| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$5,000.00 |
$10,000.00 |
$22,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 3,197 | CY |
$6.00 |
$7.00 |
$15.00 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 1,090 | CY |
$8.00 |
$10.00 |
$30.00 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$5,000.00 |
$2,500.00 |
$5,000.00 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 1,667 | LF |
$3.50 |
$3.00 |
$2.00 |
| 6 | 221(F) 0100 |
TEMPORARY SILT DIKE | 147 | LF |
$6.00 |
$8.00 |
$10.00 |
| 7 | 230(A) 2806 |
SOLID SLAB SODDING | 13,144 | SY |
$3.00 |
$2.50 |
$1.75 |
| 8 | 233(A) 2817 |
VEGETATIVE MULCHING | 2.61 | AC |
$500.00 |
$300.00 |
$1,000.00 |
| 9 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 827 | TON |
$25.00 |
$35.00 |
$25.00 |
| 10 | 509(D) 0325 |
CLASS C CONCRETE | 10 | CY |
$300.00 |
$300.00 |
$400.00 |
| 11 | 624(C) 4459 |
FENCE-STYLE SWF (5 BARBED WIRE) | 1,006 | LF |
$5.00 |
$5.00 |
$6.00 |
| 12 | 624(C) 7181 |
FENCE-STYLE SWF (6 BARBED WIRE) | 1,010 | LF |
$5.00 |
$5.20 |
$6.15 |
| 13 | 501(A) 1306 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 141 | CY |
$15.00 |
$25.00 |
$15.00 |
| 14 | 509(B) 1328 |
CLASS A CONCRETE | 330.9 | CY |
$410.00 |
$550.00 |
$500.00 |
| 15 | 511(A) 1332 |
REINFORCING STEEL | 56,780 | LB |
$0.9500 |
$1.00 |
$1.00 |
| 16 | 601(D) 1357 |
TYPE II SPECIAL PLAIN RIPRAP | 180 | TON |
$35.00 |
$40.00 |
$38.00 |
| 17 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$2,500.00 |
$5,000.00 |
$15,000.00 |
| 18 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$2,000.00 |
$3,000.00 |
$3,500.00 |
| 19 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$2,500.00 |
$2,500.00 |
$6,500.00 |
| 20 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$1,500.00 |
$3,500.00 |
| 21 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$35,100.00 |
$15,000.00 |
$40,000.00 |