| 1 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 742 | CY |
$12.00 |
$4.30 |
$7.75 |
$18.78 |
| 2 | 202(D) 0184 |
UNCLASSIFIED BORROW | 11,500 | CY |
$15.00 |
$5.50 |
$9.25 |
$10.08 |
| 3 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$15,000.00 |
$5,000.00 |
$6,250.00 |
$5,796.00 |
| 4 | 221(C) 2801 |
TEMPORARY SILT FENCE | 417 | LF |
$2.50 |
$15.00 |
$2.00 |
$4.00 |
| 5 | 221(F) 0100 |
TEMPORARY SILT DIKE | 112 | LF |
$8.50 |
$20.00 |
$11.00 |
$10.00 |
| 6 | 230(A) 2806 |
SOLID SLAB SODDING | 4,331 | SY |
$2.25 |
$1.95 |
$2.50 |
$2.25 |
| 7 | 307(E) 4240 |
CEMENTITIOUS STABILIZED SUBGRADE | 3,480 | SY |
$3.25 |
$6.95 |
$7.70 |
$6.95 |
| 8 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 114 | TON |
$36.50 |
$57.00 |
$65.00 |
$57.00 |
| 9 | 407(B) 0250 |
TACK COAT | 249 | GAL |
$3.50 |
$4.85 |
$5.50 |
$4.85 |
| 10 | 408 5774 |
PRIME COAT | 721 | GAL |
$6.25 |
$5.50 |
$7.00 |
$5.50 |
| 11 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 760 | TON |
$96.50 |
$117.00 |
$134.55 |
$117.00 |
| 12 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 369 | TON |
$98.00 |
$117.00 |
$134.55 |
$117.00 |
| 13 | 613(B) 0689 |
18" CORR. GALV. STEEL PIPE | 112 | LF |
$27.50 |
$25.00 |
$25.00 |
$27.00 |
| 14 | 613(M) 7186 |
TYPE A4 CULVERT END TREATMENT | 4 | EA |
$1,005.00 |
$1,500.00 |
$951.00 |
$1,200.00 |
| 15 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$25,000.00 |
$7,500.00 |
$35,000.00 |
$6,000.00 |
| 16 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 779 | LF |
$16.50 |
$19.65 |
$16.80 |
$14.00 |
| 17 | 623(F) 5686 |
GUARDRAIL ANCHOR UNIT (TYPE D-BF) | 4 | EA |
$1,525.00 |
$1,620.00 |
$2,430.00 |
$2,025.00 |
| 18 | 623(G) 8571 |
GUARDRAIL END TREATMENT (GET) | 2 | EA |
$2,000.00 |
$2,315.00 |
$2,520.00 |
$2,100.00 |
| 19 | 853 9033 |
DELINEATORS(TYPE 2, CODE 1) | 200 | EA |
$10.00 |
$11.50 |
$6.00 |
$5.00 |
| 20 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 120 | CY |
$50.00 |
$40.00 |
$11.00 |
$19.00 |
| 21 | 501(F) 6352 |
GRANULAR BACKFILL | 70 | CY |
$55.00 |
$100.00 |
$71.00 |
$85.00 |
| 22 | 503(A) 1312 |
PRESTRESSED CONCRETE BEAMS (TYPE III) | 678 | LF |
$180.00 |
$225.00 |
$187.00 |
$270.00 |
| 23 | 504(A) 1304 |
APPROACH SLAB | 142 | SY |
$195.00 |
$215.00 |
$207.00 |
$150.00 |
| 24 | 504(D) 6239 |
CONCRETE RAIL (TR3) | 397 | LF |
$65.50 |
$65.00 |
$74.50 |
$65.00 |
| 25 | 506(A) 1322 |
STRUCTURAL STEEL | 760 | LB |
$10.00 |
$4.00 |
$3.00 |
$5.25 |
| 26 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 8 | EA |
$686.00 |
$500.00 |
$375.00 |
$275.00 |
| 27 | 507(B) 6176 |
WEATHERING STEEL EXPANSION BEARING ASSEMBLY | 8 | EA |
$1,105.00 |
$750.00 |
$550.00 |
$950.00 |
| 28 | 507(C) 6282 |
ELASTOMERIC BEARING PADS | 8 | EA |
$550.00 |
$450.00 |
$550.00 |
$300.00 |
| 29 | 509(A) 1326 |
CLASS AA CONCRETE | 184 | CY |
$550.00 |
$575.00 |
$597.50 |
$500.00 |
| 30 | 509(B) 1328 |
CLASS A CONCRETE | 79 | CY |
$535.00 |
$575.00 |
$627.50 |
$700.00 |
| 31 | 511(A) 1332 |
REINFORCING STEEL | 49,310 | LB |
$0.9500 |
$0.9500 |
$0.9100 |
$1.10 |
| 32 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 539 | LF |
$27.50 |
$30.00 |
$28.00 |
$51.00 |
| 33 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 539 | LF |
$12.50 |
$20.00 |
$12.00 |
$8.00 |
| 34 | 516(A) 6096 |
DRILLED SHAFTS 60" DIAMETER | 92 | LF |
$682.00 |
$750.00 |
$708.00 |
$850.00 |
| 35 | 516(C) 6200 |
CROSSHOLE SONIC LOGGING | 2 | EA |
$1,600.00 |
$1,600.00 |
$2,000.00 |
$1,800.00 |
| 36 | 516(D) 6400 |
CSL ACCESS TUBES | 520 | LF |
$10.00 |
$20.00 |
$14.00 |
$11.00 |
| 37 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 1,042 | TON |
$50.00 |
$40.00 |
$43.70 |
$55.00 |
| 38 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 233 | TON |
$35.00 |
$35.00 |
$33.32 |
$40.00 |
| 39 | 613(H) 0450 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 66 | LF |
$19.00 |
$40.00 |
$37.00 |
$19.00 |
| 40 | 613(I) 1096 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 50 | LF |
$15.00 |
$40.00 |
$35.00 |
$22.00 |
| 41 | 854(A) 8800 |
TRAFFIC STRIPE(PAINT)(4" WIDE) | 3,249 | LF |
$0.3500 |
$0.3500 |
$0.5000 |
$0.3500 |
| 42 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$20,000.00 |
$3,800.00 |
$5,000.00 |
$2,580.00 |
| 43 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$30,000.00 |
$7,500.00 |
$7,000.00 |
$8,400.00 |
| 44 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$3,800.00 |
$4,500.00 |
$5,000.00 |
$3,500.00 |
| 45 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$75,120.00 |
$66,000.00 |
$55,000.00 |
$64,000.00 |