| 1 | 202(H) 0185 |
EARTHWORK | 1 | LSUM |
$20,000.00 |
$45,000.00 |
$56,000.00 |
$82,014.95 |
$53,000.00 |
$100,593.40 |
$70,035.00 |
| 2 | 221(C) 2801 |
TEMPORARY SILT FENCE | 200 | LF |
$1.75 |
$2.50 |
$2.75 |
$2.85 |
$3.00 |
$3.00 |
$3.65 |
| 3 | 221(F) 0100 |
TEMPORARY SILT DIKE | 230 | LF |
$8.00 |
$10.00 |
$10.35 |
$8.68 |
$9.00 |
$10.00 |
$10.96 |
| 4 | 230(A) 2806 |
SOLID SLAB SODDING | 8,200 | SY |
$1.75 |
$1.52 |
$1.70 |
$1.33 |
$1.75 |
$2.00 |
$1.73 |
| 5 | 233(A) 2817 |
VEGETATIVE MULCHING | 1.72 | AC |
$400.00 |
$990.00 |
$1,200.00 |
$578.00 |
$600.00 |
$1,200.00 |
$2,192.40 |
| 6 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 492 | CY |
$50.00 |
$55.00 |
$77.00 |
$85.00 |
$55.50 |
$65.00 |
$66.45 |
| 7 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 76 | TON |
$35.00 |
$30.00 |
$32.00 |
$25.85 |
$31.00 |
$50.00 |
$36.81 |
| 8 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 224 | TON |
$80.00 |
$131.00 |
$130.90 |
$118.00 |
$138.00 |
$140.00 |
$131.75 |
| 9 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 221 | TON |
$80.00 |
$133.00 |
$133.10 |
$131.00 |
$151.00 |
$160.00 |
$146.26 |
| 10 | 509(D) 0325 |
CLASS C CONCRETE | 10 | CY |
$300.00 |
$500.00 |
$300.00 |
$400.00 |
$250.00 |
$240.00 |
$279.36 |
| 11 | 613(B) 4528 |
28" X 20" CORR. GALV. STEEL PIPE ARCH | 208 | LF |
$40.00 |
$28.00 |
$36.40 |
$25.97 |
$45.00 |
$35.00 |
$34.13 |
| 12 | 613(M) 7187 |
TYPE B4 CULVERT END TREATMENT | 8 | EA |
$1,100.00 |
$1,200.00 |
$1,200.00 |
$2,200.00 |
$1,200.00 |
$1,200.00 |
$1,013.01 |
| 13 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 9 | SF |
$20.00 |
$25.00 |
$22.00 |
$20.00 |
$24.00 |
$25.00 |
$24.36 |
| 14 | 851(C) 8330 |
2 1/2" SQUARE TUBE POST | 12 | LF |
$8.00 |
$20.00 |
$12.00 |
$10.00 |
$13.00 |
$12.00 |
$21.92 |
| 15 | 202(A) 1301 |
UNCLASSIFIED EXCAVATION | 2,118 | CY |
$10.00 |
$8.00 |
$7.50 |
$5.77 |
$12.00 |
$18.00 |
$9.74 |
| 16 | 501(A) 1306 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 176 | CY |
$10.00 |
$15.00 |
$25.00 |
$5.00 |
$22.00 |
$14.00 |
$24.36 |
| 17 | 509(A) 1326 |
CLASS AA CONCRETE | 467.58 | CY |
$475.00 |
$485.00 |
$425.00 |
$369.27 |
$515.00 |
$370.00 |
$545.11 |
| 18 | 511(A) 1332 |
REINFORCING STEEL | 78,684 | LB |
$0.9000 |
$1.00 |
$1.05 |
$0.9000 |
$1.05 |
$1.00 |
$1.10 |
| 19 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 1,700 | TON |
$38.00 |
$39.00 |
$39.00 |
$40.93 |
$50.50 |
$40.00 |
$58.28 |
| 20 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 567 | TON |
$32.00 |
$31.00 |
$33.00 |
$29.90 |
$39.50 |
$40.00 |
$46.92 |
| 21 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$10,000.00 |
$10,000.00 |
$10,000.00 |
$8,651.60 |
$10,000.00 |
$29,100.00 |
$25,679.50 |
| 22 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$7,500.00 |
$2,250.00 |
$2,000.00 |
$1,800.00 |
$2,200.00 |
$1,500.00 |
$2,496.90 |
| 23 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$7,500.00 |
$8,250.00 |
$7,700.00 |
$7,500.00 |
$7,400.00 |
$5,000.00 |
$9,135.00 |
| 24 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$2,500.00 |
$2,500.00 |
$3,500.00 |
$8,000.00 |
$2,500.00 |
$2,735.93 |
| 25 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$30,000.00 |
$17,000.00 |
$18,000.00 |
$62,200.00 |
$20,000.00 |
$60,000.00 |
$59,682.00 |