| 1 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 150 | CY |
$50.00 |
$73.66 |
$107.91 |
$73.36 |
$65.00 |
| 2 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 2,760 | TON |
$25.00 |
$22.12 |
$19.21 |
$27.09 |
$21.00 |
| 3 | 407(B) 0250 |
TACK COAT | 5,640 | GAL |
$3.50 |
$2.89 |
$2.66 |
$2.69 |
$2.50 |
| 4 | 411(C) 5955 |
SUPERPAVE, TYPE S4(PG 70-28 OK) | 10,400 | TON |
$76.00 |
$78.00 |
$79.15 |
$81.31 |
$84.50 |
| 5 | 411(H) 6210 |
SUPERPAVE, TYPE S3(PATCH)(PG64-22OK) | 100 | TON |
$150.00 |
$120.00 |
$90.59 |
$158.43 |
$135.00 |
| 6 | 411(I) 6310 |
SUPERPAVE, TYPE S4(PATCH)(PG64-22OK) | 75 | TON |
$150.00 |
$140.00 |
$100.59 |
$180.33 |
$145.00 |
| 7 | 412 5267 |
COLD MILLING PAVEMENT | 1,600 | SY |
$2.75 |
$7.18 |
$7.40 |
$6.80 |
$3.33 |
| 8 | 855(A) 8840 |
TRAFFIC STRIPE(PLASTIC)(THIN LINE)(4" WIDE) | 87,500 | LF |
$0.3600 |
$0.4100 |
$0.3500 |
$0.3400 |
$0.3500 |
| 9 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$6,500.00 |
$3,617.87 |
$3,108.15 |
$5,500.00 |
$12,950.00 |
| 10 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$22,000.00 |
$12,000.00 |
$38,041.50 |
$23,700.00 |
$14,500.00 |