62Let jobs
$85,600,897Total low bids
$73,139,957Total estimates
+17.0%Low bids vs estimates
Jan 2014 results
Bid tabs (Excel) ExcelCSV| Let date | Contract | County / District | Project | Estimate | Low bid | Low bidder | % vs est. | Bidders |
|---|---|---|---|---|---|---|---|---|
| Jan 23, 2014 | 140029STPY-222C(002)3P | Stpy-222c(003)3p |
29162(06) STPY-222C(004)3P DEWEY RESURFACE (ASPHALT ) US-60: BEGIN AT THE SOUTH SH -34 JCT, EXTEND EAST. PROJECT LENGTH = 19.980 MILES · | $4,706,020 | $5,526,187 | CORNELL CONSTRUCTION COMPANY, INC. | +17.4% | 5 |
| Jan 23, 2014 | 140045STPY-140A(218)3P | Leflore |
RESURFACE (ASPHALT ) US-59: FROM SH-9 (SUNSET CORNERS ), EXTEND SOUTH. PROJECT LENGTH = 5.74 MILES · | — | $4,610,467 | JOB CONSTRUCTION CO., INC. | 2 | |
| Jan 23, 2014 | 140077SSR-172A(512)SR | Tulsa Division 8 |
RESURFACE (ASPHALT AND PC CONCRETE ) US-64: BEGIN 0.65 MILE EAST OF THE OSAGE CL , EXTEND EAST. PROJECT LENGTH = 3.903 MILES · | $3,628,433 | $3,999,616 | Keystone Services, Inc. | +10.2% | 6 |
| Jan 23, 2014 | 140078SSP-272A(062)SS | Tulsa Division 8 |
BRIDGE REHABILITATION SH-51: OVER THE ARKANSAS RIVER, 0.10 MILES NORTH OF SH-97. · | $4,264,000 | $3,861,001 | GIBSON & ASSOCIATES, INC. | -9.5% | 3 |
| Jan 23, 2014 | 140030CIRB-123C(085)RB | Ellis Division 6 |
RESURFACE (ASPHALT ) COUNTY ROAD (NS-190): BEGIN AT US -60, THEN EXTEND NORTH . PROJECT LENGTH = 6.69 MILES · | $3,489,869 | $3,271,591 | THE CUMMINS CONSTRUCTION CO., INC. | -6.3% | 4 |
| Jan 23, 2014 | 140004CIRB-103C(074)RB | Atoka Division 2 |
GRADE, DRAIN, SURFACE , AND BRIDGE COUNTY ROAD (NS-395/IRON STOB RD ): BEGIN AT SH -3, EXTEND SOUTH. PROJECT LENGTH = 4.809 MILES · | $2,818,218 | $3,078,910 | THE CUMMINS CONSTRUCTION CO., INC. | +9.3% | 3 |
| Jan 23, 2014 | 140005STPY-204N(014)3P | Beaver Division 6 |
RESURFACE (ASPHALT ) US-270: FROM 0.14 MILE EAST OF SH -23, EXTEND EAST. PROJECT LENGTH = 6.86 MILES · | $2,270,610 | $2,464,182 | HIGHWAY CONTRACTORS, INC. | +8.5% | 1 |
| Jan 23, 2014 | 140058STP-255B(179)AG | Stp-255a(208)ag |
OKLAHOMA RESURFACE (ASPHALT ) CITY STREETS (PORTLAND AVE /WESTERN AVE ): WESTERN AVE FROM SW 44TH ST EXT NORTH . PORTLAND AVE FROM RENO AVE , EXT NORTH . PROJECT LENGTH = 4.062 MILES · | $2,600,285 | $2,315,322 | MARKWELL PAVING COMPANY, INC. | -11.0% | 6 |
| Jan 23, 2014 | 140043STPY-238C(010) | Kiowa Division 5 |
BRIDGE AND APPROACHES US -62B: OVER OTTER CREEK AND OVERFLOW , 2.0 MILE NORTHEAST OF THE TILLMAN COUNTY LINE. PROJECT LENGTH = 0.251 MILE · | $2,382,613 | $2,299,692 | SEWELL BROS., INC. | -3.5% | 4 |
| Jan 23, 2014 | 140035STPY-127C(117) | Grant Division 4 |
BRIDGE AND APPROACHES SH -11: OVER POLECAT CREEK , 5.9 MILES EAST OF US -81. PROJECT LENGTH = 0.270 MILE · | $1,924,560 | $2,202,406 | OBC, INC. | +14.4% | 3 |
| Jan 23, 2014 | 140036SSP-127C(123)SS | Ssp-127c(126)ss |
GRANT BRIDGE AND APPROACHES US -64: OVER UNNAMED CREEKS 3.5 MILES AND 5.5 MILES EAST OF THE ALFALFA COUNTY LINE . PROJECT LENGTH = 0.197 MILES · | $1,534,083 | $1,993,929 | IHC Scott, INC. | +30.0% | 1 |
| Jan 23, 2014 | 140053SBR-250C(004)SB | Sbr-250c(005)sb |
MURRAY BRIDGE REHABILITATION US -77: OVER CHIGLEY SANDY CREEK , 0.59 MILES NORTH OF SH -7. US-77: OVER KICKAPOO SANDY CREEK , 7.98 MILES NORTH OF SH -7. · | $2,027,210 | $1,956,545 | K & R BUILDERS, INC. | -3.5% | 2 |
| Jan 23, 2014 | 140068STPY-262N(018)3P | Pontotoc |
RESURFACE (PC CONCRETE) SH-1: FROM SH-3, EXTEND NORTH . SH-3: FROM SH-1, EXTEND EAST. PROJECT LENGTH = 4.090 MILES · | $2,113,203 | $1,935,823 | DIAMOND SURFACE, INC. | -8.4% | 7 |
| Jan 23, 2014 | 140079SSR-273N(010)SR | Wagoner Division 1 |
RESURFACE (ASPHALT ) US-69: BEGIN 6.74 MILES NORTH OF THE MUSKOGEE CL , EXTEND NORTH . PROJECT LENGTH = 2.600 MILES · | $1,903,659 | $1,769,909 | GLOVER & ASSOCIATES, INC. | -7.0% | 4 |
| Jan 23, 2014 | 140065STPY-259B(001)3P | Pawnee Division 8 |
RESURFACE (ASPHALT ) SH-18: BEGIN 0.40 MILES NORTH OF US -64, EXTEND NORTH . PROJECT LENGTH = 7.189 MILES · | $1,478,768 | $1,760,971 | THE QUAPAW COMPANY | +19.1% | 2 |
| Jan 23, 2014 | 140038STPY-227B(006)3P | Stpy-227b(007)3p |
GRANT RESURFACE (ASPHALT ) SH-11: FROM THE KAY COUNTY LINE , EXTEND WEST. PROJECT LENGTH = 10.680 MILES · | — | $1,739,975 | Evans & Associates Construction Co., Inc. | 1 | |
| Jan 23, 2014 | 140016SSR-216N(003)SR | Comanche Division 7 |
RESURFACE (ASPHALT ) US-62: BEGIN 4.98 MILES EAST OF THE KIOWA CL , EXTEND EAST. PROJECT LENGTH = 5.600 MILES · | $1,624,666 | $1,696,878 | T & G CONSTRUCTION, INC. | +4.4% | 2 |
| Jan 23, 2014 | 140062SSR-256N(017)SR | Okmulgee Division 1 |
RESURFACE (ASPHALT ) US-75: BEGIN 2.39 MILES NORTH OF I -40, EXTEND NORTH (SOUTHBOUND LANES ONLY ). PROJECT LENGTH = 3.932 MILES · | $1,559,603 | $1,668,272 | GLOVER & ASSOCIATES, INC. | +7.0% | 3 |
| Jan 23, 2014 | 140019SSR-216B(025)SR | Comanche Division 7 |
RESURFACE (ASPHALT ) SH-36: BEGIN 10.84 MILES EAST OF THE TILLMAN CL , EXTEND EAST TO I-44. PROJECT LENGTH = 5.350 MILES · | $1,459,032 | $1,585,922 | T & G CONSTRUCTION, INC. | +8.7% | 1 |
| Jan 23, 2014 | 140117SSP-158C(128)SS | Ottawa Division 8 |
BRIDGE AND APPROACHES SH -125: OVER HUDSON CREEK, 3.8 MILES NORTH OF US -60. PROJECT LENGTH = 0.215 MILES · | $1,421,993 | $1,555,000 | PACE CONSTRUCTION CO., LLC | +9.4% | 2 |
| Jan 23, 2014 | 140056STPY-252C(014)3P | Noble Division 4 |
RESURFACE (ASPHALT ) US-177: BEGIN 2.68 MILES NORTH OF SH -15 WEST, EXTEND NORTH . PROJECT LENGTH = 6.39 MILES · | — | $1,430,133 | Evans & Associates Construction Co., Inc. | 1 | |
| Jan 23, 2014 | 140023CIRB-122C(062)RB | Dewey Division 5 |
BRIDGE AND APPROACHES COUNTY ROAD : OVER LONE CREEK, 3.2 MILES EAST OF WEBB . PROJECT LENGTH = 0.879 MILES · | $1,178,779 | $1,363,936 | SEWELL BROS., INC. | +15.7% | 4 |
| Jan 23, 2014 | 140063SSR-157B(181)SR | Osage Division 8 |
RESURFACE (ASPHALT ) SH-11: BEGIN AT THE US -60 JCT, EXTEND SOUTH. PROJECT LENGTH = 5.23 MILES · | $1,334,565 | $1,348,525 | APAC-CENTRAL, INC. | +1.0% | 2 |
| Jan 23, 2014 | 140018NHPPY-020N(043)3P | Comanche Division 7 |
RESURFACE (ASPHALT ) US-62: BEGIN 1.23 MILES NORTH OF I -44, EXTEND NORTH . PROJECT LENGTH = 3.310 MILES · | $1,231,678 | $1,342,832 | T & G CONSTRUCTION, INC. | +9.0% | 1 |
| Jan 23, 2014 | 140049STPY-242C(012)3P | Logan Division 4 |
RESURFACE (ASPHALT ) US-77: BEGIN 0.90 MILES NORTH OF SH -33, EXTEND NORTH . PROJECT LENGTH = 6.160 MILES · | $1,084,640 | $1,265,895 | MARKWELL PAVING COMPANY, INC. | +16.7% | 2 |
| Jan 23, 2014 | 140012SSR-114B(272)SR | Cleveland Division 3 |
RESURFACE (ASPHALT ) SH-9: FROM 72ND AVENUE , EXTEND EAST. PROJECT LENGTH = 6.000 MILES · | $1,454,901 | $1,227,512 | HASKELL LEMON CONSTRUCTION CO. | -15.6% | 4 |
| Jan 23, 2014 | 140080STPY-176B(179)3P | Woods Division 6 |
RESURFACE (ASPHALT ) US-281: BEGIN 8.4 MILES NORTH OF US -64, EXTEND NORTH . PROJECT LENGTH = 5.63 MILES · | $1,135,065 | $1,205,425 | Venture Corporation dba VCO Paving | +6.2% | 1 |
| Jan 23, 2014 | 140009SSR-110B(233)SR | Carter Division 7 |
RESURFACE (ASPHALT ) US-70: FROM SH-76, EXTEND EAST (EASTBOUND LANES ONLY ). PROJECT LENGTH = 4.000 MILES · | $1,366,179 | $1,172,790 | OVERLAND CORPORATION | -14.2% | 3 |
| Jan 23, 2014 | 140015STP-NBIL(205)CI | Comanche Division 7 |
BRIDGE AND APPROACHES COUNTY ROAD (EW-170/WOODLAWN RD ): OVER BEAVER CREEK 3.0 MILES SOUTH AND 2.7 MILES EAST OF THE SH -7/SH-65 JUNCTION. PROJECT LENGTH = 0.390 MILES · | $1,092,344 | $1,158,970 | K & R BUILDERS, INC. | +6.1% | 3 |
| Jan 23, 2014 | 140031SSR-223C(001)SR | Ellis Division 6 |
RESURFACE (ASPHALT ) SH-15: FROM THE TEXAS STATE LINE , EXTEND EAST. PROJECT LENGTH = 6.550 MILES · | $1,115,255 | $1,152,714 | J & R SAND COMPANY, INC. | +3.4% | 3 |
| Jan 23, 2014 | 140051SSR-247B(010)SR | Major Division 6 |
RESURFACE (ASPHALT ) SH-8: BEGIN 3.0 MILES SOUTH OF THE MAJOR COUNTY LINE , EXTEND NORTH . PROJECT LENGTH = 8.00 MILES · | $1,189,200 | $1,150,075 | THE CUMMINS CONSTRUCTION CO., INC. | -3.3% | 3 |
| Jan 23, 2014 | 140020STPY-218B(006)3P | Craig Division 8 |
RESURFACE (ASPHALT ) US-60: FROM I-44, EXTEND EAST TO SH -82. PROJECT LENGTH = 3.939 MILES · | $1,146,321 | $1,113,363 | APAC-CENTRAL, INC. | -2.9% | 3 |
| Jan 23, 2014 | 140034STPY-226B(001)3P | Grady Division 7 |
RESURFACE (ASPHALT ) SH-4: BEGIN AT SH -37, EXTEND NORTH TO CANADIAN RIVER BRIDGE . PROJECT LENGTH = 2.300 MILES · | — | $1,110,104 | MARKWELL PAVING COMPANY, INC. | 3 | |
| Jan 23, 2014 | 140001STPY-201C(006)3P | Adair Division 1 |
RESURFACE (ASPHALT ) SH-51: BEGIN AT SH -59, EXTEND EAST TO THE ARKANSAS STATE LINE . PROJECT LENGTH = 7.010 MILES · | $1,078,030 | $1,099,309 | GLOVER & ASSOCIATES, INC. | +2.0% | 5 |
| Jan 23, 2014 | 140017NHPPY-216N(015)3P | Comanche Division 7 |
RESURFACE (ASPHALT ) SH-7: BEGIN AT THE SH -65 JCT, EXTEND EAST. PROJECT LENGTH = 4.000 MILES · | $993,626 | $1,077,453 | T & G CONSTRUCTION, INC. | +8.4% | 1 |
| Jan 23, 2014 | 140003NHPPY-201N(008)3P | Adair Division 1 |
RESURFACE (ASPHALT) US-59: BEGIN AT US-62, EXTEND NORTH. PROJECT LENGTH = 1.936 MILES · | $1,072,629 | $1,064,236 | GLOVER & ASSOCIATES, INC. | -0.8% | 4 |
| Jan 23, 2014 | 140008STPY-209B(011)3P | Canadian Division 4 |
RESURFACE (UTBWC) SH-4: FROM THE GRADY CL , EXTEND NORTH TO SH -152. PROJECT LENGTH = 4.500 MILES · | $984,042 | $1,050,013 | HASKELL LEMON CONSTRUCTION CO. | +6.7% | 2 |
| Jan 23, 2014 | 140057STPY-254C(017)3P | Okfuskee Division 3 |
RESURFACE (ASPHALT ) SH-56: BEGIN 10.49 MILES EAST THEN NORTH OF SH -27, EXTEND NORTH . PROJECT LENGTH = 6.50 MILES · | $1,014,773 | $1,044,312 | HASKELL LEMON CONSTRUCTION CO. | +2.9% | 2 |
| Jan 23, 2014 | 140052STPY-249C(002)3P | Mayes Division 8 |
RESURFACE (ASPHALT ) SH-28: BEGIN 7.91 MILES EAST OF US -69, EXTEND EAST. PROJECT LENGTH = 4.547 MILES · | $977,290 | $985,081 | GLOVER & ASSOCIATES, INC. | +0.8% | 4 |
| Jan 23, 2014 | 140042CIRB-236C(004)RB | Kay Division 4 |
BRIDGE AND APPROACHES COUNTY ROAD (EW-18/HUBBARD RD): OVER CHIKASKIA RIVER , 2.3 MILES EAST OF US -177. PROJECT LENGTH = 0.18 MILES · | — | $983,705 | B & B BRIDGE COMPANY, LLC | 3 | |
| Jan 23, 2014 | 140013STP-214B(006)AG | Cleveland Division 3 |
RESURFACE (ASPHALT ) CITY STREET (WESTERN AVE ): FROM SW 134TH STREET TO SW 104TH STREET IN OKLAHOMA CITY . PROJECT LENGTH = 1.982 MILES · | $1,181,519 | $979,860 | MARKWELL PAVING COMPANY, INC. | -17.1% | 5 |
| Jan 23, 2014 | 140033CIRB-126C(196)RB | Grady Division 7 |
BRIDGE AND APPROACHES COUNTY ROAD (NS-292): OVER EAST BITTER CREEK 3.2 MILES SOUTH OF I-44. PROJECT LENGTH = 0.302 MILES · | $852,812 | $920,491 | K & R BUILDERS, INC. | +7.9% | 4 |
| Jan 23, 2014 | 140060SSP-156C(096)SS | Okmulgee Division 1 |
BRIDGE AND APPROACHES US -266: OVER HOFFMAN CREEK, 8.7 MILES EAST OF US -62. PROJECT LENGTH = 0.028 MILES · | $836,224 | $827,600 | Tri Star Construction Arkansas, LLC | -1.0% | 3 |
| Jan 23, 2014 | 140064SSR-258C(008)SR | Ottawa Division 8 |
RESURFACE (ASPHALT ) SH-10: FROM SH-137, EXTEND WEST TO SH -10C. PROJECT LENGTH = 4.186 MILES · | $703,700 | $713,967 | SWIFT CONSTRUCTION CO., INC. DBA SWIFT ASPHALT | +1.5% | 3 |
| Jan 23, 2014 | 140055SSP-152C(131)SS | Noble Division 4 |
BRIDGE AND APPROACHES SH -164: OVER EAST WARREN CREEK , 1.3 MILES EAST OF THE GARFIELD COUNTY LINE . PROJECT LENGTH = 0.075 MILES · | $694,957 | $688,626 | Tri Star Construction Arkansas, LLC | -0.9% | 3 |
| Jan 23, 2014 | 140069SSP-203F(021)SS | Atoka, Bryan, Pittsburg |
JOINT SEAL/REPAIR US-69/US-70/US-270/SH-43: AT MULTIPLE LOCATIONS IN DIVISION II. · | $623,546 | $632,479 | B & B CONSTRUCTION SERVICE J.T., INC. | +1.4% | 5 |
| Jan 23, 2014 | 140074SBR-269N(014)SB | Stephens Division 7 |
BRIDGE REPAIR US-81: OVER CLARIDY CREEK, 1.5 MILES NORTH OF SH-7. · | $559,649 | $624,305 | EARTH BUILDERS, L.P. | +11.6% | 2 |
| Jan 23, 2014 | 140021STP-120C(115)CI | Custer Division 5 |
BRIDGE AND APPROACHES COUNTY ROAD (EW-99): OVER TURTLE CREEK 4.0 MILES EAST OF US-183. PROJECT LENGTH = 0.152 MILES · | $579,084 | $619,854 | SEWELL BROS., INC. | +7.0% | 6 |
| Jan 23, 2014 | 140048SSP-142C(133)SS | Logan Division 4 |
BRIDGE AND APPROACHES US -77: OVER LAWRIE CREEK , 5.37 MILES NORTH OF SH -3. PROJECT LENGTH = 0.056 MILES · | $746,252 | $612,350 | Cimarron Construction Company, LLC | -17.9% | 4 |
| Jan 23, 2014 | 140061STPY-256A(004)3P | Okmulgee Division 1 |
RESURFACE (ASPHALT) US-75B: BEGIN AT I-40, EXTEND EAST. PROJECT LENGTH = 1.630 MILES · | $511,904 | $588,947 | GLOVER & ASSOCIATES, INC. | +15.1% | 3 |
| Jan 23, 2014 | 140047SSR-241B(009)SR | Lincoln Division 3 |
RESURFACE (ASPHALT ) US-177: FROM SH-105, EXTEND NORTH TO PAYNE CL . PROJECT LENGTH = 4.800 MILES · | $558,296 | $556,860 | Atlas Paving Company | -0.3% | 5 |
| Jan 23, 2014 | 140022SSR-121B(151)SR | Delaware Division 8 |
RESURFACE (ASPHALT ) US-59: FROM THE OTTAWA CL , EXTEND SOUTH. PROJECT LENGTH = 2.303 MILES · | — | $482,490 | APAC-CENTRAL, INC. | 3 | |
| Jan 23, 2014 | 140066STPY-260C(011)3P | Payne Division 4 |
RESURFACE (ASPHALT ) SH-86: FROM SH-51 EXTEND NORTH 3.01 MILES TO THE NOBLE COUNTY LINE. PROJECT LENGTH = 2.91 MILES · | $430,136 | $436,240 | THE QUAPAW COMPANY | +1.4% | 2 |
| Jan 23, 2014 | 140002STPY-201B(007)3P | Adair Division 1 |
RESURFACE (ASPHALT ) US-62: BEGIN 1.01 MILES EAST OF SH -59, EXTEND EAST TO THE ARKANSAS STATE LINE . PROJECT LENGTH = 1.879 MILES · | $366,315 | $428,667 | GLOVER & ASSOCIATES, INC. | +17.0% | 4 |
| Jan 23, 2014 | 140010STP-112D(057)CI | Choctaw Division 2 |
BRIDGE AND APPROACHES COUNTY ROAD (EW-212): OVER CARNEY CREEK , 5.0 MILES EAST OF GRANT. PROJECT LENGTH = 0.179 MILES · | $364,236 | $404,326 | HUB Construction, Inc. | +11.0% | 2 |
| Jan 23, 2014 | 140070STPY-NBIP(473) | Atoka, Bryan |
BRIDGE PAINTING US-69/US-70/SH-43: AT MULTIPLE LOCATIONS IN DIVISION II. · | $415,943 | $371,081 | POSEIDON CONSTRUCTION, INC. | -10.8% | 6 |
| Jan 23, 2014 | 140032STPY-225B(022)3P | Garvin Division 3 |
RESURFACE (ASPHALT ) SH-19: FROM US-77, EXTEND NORTHEAST IN PAULS VALLEY . PROJECT LENGTH = 0.400 MILES · | $291,298 | $310,100 | Silver Star Construction Company, Inc. | +6.5% | 4 |
| Jan 23, 2014 | 140073STPY-267B(018)3P | Seminole Division 3 |
RESURFACE (ASPHALT ) SH-270A: FROM 0.78 MILES NORTH OF US -270, EXTEND NORTH . PROJECT LENGTH = 0.720 MILES · | $225,137 | $219,871 | THE CUMMINS CONSTRUCTION CO., INC. | -2.3% | 2 |
| Jan 23, 2014 | 140039STPY-232B(019)3P | Hughes Division 3 |
RESURFACE (ASPHALT ) SH-1: FROM 0.74 MILES WEST OF US -75, EXTEND EAST. PROJECT LENGTH = 0.530 MILES · | $219,066 | $207,858 | GLOVER & ASSOCIATES, INC. | -5.1% | 4 |
| Jan 23, 2014 | 140011SBR-212C(006)SB | Choctaw Division 2 |
BRIDGE REHABILITATION SH-93: OVER FRAZIER CREEK, 11.7 MILES NORTH OF US-70. · | $175,046 | $153,985 | B & B CONSTRUCTION SERVICE J.T., INC. | -12.0% | 5 |
| Jan 23, 2014 | 140081MC-240N(023) | Leflore |
BRIDGE REPAIR US -59: OVER POTEAU RIVER APPROXIMATELY 3.0 MILES SOUTH OF THE NORTH US-270 JCT NEAR HEAVENER . · | $82,406 | $91,997 | LOGOS CONSTRUCTION CO., LLC | +11.6% | 4 |
| Jan 23, 2014 | 140040MC-232B(020) | Hughes Division 3 |
BRIDGE REPAIR US-75: OVER WEWOKA CREEK 2.5 MILES SOUTH OF SH-9. · | $66,292 | $89,964 | B & B CONSTRUCTION SERVICE J.T., INC. | +35.7% | 3 |
1–62 of 62
Source: ODOT bid tabulations for each letting on Contracts and Proposals, read from ODOT's published bid tab reports, including the engineer's estimate. Bid Potato loads new lettings as ODOT posts them and backfills the last two years. Confirm against ODOT's official tabulations.