| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$40,000.00 |
$24,665.00 |
$130,650.00 |
$50,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 12,000 | CY |
$6.00 |
$7.40 |
$10.90 |
$11.11 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 21,000 | CY |
$10.00 |
$8.40 |
$6.10 |
$10.94 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$20,000.00 |
$29,775.00 |
$77,250.00 |
$46,500.00 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 10,000 | LF |
$2.25 |
$1.65 |
$1.40 |
$1.40 |
| 6 | 221(F) 0100 |
TEMPORARY SILT DIKE | 1,000 | LF |
$9.00 |
$8.80 |
$8.10 |
$7.54 |
| 7 | 230(A) 2806 |
SOLID SLAB SODDING | 55,000 | SY |
$1.50 |
$1.45 |
$1.45 |
$1.65 |
| 8 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 5,000 | CY |
$32.00 |
$55.55 |
$36.40 |
$47.00 |
| 9 | 311(D) 0154 |
PROCESSING EXISTING BASE & SURFACE, METHOD D | 14,786.31 | LF |
$4.00 |
$5.30 |
$2.20 |
$3.82 |
| 10 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 10,750 | TON |
$25.00 |
$24.35 |
$18.70 |
$24.97 |
| 11 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 11,000 | TON |
$70.00 |
$68.90 |
$70.50 |
$77.00 |
| 12 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 7,200 | TON |
$70.00 |
$80.60 |
$81.60 |
$82.00 |
| 13 | 601(B) 0536 |
TYPE I-A PLAIN RIPRAP | 2,000 | TON |
$43.00 |
$48.15 |
$27.50 |
$37.00 |
| 14 | 601(I) 6312 |
FILTER FABRIC (RIPRAP) | 1,500 | SY |
$12.50 |
$3.55 |
$2.10 |
$22.00 |
| 15 | 613(B) 0689 |
18" CORR. GALV. STEEL PIPE | 170 | LF |
$25.00 |
$21.05 |
$31.90 |
$27.13 |
| 16 | 613(B) 4528 |
28" X 20" CORR. GALV. STEEL PIPE ARCH | 340 | LF |
$35.00 |
$25.90 |
$36.25 |
$31.33 |
| 17 | 613(B) 4533 |
64" X 43" CORR. GALV. STEEL PIPE ARCH | 80 | LF |
$90.00 |
$116.05 |
$129.40 |
$84.50 |
| 18 | 613(C) 5105 |
36" PRECOATED CORR. STEEL PIPE | 200 | LF |
$60.00 |
$67.40 |
$93.40 |
$60.56 |
| 19 | 613(C) 5108 |
42" PRECOATED CORR. STEEL PIPE | 50 | LF |
$70.00 |
$78.60 |
$72.40 |
$170.00 |
| 20 | 613(C) 5113 |
54" PRECOATED CORR. STEEL PIPE | 120 | LF |
$80.00 |
$103.25 |
$116.20 |
$110.00 |
| 21 | 613(C) 5114 |
60" PRECOATED CORR. STEEL PIPE | 120 | LF |
$90.00 |
$124.00 |
$125.30 |
$129.24 |
| 22 | 613(C) 5206 |
21" X 15" PRECOATED CORR. STL. PIPE ARCH | 60 | LF |
$40.00 |
$36.60 |
$36.70 |
$65.00 |
| 23 | 613(C) 5216 |
28" X 20" PRECOATED CORR. STL. PIPE ARCH | 80 | LF |
$40.00 |
$50.25 |
$67.40 |
$67.00 |
| 24 | 613(C) 5230 |
42" X 29" PRECOATED CORR. STL. PIPE ARCH | 140 | LF |
$60.00 |
$65.50 |
$85.40 |
$94.00 |
| 25 | 613(C) 5231 |
49" X 33" PRECOATED CORR. STL. PIPE ARCH | 135 | LF |
$50.00 |
$88.75 |
$123.60 |
$107.57 |
| 26 | 613(C) 5285 |
57" X 38" PRECOATED CORR. STL. PIPE ARCH | 80 | LF |
$60.00 |
$117.75 |
$125.10 |
$123.19 |
| 27 | 613(P) 0760 |
18" GALV. STEEL CULVERT END SECTION ROUND | 12 | EA |
$350.00 |
$214.55 |
$225.00 |
$203.80 |
| 28 | 613(P) 0763 |
36" GALV. STEEL CULVERT END SECTION ROUND | 10 | EA |
$250.00 |
$506.25 |
$355.00 |
$366.49 |
| 29 | 613(P) 0764 |
42" GALV. STEEL CULVERT END SECTION ROUND | 2 | EA |
$1,400.00 |
$752.00 |
$415.00 |
$674.16 |
| 30 | 613(P) 0766 |
54" GALV. STEEL CULVERT END SECTION ROUND | 4 | EA |
$2,000.00 |
$1,163.00 |
$650.00 |
$773.98 |
| 31 | 613(P) 0767 |
60" GALV. STEEL CULVERT END SECTION ROUND | 4 | EA |
$2,000.00 |
$1,640.10 |
$825.00 |
$949.70 |
| 32 | 613(P) 4571 |
28" X 20" GALV. STEEL CULVERT END SECTION ARCH | 22 | EA |
$1,500.00 |
$242.65 |
$305.00 |
$300.00 |
| 33 | 613(P) 4573 |
42" X 29" GALV. STEEL CULVERT END SECTION ARCH | 8 | EA |
$1,250.00 |
$461.15 |
$510.00 |
$421.70 |
| 34 | 613(P) 4574 |
49" X 33" GALV. STEEL CULVERT END SECTION ARCH | 8 | EA |
$2,250.00 |
$701.75 |
$650.00 |
$628.31 |
| 35 | 613(P) 4575 |
57" X 38" GALV. STEEL CULVERT END SECTION ARCH | 4 | EA |
$3,000.00 |
$824.05 |
$775.00 |
$830.71 |
| 36 | 613(P) 7025 |
21" X 15" GALV. STEEL CULVERT END SECTION ARCH | 4 | EA |
$550.00 |
$213.65 |
$360.00 |
$200.00 |
| 37 | 619(B) 0291 |
REMOVAL OF HEADWALL | 1 | EA |
$1,500.00 |
$1,002.50 |
$500.00 |
$1,415.23 |
| 38 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 325 | LF |
$20.00 |
$16.55 |
$34.15 |
$26.30 |
| 39 | 623(G) 8571 |
GUARDRAIL END TREATMENT (GET) | 2 | EA |
$2,500.00 |
$2,055.15 |
$4,560.00 |
$2,151.68 |
| 40 | 629(A) 4958 |
MAILBOX INSTALLATION-SINGLE | 14 | EA |
$70.00 |
$85.25 |
$105.00 |
$119.54 |
| 41 | 629(B) 4959 |
MAILBOX INSTALLATION-MULTIPLE | 2 | EA |
$150.00 |
$185.50 |
$210.00 |
$239.08 |
| 42 | 629(C) 4960 |
MAILBOX | 17 | EA |
$25.00 |
$50.15 |
$30.00 |
$29.88 |
| 43 | 629(D) 4961 |
REMOVAL OF MAILBOX INSTALLATION | 17 | EA |
$25.00 |
$50.15 |
$10.00 |
$11.95 |
| 44 | 855(A) 8812 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 50,800 | LF |
$0.5000 |
$0.4100 |
$0.3800 |
$0.4300 |
| 45 | 501(A) 1306 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 11.13 | CY |
$50.00 |
$100.25 |
$260.00 |
$49.62 |
| 46 | 509(A) 1326 |
CLASS AA CONCRETE | 29.52 | CY |
$700.00 |
$852.15 |
$706.28 |
$836.76 |
| 47 | 509(B) 1328 |
CLASS A CONCRETE | 34.3 | CY |
$650.00 |
$832.10 |
$800.40 |
$717.22 |
| 48 | 511(A) 1332 |
REINFORCING STEEL | 10,446 | LB |
$1.00 |
$1.50 |
$0.6000 |
$1.20 |
| 49 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 200 | TON |
$45.00 |
$48.15 |
$60.65 |
$39.18 |
| 50 | 601(I) 6312 |
FILTER FABRIC (RIPRAP) | 100 | SY |
$3.00 |
$5.05 |
$1.00 |
$16.58 |
| 51 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$10,000.00 |
$11,530.00 |
$17,950.00 |
$7,172.25 |
| 52 | 501(A) 1306 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 13.55 | CY |
$50.00 |
$100.25 |
$215.00 |
$101.88 |
| 53 | 509(A) 1326 |
CLASS AA CONCRETE | 38.72 | CY |
$700.00 |
$852.15 |
$523.90 |
$836.76 |
| 54 | 509(B) 1328 |
CLASS A CONCRETE | 37.63 | CY |
$650.00 |
$832.10 |
$692.40 |
$717.22 |
| 55 | 511(A) 1332 |
REINFORCING STEEL | 11,839 | LB |
$1.00 |
$1.50 |
$0.6000 |
$1.20 |
| 56 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 200 | TON |
$45.00 |
$48.15 |
$60.65 |
$36.42 |
| 57 | 601(I) 6312 |
FILTER FABRIC (RIPRAP) | 100 | SY |
$3.00 |
$5.05 |
$1.00 |
$16.58 |
| 58 | 504(D) 6239 |
CONCRETE RAIL (TR3) | 50 | LF |
$80.00 |
$404.00 |
$236.66 |
$836.76 |
| 59 | 509(D) 1331 |
CLASS C CONCRETE | 20 | CY |
$500.00 |
$404.00 |
$270.40 |
$478.15 |
| 60 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 600 | TON |
$45.00 |
$48.15 |
$46.00 |
$34.58 |
| 61 | 601(I) 6312 |
FILTER FABRIC (RIPRAP) | 300 | SY |
$3.00 |
$5.05 |
$1.00 |
$12.90 |
| 62 | 623(A) 1418 |
BEAM GUARDRAIL W-BEAM SINGLE | 200 | LF |
$15.00 |
$16.55 |
$34.15 |
$26.30 |
| 63 | 623(F) 5686 |
GUARDRAIL ANCHOR UNIT (TYPE D-BF) | 4 | EA |
$2,000.00 |
$952.40 |
$2,995.00 |
$1,434.45 |
| 64 | 623(G) 8571 |
GUARDRAIL END TREATMENT (GET) | 4 | EA |
$2,500.00 |
$2,056.00 |
$4,560.00 |
$2,151.67 |
| 65 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$1.00 |
$69,925.00 |
$75,000.00 |
$50,803.40 |
| 66 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$10,000.00 |
$5,665.00 |
$5,500.00 |
$1,500.00 |
| 67 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$50,000.00 |
$84,300.00 |
$198,950.00 |
$65,000.00 |