IDOT Jobs

2020 · 143 jobs · — Sign up free
★ My Jobs

Filtered by: County: Cook Clear all

143 jobs · — estimated

ExcelCSV
Let date Contract / PPS County / Division Highway Description Estimate Status Added Low bidder
Jan 17, 2020 60L88 CookDistrict 1 Designed overlay and ADA pedestrian ramps on Bryn Mawr Avenue beginning just east of IL 43 and extending 2.14 miles to the east, in the City of Chicago. — Executed Nov 26 New J. A. Johnson Paving Company $2,124,700 ·
Jan 17, 2020 60M68 CookDistrict 1 Bridge deck and approach overlay, bridge deck and approach repairs, reconstruction of deck joints, substructure repairs and pavement patching and overlay on existing structure no. 016-0811. — Executed Nov 26 New Martam Construction Incorporated $2,794,215 ·
Jan 17, 2020 60Y74 CookDistrict 1 Intersection improvement, channelization, and traffic signal modernization project on Golf Rd from Overlook Dr to Harms Rd in Morton Grove and Cook County Forest Preserve. — Executed Nov 26 New Capitol Cement Co., Inc. $1,293,582 ·
Jan 17, 2020 61E86 CookDistrict 1 Reconstruct the intersection of US 12/US 45 at Forest Avenue in Des Plaines. — Executed Nov 26 New Berger Excavating Contractors, Inc. $2,524,434 ·
Jan 17, 2020 61F36 CookDistrict 1 Reconstruction of Lake Street from Harlan Avenue to Euclid Avenue in Oak Park. — Executed Nov 26 New R. W. Dunteman Company $10,557,782 ·
Jan 17, 2020 61F86 CookDistrict 1 Reconstruction of 151st Street from West Avenue to Ravinia Avenue and the contruction of a roundabout at West Avenue in Orland Park. — Executed Nov 26 New P. T. Ferro Construction Co. $4,647,786 ·
Jan 17, 2020 61F91 CookDistrict 1 Resurfacing 175th Street from Ashland Avenue to Halsted Avenue in the Village of Homewood. — Executed Nov 26 New D. Construction, Inc. $464,570 ·
Jan 17, 2020 61G08 CookDistrict 1 Resurfacing, bike path contruction and traffic signal improvment on Howard Street from Milwaukee Avenue to Lehigh Avenue in Niles. — Executed Nov 26 New Capitol Cement Co., Inc. $6,976,099 ·
Jan 17, 2020 61G13 CookDistrict 1 Resurfacing Joliet Avenue from 47th Street to 39th Street in the Village of Lyons. — Executed Nov 26 New Lindahl Brothers, Inc. $911,086 ·
Jan 17, 2020 62A26 CookDistrict 1 Pavement widening on IL 53 / IL 68 to provide a new southbound right turn lane at the intersection of Rand Road and Dundee Road; includes new median, patching, resurfacing, traffic and lighting modifications and sewer installation. — Executed Nov 26 New R. W. Dunteman Company $5,247,345 ·
Jan 17, 2020 62G17 CookDistrict 1 3.1 miles of designed overlay and ADA ramp improvements on Northwest Highway from US 14 (Miner Street) to Merrill Street in Maine Township. — Executed Nov 26 New J. A. Johnson Paving Company $4,016,610 ·
Jan 17, 2020 62H96 CookDistrict 1 Overlay and pedestrian ramps on US 41; bridge deck repair on the I-94 off ramp to US 41 from I-94 to North of Old Orchard Rd. in Willmette and Skokie. — Rejected Nov 26 New Peter Baker & Son Co. $2,297,777 ·
Jan 17, 2020 62J33 CookDistrict 1 Bridge overlay and joint repair on SN 016-2036 carrying Halsted Street over I-57 in Bellwood. — Executed Nov 26 New D. Construction, Inc. $496,790 ·
Jan 17, 2020 62J45 CookDistrict 1 0.48 miles of designed overlay and pedestrian ramp improvements on Avondale Avenue from Pulaski Road to Addison Street in the City of Chicago. — Executed Nov 26 New MAT Construction Leasing, Inc. $643,197 ·
Jan 17, 2020 62J48 CookDistrict 1 Resurfacing (3R) ADA improvements on OR 309a (Old Western Ave) from Broadway Street to Western Avenue. — Executed Nov 26 New Gallagher Asphalt Corporation $197,238 ·
Jan 17, 2020 62J51 CookDistrict 1 Cleaning and painting designated steel surfaces of bridge structures carrying 1) Chicago Heights Glenwood Road over Butterfield Creek; 2) 183rd Street over I-57; 3) IL 50 over I-57; in the City of Country Club Hills and the Village of Glenwood. (SN 016-0793, 016-0583, 016-1014) — Executed Nov 26 New Capital Industrial Services $1,113,633 ·
Jan 17, 2020 62J52 CookDistrict 1 Cleaning and painting designated steel surfaces of bridge structures carrying Touhy Ave over Des Plaines River, and Wolf Rd over Weller Ditch in Des Plaines. — Executed Nov 26 New Eagle Painting & Maintenance Company, Inc. $392,220 ·
Jan 17, 2020 62J53 CookDistrict 1 Cleaning and sealing longitudinal cracks in the existing concrete pavement between traffic lanes and curb and gutter, restriping with modified urethane pavement marking in Ford Heights, Lynwood, and Sauk Village. — Executed Nov 26 New Denler, Inc. $200,433 ·
Jan 17, 2020 62J54 CookDistrict 1 4.6 miles of designed overlay and ADA pedestrian ramp improvements on Golf road from IL 43 (Waukegan Road) to McCormick Boulevard in the Villages of Glenview, Golf, Morton Grove, Skokie and City of Evanston. — Executed Nov 26 New Builders Paving, LLC $5,648,000 ·
Jan 17, 2020 62J57 CookDistrict 1 0.8 miles of standard overlay and ADA improvements on Butterfield Road in the Village of Bellwood. — Executed Nov 26 New Plote Construction, Inc. $814,877 ·
Jan 17, 2020 62K36 CookDuPageDistrict 1 Litter/Debris Removal from the edge of the pavement to the Pedestrian Barrier adjacent to the State-Owned Expr The improvement consists of Litter/Debris Removal from the edge of the pavement to the Pedestrian Barrier adjacent to the State-Owned Expressway. 200 miles in length. — Rejected Nov 26 New Sewer Rat Contractors, LLC $288,000 ·
Jan 17, 2020 62K37 CookDuPageDistrict 1 Litter/Debris Removal from the edge of the pavement to the Pedestrian Barrier on I-290 Expressway from IL 83 ( The improvement consists of Litter/Debris Removal from the edge of the pavement to the Pedestrian Barrier on I-290 Expressway from IL 83 (Kingery Hwy) to Austin Blvd. 135 miles in length. — Rejected Nov 26 New Sewer Rat Contractors, LLC $192,000 ·
Jan 17, 2020 62K38 CookDistrict 1 Litter/Debris Removal from the edge of the pavement to the Pedestrian Barrier on I-290/IL 110 Expressway from The improvement consists of Litter/Debris Removal from the edge of the pavement to the Pedestrian Barrier on I-290/IL 110 Expressway from Austin Blvd to Wells St. 253 miles in length. — Rejected Nov 26 New 10x Contractors LLC $197,600 ·
Jan 17, 2020 62K39 CookLakeDistrict 1 Litter/Debris Removal from the edge of the pavement to the pedestrian Barrier I-94 (Edens Expressway)/US 41 (S The improvement consists of Litter/Debris Removal from the edge of the pavement to the pedestrian Barrier I-94 (Edens Expressway)/US 41 (Skokie Hwy) expressway from Clavey Rd to I-90 (Kennedy Expwy). 147 miles in length. — Rejected Nov 26 New Sewer Rat Contractors, LLC $211,200 ·
Jan 17, 2020 62K40 CookDistrict 1 Litter/Debris Removal from the edge of the pavement to the Pedestrian Barrier on I-90 The improvement consists of Litter/Debris Removal from the edge of the pavement to the Pedestrian Barrier on I-90; I-90/94 expressways from W of US 12/45 Mannheim Rd to Congress Pkwy. 185 miles in length. — Rejected Nov 26 New 10x Contractors LLC $214,500 ·
Jan 17, 2020 62K41 CookDistrict 1 Litter/Debris Removal from the edge of the pavement to the pedestrian barrier on I-90/94 (Dan Ryan Expy) from The improvement consists of Litter/Debris Removal from the edge of the pavement to the pedestrian barrier on I-90/94 (Dan Ryan Expy) from Congress Pkwy to I-57/I-94 Bishop Ford Expy). 360 miles in length. — Rejected Nov 26 New 10x Contractors LLC $280,800 ·
Jan 17, 2020 62K42 CookDistrict 1 Litter/Debris Removal from the edge of the pavement to the pedestrian barrier on I-57 expressway from I 94 (Da The improvement consists of Litter/Debris Removal from the edge of the pavement to the pedestrian barrier on I-57 expressway from I 94 (Dan Ryan Expwy) to I-80. 275 miles in length. — Rejected Nov 26 New Sewer Rat Contractors, LLC $230,400 ·
Jan 17, 2020 62K43 CookDistrict 1 Litter/Debris Removal from the edge of the pavement to the pedestrian barrier on 1) FAI 94: I-94 from I-90/94 The improvement consists of Litter/Debris Removal from the edge of the pavement to the pedestrian barrier on 1) FAI 94: I-94 from I-90/94 (Dan Ryan Expwy) to I-80; 2) FAP 341: Stony Island from I-94 to US 12(95th St); 3) FAU 1574: 103rd St from Cottage Groove to Stony Island. 175 miles in length. — Rejected Nov 26 New 10x Contractors LLC $214,500 ·
Jan 17, 2020 62K44 CookWillDistrict 1 Litter/Debris Removal from the edge of the pavement to the pedestrian barrier on I-80 Expwy from I-294 to I-35 The improvement consists of Litter/Debris Removal from the edge of the pavement to the pedestrian barrier on I-80 Expwy from I-294 to I-355. 325 miles in length. — Rejected Nov 26 New Sewer Rat Contractors, LLC $177,600 ·
Jan 17, 2020 62K46 CookDistrict 1 Litter/Debris Removal from the edge of the pavement to the pedestrian barrier on I-55 - Stevenson Expwy from L The improvement consists of Litter/Debris Removal from the edge of the pavement to the pedestrian barrier on I-55 - Stevenson Expwy from Lake Shore Dr to IL 43 (Harlem Ave). 250 miles of total length. — Rejected Nov 26 New 10x Contractors LLC $195,000 ·
Jan 17, 2020 62K47 CookDuPageDistrict 1 Litter/debris removal from the edge of the pavement to the pedestrian barrier on I-55 - Stevenson Expressway from IL 43 (Harlem Ave) to I-355._150 miles in length. — Rejected Nov 26 New Viridian Enterprises, Inc. $119,250 ·
Mar 6, 2020 60M90 CookDistrict 1 0.049 miles of bridge repair, bridge joint repair, and bridge deck overlay on the structure carrying US 14 over IL 58. — Executed Nov 26 New Martam Construction Incorporated $474,343 ·
Mar 6, 2020 60R66 CookDistrict 1 Bridge deck overlay and joint repairs of Chicago Ave over the Des Plaines River. — Executed Nov 26 New MYS, Incorporated $573,893 ·
Mar 6, 2020 60R72 CookDistrict 1 Bridge deck scarification and replacement with latex concrete overlay, resufacing of both approaches and deck repairs on the structure carrying Central Rd over the Des Plaines River in Maine and Northfield Townships. — Executed Nov 26 New Martam Construction Incorporated $593,744 ·
Mar 6, 2020 60T05 CookDistrict 1 1.5 miles of reconstruction and ADA improvements on Wolf Road from IL 21 (Milwaukee Road) to north of Hintz Road in the Village of Wheeling. — Executed Nov 26 New Acura Inc. $12,538,085 ·
Mar 6, 2020 61F95 CookDistrict 1 Pavement marking removal, new pavement markings and the installation of signs on Pratt Avenue from Lawndale Avenue to McCormick Boulevard in the Village of Lincolnwood. — Rejected Nov 26 New Marking Specialists Corporation $53,296 ·
Mar 6, 2020 61G30 CookDistrict 1 Resurfacing, sidewalk construction, curb and gutter, watermain replacement, roadway lighting and traffic signal modernization on Howard Street from Sacramento Avenue to Cellan Avenue in Evanston. — Executed Nov 26 New Acura Inc. $10,088,928 ·
Mar 6, 2020 62G01 CookDistrict 1 Turn lane and median repair, ADA improvments and traffic signal modernization at the intersection of IL 50 and 115th Street and traffic signal improvements on IL 50 at 122nd Street within the Village of Alsip. — Executed Nov 26 New D. Construction, Inc. $736,313 ·
Mar 6, 2020 62G92 CookDistrict 1 Removal and replacement of the existing box culvert on Chicago Rd over Thorn Creek Tributary in Chicago Heights. — Executed Nov 26 New Dunnet Bay Construction Company $2,208,417 ·
Mar 6, 2020 62H85 CookDuPageWillDistrict 1 This is a safety (HSIP) improvement including guardrail end section replacement and new guardrail installation on various state maintained arterial routes. — Executed Nov 26 New Copenhaver Construction, Inc. $584,674 ·
Mar 6, 2020 62J44 CookDistrict 1 3.01 miles of designed overlay, pedestrian ramp, and drainage improvements on McCormick Blvd from Dempster St to Devon Ave. — Executed Nov 26 New Builders Paving, LLC $4,038,000 ·
Mar 6, 2020 62J55 CookDistrict 1 1.826 miles of designed overlay/pedestrian ramp (ADA) improvements along 106th ST from Torrence Ave to US 12/41 (Indianapolis Ave). — Executed Nov 26 New Gallagher Asphalt Corporation $2,478,606 ·
Mar 6, 2020 62J66 CookDistrict 1 0.5 miles of designed overlay and ADA improvments on Canal Street from Archer Avenue to W 28th Street in the City of Chicago. — Executed Nov 26 New MAT Construction Leasing, Inc. $467,338 ·
Mar 6, 2020 62J71 CookDistrict 1 1.62 miles of resurfacing improvements and ADA ramp improvements along US 14 (Northwest Highway) from E of Smith St to S Hicks Rd. — Executed Nov 26 New Arrow Road Construction Co. $2,317,789 ·
Mar 6, 2020 62J77 CookDistrict 1 1.3 miles of designed overlay on 5th Avenue from IL 64 (North Avenue) to Lake Street in the Villages of Melrose Park and Maywood. — Executed Nov 26 New Arrow Road Construction Co. $1,417,367 ·
Mar 6, 2020 62J85 CookDistrict 1 2.09 miles of designed overlay from S of IL 171 (Archer Ave) to 107th in Willow Springs. — Executed Nov 26 New K-Five Construction Corporation $1,026,000 ·
Mar 6, 2020 62J86 CookDistrict 1 0.70 miles of standard overlay and ADA improvements on Palatine Rd - South Frontage Rd, N Verde Ave to Palatine Rd in Arlington Heights. — Executed Nov 26 New J. A. Johnson Paving Company $539,293 ·
Mar 6, 2020 62J88 CookDistrict 1 4.4 miles of HMA surface removal, patching, resurfacing, ADA sidewalk repairs, HMA shoulders and drainage improvements on Des Plaines River Road from Foster Avenue to IL 171 (1st Avenue) and Lawrence Avenue from East River Road to Ridgewood Avenue within the Villages of Schiller Park, Norridge, Franklin Park and River Grove. — Executed Nov 26 New R. W. Dunteman Company $4,948,861 ·
Mar 6, 2020 62J97 CookDistrict 1 0.41 miles of designed overlay and pedestrian ramp upgrades on Lincoln Ave approximately 100 ft S of Main St E to approximately 50 ft N of Niles Center Rd. — Executed Nov 26 New Arrow Road Construction Co. $511,357 ·
Mar 6, 2020 62K01 CookDistrict 1 Structure improvements to SN 016-0141 carrying the CTA RR over the Dan Ryan Expressway, approximately 0.5 miles south of 55th Street. — Executed Nov 26 New Kiewit Infrastructure Co. $654,013 ·
Mar 6, 2020 62K25 CookDistrict 1 Cleaning and painting all steel surfaces of the bridge carrying 55th St over I-94 (Dan Ryan Expw) in Chicago. — Executed Nov 26 New ERA-Valdivia Contractors, Inc. $1,073,500 ·
Mar 6, 2020 62K26 CookDistrict 1 Weep hole coring, cleaning drainage structure, reconstructing drainage structure, gutter removal and replacement, debris removal, and selective clearing in the village of McCook and Lyons Township. — Executed Nov 26 New MYS, Incorporated $198,148 ·
Mar 6, 2020 62K32 CookWillDistrict 1 Concrete bridge deck sealing upon the entire top surface of the bridge deck, top of sidewalks, and the inside and top of parapets on structures at various locations. — Executed Nov 26 New M & M Concrete, Inc. $179,824 ·
Mar 6, 2020 62K56 CookDistrict 1 Light tower and foundation removal, installation of new light poles, metal foundations, LED luminaires, conduit, cable, excavation and site restoration on US 30 (Lincoln Highway) at IL 43 (Harlem Avenue) in the Village of Frankfort. — Executed Nov 26 New John Burns Construction Company $712,222 ·
Apr 24, 2020 60D77 CookDistrict 1 Roadway Construction and ramp rehab. Includes replace. concrete deck, bearings expansion joint and wingwalls. Substructure will be repaired. Project 3,709 LF. , Project 3,709 LF. Roadway reconstruction and ramp bridge rehab. Replacement of concrete deck, bearings, expansion joint and wingwall. Substructure will be repaired. — Executed Nov 26 New Lorig Construction Company $4,711,922 ·
Apr 24, 2020 60Y00 CookDistrict 1 Construction of the Intelligent Transportation System infrastructure including a new Comm. Hut, LED lighting for U/P expwys, retrofit of existing HMLTs with LED, and fiber optic cables for the Jane Byrne interchange corridor along I-90/94/290. — Executed Nov 26 New Meade Inc. $2,709,903 ·
Apr 24, 2020 62A76 CookDistrict 1 9,508 FT Construction and widening the Kennedy mainline Expwy NB from Roosevelt Rd. to Lake/Madison Sts, construction/rehab. of 10 ret. walls total, lighting, ITS, interstate resurfacing from the north. project limits to Ohio St through Hubbard's Cave. — Executed Nov 26 New Lorig Construction Company $56,078,988 ·
Apr 24, 2020 62A77 CookDistrict 1 Construction and wideing the Kennedy mainline Expwy SB from Lake/Madison St. to Roosevelt Rd., rehab. of 3 exist. ret. walls, lighting, ITS, interstate resurfacing from the north limits to Ohio St. thru Hubbard's Cave. Construction of detention storage under the AIS. — Executed Nov 26 New Lorig Construction Company $43,795,682 ·
Apr 24, 2020 62D42 CookDistrict 1 Bridge removal, roadway widening and sidewalk improvements on Pulaski Road at Ford City Drive in the City of Chicago. (SN 016-0750) — Executed Nov 26 New Dunnet Bay Construction Company $2,218,412 ·
Apr 24, 2020 62F18 CookDistrict 1 Drainage improvement, and ADA improvements at the drainage ditch along the N side of FAU Fullerton Ave from Sarah St to Silver Creek Dr in Franklin Park. — Executed Nov 26 New Pan-Oceanic Engineering Co., Inc. $449,389 ·
Apr 24, 2020 62H64 CookDistrict 1 Culvert headwall repair in the Village of Schiller Park. — Executed Nov 26 New Lakes & Rivers Contracting, Inc. $156,700 ·
Apr 24, 2020 62H71 CookDistrict 1 Bridge repair project on IL-83 at Sanitary and Ship Canal. — Executed Nov 26 New Path Construction Company, Inc. $2,378,102 ·
Apr 24, 2020 62J59 CookDistrict 1 Designed overlay including milling and resurfacing, installation of shoulder rumble strips, and other safety and drainage improvements along I-90 from IL 43 to I-94. — Executed Nov 26 New Plote Construction, Inc. $19,665,312 ·
Apr 24, 2020 62J67 CookDistrict 1 Designed overlay and pedestrian ramps on US 41 from 31 ft SE of the centerline of Kedzie Ave to 44 ft N of the centerline of Foster Ave. — Executed Nov 26 New MAT Construction Leasing, Inc. $2,257,684 ·
Apr 24, 2020 62J70 CookDistrict 1 SMART Overlay and ADA improvements on US 6 from IL-50 to E of I-294. — Executed Nov 26 New Iroquois Paving Corporation $1,256,078 ·
Apr 24, 2020 62J80 CookDistrict 1 HMA Design Overlay of Touhy Ave from 240 ft W of the intersection of Lee St, E to 100 ft E of US-14. — Executed Nov 26 New Arrow Road Construction Co. $7,128,300 ·
Apr 24, 2020 62J82 CookDistrict 1 Smart Overlay and ADA improvements on US 12 from IL 19 to N of US 20. — Executed Nov 26 New Plote Construction, Inc. $4,589,135 ·
Apr 24, 2020 62J96 CookKaneDistrict 1 Centerline joint repair and patching project on US 20 that starts at Plank Rd and extends E for 7.4 miles to a point approximately 80 ft W of the centerline of Shales Pkwy. — Executed Nov 26 New Geneva Construction Company $1,396,008 ·
Apr 24, 2020 62K21 CookDistrict 1 Bridge Deck Overlay and Bridge Repairs on I-57 over Little Calumet River in Dixmoor. — Executed Nov 26 New Dunnet Bay Construction Company $2,168,250 ·
Apr 24, 2020 62K23 CookDistrict 1 Bridge repairs and improvements on various bridges over I-290 from 25th Ave to Ridgeland Ave. — Executed Nov 26 New Lorig Construction Company $1,727,469 ·
Apr 24, 2020 62K31 CookDistrict 1 Bridge repair, bridge joint repair, and bridge deck overlay on the structure carrying Ashland Ave at Cal Sag Channel in Blue Island. — Executed Nov 26 New Rausch Infrastructure, LLC $1,597,411 ·
Jun 12, 2020 46544 CookDistrict 1 Applying water borne, lead free, white and yellow paint pavement marking lines of 4, 6, and 8 Inches In width This work shall consist of applying water borne, lead free, white and yellow paint pavement marking lines of 4, 6, and 8 Inches In width. — Executed Nov 26 New Preform Traffic Control Systems, Ltd. $795,000 ·
Jun 12, 2020 60N80 CookDistrict 1 Removal and replacement the bridge superstructure, raising roadway profile on Joliet Road over Flag Creek in the Village of indian Head Park and Burr Ridge. LT 600 FT SN 016-0393 — Executed Nov 26 New D. Construction, Inc. $2,902,020 ·
Jun 12, 2020 60X71 CookDistrict 1 Intersection re-alignment of Joliet Road at 55th Street in the village of McCook, in Lyons Township, in Cook County. — Executed Nov 26 New K-Five Construction Corporation $2,108,300 ·
Jun 12, 2020 60X94 CookDistrict 1 Reconstruction of Adams St and Jackson Blvd bridges over I-90/94 including reconstruction of entrance and exit ramps, construction of 5 prop. Conc. Retaining walls and rehab of one existing retaining wall, signing, ITS, lighting and urban enhancements. — Executed Nov 26 New Lorig Construction Company $42,620,595 ·
Jun 12, 2020 60Y69 CookDistrict 1 Landscaping within the following boundaries I-90/94: Roosevelt Rd to Washington Blvd and Peoria St to Clinton St and I-290: Roosevelt Rd to Van Buren St and Damen ve to Clinton St. — Executed Nov 26 New Nettle Creek Nursery, Inc. $275,916 ·
Jun 12, 2020 61G20 CookDistrict 1 Pavement reconstruction, storm sewers, curb and gutter, sidewalks, traffic signals, lighting, water main, landscaping and pavement markings on IL 62 in Schaumburg. — Executed Nov 26 New R. W. Dunteman Company $9,776,015 ·
Jun 12, 2020 61G33 CookDistrict 1 Construct a pedestrian underpass from Burlington Avenue, through the BNSF Railway embankment, to Hillgrove Avenue at Prospect Avenue in Western Springs. — Executed Nov 26 New D. Construction, Inc. $1,373,593 ·
Jun 12, 2020 61G35 CookDistrict 1 Reconstruction of 21st Avenue from 16th Street to 19th Street, and the reconstruction of 19th Street from 21st Avenue to 17th Avenue in Broadview. — Executed Nov 26 New A Lamp Concrete Contractors, Inc. $3,090,000 ·
Jun 12, 2020 61G39 CookDistrict 1 Resurfacing Wentworth Avenue from Bernice Road to Ridge Road in Lansing. — Executed Nov 26 New D. Construction, Inc. $799,663 ·
Jun 12, 2020 61G41 CookDistrict 1 Construction of a pedestrian path adjacent to IL 72/Higgins Road, from west of Plum Grove Road to east of Plum Grove Road in Schaumburg. — Executed Nov 26 New A Lamp Concrete Contractors, Inc. $689,669 ·
Jun 12, 2020 61G42 CookDistrict 1 Reconstruction of Central Avenue from the Union Pacific Railroad to Sheridan Road. Resurfacing of Wilmette Avenue from the Union Pacific Railroad to Lake Avenue, and traffic signal modernization at Central and Wilmette Avenues in Wilmette. — Executed Nov 26 New A Lamp Concrete Contractors, Inc. $9,504,079 ·
Jun 12, 2020 61G50 CookDistrict 1 Resurface Vincennes Road from Us 6 to Armory Drive, Armory Drive from Westview Avenue to Vincennes Road, and Westview Avenue from 172nd Street to Armory Drive in South Holland. — Executed Nov 26 New Gallagher Asphalt Corporation $1,234,904 ·
Jun 12, 2020 61G51 CookDistrict 1 Construction of a pedestrian bridge on Bryn Mawr Avenue over the Des Plaines River in Rosemont. — Executed Nov 26 New Copenhaver Construction, Inc. $1,253,143 ·
Jun 12, 2020 61G52 CookDistrict 1 Buffalo Creek trail extension from Lake Cook Road to the existing trail in Arlington. — Executed Nov 26 New A Lamp Concrete Contractors, Inc. $265,753 ·
Jun 12, 2020 61G61 CookDistrict 1 Construction of a multi-use path adjacent to Old Green Bay Road, from Maple Hill Road to Park Avenue in Glencoe. — Executed Nov 26 New A Lamp Concrete Contractors, Inc. $776,067 ·
Jun 12, 2020 62A38 CookDistrict 1 (0.27 mile) Intersection improvement consisting of HMA surface removal, pavement widening, earth excavation, ADA sidewalk repair, construction of a concrete barrier median and HMA resurfacing on IL 171 (1st Ave) at Roosevelt Rd. — Executed Nov 26 New K-Five Construction Corporation $1,462,098 ·
Jun 12, 2020 62F20 CookDuPageDistrict 1 (18.3 mi), IL 83 between IL 171 and Third Ave, guardrail installation, shoulder rumble strip, re-striping pavement markings, wireless interconnect and reflecto ized traffic signal backplates. — Executed Nov 26 New K-Five Construction Corp & Quality Seal & Saw, Inc & Midwest Fence Corp Tri-Venture $1,074,369 ·
Jun 12, 2020 62F90 CookDistrict 1 Traffic Signal Modernization, Channelization, Standard Overlay, ADA Improvements; FAP Route 348 (IL 43 / Harlem Ave) at Archer Ave in the City of Chicago and the Village of Summit in Cook County. — Executed Nov 26 New K-Five Construction Corporation $1,287,974 ·
Jun 12, 2020 62G02 CookDistrict 1 Traffic Signal Modernization and left turn lane storage extension at the the intersection of Ogden Ave and Austin Blvd located in the Town of Cicero. — Executed Nov 26 New Lyons Electric Company, Inc. $758,758 ·
Jun 12, 2020 62H70 CookDistrict 1 This is a slope stabilization project on IL Rte 83 from north of Glenwood Dyer Road to south of Glenwood Lansing Road that includes guardrail replacement. It is located in Village of Lynwood in Cook county. The gross and net length of the project is 1.183 miles (6250 ft). , (6250 ft) Slope stabilization on IL Rte 83 from N. of Glenwood Dyer Rd. to S. of Glenwood Lansing Rd, includes guardrail replacement located in the Village of Lynwood. — Executed Nov 26 New D. Construction, Inc. $760,107 ·
Jun 12, 2020 62J28 CookDistrict 1 Removal and replacement of an existing 32-foot long 18" x 24" culvert with a proposed 48-foot long 36" x 72" cast in place culvert (Proposed SN 016-2272) on 147th Street over Tributary C. of Cal-Sag Channel in the city of Oak Forest and The Forest Preserve District of Cook County. , (LT 351 Ft.) Improve 147th Street over Tributary C. of Cal-Sag Channel — Executed Nov 26 New Scanlon Excavating & Concrete, Inc. $334,356 ·
Jun 12, 2020 62J68 CookDistrict 1 8 miles of standard overlay, HMA and Class B patching, and pedestrian ramps on US 45 / IL 21 from just north of Columbus Parkway to North of Rand Road in the Villages of Wheeling, Mount Prospect and Cities of Prospect Heights and Des Plaines. , Standard Overlay, HMA, Class B patching and pedestrian ramp begins 500 ft north of Columbus Pkwy and proceeds 41323 ft (8.0 miles) southerly direction to North of Rand Rd. in the Villages of Wheeling, Mount Prospect and Cities of Prospect Height and Des·P — Executed Nov 26 New Arrow Road Construction Co. $4,381,945 ·
Jun 12, 2020 62J89 CookDistrict 1 (5 mile) Standard overlay and ADA Pedestrian Ramps on Michigan Ave. Located within South Chicago and Hyde park Townships. , (5 mile) Standard overlay and ADA Pedestrian Ramps on Michigan Ave. Located — Executed Nov 26 New K-Five Construction Corporation $4,658,002 ·
Jun 12, 2020 62J98 CookDistrict 1 Bridge beam replacement for SN 016-0825 carrying Church St over I-94. — Executed Nov 26 New ICC Group Inc. $676,200 ·
Jun 12, 2020 62K20 CookDistrict 1 Improvements to bridge parapet, joint, steel, and wingwall on I-55 over BRC RR in Chicago. — Executed Nov 26 New D. Construction, Inc. $655,770 ·
Jun 12, 2020 62K35 CookDistrict 1 Permanent protective shield installation on IL 53 bridges over IL 62, US 14 and RR, Palatine Rd, Kirchoff Rd, Anderson Dr, as well as Fulton Market St bridge over I-90/I-94. — Executed Nov 26 New Herlihy Mid-Continent Company $790,785 ·
Jun 12, 2020 62K49 CookDistrict 1 Partial beam and deck replacement on the bridge carrying Sibley Blvd. over I- 94 located in the Village of Dolton, IL. LT= 1110 FT (0.21MI) — Executed Nov 26 New D. Construction, Inc. $682,072 ·
Jun 12, 2020 62K72 CookDistrict 1 (593.9 FT.) Bridge repair project of the structure carrying Torrence Ave over IHB and BandOCT Railroads, in the Village of Burnham, in Thornton Township, in Cook County. SN 016-0935 — Executed Nov 26 New ERA-Valdivia Contractors, Inc. $479,948 ·
Jun 12, 2020 62K76 CookDistrict 1 Cleaning and painting existing steel on the structures carrying, Michigan Ave. Over 1-55, in the South Chicago Township, and Roosevelt Road over IHB Rail Road. , Cleaning and painting existing steel on the structures carrying, Michigan Ave. Over 1-55, and Roosevelt Road Over IHB Railroad. — Executed Nov 26 New ERA-Valdivia Contractors, Inc. $428,200 ·
1–100 of 143Next ›

Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.