Filtered by: County: Cook Clear all
| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Mar 5, 2021 | 62L54 | CookDistrict 1 | (0.7-Mile) Standard overlay with ADA improvements on Ashland Avenue from just south of Marketplace Access Road to Cermak Road, in the City of Chicago. | — | Executed | Bigane Paving Company $762,654 · | ||
| Mar 5, 2021 | 62L57 | CookDistrict 1 | (3.1-Mile) Smart Overlay improvements, ADA improvements along IL 43 (Harlem Avenue) from .IL 64 (North Avenue) to IL 19 (Irving Park Road) in the City of Chicago and Villages of Elmwood Park, Oak Park and River Forest Cook County. | — | Executed | Bigane Paving Company $2,581,721 · | ||
| Mar 5, 2021 | 62L59 | CookDistrict 1 | (1.52-Mile) SMART Overlay, ADA improvements. Location: Busse Road, from 534-ft south of IL-72 (Higgins Road) to 86 feet south of IL-58 (Golf Road) in the Villages of Elk Grove and Mount Prospect, in Elk Grove Township in Cook County. | — | Executed | Builders Paving, LLC $1,398,000 · | ||
| Mar 5, 2021 | 62L60 | CookDistrict 1 | Smart Overlay Improvement in the City of Chicago in West Chicago Townships This improvement on Washington Blvd. from IL-50 (Cicero Ave.) to Hamlin Ave. consists of Smart Overlay Improvement in the City of Chicago in West Chicago Townships. | — | Executed | Bigane Paving Company $766,871 · | ||
| Mar 5, 2021 | 62L73 | CookDistrict 1 | (3.05-Mile) Standard overlay and pedestrian ramp ADA improvements on IL 64 from IL 43 (Harlem Ave.) to IL 50 (Cicero Ave) within the Village of Oak Park and City of Chicago. | — | Executed | Arrow Road Construction Co. $4,285,543 · | ||
| Mar 5, 2021 | 62L86 | CookDistrict 1 | (5.36-Mile) Smart overlay and ADA improvements project on Pulaski Rd from IL 64 (North Ave.) to Devon Ave. within the City of Chicago in Cook County. | — | Executed | Bigane Paving Company $4,394,460 · | ||
| Mar 5, 2021 | 62L93 | CookDistrict 1 | (5.1-Mile) SMART overlay and ADA improvements on Arlington Heights Road from Palatine Road to IL 72 (Higgins Road) within the City of Arlington Heights. | — | Executed | Builders Paving, LLC $4,780,000 · | ||
| Mar 5, 2021 | 62L94 | CookDistrict 1 | (1.80-Mile) SMART Overlay and ADA Improvements on Montrose Ave. between Central Ave. and Pulaski Road and is located within the City of Chicago. | — | Executed | Bigane Paving Company $1,172,657 · | ||
| Mar 5, 2021 | 62L95 | CookDistrict 1 | (2.5-Mile) SMART overlay and ADA improvements on Cermak Road from Kedzie Avenue to Halsted Street in the City of Chicago. | — | Executed | Bigane Paving Company $1,397,407 · | ||
| Mar 5, 2021 | 62M08 | CookDistrict 1 | (2.8-Mile) SMART overlay, detector loop replacement and ADA improvements on US 30 (Lincoln Highway) from IL 43 (Harlem Avenue) to IL 50 (Cicero Avenue) within the Village of Matteson. | — | Executed | D. Construction, Inc. $2,036,371 · | ||
| Mar 5, 2021 | 62M12 | CookDistrict 1 | (2.7-Mile) SMART overlay and ADA improvements on 87th Street from Keeler Avenue to Damen Street in the Village of Evergreen Park, and the Cities of Chicago and Hometown. | — | Executed | MAT Construction Leasing, Inc. $1,983,305 · | ||
| Mar 5, 2021 | 62M14 | CookDistrict 1 | (1.08-Mile) SMART Overlay, ADA Improvements; Location: FAP 358: Torrence Ave from Grand Calumet River to Harding Ave in the Villages of Burnham and Calumet City. | — | Executed | K-Five Construction Corporation $970,850 · | ||
| Mar 5, 2021 | 62M18 | CookDistrict 1 | (1.5-Mile) SMART resurfacing and ADA improvements on Ballard Road from Rand Road to Greenwood in the City of Des Plaines, City of Park Ridge, Village of Niles and unincorporated Maine Township. | — | Executed | Arrow Road Construction Co. $871,373 · | ||
| Mar 5, 2021 | 62M29 | CookDistrict 1 | Bridge deck overlay, joint repairs, bearing replacement and concrete repairs on SN 016-0456 and 016-1041 carrying IL 394 over CN and NS Railroads, south of US 30. | — | Executed | D. Construction, Inc. $1,577,079 · | ||
| Mar 5, 2021 | 62M87 | CookDistrict 1 | Trombone Mast Arm Replacement at various locations in District One. | — | Executed | Thorne Electric, Inc. $914,786 · | ||
| Mar 5, 2021 | 62M94 | CookDistrict 1 | Building demolition located along Rand Road near the bridge over the Des Plaines River This work consists of building demolition located along Rand Road near the bridge over the Des Plaines River. This project has a gross length of 349 LF. | — | Executed | Martam Construction Incorporated $173,405 · | ||
| Mar 5, 2021 | 62N03 | CookDistrict 1 | Bridge deck repairs and expansion joint repairs (575-Ft.) The improvement on Des Plaines Ave. bridge and Ridgeland Ave. bridge over 1-290 consists of bridge deck repairs and expansion joint repairs. Located in the Villages of Oak Park and Forest Park in Cook County, IL. | — | Executed | Herlihy Mid-Continent Company $381,292 · | ||
| Mar 5, 2021 | 62N09 | CookDistrict 1 | Cleaning and painting the steel surfaces of bridge structures carrying Sauk Trail over 1-57 in the Village of Richton Park, Rich Township. | — | Executed | Eagle Painting & Maintenance Company, Inc. $489,433 · | ||
| Mar 5, 2021 | 62N12 | CookDistrict 1 | Cleaning and painting the steel surfaces at CTA bridge structure over 1-90/94 S This improvement consists of cleaning and painting the steel surfaces at CTA bridge structure over 1-90/94 S. of 55th Street, in the City of Chicago, Lake Township. | — | Executed | Capital Industrial Services $2,533,300 · | ||
| Apr 23, 2021 | 60T06 | CookDistrict 1 | Replace bridge structure carrying northbound IL Route 43 over the Metropolitan Water Reclamation District of Greater Chicago Railroad in the Village of Lyons. SN 016-0314 , Replace bridge structure carrying northbound IL Route 43 over the Metropolitan Water Reclamation District of Greater Chicago Railroad in the Village of Lyons. SN 016-0314 | — | Executed | ICC Group Inc. $5,307,000 · | ||
| Apr 23, 2021 | 60T17 | CookDistrict 1 | Intersection Reconstruction (traffic signal installation), ADA Improvements at the intersection of FAU 2710: Des Plaines River Road and Robinson. Location: Village of Franklin Park in Cook County. | — | Executed | Plote Construction, Inc. $1,311,636 · | ||
| Apr 23, 2021 | 60X72 | CookDistrict 1 | The construction of a parking lot, storm sewer removal and replacement of existing frame and lid with bolted f The improvement consists of the construction of a parking lot, storm sewer removal and replacement of existing frame and lid with bolted frame and ltd. The work is located on IL 64 (North Ave.) at pump station #12 in Melrose Park. | — | Executed | Martam Construction Incorporated $361,804 · | ||
| Apr 23, 2021 | 61G09 | CookDistrict 1 | Resurfacing Park Boulevard from Irving Park Road to Schaumburg Road in Streamwood. | — | Executed | A Lamp Concrete Contractors, Inc. $1,304,037 · | ||
| Apr 23, 2021 | 61G99 | CookDistrict 1 | Concrete Sidewalk, curb and gutter replacement, tree removal, and landscaping on US 30 from Orchard Drive to the east village limits on Rockwell Street in Park Forest. | — | Executed | Copenhaver Construction, Inc. $243,209 · | ||
| Apr 23, 2021 | 61H01 | CookDistrict 1 | Resurfacing, HMA pavement patching, curb and gutter repairs on Old Willow Road from South Wolf Road to US 45 in Prospect Heights. | — | Executed | Arrow Road Construction Co. $510,388 · | ||
| Apr 23, 2021 | 61H06 | CookDistrict 1 | Streetscape improvements on St. Charles Road from Mannheim Road to 25th Avenue in Bellwood. | — | Executed | Landmark Contractors, Inc. $964,551 · | ||
| Apr 23, 2021 | 61H08 | CookDistrict 1 | Resurfcing, curb and gutter, sidewalk replacement, detector loops and pavement markings on Kensington Road from Dryden Place to Regency Drive West in Arlington Heights. | — | Executed | Arrow Road Construction Co. $1,282,651 · | ||
| Apr 23, 2021 | 61H09 | CookDistrict 1 | Resurfacing Salem Drive from the village limits to Bode Road, Jones Road from Highland Boulevard to Hassel Road, and Hassell Road from Rosedale to Jones Road in Hoffman Estates. | — | Executed | Schroeder Asphalt Services, Inc. $651,585 · | ||
| Apr 23, 2021 | 62633 | CookDistrict 1 | (4,391-Ft) Intersection improvement including channelization, traffic signal modernization and resurfacing of IL 58 at Niles Center Rd. and at US 41 (Skokie Blvd.) in the Village of Skokie. | — | Executed | Alliance Contractors, Inc. $4,496,491 · | ||
| Apr 23, 2021 | 62K80 | CookWillDistrict 1 | Demolition and reconstruction of the existing bridge deck and concrete approaches, resurfacing to meet the bridge approaches, reconstruction and expansion of outside shoulders, removal and replacement of existing guar guardrail, and various drainage and grading improvements. | — | Executed | D. Construction, Inc. $2,056,069 · | ||
| Apr 23, 2021 | 62L52 | CookDistrict 1 | (1.762-Mile) Cleaning and sealing longitudinal joints in the existing HMA pavement between traffic lanes and curb and gutter, restriping pavement marking in the City of Chicago, Lake and North Chicago Townships. | — | Executed | SKC Construction, Inc. $183,344 · | ||
| Apr 23, 2021 | 62L89 | CookDistrict 1 | (1.73-Mile) SMART overlay (resurfacing) and ADA improvement project on Dempster St. from east of Skokie Blvd. to McCormick Ave. within the Village of Skokie in Cook County. | — | Executed | Builders Paving, LLC $2,092,030 · | ||
| Apr 23, 2021 | 62M04 | CookDistrict 1 | (3.553-Mile) Crack and Joint Sealing pavement preservation project. Includes renewal of pavement markings. Location: FAP 344: IL 83 from S. of Weiland Rd to Palatine Rd in the City of Prospect Heights and the Village | — | Executed | SKC Construction, Inc. $179,385 · | ||
| Apr 23, 2021 | 62M13 | CookDistrict 1 | SMART Overlay, ADA Improvements: HMA removal and replacement (single pass), pavement patching, pavement markings. Location: FAU 3520: Gross Point Road from N of Oakton St to Howard St in the Village of Morton Grove and Skokie. | — | Executed | Peter Baker & Son Co. $545,253 · | ||
| Apr 23, 2021 | 62M26 | CookDistrict 1 | Bridge deck overlay and joint repair The improvement of McHenry Road over Wheeling Drainage Ditch consists of bridge deck overlay and joint repair. The improvement is located in the Village of Wheeling in Cook County, IL. | — | Executed | Lorig Construction Company $446,325 · | ||
| Apr 23, 2021 | 62M31 | CookDistrict 1 | This is a bridge repair project that includes bridge deck overlay, partial depth approach reconstruction, joint reconstruction, concrete bridge deck repair, full depth bridge deck repair. Located: IL Route 7 at 86th Ave. within within the Village of Palos Park. | — | Executed | Lorig Construction Company $298,774 · | ||
| Apr 23, 2021 | 62M40 | CookDistrict 1 | Bridge Preservation Project, including bridge deck overlay (scarification and latex concrete overlay), deck repairs, reconstructing transverse joints. Location: Bridge carrying Roosevelt Rd over Des Plaines River, East of IL 171 in the Village of Forest Park in Cook County. | — | Executed | MYS, Incorporated $512,616 · | ||
| Apr 23, 2021 | 62N30 | CookDistrict 1 | A Bridge Substructure Repair in the City of Chicago, and the Village of Skokie and Wilmette in the Townships o (0.102-Mile) Improvement on I-94 at IL 50 (Cicero Ave.), II 58 (Dempster Ave.) and Lake Ave. consist of a Bridge Substructure Repair in the City of Chicago, and the Village of Skokie and Wilmette in the Townships of New Trier, Jefferson and Niles. | — | Executed | Rausch Infrastructure, LLC $830,616 · | ||
| Apr 23, 2021 | 62N92 | CookDuPageDistrict 1 | Litter/Debris removal from edge of pavement to the Pedestrian Barrier on I-55 - Stevenson expressway from IL 4 (150-Mile) Improvement consists of Litter/Debris removal from edge of pavement to the Pedestrian Barrier on I-55 - Stevenson expressway from IL 43 (Harlem Ave.) to I-355. | — | Executed | Western Remac, Inc. $207,720 · | ||
| Jun 11, 2021 | 61G98 | CookDistrict 1 | Installation of a wireless interconnect system and traffic signal modificatons on 143rd St. from Wolf Rd. to LaGrange Rd. in Orland Park. | — | Executed | Hecker and Company, Inc. $192,511 · | ||
| Jun 11, 2021 | 61H11 | CookDistrict 1 | Resurface East Fullerton Ave. from North Worlf Rd. to Geneva Ave. in Northlake. | — | Executed | J. A. Johnson Paving Company $652,256 · | ||
| Jun 11, 2021 | 61H13 | CookDistrict 1 | Construction of a multi-use path and traffic signal modifications along Wolf Road from the Bemis Woods Trial to Ogden Avenue in Western Springs. | — | Executed | Martam Construction Incorporated $377,363 · | ||
| Jun 11, 2021 | 62F39 | CookDistrict 1 | Drainage Improvement (reinstating roadside berms, storm sewer, PS 17 improvements), Retaining Wall, Standard Overlay Location: IL 58, from West of US 45 (West Hospital Entrance) to East River Road, in the City of Des Plaines. | — | Executed | Martam Construction Incorporated $2,777,624 · | ||
| Jun 11, 2021 | 62F84 | CookDistrict 1 | (1.811-Mile) Pavement widening project on Glenwood Dyer Road from Stony Island Avenue to Torrence Avenue that includes standard overlay, traffic signal modification, and ADA improvement work It is located in the Village of Lynwood and unincorporated Cook County. | — | Executed | K-Five Construction Corporation $4,242,424 · | ||
| Jun 11, 2021 | 62K79 | CookDistrict 1 | Bridge deck overlay, expansion joint replacement, cleaning and resealing, bridge substructure repair and traff The improvement consists of bridge deck overlay, expansion joint replacement, cleaning and resealing, bridge substructure repair and traffic signal replacement at the bridge located on IL 394 over Glenwood Dyre Road in the Villages of Glenwood and Lynwood, in Cook County. IL. Gross and net length is 1,160 FT (0.22 Miles). | — | Executed | D. Construction, Inc. $1,404,369 · | ||
| Jun 11, 2021 | 62L07 | CookDistrict 1 | Design overlay resurfacing on Oak Park Avenue approximately 85 feet south of 31S1 St This improvement consists of design overlay resurfacing on Oak Park Avenue approximately 85 feet south of 31S1 St. and extends in a northerly direction approximately 10,920 feet (2.07 miles) to Approximately 190 feet north of Roosevelt Rd. | — | Executed | K-Five Construction Corporation $1,519,500 · | ||
| Jun 11, 2021 | 62L20 | CookDistrict 1 | This is a Standard Overlay and ADA Pedestrian Ramps project on Avenue L (FAP 29 from 116 feet southeast of Indianapolis Ave and extends northwest toward Avenue L and then north toward 95th Street for a total distance of 0.85 miles. The project is located within Hyde Park Township. | — | Executed | MAT Construction Leasing, Inc. $613,640 · | ||
| Jun 11, 2021 | 62L21 | CookDistrict 1 | The Project includes standard overlay and ADA improvements on Dempster St. from Ridge Ave. to Chicago Ave. The gross and the net length is equal to 2061.4 ft 0.39 mile. The project is located within the City of Evanston. | — | Executed | Chicagoland Paving Contractors, Inc. $440,000 · | ||
| Jun 11, 2021 | 62L63 | CookDistrict 1 | Smart overlay resurfacing on US 41/ Foster Avenue approximately 260 feet west of Ashland Avenue and extends in This improvement consists of smart overlay resurfacing on US 41/ Foster Avenue approximately 260 feet west of Ashland Avenue and extends in an easterly direction approximately 5640 feet (1.068 miles) to Approximately 160 feet east of US 41 (Lake Shore Dr.). Location in the City of Chicago. | — | Executed | MAT Construction Leasing, Inc. $724,432 · | ||
| Jun 11, 2021 | 62L80 | CookDistrict 1 | (1.73-Mile) SMART overlay and ADA improvements on US 14 (Peterson Avenue) from US 41 to Ridge Avenue. The project is located in the City of Chicago. | — | Executed | MAT Construction Leasing, Inc. $2,139,433 · | ||
| Jun 11, 2021 | 62L87 | CookDistrict 1 | (5,213-Feet) SMART overlay and ADA improvements on Wolf Road from IL 38 (Roosevelt Road) to Cermak Road located in the Village of Hillside and Westchester. | — | Executed | Plote Construction, Inc. $719,199 · | ||
| Jun 11, 2021 | 62L91 | CookDistrict 1 | (4.40-Mile) Smart overlay and ADA improvements project on IL 43 (Waukegan Rd.) from Ammer Rd. to Lake-Cook Rd. within the Villages of Glenview, Northfield, Northbrook and Deerfield. There is an omission within the project limits. | — | Executed | Plote Construction, Inc. $3,981,000 · | ||
| Jun 11, 2021 | 62L92 | CookDistrict 1 | (5.89-Mile) SMART Overlay project and it begins on IL 43 (Harlem Ave.) at 111th Street and continues in a northerly direction for 33,426 (6.33 mile) feet to 62nd Street. The project is within the City of Chicago, Villages of Bedford Park, Bridgeview, Burbank, Chicago Ridge, Palos Hills, Summit and Worth. | — | Executed | Gallagher Asphalt Corporation $5,033,078 · | ||
| Jun 11, 2021 | 62M09 | CookDistrict 1 | Crack and joint sealing pavement preservation project. Includes renewal of pavement markings. Location: FAU 1581: 111th Street, from Central Ave to Pulaski Rd in the Village of Oak Lawn and the City of Chicago, in Cook County. | — | Executed | SKC Construction, Inc. $151,360 · | ||
| Jun 11, 2021 | 62M17 | CookDistrict 1 | Smart Overlay/Pedestrian ramp (ADA) improvements along IL 83 (Elmhurst Road) from Oakton Street to IL 58 (Golf This project consists of Smart Overlay/Pedestrian ramp (ADA) improvements along IL 83 (Elmhurst Road) from Oakton Street to IL 58 (Golf Road) spanning a total length of 8,778 ft (1.66 Miles) in the Village of Mt. Prospect and the City of Des Plaines. | — | Executed | Plote Construction, Inc. $1,551,000 · | ||
| Jun 11, 2021 | 62M41 | CookDistrict 1 | Bridge deck overlay, expansion joint replacement and bridge substructure repair located on a bridge carrying 1 The improvement consists of bridge deck overlay, expansion joint replacement and bridge substructure repair located on a bridge carrying 130th Street over 1-94 and at CSSS and IHB RR in Cook County, IL. Gross and net length is 785 FT (0.15 Miles). | — | Executed | Areatha Construction Co., Inc. $3,345,536 · | ||
| Jun 11, 2021 | 62N17 | CookDistrict 1 | Cleaning and painting existing steel structures at 3 locations Improvements consists of cleaning and painting existing steel structures at 3 locations. 1st location is located on Grand Avenue over Des Plaines River {SN 016-0 855), in the Village of River Grove; 2nd and 3rd location is located on US 64 (North Avenue) at RR-CN (SN 016-0500 and SN 016-1126), in the Village of River Grove. | — | Executed | Capital Industrial Services $493,930 · | ||
| Jun 11, 2021 | 62N24 | CookDistrict 1 | Bridge deck patching on a bridge carrying IL 53 over US 14 (Northwest Highway) in Cook County The improvement consists of bridge deck patching on a bridge carrying IL 53 over US 14 (Northwest Highway) in Cook County. IL. Gross length is 4044 FT (0. 77 Miles). Net length is 516 FT (0.10 Miles). | — | Executed | Herlihy Mid-Continent Company $276,951 · | ||
| Jun 11, 2021 | 62N29 | CookDistrict 1 | (1.17-Mile) Noise wall repairs. Location: IL-53, from IL-68 (Dundee Road) to Lake-Cook Road in the Villages of Palatine and Arlington Heights, in Palatine Township in Cook County. | — | Executed | Lorig Construction Company $421,460 · | ||
| Jun 11, 2021 | 62N38 | CookDistrict 1 | Bridge repair for the structures on 1-94/90 at various locations in the City of Chicago, Cook County, IL The improvement consists of bridge repair for the structures on 1-94/90 at various locations in the City of Chicago, Cook County, IL. Gross length is 5808 FT (1. 10 Miles). | — | Executed | Rausch Infrastructure, LLC $699,680 · | ||
| Jun 11, 2021 | 62N90 | CookMcHenryDistrict 1 | Cleaning and painting designated steel surfaces of bridge structures carrying 1 )IL 72 (Higgins Rd) over RR This improvement consists of cleaning and painting designated steel surfaces of bridge structures carrying 1 )IL 72 (Higgins Rd) over RR; 2) US 14 (Northwest Hwy) over Fox River; 3) IL62 (Algonquin Rd) over Fox River in the Villages of Hoffman Estates, Fox River Grove and Algonquin in Barrington and Algonquin Townships. | — | Executed | Capital Industrial Services $683,300 · | ||
| Jul 30, 2021 | 60M12 | CookDistrict 1 | (2,558-Ft) Designed Overlay, ADA Improvements, includes HMA removal and replacement, Class D patching and PMK installation. Location: FAU 2839 California Ave. from 59th St. to 63rd St. within the City of Chicago in Cook County. | — | Executed | MAT Construction Leasing, Inc. $347,601 · | ||
| Jul 30, 2021 | 60X74 | CookDistrict 1 | Removal and replacement of the structure that carries IL 83 over Tinley Creek (1229.52-Ft) This project consists of removal and replacement of the structure that carries IL 83 over Tinley Creek. Also included are intersection improvements, pavement reconstruction, widening, resurfacing, drainage adjustments, and ADA improvements. Located in the Villages of Alsip and Crestwood in Cook County. | — | Executed | Copenhaver Construction, Inc. $7,156,871 · | ||
| Jul 30, 2021 | 61H07 | CookDistrict 1 | Resurfacing Weathersfield Way from Braintree Drive to Salem Drive, includes the construction of an shared use path on the north side and new street lighting, in Schaumburg | — | Executed | R. W. Dunteman Company $1,488,508 · | ||
| Jul 30, 2021 | 61H16 | CookDistrict 1 | Resurfacing and improvements on Summit drive from Wise Road to Schaumburg Road in Schaumburg. | — | Executed | Plote Construction, Inc. $1,309,098 · | ||
| Jul 30, 2021 | 62N83 | CookDistrict 1 | I-80/94 (15,592-Ft), I-57 (2,000-Ft) Patching CRPCC with Class A and Full Depth HMA with Class D); Location: FAI 80: I-80/94 from IL 394 to IL/IN State Line in the Village of Lansing and I-57 at I-80 in the City of Country Club Hills | — | Executed | Plote Construction, Inc. $2,101,659 · | ||
| Sep 17, 2021 | 62D79 | CookLakeDistrict 1 | The project extends from Montrose Ave to Park Blvd. Improvements cover 13.5 miles along 1-94 and 2 miles along US 41. The scope includes fiber optic cable, CCTV and dynamic message signs in order to provide surveillance coverage of the highway. | — | Executed | Meade Inc. $11,996,355 · | ||
| Sep 17, 2021 | 62H87 | CookDistrict 1 | Intersection improvements at US 14 and Propect Road to include traffic signal modernization, left turn lanes, railroad interconnect, pedestrian signals, drainage system, and ADA/shared-use path improvements in Des Plaines and Mt. Prospect. | — | Executed | Berger Excavating Contractors, Inc. $2,974,033 · | ||
| Sep 17, 2021 | 62K02 | CookDistrict 1 | (2,897-Ft) Intersection improvement and traffic signal modernization project located at the intersection of IL 19 (FAU 1321) and Barrington Road in the Village of Hanover Park in Cook County. | — | Executed | Alliance Contractors, Inc. $2,935,409 · | ||
| Sep 17, 2021 | 62L67 | CookDistrict 1 | (5,255-Ft) Standard Overlay with ADA improvements. Location: 47th Street, from Central Ave to IL-50 (Cicero Ave) in the Village of Stickney and the City of Chicago, in Cook County. | — | Executed | MAT Construction Leasing, Inc. $904,416 · | ||
| Sep 17, 2021 | 62M76 | CookDistrict 1 | The improvement is located at the structure carrying Metra commuter rail over 1-90 and CTA at Jefferson Park (SN 016-0515) in the city of Chicago. | — | Executed | Copenhaver Construction, Inc. $367,420 · | ||
| Sep 17, 2021 | 62P25 | CookDistrict 1 | (597-Ft.) Cleaning and painting designated steel surfaces of bridge structure carrying Western Ave over Calumet Sag Channel in the City of Blue Island, Worth and Calumet Townships, Cook County. | — | Executed | Capital Industrial Services $1,533,930 · | ||
| Nov 5, 2021 | 61H15 | CookDistrict 1 | Reconstruction and widening of roadway, sidewalk replacement, construct multi-use path, roadway lighting and traffic signal upgrade on IL 19 from Winchester DRive to east of Bartlett Road and on Bartlett Road from East Oltendorf Road to south of IL 19 in Streamwood | — | Executed | Plote Construction, Inc. $5,898,529 · | ||
| Nov 5, 2021 | 62C25 | CookDistrict 1 | (1.86-Mile) Channelization improvements at the intersections of East Ave. at Joliet Rd. and 55th St., traffic signal modernization, drainage improvements, retaining walls, culvert rehabilitation, and modifications to lighting in McCook, Hodgkins, and Countryside. | — | Executed | K-Five Construction Corporation $16,873,742 · | ||
| Nov 5, 2021 | 62F87 | CookWillDistrict 1 | (1,215 Ft.) Channelization project on Illinois Route 50 (Cicero Avenue) and Steger Road that includes standard overlay, traffic signal installation, and lighting installation. Located in the Villages of University Park and Richton Park. | — | Executed | P. T. Ferro Construction Co. $1,073,908 · | ||
| Nov 5, 2021 | 62L12 | CookDistrict 1 | (1.34-Mile) Designed Overlay, Pedestrian Ramps. Location: Torrence Avenue, from Calumet River to 86 feet N. of 114th Street in the City of Chicago. | — | Executed | K-Five Construction Corporation $1,443,742 · | ||
| Nov 5, 2021 | 62L84 | CookDistrict 1 | (2.87-Mile) Standard Overlay, ADA Improvements; Location: FAP 353: US 30 Lincoln Highway from Lowe Ave to East of IL 394 in the City of Chicago Heights and Village of Ford Heights in Cook County. | — | Executed | Iroquois Paving Corporation $2,371,635 · | ||
| Nov 5, 2021 | 62M19 | CookDistrict 1 | (5.18-Mile) SMART Overlay, ADA improvements, patching, crack and joint sealing, pavement markings project on US 12-20-41 from I-94 (Dan Ryan Expy) to I-90 (Chicago Skyway). Located in the City of Chicago in Cook County. | — | Executed | MAT Construction Leasing, Inc. $3,699,988 · | ||
| Nov 5, 2021 | 62M28 | CookDistrict 1 | (364-ft) Bridge Preservation Project including bridge deck patching and overlay expansion joints replacement, bearings, piers and beams repairs. Location: Bridge carrying Glenwood-Lansing Road over IL 394, in the Village of Glenwood. | — | Executed | Lorig Construction Company $990,562 · | ||
| Nov 5, 2021 | 62M30 | CookDistrict 1 | (675-ft) Bridge repair, joint replacement and bridge deck overlay, located on Interstate 57 (I-57) over the Wisconsin Central Limited (WCL) Railroad in the Villages of Matteson and Richton Park. | — | Executed | Lorig Construction Company $2,179,021 · | ||
| Nov 5, 2021 | 62M93 | CookDistrict 1 | (0.17-Mile) Roadway lighting improvement, located in the Village of South Holland, IL. on US6 (162ND St.) east of 1-94 (Bishop Ford Expressway). Light tower and foundation removal. Install new light poles, metal foundations, LED luminaires, conduits and cables, excavations and site restoration. | — | Executed | H & H Electric Co. $220,484 · | ||
| Nov 5, 2021 | 62N52 | CookKaneDistrict 1 | (2.63-Mile) Standard overlay and ADA improvement project on IL 19 (Irving Park Road) from IL 25 to IL 59 in Cook and Kane Counties. | — | Executed | Arrow Road Construction Co. $2,384,740 · | ||
| Nov 5, 2021 | 62N63 | CookDistrict 1 | Standard overlay resurfacing of IL 58 (Summit St) begins 240 ft west of Hawatha Dr, proceed easterly (3.578 miles) to 300 ft east of IL 59 (Sutton Rd) in the Villages of Elgin and Hoffman Estates, Hanover Township. | — | Executed | J. A. Johnson Paving Company $3,313,313 · | ||
| Nov 5, 2021 | 62P24 | CookDistrict 1 | (1,054-ft) Bridge Painting on (SNs 016-0343, 016-0344) carrying US Route 45 over the Cal Sag Channel in unincorporated Cook County. | — | Executed | Capital Industrial Services $1,583,300 · | ||
| Nov 5, 2021 | 62P46 | CookDistrict 1 | Cleaning and painting of steel bridge structures at 3 locations. 1)Lake-Cook Road over US 41 (SN-016-0811) in Village of Highland Park. 2) Dundee Road (IL-68) over 1-94 (SN-016-0939) in the Village of Northbrook and Glencoe. 3) US-14 over IL-58 (Golf Road) (SN-016-0236) in the City of Des Plaines. | — | Executed | Capital Industrial Services $1,230,733 · | ||
| Nov 5, 2021 | 62P48 | CookDistrict 1 | Bridge repairs and substructure repair at the bridge spanning 1-290 over Des Plaines River (SN 016-0090) in th This improvement consists of bridge repairs and substructure repair at the bridge spanning 1-290 over Des Plaines River (SN 016-0090) in the Village of Park, Proviso Township, Cook County. | — | Rejected | Martam Construction Incorporated $508,935 · | ||
| Nov 5, 2021 | 62P49 | CookDistrict 1 | Bridge deck sealing and bridge joint repair. Location: 1-90/94 at various locations in the City of Chicago in Cook County. (SN-016-0189, SN-016-0398, SN-016-1007, SN-016-1152, SN-016-1153). | — | Executed | Herlihy Mid-Continent Company $210,646 · | ||
| Nov 5, 2021 | 62P61 | CookDistrict 1 | (631-Mile) Litter/ Debris Removal project from edge of pavement to the Pedestrian Barrier on 1-90/94 (Dan Ryan Expwy) expressway from Congress Pkwy to 1-57/ 1-94 (Bishop Ford Expwy). | — | Executed | Peeples Landscaping and Snow Removal Ltd. $693,406 · | ||
| Nov 5, 2021 | 62P62 | CookDistrict 1 | (528-Mile) Litter/ Debris Removal from edge of pavement to the Pedestrian Barrier on 1) FAI 94: 1-94 from 1-90/94 (Dan Ryan Expwy) to 1-80; 2) FAP 341: Stony Island from 1-94 to US 12 (95th) 3) FAU 1574: 103rd St from Cottage Groove to Stony Island. | — | Executed | Peeples Landscaping and Snow Removal Ltd. $580,267 · | ||
| Nov 5, 2021 | 62P63 | CookDistrict 1 | (167.4-Mile) Litter/ Debris Removal from edge of pavement to the Pedestrian Barrier on 1-55 - Stevenson expressway from Lake Shore Dr. to IL 43 (Harlem Ave.). | — | Executed | Peeples Landscaping and Snow Removal Ltd. $183,971 · | ||
| Nov 5, 2021 | 62P64 | CookDistrict 1 | (417.6-Mile) Litter/ Debris Removal from edge of pavement to the Pedestrian Barrier on 1-290/ IL 11 O expressway from Austin Blvd to Wells St. | — | Executed | Peeples Landscaping and Snow Removal Ltd. $458,938 · | ||
| Nov 5, 2021 | 62P65 | CookDistrict 1 | (292.2-Mile) Litter/ Debris Removal from edge of pavement to the Pedestrian Barrier on 1-190; 1-90/94 expressways from W. of US 12/45 Mannheim Rd to Congress Parkway. | — | Executed | Peeples Landscaping and Snow Removal Ltd. $321,125 · | ||
| Jan 21, 2022 | 61G71 | CookDistrict 1 | Roadway reconstruction and lighting on Proviso Drive from the Union Pacific Rail Yard entrance to Wolf Road in Berkeley. | — | Executed | R. W. Dunteman Company $2,659,791 · | ||
| Jan 21, 2022 | 61H24 | CookDistrict 1 | Resurfacing, streetscape, lighting and traffic signal improvements at various locations in Berwyn. | — | Executed | R. W. Dunteman Company $16,486,777 · | ||
| Jan 21, 2022 | 62H49 | CookDistrict 1 | (0.989-Mile) Bridge new deck, widening, bridge repair scour mitigation and lighting in the City of Countryside and the Villages of Willow Springs, Justice and Hodgkins. | — | Executed | Dunnet Bay Construction Company $21,386,753 · | ||
| Jan 21, 2022 | 62L09 | CookDistrict 1 | Full depth patching along Palatine Road from Quentin Road to Smith Street spanning a total length of 4,073 ft This project consists of full depth patching along Palatine Road from Quentin Road to Smith Street spanning a total length of 4,073 ft (0.77 Miles) in the Village of Palatine, Cook County. | — | Executed | M & J Underground Inc. $207,992 · | ||
| Jan 21, 2022 | 62M54 | CookDistrict 1 | (1,334-Ft) Bridge rehabilitation project on the four bridges that carry I-57 over I-80. The work includes deck overlay with latex concrete, substructure repair and reconstruction and patching of bridge approaches located within the City of Country Club Hills. | — | Executed | D. Construction, Inc. $5,296,504 · | ||
| Jan 21, 2022 | 62M84 | CookDistrict 1 | (7.63-Mile) Standard overlay, Class A patching, drainage, ITS improvements, and bridge deck sealing on Interstate 57 (I-57) between I-294 and IL 1 (Halsted St.), located within the City of Chicago and Villages of Calumet Park, Blue Island, Posen, Dixmoor and Riverdale. | — | Executed | Gallagher Asphalt Corporation & K-Five Construction Corporation & D. Construction, Inc. $32,635,797 · | ||
| Jan 21, 2022 | 62N35 | CookDistrict 1 | Intersection improvement and traffic signal modernization project on US Route 6/Illinois Route 83 (Torrence Avenue), approximately 2,640 feet north of the I- 80/94 (Kingery Expressway) overpass and extends in a north for 1,007 lineal feet within the Village of Lansing and City of Calumet City. | — | Executed | Gallagher Asphalt Corporation $969,778 · | ||
| Jan 21, 2022 | 62N71 | CookDistrict 1 | (1,569-Ft) Designed Overlay and ADA improvements along Addison Street from Halsted Street to US 41 (Lake Shore Dr.) in the City of Chicago. | — | Executed | Bigane Paving Company $733,790 · |
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.