68G05 | PeoriaTazewellDistrict 4 | Replacement of existing video detection systems at various locations in Peoria various locations in Peoria and Tazewell Counties in District Four. | — | Executed | Oberlander Electric Co. $406,250 · | ||
| Nov 6, 2020 | 89745 | PeoriaDistrict 4 | Replace the bridge carrying CH 29D over Jubilee Creek, 2.7 miles east of Brimfield | — | Executed | Stark Excavating, Inc. $1,296,220 · | ||
| Nov 6, 2020 | 89754 | WoodfordDistrict 4 | Remove and replace guardrail and terminals at various locations in Woodford County. | — | Executed | Midwest Fence Corporation $625,958 · | ||
| Nov 6, 2020 | 89766 | PeoriaDistrict 4 | Reconstruction of Western Ave, from Adams Street to Lincoln Avenue and a portion of IL 8, from Lincoln Avenue to Howett St in Peoria. | — | Executed | R. A. Cullinan and Son, a div of UCM, Inc. $12,585,868 · | ||
| Nov 6, 2020 | 89769 | TazewellDistrict 4 | Sidewalk construction algon the north side of Bobolink Drive, from Elgin Street to Eagle Avenue, and along the east side of Eagle Avenue from Bobolink Drive to the north entrance to Central Intermediate School in Washington. | — | Executed | Stark Excavating, Inc. $207,461 · | ||
| Jan 15, 2021 | 68F54 | TazewellDistrict 4 | Bridge painting, bridge deck scarification and overlay, joint replacement, bearing replacement, slopewall repa This project is 5.5 miles long and the structure repair work consists of bridge painting, bridge deck scarification and overlay, joint replacement, bearing replacement, slopewall repair, substructure repair, and other related work on various structures on 1-74 from 0.8 miles east of Morton Ave. to the Woodford County line. | — | Executed | Stark Excavating, Inc. $4,871,748 · | ||
| Jan 15, 2021 | 68F63 | MarshallMasonTazewellDistrict 4 | Bridge washing of eight (8) bridges over the Illinois River in Marshall, Tazewell and Mason counties. | — | Executed | Interstate Maintenance, Incorporated $239,996 · | ||
| Jan 15, 2021 | 68F97 | PeoriaDistrict 4 | Landscaping along 1-74 from Ellis Street in Peoria to the Illinois River in Peoria County. | — | Executed | JIMAX Landscape LLC $225,732 · | ||
| Jan 15, 2021 | 68F99 | KnoxDistrict 4 | Replace two steel girders on Bridge S.N. 048-0065 carrying Farnham Street over US Route 34, just west of the 1-74 interchange in Galesburg for a total length of 0.11 mile. | — | Executed | White Construction LLC $206,222 · | ||
| Jan 15, 2021 | 68G07 | FultonPeoriaWarrenDistrict 4 | Tree removal and other collateral work located along US 24 at Copperas Creek near Banner in Fulton County, alo This project consists of tree removal and other collateral work located along US 24 at Copperas Creek near Banner in Fulton County, along US 67 north of Monmouth in Warren County, and along IL 40 between Northmoor Road and Mt. Hawley in Peoria County. | — | Executed | Homer Tree Service, Inc. $146,325 · | ||
| Jan 15, 2021 | 68G08 | VariousDistrict 4 | District-wide weed spraying (off road) in various counties on various routes. | — | Rejected | The Daltons Inc. $111,920 · | ||
| Jan 15, 2021 | 89720 | TazewellDistrict 4 | Replace the bridge carrying CH 14 over Dry Creek, 2.3 miles east of Green Valley. | — | Executed | Illinois Civil Contractors, Inc. $559,587 · | ||
| Jan 15, 2021 | 89759 | McDonoughDistrict 4 | Replace the bridge carrying CH 5 over the North Fork of Lamoine River, 4.3 miles east of IL 110/US 67. | — | Executed | Brandt Construction Co. $725,982 · | ||
| Mar 5, 2021 | 68636 | WarrenDistrict 4 | Widening and resurfacing on US Route 67 from just west of Tom's Creek on US 67/IL 135 to just south of 270th Avenue/CH 3 in Warren County. Net length= 4.5 miles. | — | Executed | McCarthy Improvement Company $11,758,158 · | ||
| Mar 5, 2021 | 68F12 | PeoriaDistrict 4 | Overlay on IL 29 (Fourth Street) from Senachwine Creek to Truitt Avenue in Chillicothe with ADA ramp construction. Length =0.94 mile. | — | Executed | Advanced Asphalt Company $1,042,379 · | ||
| Mar 5, 2021 | 68F67 | HendersonDistrict 4 | 0.15 mile, Bridge Preservation, Bridge deck overlay and bridge joint replace/repair at Structure No. 036-0042 carrying IL Route 94 over Fall Creek, 4.3 miles north of IL Route 164. | — | Executed | Brandt Construction Co. $506,959 · | ||
| Mar 5, 2021 | 68F69 | TazewellDistrict 4 | 0.89 mile, resurfacing of Main Street (IL 1 16/US 150) from North of 1-74 to South Highview Road in East Peoria, Tazewell County. | — | Executed | R. A. Cullinan and Son, a div of UCM, Inc. $1,449,784 · | ||
| Mar 5, 2021 | 68F96 | VariousDistrict 4 | Guardrail repairs caused by motorists (MCHD) and cable guardrail repairs (high- tension cable barrier) at various location in District Four. | — | Executed | Northern Contracting, Inc. $656,698 · | ||
| Mar 5, 2021 | 68G02 | VariousDistrict 4 | Bridge painting at various locations in various counties. | — | Executed | Civil Coatings and Construction Inc. $1,394,916 · | ||
| Mar 5, 2021 | 68G06 | VariousDistrict 4 | Installation of dilemma zone detection and LED lighting at various signalized intersections in District Four. | — | Executed | Oberlander Electric Co. $404,469 · | ||
| Mar 5, 2021 | 89475 | KnoxDistrict 4 | Replace the bridge carrying CH 8 over Brush Creek, 5 miles east of Abingdon. | — | Executed | Curnyn Construction Co. $1,168,725 · | ||
| Mar 5, 2021 | 89765 | FultonDistrict 4 | Processing modified soil, HMA resurfacing, aggregate shoulders, box culvert extension, and the construction of a box culvert, located on CH2 from CH 14 to Airport Road. | — | Executed | Gunther Construction, a div of UCM, Inc. $2,983,349 · | ||
| Mar 5, 2021 | 89788 | McDonoughDistrict 4 | Resurface CH 24 from CH 19 to CH 8. | — | Executed | Gunther Construction, a div of UCM, Inc. $1,083,880 · | ||
| Apr 23, 2021 | 68F68 | VariousDistrict 4 | Bridge deck sealing at various structures throughout District Four. | — | Executed | All States Painting, Inc. $189,900 · | ||
| Apr 23, 2021 | 68F76 | VariousDistrict 4 | Crack and joint sealing at various locations in Knox, Peoria, and Tazewell Counties. | — | Executed | Denler, Inc. $500,279 · | ||
| Apr 23, 2021 | 68F95 | VariousDistrict 4 | Pavement markings on various routes in various counties throughout District Four. | — | Executed | Varsity Striping & Construction Co. $300,626 · | ||
| Apr 23, 2021 | 68G09 | MarshallDistrict 4 | Rout and seal along Interstate 39 from 2 mile south of IL Route 17 to LaSalle County line and IL Route 18 from IL Route 29 in Henry to the Illinois River. | — | Executed | Freehill Asphalt, Inc. $239,675 · | ||
| Apr 23, 2021 | 68G18 | PeoriaDistrict 4 | Longitudinal joint repair and partial depth patching along US 150 (War Memorial Drive) from West of Brandywine Drive to IL 29 (Adams St) in Peoria. | — | Executed | R. A. Cullinan and Son, a div of UCM, Inc. $515,084 · | ||
| Apr 23, 2021 | 68G19 | VariousDistrict 4 | Installation of new traffic signal cabinets, traffic signal controllers, communications equipment, and video detection systems at various locations in District Four. | — | Executed | Laser Electric, Inc. $434,861 · | ||
| Apr 23, 2021 | 68G20 | MarshallMcLeanWoodfordDistrict 4 | Installation of communications duct, communications vaults, and fiber optic cable along Interstate 39 from the Interstate 55 interchange to Illinois Route 17 in District Four. | — | Executed | Gerstner Electric, Inc. $1,837,876 · | ||
| Apr 23, 2021 | 68G21 | PeoriaTazewellDistrict 4 | Installation of new traffic signal cabinets, traffic signal controllers, communications equipment, and video detection systems at various locations in District Four. | — | Executed | Laser Electric, Inc. $482,887 · | ||
| Apr 23, 2021 | 68G22 | WoodfordDistrict 4 | Removal of existing high mast towers and installation of new lighting system at Interstate 39 at the Minonk interchange and replacement of light towers at Interstate 74 Mackinaw Dells rest areas. | — | Executed | Laser Electric, Inc. $279,781 · | ||
| Apr 23, 2021 | 68G23 | TazewellDistrict 4 | Installation of overhead light poles, luminaires, flashing beacons, signs, pavement markings, rumble strips on IL Route 9 in Woodford County. | — | Executed | Laser Electric, Inc. $122,483 · | ||
| Apr 23, 2021 | 68G24 | VariousDistrict 4 | Electrical maintenance contract (maintenance and repair 04 traffic signals, overhead lighting, and ITS facilities). | — | Executed | Laser Electric, Inc. $649,929 · | ||
| Apr 23, 2021 | 89723 | PeoriaDistrict 4 | Construction of Rock Island Trail Extension within the City of Peoria, along Park Avenue, from NE Perry Avenue to the old railroad crossing, and along the former Peoria and Peoria Heights railroad bed from Park Avenue to Harvard Avenue, including rehabilitation of the abandoned railroad bridge over War Memorial Drive. | — | Executed | Illinois Civil Contractors, Inc. $1,793,566 · | ||
| Apr 23, 2021 | 89777 | FultonDistrict 4 | Replace the culvert carrying CH 15 over an unnamed tributary located 0.4 mile west of CH 38. | — | Executed | Phoenix Corporation of the Quad Cities $125,253 · | ||
| Apr 23, 2021 | 89783 | MercerDistrict 4 | Full Depth Reclamation, bituminous surface treatment, aggregate shoulders and guardrail replacement on CH 9 from the north village limits of Joy to 110th Street. | — | Executed | Brandt Construction Co. $882,001 · | ||
| Apr 23, 2021 | 89799 | FultonDistrict 4 | Remove and replace guardrail at various locations in Fulton County. | — | Rejected | Midwest Fence Corporation $872,639 · | ||
| Jun 11, 2021 | 46569 | VariousDistrict 4 | Removing damaged raised reflective pavement markers and perplacing them with new raised reflective pavement markers within the limits shown in the plans. | — | Executed | P & P Construction Co. $395,933 · | ||
| Jun 11, 2021 | 46570 | VariousDistrict 4 | Placing epoxy and modified urethane pavement marking lines, letters and symbols, and the removal of existing pavement markings within the limits specified on each individual work order. | — | Executed | ROADSAFE TRAFFIC SYSTEMS, INC. $1,481,081 · | ||
| Jun 11, 2021 | 46926 | PeoriaDistrict 4 | Removal of the three 36-inch diameter culverts and replacing them witha 54-inch diameter culvert, and other drainage and signage work at Jubilee College State Park in Peoria County. | — | Executed | Stark Excavating, Inc. $272,935 · | ||
| Jun 11, 2021 | 46929 | McDonoughDistrict 4 | The slope failure repairs and pavement repairs of Argyle Park road and parking area, pavement markings, and al These proposed improvements consist of the slope failure repairs and pavement repairs of Argyle Park road and parking area, pavement markings, and all other necessary work to complete the project within the Argyle Lake State Park in McDonough County. net length 280' (0.053 mi.). | — | Executed | Brandt Construction Co. $531,591 · | ||
| Jun 11, 2021 | 68503 | HendersonDistrict 4 | Carman Road from 0.5 mile North of 750N to IL Route 96 and IL Route 96 from East of Carman Road to West of Benton Street in Lomax. 5. 75 miles of resurfacing and other collateral work in Henderson County. | — | Executed | Gunther Construction, a div of UCM, Inc. $4,479,557 · | ||
| Jun 11, 2021 | 68C45 | PeoriaDistrict 4 | Resurfacing and bridge deck overlays and repairs to various structures on Interstate 474 from Interstate 474 to the Illinois River in Peoria County. | — | Executed | Advanced Asphalt Company $20,960,049 · | ||
| Jun 11, 2021 | 68C58 | PeoriaDistrict 4 | Superstructure replacement to S.N. 072-0076 carrying Maher Road over 1-74 (S.N. 072-0076) near Brimfield in Peoria County. | — | Executed | Stark Excavating, Inc. $3,514,647 · | ||
| Jun 11, 2021 | 68D34 | FultonDistrict 4 | Replacement of existing S.N. 029-0001 carrying US 24/IL 9 over Copperas Creek, and associated roadway work. at the east end of Banner. | — | Executed | Stark Excavating, Inc. $9,110,397 · | ||
| Jun 11, 2021 | 68E48 | PeoriaDistrict 4 | Crossover construction to maintain traffic, superstructure replacement, and other minor substructure repairs o This project is approximately 0.6 mile in length and consist of crossover construction to maintain traffic, superstructure replacement, and other minor substructure repairs on S.N. 072-0008, located 1.0 mile West of Mapleton in Peoria County. | — | Executed | Otto Baum Company, Inc. $1,675,118 · | ||
| Jun 11, 2021 | 68E52 | PeoriaDistrict 4 | Bridge Rehabilitation to six (6) structures at the I-74/I-474/IL 6 interchange in Peoria. | — | Executed | Stark Excavating, Inc. $4,067,495 · | ||
| Jun 11, 2021 | 68E82 | PeoriaDistrict 4 | 0.17 mile. Sidewalk replacement, railing repairs, and miscellaneous drainage improvements along US Route 150 (War Memorial Drive) from Grand Avenue to Harvard Avenue in Peoria. | — | Executed | Otto Baum Company, Inc. $208,725 · | ||
| Jun 11, 2021 | 68G01 | WarrenDistrict 4 | Patching and pavement repairs to US Route 67 from North of the Roseville Bypass to Roseville South of the Roseville Bypass. | — | Executed | Gunther Construction, a div of UCM, Inc. $557,276 · | ||
| Jun 11, 2021 | 68G03 | PeoriaDistrict 4 | Bridge deck waterproofing and deck overlay to Structure No. 072-0134 carrying US 24 over Kickapoo Creek near Bartonville in Peoria County. | — | Executed | R. A. Cullinan and Son, a div of UCM, Inc. $406,194 · | ||
| Jun 11, 2021 | 68G12 | VariousDistrict 4 | Distressed tree removal at various locations within District Four. | — | Rejected | Homer Tree Service, Inc. $262,247 · | ||
| Jun 11, 2021 | 68G13 | PeoriaDistrict 4 | This project is approximately 0.06 mile in length, consisting of slope repair and drainage improvements along IL Route 40, between North Mt. Hawley Road and Northmoor Road in Peoria. | — | Executed | Phoenix Corporation of the Quad Cities $437,836 · | ||
| Jun 11, 2021 | 68G14 | FultonDistrict 4 | Pavement patching on IL 9 from Big Creek to Avenue A in Canton. | — | Executed | R. A. Cullinan and Son, a div of UCM, Inc. $456,015 · | ||
| Jun 11, 2021 | 68G15 | PeoriaDistrict 4 | Slope stabilization and landscaping along WB Interstate 74 between Ellis Street and North Street in Peoria County. | — | Executed | Central Landscaping, LP $245,433 · | ||
| Jun 11, 2021 | 68G16 | McDonoughDistrict 4 | Resurfacing on US Route 67, North of Industry from 2.2 miles South of US Route 136 to Grindstone Creek in McDonough County. | — | Executed | Gunther Construction, a div of UCM, Inc. $2,984,173 · | ||
| Jun 11, 2021 | 68G17 | MarshallWoodfordDistrict 4 | Class A and B patching on 1-39 from 1 mile North of IL Route 116 to 2 miles South of IL Route 17 and ramps at the Minonk Interchange. | — | Executed | Kinney Contractors, Inc. $377,733 · | ||
| Jun 11, 2021 | 68G25 | TazewellWoodfordDistrict 4 | Patching on IL Route 116 from IL Route 26 to East of Lourdes Road in Germantown Hills. | — | Executed | Kinney Contractors, Inc. $615,751 · | ||
| Jun 11, 2021 | 68G26 | TazewellDistrict 4 | Patching on US 24/US 150 from the East end of the McClugage Bridge to East of Hollands Grove Road in Tazewell County. | — | Executed | R. A. Cullinan and Son, a div of UCM, Inc. $671,702 · | ||
| Jun 11, 2021 | 68G54 | PeoriaDistrict 4 | Traffic signal mast arm replacement at various locations throughout Peoria County. | — | Executed | Oberlander Electric Co. $565,500 · | ||
| Jun 11, 2021 | 68G55 | KnoxDistrict 4 | 1.2 miles of patching on US 150 (Henderson Street) from Home Boulevard to West North Street in Galesburg in Knox County. | — | Executed | G. M. Sipes Construction, Inc. $72,146 · | ||
| Jun 11, 2021 | 68G56 | TazewellDistrict 4 | Highway lighting improvements along WB I-74 between I-474 and I-155 and US 24/BUS 24 interchange near Washington in Tazewell County. | — | Executed | Bodine Electric of Decatur $218,685 · | ||
| Jun 11, 2021 | 89681 | TazewellDistrict 4 | Realignment, pavement reconstruction, culvert extensions, culverts and pavement markings on Allentown Road from 1000 feet east of Court Street and extending 1,000 feet into the city of Pekin. | — | Executed | Otto Baum Company, Inc. $617,543 · | ||
| Jun 11, 2021 | 89725 | TazewellDistrict 4 | Construction of a PCC multi-use path and drainage items along Centennial Drive from Spring Creek Road to IL 8 in Washington. | — | Rejected | Knapp Concrete Contractors, Inc. $388,163 · | ||
| Jun 11, 2021 | 89785 | PeoriaDistrict 4 | Sidewalk construction on Allen Road from 0.6 mile north of Wilhelm Rd. to Whilhelm Rd. and on Orange Prairie Road from Landens Way to War Memorial Drive in Peoria | — | Executed | Otto Baum Company, Inc. $109,223 · | ||
| Jun 11, 2021 | 89801 | PeoriaDistrict 4 | Rehabilitate the bridge carrying Truitt Road over Hollow Creek. Remove and replace superstructure, backwalls at the abutments and repair piers. | — | Executed | Stark Excavating, Inc. $827,258 · | ||
| Jun 11, 2021 | 89808 | HendersonDistrict 4 | HMA removal and rubbilization of the PCC base on Roseville Road from CH 9 to IL 116. | — | Executed | Brandt Construction Co. $128,910 · | ||
| Jul 30, 2021 | 68799 | PeoriaDistrict 4 | Removal and replacement of the existing structure carrying IL Route 8 over BNSF Railway (Existing S.N. 072-0049; Proposed S.N. 072-0248) at Edwards on a realigned IL Route 8. The project length is 0.68 mile. | — | Executed | White Construction LLC $12,957,193 · | ||
| Jul 30, 2021 | 68F71 | WarrenDistrict 4 | Bridge joint replace/repair on Structure No. 094-0016 carrying IL 94/IL 135 over Henderson Creek, approximately 2.0 miles North of Little York in Warren County. | — | Executed | Civil Constructors, Inc. d/b/a/ Helm Civil $434,766 · | ||
| Jul 30, 2021 | 68F78 | MercerDistrict 4 | Bridge joint replace/repair, bridge painting, bridge repair to S.N. 066-0007 carrying Illinois Route 94 over Camp Creek, approximately 5 miles North of Aledo in Mercer County. | — | Executed | Civil Constructors, Inc. d/b/a/ Helm Civil $429,504 · | ||
| Jul 30, 2021 | 89784 | TazewellDistrict 4 | Resurfacing on Parkway Drive from Lick Creek to Willow Street in Pekin. | — | Executed | R. A. Cullinan and Son, a div of UCM, Inc. $1,195,692 · | ||
| Jul 30, 2021 | 89786 | PeoriaDistrict 4 | Construction of sidewalks and ADA ramps on the south side of West Knolls Road from North University Drive to 0.15 mile east of Allen Road in Peoria. | — | Executed | Illinois Civil Contractors, Inc. $234,082 · | ||
| Jul 30, 2021 | 89791 | KnoxDistrict 4 | Resurfacing, patching and ADA ramps on Henderson Road from the County Fairground entrance to Poplar Street in Knoxville. | — | Executed | Gunther Construction, a div of UCM, Inc. $275,374 · | ||
| Jul 30, 2021 | 89807 | PutnamDistrict 4 | Resurfacing, aggregate shoulders, and guardrail on CH 11 from IL 89 to the LaSalle County line. | — | Executed | Advanced Asphalt Company $753,023 · | ||
| Sep 17, 2021 | 68D17 | WoodfordDistrict 4 | Box culvert replacements on US 150 (S.N. 102-1005; S.N. 102-2503 (new)), 0.9 mile East of Mackinaw River and (S.N. 102-1004; S.N. 102-2030 (new)), 0.16 mile East of CR 1825E. | — | Executed | Phoenix Corporation of the Quad Cities $2,337,434 · | ||
| Sep 17, 2021 | 68G62 | FultonDistrict 4 | Intersection improvement with flashing lights and lighting upgrades in Fulton County. | — | Executed | Illinois Civil Contractors, Inc. $723,553 · | ||
| Sep 17, 2021 | 68G63 | WoodfordDistrict 4 | New shoulders along US 150 from County Road 1250E, West of Goodfield to the McLean County Line. | — | Executed | Rowe Construction, a div of UCM, Inc. $3,018,142 · | ||
| Sep 17, 2021 | 89795 | FultonDistrict 4 | Replace the bridge carrying CH 2 over Coal Creek, 4.25 miles south of London Mills. | — | Executed | Stark Excavating, Inc. $1,359,595 · | ||
| Nov 5, 2021 | 68E12 | FultonDistrict 4 | Culvert replacement with slope repair on IL Route 97, 1.0 mile North of Cuba, Fulton County. | — | Executed | Phoenix Corporation of the Quad Cities $311,555 · | ||
| Nov 5, 2021 | 68F74 | PeoriaDistrict 4 | Bridge deck overlay and bridge joint replace/repair on IL 8 structures; S.N. 072-0164 over Nixon Run Creek; S.N. 072-0165 over Warsaw Creek and S.N. 072-0166 over Kickapo Creek Tributary. | — | Executed | Stark Excavating, Inc. $993,747 · | ||
| Nov 5, 2021 | 68G57 | MarshallWoodfordDistrict 4 | Bridge painting at various locations in Marshall and Woodford Counties on Structure Nos.: 062-0085, 062-0049, 062-0053, 062-0054, 062-0055, 102-048, 102-0050 and 102-0051. | — | Executed | Eagle Painting & Maintenance Company, Inc. $1,487,500 · | ||
| Nov 5, 2021 | 68G64 | TazewellDistrict 4 | Remove and replace existing high mast light tower, luminaires and concrete foundation on Riverfront Drive Spur, e ast of W ashinton Street in East Peoria. | — | Executed | Oberlander Electric Co. $127,380 · | ||
| Nov 5, 2021 | 89721 | TazewellDistrict 4 | Replace the bridge carrying Furrow Road over Lost Creek, one half mile east of Pekin. | — | Executed | Stark Excavating, Inc. $1,138,863 · | ||
| Nov 5, 2021 | 89727 | TazewellDistrict 4 | Resurfacing, HMA shoulders, concrete curb, drainage improvements and pavement markings on Broadway Road from Veterans Drive to Springfield Road. | — | Executed | R. A. Cullinan and Son, a div of UCM, Inc. $4,998,272 · | ||
| Nov 5, 2021 | 89811 | PeoriaDistrict 4 | Replace the bridge carrying CH 23R over the west fork of Kickapoo Creek, located southeast of Elmwood. | — | Executed | Stark Excavating, Inc. $1,996,313 · | ||
| Jan 21, 2022 | 68755 | KnoxDistrict 4 | Replace bridge 048-0017 carrying IL 8 over Hickory Creek, 0.7 mile east of IL 97. | — | Executed | Stark Excavating, Inc. $1,526,949 · | ||
| Jan 21, 2022 | 68D73 | TazewellDistrict 4 | Resurfacing on IL-9 from East Chestnut St. in Tremont to just West of the Prairie Creek Bridge (S.N. 090-0061). | — | Executed | R. A. Cullinan and Son, a div of UCM, Inc. $1,282,674 · | ||
| Jan 21, 2022 | 68F11 | TazewellDistrict 4 | This pavement patching and HMA overlay project is located on Interstate 74 from 0.8 miles East of Morton to the Woodford Co. line. Project length is 6.42 miles. | — | Executed | R. A. Cullinan and Son, a div of UCM, Inc. $11,367,686 · |
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.