| 1 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 55 | CY |
$50.00 |
$84.50 |
$65.00 |
| 2 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 4,350 | TON |
$21.00 |
$29.50 |
$28.70 |
| 3 | 407(B) 0250 |
TACK COAT | 8,930 | GAL |
$2.75 |
$5.00 |
$2.70 |
| 4 | 411(C) 5955 |
SUPERPAVE, TYPE S4(PG 70-28 OK) | 16,440 | TON |
$76.00 |
$89.95 |
$90.00 |
| 5 | 411(H) 6210 |
SUPERPAVE, TYPE S3(PATCH)(PG64-22OK) | 85 | TON |
$150.00 |
$160.00 |
$190.00 |
| 6 | 411(I) 6310 |
SUPERPAVE, TYPE S4(PATCH)(PG64-22OK) | 60 | TON |
$150.00 |
$200.00 |
$225.00 |
| 7 | 412 5267 |
COLD MILLING PAVEMENT | 3,270 | SY |
$3.50 |
$3.50 |
$4.00 |
| 8 | 855(A) 8840 |
TRAFFIC STRIPE(PLASTIC)(THIN LINE)(4" WIDE) | 138,500 | LF |
$0.3500 |
$0.4000 |
$0.3600 |
| 9 | 855(B) 8818 |
TRAFFIC STRIPE(PLASTIC)(ARROWS) | 5 | EA |
$200.00 |
$75.00 |
$56.00 |
| 10 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$8,000.00 |
$4,250.00 |
$18,500.00 |
| 11 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$20,000.00 |
$7,500.00 |
$24,750.00 |