| 1 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 2,925 | CY |
$6.44 |
$8.50 |
$15.00 |
$9.00 |
| 2 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$4,843.56 |
$13,157.00 |
$4,000.00 |
$10,000.00 |
| 3 | 221(C) 2801 |
TEMPORARY SILT FENCE | 832 | LF |
$2.18 |
$3.00 |
$2.10 |
$2.25 |
| 4 | 221(F) 0100 |
TEMPORARY SILT DIKE | 14 | LF |
$11.76 |
$11.00 |
$8.00 |
$8.00 |
| 5 | 230(A) 2806 |
SOLID SLAB SODDING | 3,755 | SY |
$2.31 |
$3.35 |
$2.35 |
$2.75 |
| 6 | 233(A) 2817 |
VEGETATIVE MULCHING | 0.8 | AC |
$754.02 |
$745.00 |
$510.00 |
$500.00 |
| 7 | 241 2832 |
MOWING | 3.25 | AC |
$112.75 |
$74.50 |
$52.00 |
$50.00 |
| 8 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 448 | CY |
$61.49 |
$99.75 |
$65.00 |
$75.00 |
| 9 | 307(A) 4200 |
FLY ASH | 115 | TON |
$75.00 |
$89.50 |
$72.00 |
$95.00 |
| 10 | 307(F) 4250 |
CEMENTITIOUS MODIFIED SUBGRADE | 2,126 | SY |
$5.00 |
$5.25 |
$3.50 |
$5.35 |
| 11 | 325 5271 |
SEPARATOR FABRIC | 2,527 | SY |
$1.89 |
$1.15 |
$2.00 |
$2.00 |
| 12 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 186 | TON |
$36.19 |
$50.00 |
$45.00 |
$42.25 |
| 13 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 586 | TON |
$100.00 |
$180.00 |
$102.00 |
$125.00 |
| 14 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 197 | TON |
$115.00 |
$200.00 |
$132.00 |
$165.00 |
| 15 | 509(D) 0325 |
CLASS C CONCRETE | 42 | CY |
$500.00 |
$345.50 |
$300.00 |
$275.00 |
| 16 | 609(B) 1524 |
2'-8" COMB. CURB & GUTTER (6" MNTBLE) | 358 | LF |
$23.39 |
$25.50 |
$30.00 |
$40.00 |
| 17 | 611(G) 5113 |
INLET CI DES. 2 (B) | 2 | EA |
$3,531.86 |
$4,141.00 |
$4,000.00 |
$4,150.00 |
| 18 | 613(A) 0491 |
18" R.C.PIPE CLASS III | 82 | LF |
$60.00 |
$64.00 |
$70.00 |
$108.00 |
| 19 | 613(J) 5915 |
EDGE DRAIN CONDUIT-PERFORATED | 350 | LF |
$12.00 |
$10.30 |
$18.00 |
$18.00 |
| 20 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$15,000.00 |
$23,000.00 |
$4,250.00 |
$15,000.00 |
| 21 | 619(B) 4763 |
REMOVAL OF CONCRETE PAVEMENT W/ASPHALT OVERLAY | 967 | SY |
$5.76 |
$7.25 |
$10.00 |
$20.00 |
| 22 | 619(C) 0924 |
SAWING PAVEMENT | 45 | LF |
$6.06 |
$2.25 |
$6.00 |
$5.00 |
| 23 | 624(C) 4459 |
FENCE-STYLE SWF (5 BARBED WIRE) | 908 | LF |
$6.06 |
$5.00 |
$6.50 |
$8.00 |
| 24 | 202(A) 1301 |
UNCLASSIFIED EXCAVATION | 2,150 | CY |
$15.00 |
$8.50 |
$15.00 |
$18.00 |
| 25 | 501(A) 1306 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 164 | CY |
$25.00 |
$26.00 |
$35.00 |
$30.00 |
| 26 | 501(G) 6309 |
CLSM BACKFILL | 100 | CY |
$175.00 |
$119.00 |
$150.00 |
$225.00 |
| 27 | 509(A) 1326 |
CLASS AA CONCRETE | 440.7 | CY |
$500.00 |
$422.00 |
$580.00 |
$650.00 |
| 28 | 511(A) 1332 |
REINFORCING STEEL | 60,110 | LB |
$1.00 |
$1.00 |
$1.00 |
$1.25 |
| 29 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$20,000.00 |
$18,000.00 |
$25,000.00 |
$25,000.00 |
| 30 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$10,000.00 |
$7,200.00 |
$4,738.00 |
$15,000.00 |
| 31 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 60 | SD |
$25.00 |
$37.25 |
$26.00 |
$32.00 |
| 32 | 854(A) 8800 |
TRAFFIC STRIPE(PAINT)(4" WIDE) | 2,400 | LF |
$0.9900 |
$0.5000 |
$1.00 |
$0.4500 |
| 33 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$20,000.00 |
$8,000.00 |
$6,500.00 |
$14,000.00 |
| 34 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$3,725.00 |
$1,800.00 |
$6,000.00 |
| 35 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$55,000.00 |
$15,000.00 |
$60,000.00 |
$30,000.00 |