| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Jan 17, 2020 | 60L88 | CookDistrict 1 | Designed overlay and ADA pedestrian ramps on Bryn Mawr Avenue beginning just east of IL 43 and extending 2.14 miles to the east, in the City of Chicago. | — | Executed | J. A. Johnson Paving Company $2,124,700 · | ||
| Jan 17, 2020 | 60M68 | CookDistrict 1 | Bridge deck and approach overlay, bridge deck and approach repairs, reconstruction of deck joints, substructure repairs and pavement patching and overlay on existing structure no. 016-0811. | — | Executed | Martam Construction Incorporated $2,794,215 · | ||
| Jan 17, 2020 | 60Y74 | CookDistrict 1 | Intersection improvement, channelization, and traffic signal modernization project on Golf Rd from Overlook Dr to Harms Rd in Morton Grove and Cook County Forest Preserve. | — | Executed | Capitol Cement Co., Inc. $1,293,582 · | ||
| Jan 17, 2020 | 61E86 | CookDistrict 1 | Reconstruct the intersection of US 12/US 45 at Forest Avenue in Des Plaines. | — | Executed | Berger Excavating Contractors, Inc. $2,524,434 · | ||
| Jan 17, 2020 | 61F36 | CookDistrict 1 | Reconstruction of Lake Street from Harlan Avenue to Euclid Avenue in Oak Park. | — | Executed | R. W. Dunteman Company $10,557,782 · | ||
| Jan 17, 2020 | 61F86 | CookDistrict 1 | Reconstruction of 151st Street from West Avenue to Ravinia Avenue and the contruction of a roundabout at West Avenue in Orland Park. | — | Executed | P. T. Ferro Construction Co. $4,647,786 · | ||
| Jan 17, 2020 | 61F91 | CookDistrict 1 | Resurfacing 175th Street from Ashland Avenue to Halsted Avenue in the Village of Homewood. | — | Executed | D. Construction, Inc. $464,570 · | ||
| Jan 17, 2020 | 61G08 | CookDistrict 1 | Resurfacing, bike path contruction and traffic signal improvment on Howard Street from Milwaukee Avenue to Lehigh Avenue in Niles. | — | Executed | Capitol Cement Co., Inc. $6,976,099 · | ||
| Jan 17, 2020 | 61G13 | CookDistrict 1 | Resurfacing Joliet Avenue from 47th Street to 39th Street in the Village of Lyons. | — | Executed | Lindahl Brothers, Inc. $911,086 · | ||
| Jan 17, 2020 | 62A26 | CookDistrict 1 | Pavement widening on IL 53 / IL 68 to provide a new southbound right turn lane at the intersection of Rand Road and Dundee Road; includes new median, patching, resurfacing, traffic and lighting modifications and sewer installation. | — | Executed | R. W. Dunteman Company $5,247,345 · | ||
| Jan 17, 2020 | 62G17 | CookDistrict 1 | 3.1 miles of designed overlay and ADA ramp improvements on Northwest Highway from US 14 (Miner Street) to Merrill Street in Maine Township. | — | Executed | J. A. Johnson Paving Company $4,016,610 · | ||
| Jan 17, 2020 | 62H96 | CookDistrict 1 | Overlay and pedestrian ramps on US 41; bridge deck repair on the I-94 off ramp to US 41 from I-94 to North of Old Orchard Rd. in Willmette and Skokie. | — | Rejected | Peter Baker & Son Co. $2,297,777 · | ||
| Jan 17, 2020 | 62J33 | CookDistrict 1 | Bridge overlay and joint repair on SN 016-2036 carrying Halsted Street over I-57 in Bellwood. | — | Executed | D. Construction, Inc. $496,790 · | ||
| Jan 17, 2020 | 62J45 | CookDistrict 1 | 0.48 miles of designed overlay and pedestrian ramp improvements on Avondale Avenue from Pulaski Road to Addison Street in the City of Chicago. | — | Executed | MAT Construction Leasing, Inc. $643,197 · | ||
| Jan 17, 2020 | 62J48 | CookDistrict 1 | Resurfacing (3R) ADA improvements on OR 309a (Old Western Ave) from Broadway Street to Western Avenue. | — | Executed | Gallagher Asphalt Corporation $197,238 · | ||
| Jan 17, 2020 | 62J51 | CookDistrict 1 | Cleaning and painting designated steel surfaces of bridge structures carrying 1) Chicago Heights Glenwood Road over Butterfield Creek; 2) 183rd Street over I-57; 3) IL 50 over I-57; in the City of Country Club Hills and the Village of Glenwood. (SN 016-0793, 016-0583, 016-1014) | — | Executed | Capital Industrial Services $1,113,633 · | ||
| Jan 17, 2020 | 62J52 | CookDistrict 1 | Cleaning and painting designated steel surfaces of bridge structures carrying Touhy Ave over Des Plaines River, and Wolf Rd over Weller Ditch in Des Plaines. | — | Executed | Eagle Painting & Maintenance Company, Inc. $392,220 · | ||
| Jan 17, 2020 | 62J53 | CookDistrict 1 | Cleaning and sealing longitudinal cracks in the existing concrete pavement between traffic lanes and curb and gutter, restriping with modified urethane pavement marking in Ford Heights, Lynwood, and Sauk Village. | — | Executed | Denler, Inc. $200,433 · | ||
| Jan 17, 2020 | 62J54 | CookDistrict 1 | 4.6 miles of designed overlay and ADA pedestrian ramp improvements on Golf road from IL 43 (Waukegan Road) to McCormick Boulevard in the Villages of Glenview, Golf, Morton Grove, Skokie and City of Evanston. | — | Executed | Builders Paving, LLC $5,648,000 · | ||
| Jan 17, 2020 | 62J57 | CookDistrict 1 | 0.8 miles of standard overlay and ADA improvements on Butterfield Road in the Village of Bellwood. | — | Executed | Plote Construction, Inc. $814,877 · | ||
| Jan 17, 2020 | 62K36 | CookDuPageDistrict 1 | Litter/Debris Removal from the edge of the pavement to the Pedestrian Barrier adjacent to the State-Owned Expr The improvement consists of Litter/Debris Removal from the edge of the pavement to the Pedestrian Barrier adjacent to the State-Owned Expressway. 200 miles in length. | — | Rejected | Sewer Rat Contractors, LLC $288,000 · | ||
| Jan 17, 2020 | 62K37 | CookDuPageDistrict 1 | Litter/Debris Removal from the edge of the pavement to the Pedestrian Barrier on I-290 Expressway from IL 83 ( The improvement consists of Litter/Debris Removal from the edge of the pavement to the Pedestrian Barrier on I-290 Expressway from IL 83 (Kingery Hwy) to Austin Blvd. 135 miles in length. | — | Rejected | Sewer Rat Contractors, LLC $192,000 · | ||
| Jan 17, 2020 | 62K38 | CookDistrict 1 | Litter/Debris Removal from the edge of the pavement to the Pedestrian Barrier on I-290/IL 110 Expressway from The improvement consists of Litter/Debris Removal from the edge of the pavement to the Pedestrian Barrier on I-290/IL 110 Expressway from Austin Blvd to Wells St. 253 miles in length. | — | Rejected | 10x Contractors LLC $197,600 · | ||
| Jan 17, 2020 | 62K39 | CookLakeDistrict 1 | Litter/Debris Removal from the edge of the pavement to the pedestrian Barrier I-94 (Edens Expressway)/US 41 (S The improvement consists of Litter/Debris Removal from the edge of the pavement to the pedestrian Barrier I-94 (Edens Expressway)/US 41 (Skokie Hwy) expressway from Clavey Rd to I-90 (Kennedy Expwy). 147 miles in length. | — | Rejected | Sewer Rat Contractors, LLC $211,200 · | ||
| Jan 17, 2020 | 62K40 | CookDistrict 1 | Litter/Debris Removal from the edge of the pavement to the Pedestrian Barrier on I-90 The improvement consists of Litter/Debris Removal from the edge of the pavement to the Pedestrian Barrier on I-90; I-90/94 expressways from W of US 12/45 Mannheim Rd to Congress Pkwy. 185 miles in length. | — | Rejected | 10x Contractors LLC $214,500 · | ||
| Jan 17, 2020 | 62K41 | CookDistrict 1 | Litter/Debris Removal from the edge of the pavement to the pedestrian barrier on I-90/94 (Dan Ryan Expy) from The improvement consists of Litter/Debris Removal from the edge of the pavement to the pedestrian barrier on I-90/94 (Dan Ryan Expy) from Congress Pkwy to I-57/I-94 Bishop Ford Expy). 360 miles in length. | — | Rejected | 10x Contractors LLC $280,800 · | ||
| Jan 17, 2020 | 62K42 | CookDistrict 1 | Litter/Debris Removal from the edge of the pavement to the pedestrian barrier on I-57 expressway from I 94 (Da The improvement consists of Litter/Debris Removal from the edge of the pavement to the pedestrian barrier on I-57 expressway from I 94 (Dan Ryan Expwy) to I-80. 275 miles in length. | — | Rejected | Sewer Rat Contractors, LLC $230,400 · | ||
| Jan 17, 2020 | 62K43 | CookDistrict 1 | Litter/Debris Removal from the edge of the pavement to the pedestrian barrier on 1) FAI 94: I-94 from I-90/94 The improvement consists of Litter/Debris Removal from the edge of the pavement to the pedestrian barrier on 1) FAI 94: I-94 from I-90/94 (Dan Ryan Expwy) to I-80; 2) FAP 341: Stony Island from I-94 to US 12(95th St); 3) FAU 1574: 103rd St from Cottage Groove to Stony Island. 175 miles in length. | — | Rejected | 10x Contractors LLC $214,500 · | ||
| Jan 17, 2020 | 62K44 | CookWillDistrict 1 | Litter/Debris Removal from the edge of the pavement to the pedestrian barrier on I-80 Expwy from I-294 to I-35 The improvement consists of Litter/Debris Removal from the edge of the pavement to the pedestrian barrier on I-80 Expwy from I-294 to I-355. 325 miles in length. | — | Rejected | Sewer Rat Contractors, LLC $177,600 · | ||
| Jan 17, 2020 | 62K46 | CookDistrict 1 | Litter/Debris Removal from the edge of the pavement to the pedestrian barrier on I-55 - Stevenson Expwy from L The improvement consists of Litter/Debris Removal from the edge of the pavement to the pedestrian barrier on I-55 - Stevenson Expwy from Lake Shore Dr to IL 43 (Harlem Ave). 250 miles of total length. | — | Rejected | 10x Contractors LLC $195,000 · | ||
| Jan 17, 2020 | 62K47 | CookDuPageDistrict 1 | Litter/debris removal from the edge of the pavement to the pedestrian barrier on I-55 - Stevenson Expressway from IL 43 (Harlem Ave) to I-355._150 miles in length. | — | Rejected | Viridian Enterprises, Inc. $119,250 · | ||
| Mar 6, 2020 | 60M90 | CookDistrict 1 | 0.049 miles of bridge repair, bridge joint repair, and bridge deck overlay on the structure carrying US 14 over IL 58. | — | Executed | Martam Construction Incorporated $474,343 · | ||
| Mar 6, 2020 | 60R66 | CookDistrict 1 | Bridge deck overlay and joint repairs of Chicago Ave over the Des Plaines River. | — | Executed | MYS, Incorporated $573,893 · | ||
| Mar 6, 2020 | 60R72 | CookDistrict 1 | Bridge deck scarification and replacement with latex concrete overlay, resufacing of both approaches and deck repairs on the structure carrying Central Rd over the Des Plaines River in Maine and Northfield Townships. | — | Executed | Martam Construction Incorporated $593,744 · | ||
| Mar 6, 2020 | 60T05 | CookDistrict 1 | 1.5 miles of reconstruction and ADA improvements on Wolf Road from IL 21 (Milwaukee Road) to north of Hintz Road in the Village of Wheeling. | — | Executed | Acura Inc. $12,538,085 · | ||
| Mar 6, 2020 | 61F95 | CookDistrict 1 | Pavement marking removal, new pavement markings and the installation of signs on Pratt Avenue from Lawndale Avenue to McCormick Boulevard in the Village of Lincolnwood. | — | Rejected | Marking Specialists Corporation $53,296 · | ||
| Mar 6, 2020 | 61G30 | CookDistrict 1 | Resurfacing, sidewalk construction, curb and gutter, watermain replacement, roadway lighting and traffic signal modernization on Howard Street from Sacramento Avenue to Cellan Avenue in Evanston. | — | Executed | Acura Inc. $10,088,928 · | ||
| Mar 6, 2020 | 62G01 | CookDistrict 1 | Turn lane and median repair, ADA improvments and traffic signal modernization at the intersection of IL 50 and 115th Street and traffic signal improvements on IL 50 at 122nd Street within the Village of Alsip. | — | Executed | D. Construction, Inc. $736,313 · | ||
| Mar 6, 2020 | 62G92 | CookDistrict 1 | Removal and replacement of the existing box culvert on Chicago Rd over Thorn Creek Tributary in Chicago Heights. | — | Executed | Dunnet Bay Construction Company $2,208,417 · | ||
| Mar 6, 2020 | 62H85 | CookDuPageWillDistrict 1 | This is a safety (HSIP) improvement including guardrail end section replacement and new guardrail installation on various state maintained arterial routes. | — | Executed | Copenhaver Construction, Inc. $584,674 · | ||
| Mar 6, 2020 | 62J44 | CookDistrict 1 | 3.01 miles of designed overlay, pedestrian ramp, and drainage improvements on McCormick Blvd from Dempster St to Devon Ave. | — | Executed | Builders Paving, LLC $4,038,000 · | ||
| Mar 6, 2020 | 62J55 | CookDistrict 1 | 1.826 miles of designed overlay/pedestrian ramp (ADA) improvements along 106th ST from Torrence Ave to US 12/41 (Indianapolis Ave). | — | Executed | Gallagher Asphalt Corporation $2,478,606 · | ||
| Mar 6, 2020 | 62J66 | CookDistrict 1 | 0.5 miles of designed overlay and ADA improvments on Canal Street from Archer Avenue to W 28th Street in the City of Chicago. | — | Executed | MAT Construction Leasing, Inc. $467,338 · | ||
| Mar 6, 2020 | 62J71 | CookDistrict 1 | 1.62 miles of resurfacing improvements and ADA ramp improvements along US 14 (Northwest Highway) from E of Smith St to S Hicks Rd. | — | Executed | Arrow Road Construction Co. $2,317,789 · | ||
| Mar 6, 2020 | 62J77 | CookDistrict 1 | 1.3 miles of designed overlay on 5th Avenue from IL 64 (North Avenue) to Lake Street in the Villages of Melrose Park and Maywood. | — | Executed | Arrow Road Construction Co. $1,417,367 · | ||
| Mar 6, 2020 | 62J85 | CookDistrict 1 | 2.09 miles of designed overlay from S of IL 171 (Archer Ave) to 107th in Willow Springs. | — | Executed | K-Five Construction Corporation $1,026,000 · | ||
| Mar 6, 2020 | 62J86 | CookDistrict 1 | 0.70 miles of standard overlay and ADA improvements on Palatine Rd - South Frontage Rd, N Verde Ave to Palatine Rd in Arlington Heights. | — | Executed | J. A. Johnson Paving Company $539,293 · | ||
| Mar 6, 2020 | 62J88 | CookDistrict 1 | 4.4 miles of HMA surface removal, patching, resurfacing, ADA sidewalk repairs, HMA shoulders and drainage improvements on Des Plaines River Road from Foster Avenue to IL 171 (1st Avenue) and Lawrence Avenue from East River Road to Ridgewood Avenue within the Villages of Schiller Park, Norridge, Franklin Park and River Grove. | — | Executed | R. W. Dunteman Company $4,948,861 · | ||
| Mar 6, 2020 | 62J97 | CookDistrict 1 | 0.41 miles of designed overlay and pedestrian ramp upgrades on Lincoln Ave approximately 100 ft S of Main St E to approximately 50 ft N of Niles Center Rd. | — | Executed | Arrow Road Construction Co. $511,357 · | ||
| Mar 6, 2020 | 62K01 | CookDistrict 1 | Structure improvements to SN 016-0141 carrying the CTA RR over the Dan Ryan Expressway, approximately 0.5 miles south of 55th Street. | — | Executed | Kiewit Infrastructure Co. $654,013 · | ||
| Mar 6, 2020 | 62K25 | CookDistrict 1 | Cleaning and painting all steel surfaces of the bridge carrying 55th St over I-94 (Dan Ryan Expw) in Chicago. | — | Executed | ERA-Valdivia Contractors, Inc. $1,073,500 · | ||
| Mar 6, 2020 | 62K26 | CookDistrict 1 | Weep hole coring, cleaning drainage structure, reconstructing drainage structure, gutter removal and replacement, debris removal, and selective clearing in the village of McCook and Lyons Township. | — | Executed | MYS, Incorporated $198,148 · | ||
| Mar 6, 2020 | 62K32 | CookWillDistrict 1 | Concrete bridge deck sealing upon the entire top surface of the bridge deck, top of sidewalks, and the inside and top of parapets on structures at various locations. | — | Executed | M & M Concrete, Inc. $179,824 · | ||
| Mar 6, 2020 | 62K56 | CookDistrict 1 | Light tower and foundation removal, installation of new light poles, metal foundations, LED luminaires, conduit, cable, excavation and site restoration on US 30 (Lincoln Highway) at IL 43 (Harlem Avenue) in the Village of Frankfort. | — | Executed | John Burns Construction Company $712,222 · | ||
| Apr 24, 2020 | 60D77 | CookDistrict 1 | Roadway Construction and ramp rehab. Includes replace. concrete deck, bearings expansion joint and wingwalls. Substructure will be repaired. Project 3,709 LF. , Project 3,709 LF. Roadway reconstruction and ramp bridge rehab. Replacement of concrete deck, bearings, expansion joint and wingwall. Substructure will be repaired. | — | Executed | Lorig Construction Company $4,711,922 · | ||
| Apr 24, 2020 | 60Y00 | CookDistrict 1 | Construction of the Intelligent Transportation System infrastructure including a new Comm. Hut, LED lighting for U/P expwys, retrofit of existing HMLTs with LED, and fiber optic cables for the Jane Byrne interchange corridor along I-90/94/290. | — | Executed | Meade Inc. $2,709,903 · | ||
| Apr 24, 2020 | 62A76 | CookDistrict 1 | 9,508 FT Construction and widening the Kennedy mainline Expwy NB from Roosevelt Rd. to Lake/Madison Sts, construction/rehab. of 10 ret. walls total, lighting, ITS, interstate resurfacing from the north. project limits to Ohio St through Hubbard's Cave. | — | Executed | Lorig Construction Company $56,078,988 · | ||
| Apr 24, 2020 | 62A77 | CookDistrict 1 | Construction and wideing the Kennedy mainline Expwy SB from Lake/Madison St. to Roosevelt Rd., rehab. of 3 exist. ret. walls, lighting, ITS, interstate resurfacing from the north limits to Ohio St. thru Hubbard's Cave. Construction of detention storage under the AIS. | — | Executed | Lorig Construction Company $43,795,682 · | ||
| Apr 24, 2020 | 62D42 | CookDistrict 1 | Bridge removal, roadway widening and sidewalk improvements on Pulaski Road at Ford City Drive in the City of Chicago. (SN 016-0750) | — | Executed | Dunnet Bay Construction Company $2,218,412 · | ||
| Apr 24, 2020 | 62F18 | CookDistrict 1 | Drainage improvement, and ADA improvements at the drainage ditch along the N side of FAU Fullerton Ave from Sarah St to Silver Creek Dr in Franklin Park. | — | Executed | Pan-Oceanic Engineering Co., Inc. $449,389 · | ||
| Apr 24, 2020 | 62H64 | CookDistrict 1 | Culvert headwall repair in the Village of Schiller Park. | — | Executed | Lakes & Rivers Contracting, Inc. $156,700 · | ||
| Apr 24, 2020 | 62H71 | CookDistrict 1 | Bridge repair project on IL-83 at Sanitary and Ship Canal. | — | Executed | Path Construction Company, Inc. $2,378,102 · | ||
| Apr 24, 2020 | 62J59 | CookDistrict 1 | Designed overlay including milling and resurfacing, installation of shoulder rumble strips, and other safety and drainage improvements along I-90 from IL 43 to I-94. | — | Executed | Plote Construction, Inc. $19,665,312 · | ||
| Apr 24, 2020 | 62J67 | CookDistrict 1 | Designed overlay and pedestrian ramps on US 41 from 31 ft SE of the centerline of Kedzie Ave to 44 ft N of the centerline of Foster Ave. | — | Executed | MAT Construction Leasing, Inc. $2,257,684 · | ||
| Apr 24, 2020 | 62J70 | CookDistrict 1 | SMART Overlay and ADA improvements on US 6 from IL-50 to E of I-294. | — | Executed | Iroquois Paving Corporation $1,256,078 · | ||
| Apr 24, 2020 | 62J80 | CookDistrict 1 | HMA Design Overlay of Touhy Ave from 240 ft W of the intersection of Lee St, E to 100 ft E of US-14. | — | Executed | Arrow Road Construction Co. $7,128,300 · | ||
| Apr 24, 2020 | 62J82 | CookDistrict 1 | Smart Overlay and ADA improvements on US 12 from IL 19 to N of US 20. | — | Executed | Plote Construction, Inc. $4,589,135 · | ||
| Apr 24, 2020 | 62J96 | CookKaneDistrict 1 | Centerline joint repair and patching project on US 20 that starts at Plank Rd and extends E for 7.4 miles to a point approximately 80 ft W of the centerline of Shales Pkwy. | — | Executed | Geneva Construction Company $1,396,008 · | ||
| Apr 24, 2020 | 62K21 | CookDistrict 1 | Bridge Deck Overlay and Bridge Repairs on I-57 over Little Calumet River in Dixmoor. | — | Executed | Dunnet Bay Construction Company $2,168,250 · | ||
| Apr 24, 2020 | 62K23 | CookDistrict 1 | Bridge repairs and improvements on various bridges over I-290 from 25th Ave to Ridgeland Ave. | — | Executed | Lorig Construction Company $1,727,469 · | ||
| Apr 24, 2020 | 62K31 | CookDistrict 1 | Bridge repair, bridge joint repair, and bridge deck overlay on the structure carrying Ashland Ave at Cal Sag Channel in Blue Island. | — | Executed | Rausch Infrastructure, LLC $1,597,411 · | ||
| Jun 12, 2020 | 46544 | CookDistrict 1 | Applying water borne, lead free, white and yellow paint pavement marking lines of 4, 6, and 8 Inches In width This work shall consist of applying water borne, lead free, white and yellow paint pavement marking lines of 4, 6, and 8 Inches In width. | — | Executed | Preform Traffic Control Systems, Ltd. $795,000 · | ||
| Jun 12, 2020 | 60N80 | CookDistrict 1 | Removal and replacement the bridge superstructure, raising roadway profile on Joliet Road over Flag Creek in the Village of indian Head Park and Burr Ridge. LT 600 FT SN 016-0393 | — | Executed | D. Construction, Inc. $2,902,020 · | ||
| Jun 12, 2020 | 60X71 | CookDistrict 1 | Intersection re-alignment of Joliet Road at 55th Street in the village of McCook, in Lyons Township, in Cook County. | — | Executed | K-Five Construction Corporation $2,108,300 · | ||
| Jun 12, 2020 | 60X94 | CookDistrict 1 | Reconstruction of Adams St and Jackson Blvd bridges over I-90/94 including reconstruction of entrance and exit ramps, construction of 5 prop. Conc. Retaining walls and rehab of one existing retaining wall, signing, ITS, lighting and urban enhancements. | — | Executed | Lorig Construction Company $42,620,595 · | ||
| Jun 12, 2020 | 60Y69 | CookDistrict 1 | Landscaping within the following boundaries I-90/94: Roosevelt Rd to Washington Blvd and Peoria St to Clinton St and I-290: Roosevelt Rd to Van Buren St and Damen ve to Clinton St. | — | Executed | Nettle Creek Nursery, Inc. $275,916 · | ||
| Jun 12, 2020 | 61G20 | CookDistrict 1 | Pavement reconstruction, storm sewers, curb and gutter, sidewalks, traffic signals, lighting, water main, landscaping and pavement markings on IL 62 in Schaumburg. | — | Executed | R. W. Dunteman Company $9,776,015 · | ||
| Jun 12, 2020 | 61G33 | CookDistrict 1 | Construct a pedestrian underpass from Burlington Avenue, through the BNSF Railway embankment, to Hillgrove Avenue at Prospect Avenue in Western Springs. | — | Executed | D. Construction, Inc. $1,373,593 · | ||
| Jun 12, 2020 | 61G35 | CookDistrict 1 | Reconstruction of 21st Avenue from 16th Street to 19th Street, and the reconstruction of 19th Street from 21st Avenue to 17th Avenue in Broadview. | — | Executed | A Lamp Concrete Contractors, Inc. $3,090,000 · | ||
| Jun 12, 2020 | 61G39 | CookDistrict 1 | Resurfacing Wentworth Avenue from Bernice Road to Ridge Road in Lansing. | — | Executed | D. Construction, Inc. $799,663 · | ||
| Jun 12, 2020 | 61G41 | CookDistrict 1 | Construction of a pedestrian path adjacent to IL 72/Higgins Road, from west of Plum Grove Road to east of Plum Grove Road in Schaumburg. | — | Executed | A Lamp Concrete Contractors, Inc. $689,669 · | ||
| Jun 12, 2020 | 61G42 | CookDistrict 1 | Reconstruction of Central Avenue from the Union Pacific Railroad to Sheridan Road. Resurfacing of Wilmette Avenue from the Union Pacific Railroad to Lake Avenue, and traffic signal modernization at Central and Wilmette Avenues in Wilmette. | — | Executed | A Lamp Concrete Contractors, Inc. $9,504,079 · | ||
| Jun 12, 2020 | 61G50 | CookDistrict 1 | Resurface Vincennes Road from Us 6 to Armory Drive, Armory Drive from Westview Avenue to Vincennes Road, and Westview Avenue from 172nd Street to Armory Drive in South Holland. | — | Executed | Gallagher Asphalt Corporation $1,234,904 · | ||
| Jun 12, 2020 | 61G51 | CookDistrict 1 | Construction of a pedestrian bridge on Bryn Mawr Avenue over the Des Plaines River in Rosemont. | — | Executed | Copenhaver Construction, Inc. $1,253,143 · | ||
| Jun 12, 2020 | 61G52 | CookDistrict 1 | Buffalo Creek trail extension from Lake Cook Road to the existing trail in Arlington. | — | Executed | A Lamp Concrete Contractors, Inc. $265,753 · | ||
| Jun 12, 2020 | 61G61 | CookDistrict 1 | Construction of a multi-use path adjacent to Old Green Bay Road, from Maple Hill Road to Park Avenue in Glencoe. | — | Executed | A Lamp Concrete Contractors, Inc. $776,067 · | ||
| Jun 12, 2020 | 62A38 | CookDistrict 1 | (0.27 mile) Intersection improvement consisting of HMA surface removal, pavement widening, earth excavation, ADA sidewalk repair, construction of a concrete barrier median and HMA resurfacing on IL 171 (1st Ave) at Roosevelt Rd. | — | Executed | K-Five Construction Corporation $1,462,098 · | ||
| Jun 12, 2020 | 62F20 | CookDuPageDistrict 1 | (18.3 mi), IL 83 between IL 171 and Third Ave, guardrail installation, shoulder rumble strip, re-striping pavement markings, wireless interconnect and reflecto ized traffic signal backplates. | — | Executed | K-Five Construction Corp & Quality Seal & Saw, Inc & Midwest Fence Corp Tri-Venture $1,074,369 · | ||
| Jun 12, 2020 | 62F90 | CookDistrict 1 | Traffic Signal Modernization, Channelization, Standard Overlay, ADA Improvements; FAP Route 348 (IL 43 / Harlem Ave) at Archer Ave in the City of Chicago and the Village of Summit in Cook County. | — | Executed | K-Five Construction Corporation $1,287,974 · | ||
| Jun 12, 2020 | 62G02 | CookDistrict 1 | Traffic Signal Modernization and left turn lane storage extension at the the intersection of Ogden Ave and Austin Blvd located in the Town of Cicero. | — | Executed | Lyons Electric Company, Inc. $758,758 · | ||
| Jun 12, 2020 | 62H70 | CookDistrict 1 | This is a slope stabilization project on IL Rte 83 from north of Glenwood Dyer Road to south of Glenwood Lansing Road that includes guardrail replacement. It is located in Village of Lynwood in Cook county. The gross and net length of the project is 1.183 miles (6250 ft). , (6250 ft) Slope stabilization on IL Rte 83 from N. of Glenwood Dyer Rd. to S. of Glenwood Lansing Rd, includes guardrail replacement located in the Village of Lynwood. | — | Executed | D. Construction, Inc. $760,107 · | ||
| Jun 12, 2020 | 62J28 | CookDistrict 1 | Removal and replacement of an existing 32-foot long 18" x 24" culvert with a proposed 48-foot long 36" x 72" cast in place culvert (Proposed SN 016-2272) on 147th Street over Tributary C. of Cal-Sag Channel in the city of Oak Forest and The Forest Preserve District of Cook County. , (LT 351 Ft.) Improve 147th Street over Tributary C. of Cal-Sag Channel | — | Executed | Scanlon Excavating & Concrete, Inc. $334,356 · | ||
| Jun 12, 2020 | 62J68 | CookDistrict 1 | 8 miles of standard overlay, HMA and Class B patching, and pedestrian ramps on US 45 / IL 21 from just north of Columbus Parkway to North of Rand Road in the Villages of Wheeling, Mount Prospect and Cities of Prospect Heights and Des Plaines. , Standard Overlay, HMA, Class B patching and pedestrian ramp begins 500 ft north of Columbus Pkwy and proceeds 41323 ft (8.0 miles) southerly direction to North of Rand Rd. in the Villages of Wheeling, Mount Prospect and Cities of Prospect Height and Des·P | — | Executed | Arrow Road Construction Co. $4,381,945 · | ||
| Jun 12, 2020 | 62J89 | CookDistrict 1 | (5 mile) Standard overlay and ADA Pedestrian Ramps on Michigan Ave. Located within South Chicago and Hyde park Townships. , (5 mile) Standard overlay and ADA Pedestrian Ramps on Michigan Ave. Located | — | Executed | K-Five Construction Corporation $4,658,002 · | ||
| Jun 12, 2020 | 62J98 | CookDistrict 1 | Bridge beam replacement for SN 016-0825 carrying Church St over I-94. | — | Executed | ICC Group Inc. $676,200 · | ||
| Jun 12, 2020 | 62K20 | CookDistrict 1 | Improvements to bridge parapet, joint, steel, and wingwall on I-55 over BRC RR in Chicago. | — | Executed | D. Construction, Inc. $655,770 · | ||
| Jun 12, 2020 | 62K35 | CookDistrict 1 | Permanent protective shield installation on IL 53 bridges over IL 62, US 14 and RR, Palatine Rd, Kirchoff Rd, Anderson Dr, as well as Fulton Market St bridge over I-90/I-94. | — | Executed | Herlihy Mid-Continent Company $790,785 · | ||
| Jun 12, 2020 | 62K49 | CookDistrict 1 | Partial beam and deck replacement on the bridge carrying Sibley Blvd. over I- 94 located in the Village of Dolton, IL. LT= 1110 FT (0.21MI) | — | Executed | D. Construction, Inc. $682,072 · | ||
| Jun 12, 2020 | 62K72 | CookDistrict 1 | (593.9 FT.) Bridge repair project of the structure carrying Torrence Ave over IHB and BandOCT Railroads, in the Village of Burnham, in Thornton Township, in Cook County. SN 016-0935 | — | Executed | ERA-Valdivia Contractors, Inc. $479,948 · | ||
| Jun 12, 2020 | 62K76 | CookDistrict 1 | Cleaning and painting existing steel on the structures carrying, Michigan Ave. Over 1-55, in the South Chicago Township, and Roosevelt Road over IHB Rail Road. , Cleaning and painting existing steel on the structures carrying, Michigan Ave. Over 1-55, and Roosevelt Road Over IHB Railroad. | — | Executed | ERA-Valdivia Contractors, Inc. $428,200 · |
1–100 of 143Next ›
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.