| 1 | 202(H) 0185 |
EARTHWORK | 1 | LSUM |
$150,000.00 |
$155,000.00 |
$152,000.00 |
$224,000.00 |
$230,000.00 |
| 2 | 210 0121 |
OBLITERATING ABANDONED ROAD | 3,858 | LF |
$8.50 |
$10.00 |
$2.50 |
$11.20 |
$8.00 |
| 3 | 221(C) 2801 |
TEMPORARY SILT FENCE | 3,500 | LF |
$1.50 |
$1.50 |
$1.75 |
$1.51 |
$1.22 |
| 4 | 221(F) 0100 |
TEMPORARY SILT DIKE | 1,000 | LF |
$7.00 |
$9.00 |
$9.60 |
$8.96 |
$6.88 |
| 5 | 230(A) 2806 |
SOLID SLAB SODDING | 50,000 | SY |
$1.50 |
$1.62 |
$1.60 |
$1.66 |
$1.32 |
| 6 | 233(A) 2817 |
VEGETATIVE MULCHING | 9.95 | AC |
$500.00 |
$900.00 |
$990.00 |
$924.00 |
$512.00 |
| 7 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 1,880 | CY |
$45.00 |
$70.00 |
$75.00 |
$61.60 |
$80.00 |
| 8 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 199 | TON |
$28.00 |
$32.00 |
$36.75 |
$30.20 |
$48.00 |
| 9 | 509(D) 0325 |
CLASS C CONCRETE | 20 | CY |
$350.00 |
$500.00 |
$300.00 |
$556.25 |
$650.00 |
| 10 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 912 | TON |
$38.00 |
$45.00 |
$40.50 |
$51.25 |
$50.00 |
| 11 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 304 | TON |
$32.00 |
$35.00 |
$34.50 |
$43.96 |
$48.00 |
| 12 | 613(B) 0692 |
36" CORR. GALV. STEEL PIPE | 78 | LF |
$45.00 |
$40.00 |
$46.40 |
$40.22 |
$45.00 |
| 13 | 613(B) 4528 |
28" X 20" CORR. GALV. STEEL PIPE ARCH | 178 | LF |
$35.00 |
$28.00 |
$36.40 |
$33.04 |
$35.00 |
| 14 | 613(M) 7187 |
TYPE B4 CULVERT END TREATMENT | 4 | EA |
$1,100.00 |
$1,200.00 |
$1,200.00 |
$1,396.74 |
$1,100.00 |
| 15 | 613(M) 7189 |
TYPE D4 CULVERT END TREATMENT | 1 | EA |
$1,200.00 |
$1,500.00 |
$1,500.00 |
$1,865.83 |
$1,200.00 |
| 16 | 202(A) 1301 |
UNCLASSIFIED EXCAVATION | 5,400 | CY |
$8.00 |
$7.00 |
$7.50 |
$6.72 |
$8.00 |
| 17 | 501(A) 1306 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 176 | CY |
$8.00 |
$10.00 |
$25.00 |
$13.44 |
$5.00 |
| 18 | 509(A) 1326 |
CLASS AA CONCRETE | 467.27 | CY |
$500.00 |
$585.00 |
$610.00 |
$624.12 |
$492.46 |
| 19 | 511(A) 1332 |
REINFORCING STEEL | 110,794 | LB |
$0.8500 |
$1.00 |
$1.15 |
$1.03 |
$0.9000 |
| 20 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 144 | TON |
$38.00 |
$42.00 |
$44.50 |
$47.89 |
$50.00 |
| 21 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 48 | TON |
$32.00 |
$35.00 |
$37.10 |
$40.60 |
$48.00 |
| 22 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 220 | CY |
$12.00 |
$15.00 |
$25.00 |
$8.96 |
$50.00 |
| 23 | 501(G) 6309 |
CLSM BACKFILL | 102 | CY |
$142.02 |
$140.00 |
$200.00 |
$200.41 |
$385.00 |
| 24 | 503(A) 1313 |
PRESTRESSED CONCRETE BEAMS (TYPE IV) | 299 | LF |
$225.00 |
$230.00 |
$255.00 |
$246.94 |
$750.00 |
| 25 | 504(D) 6239 |
CONCRETE RAIL (TR3) | 281.3 | LF |
$65.00 |
$65.00 |
$96.50 |
$93.90 |
$125.00 |
| 26 | 506(A) 1322 |
STRUCTURAL STEEL | 590 | LB |
$2.75 |
$4.00 |
$4.95 |
$3.23 |
$8.00 |
| 27 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 3 | EA |
$850.00 |
$800.00 |
$2,110.00 |
$1,317.87 |
$2,000.00 |
| 28 | 507(B) 6176 |
WEATHERING STEEL EXPANSION BEARING ASSEMBLY | 3 | EA |
$850.00 |
$800.00 |
$2,110.00 |
$1,317.87 |
$2,000.00 |
| 29 | 509(A) 1326 |
CLASS AA CONCRETE | 83.83 | CY |
$500.00 |
$650.00 |
$825.00 |
$709.92 |
$1,000.00 |
| 30 | 509(B) 1328 |
CLASS A CONCRETE | 79.4 | CY |
$525.00 |
$650.00 |
$800.00 |
$680.16 |
$1,000.00 |
| 31 | 511(A) 1332 |
REINFORCING STEEL | 32,931 | LB |
$0.8500 |
$1.00 |
$1.15 |
$1.14 |
$1.65 |
| 32 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 140 | LF |
$32.00 |
$31.50 |
$35.00 |
$43.47 |
$60.00 |
| 33 | 514(A) 6011 |
PILES, FURNISHED (HP 12X53) | 420 | LF |
$38.00 |
$35.00 |
$40.00 |
$51.19 |
$70.00 |
| 34 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 140 | LF |
$12.00 |
$13.50 |
$15.00 |
$11.20 |
$50.00 |
| 35 | 514(B) 6294 |
PILES, DRIVEN (HP 12X53) | 420 | LF |
$12.00 |
$15.00 |
$15.00 |
$11.20 |
$60.00 |
| 36 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 832 | TON |
$38.00 |
$42.00 |
$40.50 |
$43.41 |
$50.00 |
| 37 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 277 | TON |
$32.00 |
$35.00 |
$34.50 |
$36.12 |
$48.00 |
| 38 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$10,000.00 |
$12,000.00 |
$10,000.00 |
$16,800.00 |
$30,000.00 |
| 39 | 623(F) 6033 |
GUARDRAIL ANCHOR UNIT (TYPE II) | 4 | EA |
$2,200.00 |
$2,475.00 |
$2,600.00 |
$2,520.00 |
$2,250.00 |
| 40 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$5,000.00 |
$5,500.00 |
$5,750.00 |
$5,600.00 |
$5,000.00 |
| 41 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$7,500.00 |
$21,500.00 |
$25,000.00 |
$21,840.00 |
$20,000.00 |
| 42 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$7,500.00 |
$4,000.00 |
$2,500.00 |
$4,480.00 |
$6,000.00 |
| 43 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$40,000.00 |
$45,000.00 |
$55,500.00 |
$72,906.66 |
$210,000.00 |