| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$10,000.00 |
$10,500.00 |
$50,000.00 |
$12,000.00 |
| 2 | 202(H) 0185 |
EARTHWORK | 1 | LSUM |
$40,000.00 |
$63,500.00 |
$70,000.00 |
$85,000.00 |
| 3 | 221(C) 2801 |
TEMPORARY SILT FENCE | 4,000 | LF |
$1.50 |
$1.40 |
$1.50 |
$2.40 |
| 4 | 221(F) 0100 |
TEMPORARY SILT DIKE | 450 | LF |
$6.00 |
$9.35 |
$9.00 |
$9.61 |
| 5 | 230(A) 2806 |
SOLID SLAB SODDING | 19,460 | SY |
$1.50 |
$1.50 |
$1.60 |
$1.80 |
| 6 | 233(A) 2817 |
VEGETATIVE MULCHING | 10 | AC |
$500.00 |
$225.00 |
$600.00 |
$840.56 |
| 7 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 1,748 | TON |
$30.00 |
$24.34 |
$29.00 |
$38.03 |
| 8 | 408 5774 |
PRIME COAT | 1,288 | GAL |
$4.50 |
$8.00 |
$8.00 |
$7.20 |
| 9 | 509(D) 0325 |
CLASS C CONCRETE | 10 | CY |
$300.00 |
$265.00 |
$320.00 |
$325.60 |
| 10 | 613(B) 4527 |
21" X 15" CORR. GALV. STEEL PIPE ARCH | 32 | LF |
$40.00 |
$32.50 |
$55.00 |
$36.82 |
| 11 | 613(L) 4504 |
21" X 15" PREFAB. CULVERT END SECTION, ARCH | 2 | EA |
$350.00 |
$292.50 |
$1,000.00 |
$289.40 |
| 12 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 190 | CY |
$15.00 |
$9.50 |
$10.00 |
$20.00 |
| 13 | 501(F) 6352 |
GRANULAR BACKFILL | 76 | CY |
$50.00 |
$60.00 |
$65.00 |
$75.86 |
| 14 | 503(A) 1311 |
PRESTRESSED CONCRETE BEAMS (TYPE II) | 298 | LF |
$185.00 |
$175.00 |
$160.00 |
$152.25 |
| 15 | 503(A) 1312 |
PRESTRESSED CONCRETE BEAMS (TYPE III) | 239 | LF |
$205.00 |
$205.00 |
$195.00 |
$198.73 |
| 16 | 504(C) 6250 |
SEALED EXPANSION JOINT | 33.06 | LF |
$200.00 |
$242.50 |
$210.00 |
$269.23 |
| 17 | 504(D) 6239 |
CONCRETE RAIL (TR3) | 437.5 | LF |
$60.00 |
$75.00 |
$75.00 |
$97.72 |
| 18 | 506(A) 1322 |
STRUCTURAL STEEL | 1,220 | LB |
$2.00 |
$3.00 |
$3.00 |
$3.18 |
| 19 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 9 | EA |
$750.00 |
$1,005.00 |
$900.00 |
$740.19 |
| 20 | 507(B) 6176 |
WEATHERING STEEL EXPANSION BEARING ASSEMBLY | 9 | EA |
$800.00 |
$1,005.00 |
$900.00 |
$740.19 |
| 21 | 509(A) 1326 |
CLASS AA CONCRETE | 146.7 | CY |
$550.00 |
$597.50 |
$450.00 |
$600.00 |
| 22 | 509(B) 1328 |
CLASS A CONCRETE | 159 | CY |
$450.00 |
$612.50 |
$480.00 |
$600.00 |
| 23 | 511(A) 1332 |
REINFORCING STEEL | 69,054 | LB |
$0.9500 |
$0.9000 |
$1.00 |
$1.29 |
| 24 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 304 | LF |
$30.00 |
$25.55 |
$30.00 |
$27.18 |
| 25 | 514(A) 6011 |
PILES, FURNISHED (HP 12X53) | 736 | LF |
$35.00 |
$30.80 |
$36.00 |
$33.13 |
| 26 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 304 | LF |
$10.00 |
$10.95 |
$40.00 |
$24.50 |
| 27 | 514(B) 6294 |
PILES, DRIVEN (HP 12X53) | 736 | LF |
$12.00 |
$13.20 |
$40.00 |
$28.23 |
| 28 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 130 | SY |
$5.00 |
$11.00 |
$12.00 |
$4.62 |
| 29 | 516(A) 6094 |
DRILLED SHAFTS 48" DIAMETER | 248 | LF |
$450.00 |
$515.00 |
$600.00 |
$448.67 |
| 30 | 516(C) 6200 |
CROSSHOLE SONIC LOGGING | 4 | EA |
$2,500.00 |
$2,500.00 |
$3,500.00 |
$1,320.88 |
| 31 | 516(D) 6400 |
CSL ACCESS TUBES | 248 | LF |
$10.00 |
$20.00 |
$50.00 |
$12.75 |
| 32 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 2,100 | TON |
$35.00 |
$35.10 |
$35.00 |
$51.90 |
| 33 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 560 | TON |
$30.00 |
$27.57 |
$28.00 |
$44.16 |
| 34 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 60 | LF |
$20.00 |
$35.00 |
$25.00 |
$21.31 |
| 35 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 60 | LF |
$20.00 |
$35.00 |
$25.00 |
$51.86 |
| 36 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$5,000.00 |
$6,250.00 |
$30,000.00 |
$11,965.27 |
| 37 | 623(F) 5686 |
GUARDRAIL ANCHOR UNIT (TYPE D-BF) | 4 | EA |
$1,200.00 |
$1,375.00 |
$1,900.00 |
$1,501.00 |
| 38 | 623(F) 6029 |
GUARDRAIL ANCHOR UNIT (TYPE A) | 4 | EA |
$800.00 |
$1,485.00 |
$1,600.00 |
$1,621.08 |
| 39 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$5,000.00 |
$2,600.00 |
$5,000.00 |
$2,641.76 |
| 40 | 202(A) 1301 |
UNCLASSIFIED EXCAVATION | 1,200 | CY |
$6.00 |
$7.50 |
$10.00 |
$8.75 |
| 41 | 501(A) 1306 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 85 | CY |
$12.00 |
$15.00 |
$10.00 |
$18.00 |
| 42 | 509(A) 1326 |
CLASS AA CONCRETE | 206.75 | CY |
$420.00 |
$487.00 |
$450.00 |
$425.00 |
| 43 | 511(A) 1332 |
REINFORCING STEEL | 31,093 | LB |
$1.00 |
$0.9000 |
$1.00 |
$1.10 |
| 44 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 1,147 | TON |
$35.00 |
$37.81 |
$35.00 |
$48.00 |
| 45 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 330 | TON |
$30.00 |
$27.59 |
$28.00 |
$44.16 |
| 46 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$10,000.00 |
$5,000.00 |
$40,000.00 |
$12,000.00 |
| 47 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$15,000.00 |
$7,920.00 |
$15,000.00 |
$11,407.59 |
| 48 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$3,750.00 |
$3,500.00 |
$2,702.14 |
| 49 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$70,000.00 |
$60,000.00 |
$65,000.00 |
$60,000.00 |