| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$5,000.00 |
$15,500.00 |
$20,000.00 |
| 2 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$5,000.00 |
$7,250.00 |
$8,000.00 |
| 3 | 221(C) 2801 |
TEMPORARY SILT FENCE | 963 | LF |
$5.00 |
$4.00 |
$1.38 |
| 4 | 221(F) 0100 |
TEMPORARY SILT DIKE | 20 | LF |
$25.00 |
$40.00 |
$12.89 |
| 5 | 230(A) 2806 |
SOLID SLAB SODDING | 586 | SY |
$6.00 |
$6.00 |
$4.42 |
| 6 | 230(F) 2812 |
WATERING | 47 | KGAL |
$50.00 |
$16.00 |
$12.00 |
| 7 | 234(A) 2824 |
FERTILIZING (10-20-10) | 0.06 | TON |
$900.00 |
$2,000.00 |
$1,150.00 |
| 8 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 513.8 | TON |
$200.00 |
$120.00 |
$92.65 |
| 9 | 412 5267 |
COLD MILLING PAVEMENT | 1,922 | SY |
$15.00 |
$14.00 |
$6.95 |
| 10 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 809 | LF |
$5.00 |
$5.00 |
$5.00 |
| 11 | 623 0100 |
(PL)GUARDRAIL CURBING | 4 | EA |
$1,000.00 |
$1,050.00 |
$800.00 |
| 12 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 650 | LF |
$25.00 |
$18.60 |
$15.50 |
| 13 | 623(G) 8590 |
GUARDRAIL END TREATMENT (31") | 4 | EA |
$3,000.00 |
$2,340.00 |
$1,950.00 |
| 14 | 623(I) 8700 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 4 | EA |
$2,500.00 |
$1,740.00 |
$1,450.00 |
| 15 | 501(G) 6309 |
CLSM BACKFILL | 100 | CY |
$250.00 |
$162.50 |
$250.00 |
| 16 | 502(C) 6116 |
(PL)FALSEWORK JACKING | 1 | LSUM |
$30,000.00 |
$15,000.00 |
$22,500.00 |
| 17 | 504(A) 1304 |
APPROACH SLAB | 147.6 | SY |
$250.00 |
$316.50 |
$250.00 |
| 18 | 504(B) 1305 |
SAW-CUT GROOVING | 693.4 | SY |
$6.00 |
$4.32 |
$3.60 |
| 19 | 504(C) 6250 |
SEALED EXPANSION JOINT | 68.4 | LF |
$350.00 |
$350.00 |
$250.00 |
| 20 | 504(D) 6245 |
CONCRETE RAIL (TR4) | 402.6 | LF |
$95.00 |
$106.00 |
$125.00 |
| 21 | 506(A) 1322 |
STRUCTURAL STEEL | 52,440 | LB |
$5.00 |
$3.35 |
$8.00 |
| 22 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 15 | EA |
$1,500.00 |
$2,100.00 |
$3,500.00 |
| 23 | 507(B) 6176 |
WEATHERING STEEL EXPANSION BEARING ASSEMBLY | 15 | EA |
$1,500.00 |
$2,100.00 |
$3,500.00 |
| 24 | 509(A) 1326 |
CLASS AA CONCRETE | 140.4 | CY |
$900.00 |
$925.00 |
$850.00 |
| 25 | 509(D) 1331 |
CLASS C CONCRETE | 19.6 | CY |
$600.00 |
$700.00 |
$700.00 |
| 26 | 511 6306 |
MECHANICAL SPLICES | 524 | EA |
$25.00 |
$23.00 |
$40.00 |
| 27 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 36,200 | LB |
$1.30 |
$1.15 |
$2.00 |
| 28 | 512(A) 1323 |
PAINTING EXISTING STRUCTURES | 1 | LSUM |
$35,000.00 |
$35,760.00 |
$29,800.00 |
| 29 | 512(B) 6303 |
COLLECTION AND HANDLING OF WASTE | 1 | LSUM |
$5,000.00 |
$3,840.00 |
$3,200.00 |
| 30 | 513(B) 6019 |
CLASS B BRIDGE DECK REPAIR | 5 | SY |
$500.00 |
$450.00 |
$750.00 |
| 31 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 476 | SY |
$5.00 |
$4.00 |
$3.50 |
| 32 | 520(A) 6058 |
PREPARATION OF CRACKS, ABOVE WATER | 2 | LF |
$50.00 |
$100.00 |
$250.00 |
| 33 | 520(C) 6060 |
EPOXY RESIN, ABOVE WATER | 1 | GAL |
$150.00 |
$100.00 |
$100.00 |
| 34 | 521(A) 6210 |
PNEUMATICALLY PLACED MORTAR | 11.5 | SY |
$800.00 |
$660.00 |
$700.00 |
| 35 | 523(A) 6550 |
SEALER CRACK PREPARATION | 161.3 | LF |
$5.00 |
$10.00 |
$4.00 |
| 36 | 523(B) 6560 |
SEALER RESIN | 2 | GAL |
$150.00 |
$200.00 |
$100.00 |
| 37 | 540 4515 |
(PL)REPAIR BRIDGE ITEM (TYPE A) | 2 | EA |
$2,000.00 |
$4,400.00 |
$4,700.00 |
| 38 | 540 4525 |
(PL)REPAIR BRIDGE ITEM (TYPE B) | 2 | EA |
$2,000.00 |
$1,000.00 |
$1,100.00 |
| 39 | 545 4805 |
(PL)REPLACE BRIDGE ITEMS | 8 | EA |
$2,000.00 |
$2,000.00 |
$480.00 |
| 40 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 34 | TON |
$65.00 |
$65.00 |
$124.25 |
| 41 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 10 | TON |
$50.00 |
$80.00 |
$144.43 |
| 42 | 619(B) 2500 |
REMOVAL OF BRIDGE ITEMS | 1 | LSUM |
$85,000.00 |
$114,000.00 |
$175,000.00 |
| 43 | 413(B) 4863 |
RUMBLE STRIP-METHOD HMA-CYC | 963 | LF |
$0.5000 |
$3.60 |
$3.00 |
| 44 | 823 8478 |
(SP)PORTABLE TRAFFIC SIGNAL SYSTEM | 120 | SD |
$200.00 |
$120.00 |
$100.00 |
| 45 | 853 9033 |
DELINEATORS(TYPE 2, CODE 1) | 58 | EA |
$22.00 |
$24.00 |
$20.00 |
| 46 | 855(A) 8840 |
TRAFFIC STRIPE(PLASTIC)(THIN LINE)(4" WIDE) | 2,169 | LF |
$1.00 |
$1.44 |
$1.20 |
| 47 | 871(B) 8705 |
(SP)CONST.ZONE IMPACT ATTEN. | 240 | SD |
$15.00 |
$6.00 |
$4.00 |
| 48 | 877(B) 8484 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 1,175 | LF |
$35.00 |
$29.00 |
$49.00 |
| 49 | 877(C) 8486 |
RELOCATION OF PORTABLE LONGITUDINAL BARRIER | 800 | LF |
$5.00 |
$7.00 |
$10.00 |
| 50 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$4,950.00 |
$25,000.00 |
$18,000.00 |
| 51 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 240 | SD |
$15.00 |
$12.00 |
$10.00 |
| 52 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$13,000.00 |
$14,000.00 |
$30,000.00 |
| 53 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$120,000.00 |
$125,000.00 |
$200,000.00 |
| 54 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$5,000.00 |
$14,500.00 |
$20,000.00 |
| 55 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$5,000.00 |
$7,250.00 |
$8,000.00 |
| 56 | 221(C) 2801 |
TEMPORARY SILT FENCE | 600 | LF |
$5.00 |
$4.00 |
$1.38 |
| 57 | 221(F) 0100 |
TEMPORARY SILT DIKE | 20 | LF |
$25.00 |
$40.00 |
$12.89 |
| 58 | 230(A) 2806 |
SOLID SLAB SODDING | 805 | SY |
$6.00 |
$6.00 |
$4.42 |
| 59 | 230(F) 2812 |
WATERING | 64 | KGAL |
$50.00 |
$16.00 |
$12.00 |
| 60 | 234(A) 2824 |
FERTILIZING (10-20-10) | 0.08 | TON |
$900.00 |
$2,000.00 |
$1,150.00 |
| 61 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 457.7 | TON |
$200.00 |
$125.00 |
$97.20 |
| 62 | 412 5267 |
COLD MILLING PAVEMENT | 1,636 | SY |
$15.00 |
$15.00 |
$8.00 |
| 63 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 212 | LF |
$5.00 |
$8.00 |
$5.00 |
| 64 | 623 0100 |
(PL)GUARDRAIL CURBING | 4 | EA |
$1,000.00 |
$1,050.00 |
$800.00 |
| 65 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 100 | LF |
$25.00 |
$18.60 |
$15.50 |
| 66 | 623(G) 8590 |
GUARDRAIL END TREATMENT (31") | 4 | EA |
$3,000.00 |
$2,340.00 |
$1,950.00 |
| 67 | 623(I) 8700 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 4 | EA |
$2,500.00 |
$1,740.00 |
$1,450.00 |
| 68 | 501(G) 6309 |
CLSM BACKFILL | 142 | CY |
$250.00 |
$162.50 |
$250.00 |
| 69 | 502(C) 6116 |
(PL)FALSEWORK JACKING | 1 | LSUM |
$10,000.00 |
$7,500.00 |
$10,000.00 |
| 70 | 504(A) 1304 |
APPROACH SLAB | 222.6 | SY |
$250.00 |
$322.50 |
$250.00 |
| 71 | 504(B) 1305 |
SAW-CUT GROOVING | 697.2 | SY |
$6.00 |
$4.32 |
$3.60 |
| 72 | 504(C) 6250 |
SEALED EXPANSION JOINT | 77.6 | LF |
$350.00 |
$350.00 |
$250.00 |
| 73 | 504(D) 6245 |
CONCRETE RAIL (TR4) | 404.8 | LF |
$95.00 |
$106.00 |
$125.00 |
| 74 | 506(A) 1322 |
STRUCTURAL STEEL | 3,360 | LB |
$5.00 |
$5.80 |
$10.00 |
| 75 | 509(A) 1326 |
CLASS AA CONCRETE | 124.6 | CY |
$900.00 |
$925.00 |
$850.00 |
| 76 | 509(D) 1331 |
CLASS C CONCRETE | 19.8 | CY |
$600.00 |
$700.00 |
$700.00 |
| 77 | 511 6306 |
MECHANICAL SPLICES | 441 | EA |
$25.00 |
$23.00 |
$40.00 |
| 78 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 32,440 | LB |
$1.30 |
$1.15 |
$2.00 |
| 79 | 512(A) 1323 |
PAINTING EXISTING STRUCTURES | 1 | LSUM |
$30,000.00 |
$34,536.00 |
$28,780.00 |
| 80 | 512(B) 6303 |
COLLECTION AND HANDLING OF WASTE | 1 | LSUM |
$5,000.00 |
$3,720.00 |
$3,100.00 |
| 81 | 513(B) 6019 |
CLASS B BRIDGE DECK REPAIR | 5 | SY |
$500.00 |
$450.00 |
$750.00 |
| 82 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 484 | SY |
$5.00 |
$4.00 |
$3.50 |
| 83 | 521(A) 6210 |
PNEUMATICALLY PLACED MORTAR | 45.6 | SY |
$800.00 |
$660.00 |
$700.00 |
| 84 | 523(A) 6550 |
SEALER CRACK PREPARATION | 142 | LF |
$5.00 |
$10.00 |
$8.00 |
| 85 | 523(B) 6560 |
SEALER RESIN | 2 | GAL |
$150.00 |
$200.00 |
$100.00 |
| 86 | 540 4515 |
(PL)REPAIR BRIDGE ITEM (TYPE A) | 2 | EA |
$2,000.00 |
$4,400.00 |
$6,800.00 |
| 87 | 545 4805 |
(PL)REPLACE BRIDGE ITEMS | 2 | EA |
$2,000.00 |
$2,000.00 |
$650.00 |
| 88 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 61 | TON |
$65.00 |
$65.00 |
$125.00 |
| 89 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 18 | TON |
$50.00 |
$65.00 |
$145.00 |
| 90 | 619(B) 2500 |
REMOVAL OF BRIDGE ITEMS | 1 | LSUM |
$80,000.00 |
$106,600.00 |
$175,000.00 |
| 91 | 413(B) 4863 |
RUMBLE STRIP-METHOD HMA-CYC | 600 | LF |
$0.5000 |
$3.60 |
$3.00 |
| 92 | 823 8478 |
(SP)PORTABLE TRAFFIC SIGNAL SYSTEM | 120 | SD |
$200.00 |
$120.00 |
$100.00 |
| 93 | 853 9033 |
DELINEATORS(TYPE 2, CODE 1) | 36 | EA |
$22.00 |
$24.00 |
$20.00 |
| 94 | 855(A) 8840 |
TRAFFIC STRIPE(PLASTIC)(THIN LINE)(4" WIDE) | 1,289 | LF |
$1.00 |
$2.40 |
$2.00 |
| 95 | 871(B) 8705 |
(SP)CONST.ZONE IMPACT ATTEN. | 240 | SD |
$15.00 |
$6.00 |
$4.00 |
| 96 | 877(B) 8484 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 950 | LF |
$35.00 |
$29.00 |
$30.00 |
| 97 | 877(C) 8486 |
RELOCATION OF PORTABLE LONGITUDINAL BARRIER | 950 | LF |
$5.00 |
$8.00 |
$5.00 |
| 98 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$4,950.00 |
$21,000.00 |
$15,000.00 |
| 99 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 240 | SD |
$15.00 |
$12.00 |
$10.00 |