Bid tab 140060

Let Jan 23, 2014 · Division 1 · Okmulgee Sign up free

‹ Jan 2014 results

BRIDGE AND APPROACHES US -266: OVER HOFFMAN CREEK, 8.7 MILES EAST OF US -62. PROJECT LENGTH = 0.028 MILES

Let date
Thursday, January 23, 2014
Contract
140060
J/P numbers
21739(04)
District
Division 1
County
Okmulgee
Highway
Limits
BRIDGE AND APPROACHES US -266: OVER HOFFMAN CREEK, 8.7 MILES EAST OF US -62. PROJECT LENGTH = 0.028 MILES
Project number
SSP-156C(096)SS

Bidders 3

#ContractorTotal bidvs estimatevs low
EEEngineer's estimate$836,224
1 Tri Star Construction Arkansas, LLC Low bidder $827,600 -1.0%
2 C-GAWF CONSTRUCTION, INC. $994,064 +18.9% +20.1%
3 MANHATTAN ROAD & BRIDGE COMPANY, LLC $999,986 +19.6% +20.8%

Bid tab: unit prices 47 items

ExcelCSV
SeqBid codeDescriptionQtyUnitEstimate #1 Tri Star Constr…#2 C-GAWF CONSTRUC…#3 MANHATTAN ROAD …
1201(A) 0102 CLEARING AND GRUBBING1LSUM $1,500.00 $25,000.00 $5,000.00 $10,000.00
2202(A) 0183 UNCLASSIFIED EXCAVATION2,578CY $8.00 $9.00 $20.00 $12.00
3202(D) 0184 UNCLASSIFIED BORROW1,000CY $9.00 $12.00 $2.00 $12.00
4205(A) 4229 TYPE A-SALVAGED TOPSOIL1LSUM $10,000.00 $10,000.00 $5,000.00 $5,500.00
5221(C) 2801 TEMPORARY SILT FENCE41LF $2.75 $4.00 $10.00 $3.00
6221(D) 2803 TEMPORARY SEDIMENT FILTER4EA $250.00 $175.00 $500.00 $95.00
7221(F) 0100 TEMPORARY SILT DIKE56LF $9.00 $9.00 $10.00 $8.50
8229 4318 DITCH LINER PROTECTION511LF $2.00 $3.00 $2.00 $2.10
9230(A) 2806 SOLID SLAB SODDING11,024SY $1.80 $2.00 $1.65 $1.60
10233(A) 2817 VEGETATIVE MULCHING0.79AC $1,000.00 $700.00 $5.00 $200.00
11241 2832 MOWING4.56AC $85.00 $100.00 $5.00 $156.00
12303(A) 2100 AGGREGATE BASE TYPE A325CY $40.00 $70.00 $65.00 $65.00
13325 5271 SEPARATOR FABRIC1,263SY $1.25 $1.75 $2.25 $2.25
14402(E) 0225 TRAFFIC BOUND SURFACE COURSE TYPE E237TON $35.00 $38.00 $50.00 $35.00
15407(B) 0250 TACK COAT130GAL $4.00 $7.00 $5.00 $3.15
16408 5774 PRIME COAT735GAL $5.50 $7.00 $8.00 $7.25
17411(B) 5945 SUPERPAVE, TYPE S3(PG 64-22 OK)245TON $85.00 $130.00 $175.00 $103.00
18411(C) 5960 SUPERPAVE, TYPE S4(PG 64-22 OK)96TON $95.00 $150.00 $150.00 $157.00
19509(D) 0325 CLASS C CONCRETE93CY $290.00 $325.00 $300.00 $265.00
20611(G) 6002 INLET (SMD-TYPE 2)4EA $3,500.00 $3,700.00 $2,500.00 $2,750.00
21613(A) 0491 18" R.C.PIPE CLASS III118LF $35.00 $33.00 $50.00 $60.00
22613(T) 1187 STANDARD BEDDING MATERIAL, CLASS C33CY $40.00 $70.00 $50.00 $60.00
23613(V) 1180 TRENCH EXCAVATION44CY $10.00 $10.00 $20.00 $10.00
24619(A) 0920 REMOVAL OF STRUCTURES & OBSTRUCTIONS1LSUM $5,000.00 $10,000.00 $1,250.00 $5,000.00
25619(B) 4763 REMOVAL OF CONCRETE PAVEMENT W/ASPHALT OVERLAY247SY $12.00 $14.00 $5.00 $10.00
26619(B) 4780 REMOVAL OF GUARDRAIL549LF $3.00 $4.00 $2.00 $5.00
27619(C) 0924 SAWING PAVEMENT443LF $3.00 $5.00 $10.00 $6.00
28624(A) 4281 FENCE-STYLE WWF666LF $5.00 $5.00 $7.00 $5.50
29624(C) 4458 FENCE-STYLE SWF (4 BARBED WIRE)462LF $7.00 $6.00 $7.00 $4.75
30202(A) 1301 UNCLASSIFIED EXCAVATION4,000CY $6.75 $6.50 $10.00 $12.00
31501(A) 1306 STRUCTURAL EXCAVATION UNCLASSIFIED300CY $24.50 $20.00 $15.00 $35.00
32509(A) 1326 CLASS AA CONCRETE810CY $480.00 $375.00 $375.00 $590.00
33511(A) 1332 REINFORCING STEEL123,690LB $0.9500 $0.9000 $0.9500 $0.9500
34619(D) 1397 REMOVAL OF EXISTING BRIDGE STRUCTURE1LSUM $20,000.00 $25,000.00 $215,000.00 $35,000.00
35850(A) 8110 SHEET ALUMINUM SIGNS27.5SF $15.78 $40.00 $14.00 $34.00
36851(C) 8324 2" SQUARE TUBE POST62LF $7.16 $13.00 $12.50 $10.50
37856(A) 8530 TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE)800LF $0.3700 $5.00 $2.20 $3.75
38857(F) 8006 PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE)100LF $0.1700 $2.50 $1.20 $2.10
39880(B) 8818 CONSTRUCTION SIGNS 0 TO 6.25 SF5,535SD $0.2200 $0.1000 $1.00 $0.0600
40880(B) 8821 CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF1,260SD $0.8000 $0.1000 $2.20 $0.0600
41880(B) 8824 CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF225SD $1.22 $3.00 $3.60 $2.10
42880(C) 8842 CONSTRUCTION BARRICADES(TYPE III)1,260SD $0.4100 $0.1000 $1.75 $0.0600
43880(E) 8860 WARNING LIGHTS(TYPE A)2,520SD $0.1500 $0.3000 $0.1300 $0.2100
44882(A) 8306 PORT.CHANGEABLE MESSAGE SIGN295SD $15.10 $7.00 $7.00 $5.25
45642(B) 0096 CONSTRUCTION STAKING LEVEL II1LSUM $15,000.00 $7,000.00 $4,250.00 $5,250.00
46220 2800 SWPPP DOCUMENTATION AND MANAGEMENT1LSUM $2,000.00 $2,000.00 $2,175.00 $1,827.00
47641 1399 MOBILIZATION1LSUM $63,000.00 $78,000.00 $42,500.00 $74,995.00