| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$50,000.00 |
$15,000.00 |
$25,700.00 |
$35,000.00 |
$142,222.50 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 78,799 | CY |
$6.00 |
$4.20 |
$4.30 |
$6.80 |
$4.97 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 75,745 | CY |
$8.00 |
$5.60 |
$5.50 |
$10.80 |
$11.03 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$100,000.00 |
$140,000.00 |
$141,250.00 |
$50,000.00 |
$356,107.50 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 8,250 | LF |
$2.50 |
$1.11 |
$1.15 |
$1.11 |
$1.59 |
| 6 | 221(F) 0100 |
TEMPORARY SILT DIKE | 3,500 | LF |
$8.00 |
$6.11 |
$6.25 |
$6.11 |
$9.87 |
| 7 | 230(A) 2806 |
SOLID SLAB SODDING | 289,801 | SY |
$1.40 |
$1.03 |
$1.05 |
$1.03 |
$1.37 |
| 8 | 233(A) 2817 |
VEGETATIVE MULCHING | 60 | AC |
$500.00 |
$50.00 |
$50.87 |
$50.00 |
$109.15 |
| 9 | 241 2832 |
MOWING | 120 | AC |
$75.00 |
$65.00 |
$66.15 |
$65.00 |
$65.05 |
| 10 | 307(K) 4300 |
STABILIZED SUBGRADE | 106,625 | SY |
$5.00 |
$4.75 |
$4.60 |
$6.45 |
$5.27 |
| 11 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 433 | TON |
$30.00 |
$65.00 |
$35.60 |
$52.00 |
$54.83 |
| 12 | 408 5774 |
PRIME COAT | 40,397 | GAL |
$4.00 |
$2.25 |
$3.25 |
$2.75 |
$2.77 |
| 13 | 409(A) 4242 |
FABRIC REINFORCEMENT | 16,168 | SY |
$1.25 |
$2.50 |
$1.40 |
$1.20 |
$1.49 |
| 14 | 409(B) 4268 |
BITUMINOUS BINDER | 4,850 | GAL |
$3.00 |
$1.25 |
$2.75 |
$3.00 |
$2.97 |
| 15 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 52,366 | TON |
$70.00 |
$59.00 |
$57.75 |
$64.00 |
$67.78 |
| 16 | 411(C) 5955 |
SUPERPAVE, TYPE S4(PG 70-28 OK) | 11,862 | TON |
$85.00 |
$73.00 |
$66.50 |
$74.00 |
$83.58 |
| 17 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 10,660 | TON |
$80.00 |
$62.00 |
$59.20 |
$65.00 |
$67.26 |
| 18 | 411(H) 6210 |
SUPERPAVE, TYPE S3(PATCH)(PG64-22OK) | 1,000 | TON |
$105.00 |
$120.00 |
$146.00 |
$125.00 |
$141.76 |
| 19 | 412 5267 |
COLD MILLING PAVEMENT | 97,010 | SY |
$2.00 |
$1.00 |
$1.75 |
$1.30 |
$1.07 |
| 20 | 413(B) 4863 |
RUMBLE STRIP-METHOD HMA-CYC | 79,429 | LF |
$0.1500 |
$0.1500 |
$0.0900 |
$0.0900 |
$0.0900 |
| 21 | 501(A) 0313 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 206 | CY |
$15.00 |
$30.00 |
$30.50 |
$20.00 |
$33.08 |
| 22 | 509(A) 0319 |
CLASS AA CONCRETE | 495 | CY |
$350.00 |
$450.00 |
$488.00 |
$415.00 |
$483.13 |
| 23 | 509(B) 0321 |
CLASS A CONCRETE | 21 | CY |
$550.00 |
$440.00 |
$432.40 |
$650.00 |
$468.56 |
| 24 | 509(D) 0325 |
CLASS C CONCRETE | 1,670 | CY |
$275.00 |
$340.00 |
$325.50 |
$215.00 |
$339.18 |
| 25 | 511(A) 0332 |
REINFORCING STEEL | 75,470 | LB |
$1.00 |
$1.10 |
$1.12 |
$0.9000 |
$1.62 |
| 26 | 601(B) 0536 |
TYPE I-A PLAIN RIPRAP | 320 | TON |
$40.00 |
$40.00 |
$56.50 |
$80.00 |
$96.47 |
| 27 | 610(B) 0604 |
6" CONCRETE DRIVEWAY | 1,852 | SY |
$50.00 |
$52.00 |
$48.85 |
$55.00 |
$38.59 |
| 28 | 613(A) 0492 |
24" R.C.PIPE CLASS III | 62 | LF |
$65.00 |
$54.00 |
$49.85 |
$55.00 |
$121.28 |
| 29 | 613(A) 4497 |
36" X 22" R.C.PIPE ARCH CLASS A-III | 28 | LF |
$95.00 |
$102.00 |
$95.65 |
$150.00 |
$147.74 |
| 30 | 613(B) 0689 |
18" CORR. GALV. STEEL PIPE | 1,057 | LF |
$30.00 |
$24.00 |
$21.85 |
$30.00 |
$40.79 |
| 31 | 613(B) 0690 |
24" CORR. GALV. STEEL PIPE | 900 | LF |
$35.00 |
$28.00 |
$25.45 |
$55.00 |
$48.51 |
| 32 | 613(B) 0691 |
30" CORR. GALV. STEEL PIPE | 601 | LF |
$50.00 |
$33.00 |
$30.30 |
$60.00 |
$57.33 |
| 33 | 613(B) 0692 |
36" CORR. GALV. STEEL PIPE | 83 | LF |
$55.00 |
$37.00 |
$34.25 |
$70.00 |
$62.84 |
| 34 | 613(B) 0694 |
48" CORR. GALV. STEEL PIPE | 560 | LF |
$70.00 |
$53.00 |
$49.10 |
$70.00 |
$99.23 |
| 35 | 613(B) 4527 |
21" X 15" CORR. GALV. STEEL PIPE ARCH | 82 | LF |
$35.00 |
$24.00 |
$21.85 |
$32.00 |
$44.10 |
| 36 | 613(B) 4531 |
49" X 33" CORR. GALV. STEEL PIPE ARCH | 77 | LF |
$65.00 |
$51.00 |
$46.35 |
$56.00 |
$92.61 |
| 37 | 613(B) 5747 |
120" CORR. GALV. STEEL PIPE | 318 | LF |
$200.00 |
$235.00 |
$216.50 |
$77.00 |
$330.75 |
| 38 | 613(L) 4526 |
36" X 22" PREFAB. CULVERT END SECTION, ARCH | 2 | EA |
$900.00 |
$1,700.00 |
$2,035.00 |
$230.00 |
$1,212.75 |
| 39 | 613(L) 5730 |
24" PREFAB. CULVERT END SECTION, ROUND | 4 | EA |
$800.00 |
$1,200.00 |
$1,113.00 |
$230.00 |
$1,102.50 |
| 40 | 613(M) 7196 |
TYPE A6 CULVERT END TREATMENT | 18 | EA |
$1,100.00 |
$1,375.00 |
$1,275.00 |
$1,500.00 |
$1,378.13 |
| 41 | 613(M) 7197 |
TYPE B6 CULVERT END TREATMENT | 22 | EA |
$1,200.00 |
$1,550.00 |
$1,350.00 |
$1,800.00 |
$1,460.81 |
| 42 | 613(M) 7198 |
TYPE C6 CULVERT END TREATMENT | 8 | EA |
$1,500.00 |
$1,625.00 |
$1,500.00 |
$2,000.00 |
$1,626.19 |
| 43 | 613(M) 7199 |
TYPE D6 CULVERT END TREATMENT | 2 | EA |
$1,700.00 |
$2,200.00 |
$2,015.00 |
$2,200.00 |
$2,182.95 |
| 44 | 613(M) 7200 |
TYPE E6 CULVERT END TREATMENT | 2 | EA |
$2,200.00 |
$2,900.00 |
$2,695.00 |
$2,500.00 |
$2,921.63 |
| 45 | 613(M) 7201 |
TYPE AA6 CULVERT END TREATMENT | 2 | EA |
$2,800.00 |
$1,550.00 |
$1,425.00 |
$2,200.00 |
$1,543.50 |
| 46 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$45,000.00 |
$50,000.00 |
$28,550.00 |
$41,900.00 |
$190,080.00 |
| 47 | 619(B) 0291 |
REMOVAL OF HEADWALL | 30 | EA |
$750.00 |
$650.00 |
$765.00 |
$1,200.00 |
$1,102.50 |
| 48 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 27,074 | SY |
$3.00 |
$4.00 |
$1.85 |
$6.00 |
$3.34 |
| 49 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 943 | LF |
$3.00 |
$5.00 |
$3.15 |
$5.00 |
$2.76 |
| 50 | 619(C) 0924 |
SAWING PAVEMENT | 73,589 | LF |
$2.75 |
$1.50 |
$1.40 |
$2.00 |
$1.19 |
| 51 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 2,363 | LF |
$18.00 |
$13.75 |
$16.30 |
$13.75 |
$16.54 |
| 52 | 623(F) 4447 |
GUARDRAIL ANCHOR UNIT (TYPE B) | 7 | EA |
$800.00 |
$400.00 |
$765.00 |
$400.00 |
$716.63 |
| 53 | 623(G) 8590 |
GUARDRAIL END TREATMENT (31") | 11 | EA |
$2,200.00 |
$2,000.00 |
$2,137.00 |
$2,000.00 |
$2,370.38 |
| 54 | 623(I) 8700 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 12 | EA |
$1,862.26 |
$1,510.00 |
$1,577.00 |
$1,510.00 |
$1,598.63 |
| 55 | 624(B) 4464 |
GATES-STYLE WWF (4.5'HIGH X 14'LONG) | 2 | EA |
$500.00 |
$600.00 |
$610.00 |
$300.00 |
$551.25 |
| 56 | 624(C) 4459 |
FENCE-STYLE SWF (5 BARBED WIRE) | 19,251 | LF |
$5.00 |
$4.00 |
$4.20 |
$4.10 |
$3.31 |
| 57 | 624(E) 4292 |
FENCE-STYLE CLF (6'HIGH, CLASS A) | 406 | LF |
$30.00 |
$20.00 |
$33.00 |
$32.50 |
$11.03 |
| 58 | 629(A) 4958 |
MAILBOX INSTALLATION-SINGLE | 6 | EA |
$85.00 |
$100.00 |
$102.00 |
$100.00 |
$187.43 |
| 59 | 853 9033 |
DELINEATORS(TYPE 2, CODE 1) | 97 | EA |
$20.00 |
$20.00 |
$20.50 |
$20.00 |
$13.23 |
| 60 | 853 9039 |
DELINEATORS(TYPE 2, CODE 3) | 34 | EA |
$32.00 |
$22.00 |
$22.50 |
$22.00 |
$26.46 |
| 61 | 202(A) 1301 |
UNCLASSIFIED EXCAVATION | 530 | CY |
$10.00 |
$5.00 |
$5.10 |
$20.00 |
$11.03 |
| 62 | 501(A) 1306 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 135 | CY |
$20.00 |
$30.00 |
$30.50 |
$20.00 |
$33.08 |
| 63 | 509(A) 1326 |
CLASS AA CONCRETE | 230.5 | CY |
$600.00 |
$363.48 |
$460.30 |
$450.00 |
$400.73 |
| 64 | 511(A) 1332 |
REINFORCING STEEL | 33,930 | LB |
$1.00 |
$0.9100 |
$0.9300 |
$0.9000 |
$1.41 |
| 65 | 525(C) 1000 |
(SP)NEST PREVENTION | 1 | LSUM |
$6,000.00 |
$3,500.00 |
$3,561.00 |
$3,500.00 |
$3,858.75 |
| 66 | 619(B) 2500 |
REMOVAL OF BRIDGE ITEMS | 1 | LSUM |
$15,000.00 |
$4,500.00 |
$4,580.00 |
$20,000.00 |
$15,986.25 |
| 67 | 202(A) 1301 |
UNCLASSIFIED EXCAVATION | 176 | CY |
$10.00 |
$5.00 |
$5.10 |
$20.00 |
$11.03 |
| 68 | 501(A) 1306 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 173 | CY |
$20.00 |
$30.00 |
$30.50 |
$20.00 |
$33.08 |
| 69 | 509(A) 1326 |
CLASS AA CONCRETE | 135.2 | CY |
$600.00 |
$363.48 |
$524.10 |
$450.00 |
$400.73 |
| 70 | 511(A) 1332 |
REINFORCING STEEL | 21,442 | LB |
$1.00 |
$0.9100 |
$0.9300 |
$0.9000 |
$1.41 |
| 71 | 619(B) 2500 |
REMOVAL OF BRIDGE ITEMS | 1 | LSUM |
$15,000.00 |
$4,500.00 |
$4,578.00 |
$20,000.00 |
$4,961.25 |
| 72 | 202(A) 1301 |
UNCLASSIFIED EXCAVATION | 507 | CY |
$10.00 |
$5.00 |
$5.09 |
$20.00 |
$11.03 |
| 73 | 501(A) 1306 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 230 | CY |
$20.00 |
$30.00 |
$30.50 |
$20.00 |
$33.08 |
| 74 | 509(A) 1326 |
CLASS AA CONCRETE | 252.9 | CY |
$600.00 |
$363.48 |
$452.30 |
$450.00 |
$400.73 |
| 75 | 511(A) 1332 |
REINFORCING STEEL | 36,848 | LB |
$1.00 |
$0.9100 |
$0.9300 |
$0.9000 |
$1.41 |
| 76 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$15,000.00 |
$5,000.00 |
$5,088.00 |
$20,000.00 |
$16,537.50 |
| 77 | 509(A) 1326 |
CLASS AA CONCRETE | 13 | CY |
$700.00 |
$1,000.00 |
$1,018.00 |
$600.00 |
$1,102.50 |
| 78 | 511(A) 1332 |
REINFORCING STEEL | 1,200 | LB |
$1.00 |
$1.00 |
$1.02 |
$0.9000 |
$1.50 |
| 79 | 619(B) 2500 |
REMOVAL OF BRIDGE ITEMS | 1 | LSUM |
$2,000.00 |
$2,000.00 |
$2,035.00 |
$8,000.00 |
$13,230.00 |
| 80 | 805(D) 8756 |
(PL)REMOVE & RESET EXISTING SIGNS | 46 | EA |
$175.00 |
$125.00 |
$128.00 |
$125.00 |
$137.81 |
| 81 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 24 | SF |
$30.00 |
$50.00 |
$50.85 |
$50.00 |
$33.08 |
| 82 | 851(C) 8324 |
2" SQUARE TUBE POST | 176 | LF |
$10.00 |
$10.00 |
$10.20 |
$10.00 |
$9.92 |
| 83 | 855(A) 8812 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 163,984 | LF |
$0.5000 |
$0.4100 |
$0.4200 |
$0.4100 |
$0.4000 |
| 84 | 857(A) 8839 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) | 366,980 | LF |
$0.1500 |
$0.0800 |
$0.0800 |
$0.0800 |
$0.0900 |
| 85 | 857(E) 8890 |
(PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-2 | 1,160 | EA |
$0.6000 |
$1.00 |
$1.05 |
$1.00 |
$0.8300 |
| 86 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 334,740 | LF |
$0.2000 |
$0.0500 |
$0.0500 |
$0.0500 |
$0.1400 |
| 87 | 871(B) 8705 |
(SP)CONST.ZONE IMPACT ATTEN. | 160 | SD |
$15.00 |
$20.00 |
$20.35 |
$20.00 |
$18.74 |
| 88 | 877(B) 8484 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 350 | LF |
$20.00 |
$50.00 |
$30.50 |
$30.00 |
$33.08 |
| 89 | 877(C) 8486 |
RELOCATION OF PORTABLE LONGITUDINAL BARRIER | 395 | LF |
$5.00 |
$20.00 |
$5.10 |
$5.00 |
$12.13 |
| 90 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 7,370 | SD |
$0.3000 |
$1.00 |
$1.02 |
$1.00 |
$1.88 |
| 91 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 4,010 | SD |
$0.7500 |
$2.00 |
$2.05 |
$2.00 |
$1.88 |
| 92 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 8,030 | SD |
$1.50 |
$0.5000 |
$0.5100 |
$0.5000 |
$1.88 |
| 93 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 960 | SD |
$1.00 |
$5.00 |
$5.10 |
$5.00 |
$1.88 |
| 94 | 880(C) 8848 |
WING BARRICADES | 1,760 | SD |
$1.00 |
$0.7500 |
$0.7500 |
$0.7500 |
$0.0500 |
| 95 | 880(D) 8854 |
VERTICAL PANELS | 22,460 | SD |
$0.1500 |
$0.1000 |
$0.1000 |
$0.1000 |
$0.0200 |
| 96 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 9,950 | SD |
$0.2000 |
$0.2500 |
$0.2500 |
$0.2500 |
$0.3900 |
| 97 | 880(F) 8878 |
DRUMS | 6,600 | SD |
$0.1500 |
$0.1000 |
$0.1000 |
$0.1000 |
$0.6100 |
| 98 | 880(G) 8890 |
CHANNELIZER CONES | 57,705 | SD |
$0.2000 |
$0.0500 |
$0.0500 |
$0.0500 |
$0.3400 |
| 99 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 880 | SD |
$15.00 |
$15.00 |
$15.25 |
$15.00 |
$6.62 |
| 100 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$75,000.00 |
$100,000.00 |
$93,750.00 |
$97,500.00 |
$124,740.00 |
| 101 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$10,000.00 |
$35,000.00 |
$16,500.00 |
$6,000.00 |
$34,452.00 |
| 102 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$650,000.00 |
$585,000.00 |
$628,000.00 |
$623,600.00 |
$685,000.00 |
| 103 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 220 | CY |
$10.00 |
$25.00 |
$25.45 |
$22.68 |
$25.00 |
| 104 | 501(G) 6309 |
CLSM BACKFILL | 260 | CY |
$150.00 |
$190.00 |
$193.30 |
$131.76 |
$145.27 |
| 105 | 503(A) 1313 |
PRESTRESSED CONCRETE BEAMS (TYPE IV) | 936.1 | LF |
$220.00 |
$240.00 |
$244.25 |
$233.83 |
$257.80 |
| 106 | 504(A) 1304 |
APPROACH SLAB | 295.6 | SY |
$180.00 |
$175.00 |
$178.00 |
$198.76 |
$219.14 |
| 107 | 504(B) 1305 |
SAW-CUT GROOVING | 1,343 | SY |
$5.00 |
$5.50 |
$5.60 |
$3.24 |
$3.57 |
| 108 | 504(C) 6250 |
SEALED EXPANSION JOINT | 98.7 | LF |
$275.00 |
$400.00 |
$407.00 |
$250.76 |
$276.47 |
| 109 | 504(D) 6245 |
CONCRETE RAIL (TR4) | 602.9 | LF |
$80.00 |
$80.00 |
$81.40 |
$75.35 |
$83.08 |
| 110 | 506(A) 1322 |
STRUCTURAL STEEL | 1,520 | LB |
$4.00 |
$3.50 |
$3.55 |
$1.99 |
$2.59 |
| 111 | 507(A) 6170 |
STAINLESS STEEL FIXED BEARING ASSEMBLY | 12 | EA |
$2,500.00 |
$1,200.00 |
$1,220.00 |
$1,337.04 |
$1,474.08 |
| 112 | 507(B) 6174 |
STAINLESS STEEL EXPANSION BEARING ASSEMBLY | 12 | EA |
$2,500.00 |
$1,200.00 |
$1,220.00 |
$1,337.04 |
$1,474.08 |
| 113 | 509(A) 1326 |
CLASS AA CONCRETE | 291.2 | CY |
$600.00 |
$595.00 |
$738.00 |
$526.76 |
$580.76 |
| 114 | 509(B) 1328 |
CLASS A CONCRETE | 204 | CY |
$550.00 |
$595.00 |
$795.00 |
$585.85 |
$645.90 |
| 115 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 115,900 | LB |
$1.10 |
$1.00 |
$1.02 |
$0.9400 |
$1.44 |
| 116 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 164 | LF |
$30.00 |
$50.00 |
$50.90 |
$29.09 |
$32.07 |
| 117 | 514(A) 6011 |
PILES, FURNISHED (HP 12X53) | 870 | LF |
$35.00 |
$49.00 |
$49.85 |
$34.37 |
$37.89 |
| 118 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 164 | LF |
$13.00 |
$12.00 |
$12.20 |
$10.80 |
$11.91 |
| 119 | 514(B) 6294 |
PILES, DRIVEN (HP 12X53) | 870 | LF |
$15.00 |
$9.00 |
$9.15 |
$12.96 |
$14.29 |
| 120 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 121 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 1,199 | SY |
$4.00 |
$4.50 |
$4.60 |
$3.46 |
$3.81 |
| 122 | 516(A) 6096 |
DRILLED SHAFTS 60" DIAMETER | 188 | LF |
$700.00 |
$845.00 |
$860.00 |
$764.27 |
$842.60 |
| 123 | 516(C) 6200 |
CROSSHOLE SONIC LOGGING | 1 | EA |
$2,000.00 |
$3,000.00 |
$3,052.00 |
$6,912.00 |
$7,620.48 |
| 124 | 525(C) 1000 |
(SP)NEST PREVENTION | 1 | LSUM |
$6,000.00 |
$9,500.00 |
$9,665.00 |
$2,700.00 |
$2,976.75 |
| 125 | 601(A) 1351 |
TYPE I PLAIN RIPRAP | 1,440 | TON |
$35.00 |
$41.00 |
$41.75 |
$43.39 |
$47.84 |
| 126 | 601(C) 0538 |
TYPE I-A FILTER BLANKET | 340 | TON |
$30.00 |
$40.00 |
$40.70 |
$36.28 |
$39.99 |
| 127 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 100 | LF |
$30.00 |
$40.00 |
$40.70 |
$35.19 |
$38.80 |
| 128 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 160 | LF |
$25.00 |
$40.00 |
$40.70 |
$23.31 |
$25.70 |
| 129 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$40,000.00 |
$82,000.00 |
$83,425.00 |
$70,200.00 |
$92,830.50 |
| 130 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 80 | CY |
$25.00 |
$17.00 |
$27.50 |
$27.00 |
$29.77 |
| 131 | 501(G) 6309 |
CLSM BACKFILL | 164 | CY |
$150.00 |
$170.00 |
$128.50 |
$126.36 |
$139.31 |
| 132 | 503(A) 1312 |
PRESTRESSED CONCRETE BEAMS (TYPE III) | 837 | LF |
$250.00 |
$285.00 |
$231.40 |
$227.41 |
$250.72 |
| 133 | 504(A) 1304 |
APPROACH SLAB | 224.8 | SY |
$200.00 |
$160.00 |
$257.25 |
$252.85 |
$278.76 |
| 134 | 504(B) 1305 |
SAW-CUT GROOVING | 1,157.8 | SY |
$5.00 |
$3.00 |
$3.30 |
$3.24 |
$3.57 |
| 135 | 504(D) 6245 |
CONCRETE RAIL (TR4) | 517 | LF |
$90.00 |
$85.00 |
$82.25 |
$80.75 |
$89.03 |
| 136 | 506(A) 1322 |
STRUCTURAL STEEL | 1,050 | LB |
$4.00 |
$3.50 |
$2.60 |
$2.53 |
$3.19 |
| 137 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 8 | EA |
$1,250.00 |
$275.00 |
$402.50 |
$395.63 |
$436.18 |
| 138 | 507(B) 6174 |
STAINLESS STEEL EXPANSION BEARING ASSEMBLY | 16 | EA |
$2,500.00 |
$2,400.00 |
$1,973.00 |
$1,938.61 |
$2,137.32 |
| 139 | 507(C) 6282 |
ELASTOMERIC BEARING PADS | 16 | EA |
$500.00 |
$475.00 |
$521.40 |
$512.45 |
$564.97 |
| 140 | 509(A) 1326 |
CLASS AA CONCRETE | 274.6 | CY |
$650.00 |
$550.00 |
$683.50 |
$580.76 |
$640.29 |
| 141 | 509(B) 1328 |
CLASS A CONCRETE | 109.7 | CY |
$650.00 |
$750.00 |
$871.90 |
$629.05 |
$693.53 |
| 142 | 511(A) 1332 |
REINFORCING STEEL | 400 | LB |
$1.00 |
$3.00 |
$1.20 |
$1.18 |
$1.70 |
| 143 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 81,780 | LB |
$1.10 |
$0.9000 |
$1.10 |
$1.05 |
$1.56 |
| 144 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 645 | LF |
$40.00 |
$43.00 |
$27.70 |
$27.22 |
$30.01 |
| 145 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 645 | LF |
$15.00 |
$12.00 |
$11.00 |
$10.80 |
$11.91 |
| 146 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 147 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 908 | SY |
$4.00 |
$3.20 |
$3.50 |
$3.46 |
$3.81 |
| 148 | 516(A) 6096 |
DRILLED SHAFTS 60" DIAMETER | 180 | LF |
$850.00 |
$725.00 |
$901.75 |
$886.22 |
$977.06 |
| 149 | 516(C) 6200 |
CROSSHOLE SONIC LOGGING | 1 | EA |
$3,400.00 |
$2,900.00 |
$7,035.00 |
$6,912.00 |
$7,620.48 |
| 150 | 523(A) 6550 |
SEALER CRACK PREPARATION | 163 | LF |
$4.00 |
$3.00 |
$3.30 |
$3.24 |
$3.57 |
| 151 | 523(B) 6560 |
SEALER RESIN | 1.8 | GAL |
$200.00 |
$80.00 |
$87.95 |
$86.40 |
$95.26 |
| 152 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 950 | TON |
$40.00 |
$56.00 |
$44.15 |
$43.39 |
$47.84 |
| 153 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 210 | TON |
$35.00 |
$46.00 |
$35.90 |
$35.20 |
$38.81 |
| 154 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 84 | LF |
$30.00 |
$20.00 |
$35.90 |
$35.19 |
$38.80 |
| 155 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 106 | LF |
$25.00 |
$20.00 |
$24.80 |
$24.39 |
$26.89 |
| 156 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$50,000.00 |
$42,000.00 |
$60,500.00 |
$59,400.00 |
$80,923.50 |
| 157 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 80 | CY |
$10.00 |
$17.00 |
$27.50 |
$17.00 |
$29.77 |
| 158 | 501(G) 6309 |
CLSM BACKFILL | 122 | CY |
$150.00 |
$170.00 |
$124.20 |
$170.00 |
$134.55 |
| 159 | 503(A) 1311 |
PRESTRESSED CONCRETE BEAMS (TYPE II) | 278 | LF |
$190.00 |
$250.00 |
$180.10 |
$250.00 |
$195.21 |
| 160 | 503(A) 1312 |
PRESTRESSED CONCRETE BEAMS (TYPE III) | 259 | LF |
$210.00 |
$295.00 |
$210.50 |
$295.00 |
$228.19 |
| 161 | 504(A) 1304 |
APPROACH SLAB | 187.4 | SY |
$180.00 |
$160.00 |
$257.30 |
$160.00 |
$278.81 |
| 162 | 504(B) 1305 |
SAW-CUT GROOVING | 788.9 | SY |
$5.00 |
$3.00 |
$3.30 |
$3.00 |
$3.57 |
| 163 | 504(D) 6245 |
CONCRETE RAIL (TR4) | 351 | LF |
$120.00 |
$85.00 |
$87.65 |
$85.00 |
$94.98 |
| 164 | 506(A) 1322 |
STRUCTURAL STEEL | 1,050 | LB |
$4.00 |
$3.50 |
$3.10 |
$3.50 |
$3.78 |
| 165 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 8 | EA |
$800.00 |
$400.00 |
$715.00 |
$400.00 |
$774.71 |
| 166 | 507(B) 6174 |
STAINLESS STEEL EXPANSION BEARING ASSEMBLY | 16 | EA |
$2,500.00 |
$1,250.00 |
$1,285.00 |
$1,250.00 |
$1,392.25 |
| 167 | 507(C) 6282 |
ELASTOMERIC BEARING PADS | 16 | EA |
$500.00 |
$650.00 |
$469.95 |
$650.00 |
$509.21 |
| 168 | 509(A) 1326 |
CLASS AA CONCRETE | 184.6 | CY |
$600.00 |
$550.00 |
$739.65 |
$550.00 |
$652.20 |
| 169 | 509(B) 1328 |
CLASS A CONCRETE | 113 | CY |
$550.00 |
$750.00 |
$920.00 |
$750.00 |
$753.06 |
| 170 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 62,640 | LB |
$1.10 |
$0.9000 |
$1.20 |
$0.9000 |
$1.68 |
| 171 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 420 | LF |
$30.00 |
$43.00 |
$31.70 |
$43.00 |
$34.38 |
| 172 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 420 | LF |
$25.00 |
$12.00 |
$13.20 |
$12.00 |
$14.29 |
| 173 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 174 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 658 | SY |
$4.00 |
$3.20 |
$3.50 |
$3.20 |
$3.81 |
| 175 | 516(A) 6094 |
DRILLED SHAFTS 48" DIAMETER | 230 | LF |
$500.00 |
$500.00 |
$715.00 |
$500.00 |
$775.39 |
| 176 | 516(C) 6200 |
CROSSHOLE SONIC LOGGING | 1 | EA |
$2,000.00 |
$2,900.00 |
$7,033.00 |
$2,900.00 |
$7,620.48 |
| 177 | 523(A) 6550 |
SEALER CRACK PREPARATION | 163 | LF |
$4.00 |
$3.00 |
$3.30 |
$3.00 |
$3.57 |
| 178 | 523(B) 6560 |
SEALER RESIN | 1.8 | GAL |
$200.00 |
$80.00 |
$87.95 |
$80.00 |
$95.26 |
| 179 | 525(C) 1000 |
(SP)NEST PREVENTION | 1 | LSUM |
$6,000.00 |
$5,000.00 |
$4,945.00 |
$5,000.00 |
$5,358.15 |
| 180 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 780 | TON |
$35.00 |
$56.00 |
$46.35 |
$56.00 |
$50.22 |
| 181 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 220 | TON |
$30.00 |
$46.00 |
$39.15 |
$46.00 |
$42.38 |
| 182 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 84 | LF |
$30.00 |
$20.00 |
$29.25 |
$20.00 |
$31.66 |
| 183 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 100 | LF |
$25.00 |
$20.00 |
$24.85 |
$20.00 |
$26.89 |
| 184 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$40,000.00 |
$32,000.00 |
$72,900.00 |
$32,000.00 |
$80,923.50 |
| 185 | 202(A) 1301 |
UNCLASSIFIED EXCAVATION | 260 | CY |
$10.00 |
$5.00 |
$5.09 |
$20.00 |
$11.03 |
| 186 | 501(A) 1306 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 160 | CY |
$10.00 |
$30.00 |
$30.50 |
$20.00 |
$33.08 |
| 187 | 509(A) 1326 |
CLASS AA CONCRETE | 304 | CY |
$600.00 |
$363.48 |
$370.00 |
$450.00 |
$400.73 |
| 188 | 511(A) 1332 |
REINFORCING STEEL | 59,180 | LB |
$1.10 |
$0.9100 |
$0.9300 |
$0.9000 |
$1.41 |
| 189 | 525(C) 1000 |
(SP)NEST PREVENTION | 1 | LSUM |
$6,000.00 |
$3,500.00 |
$3,560.00 |
$3,500.00 |
$3,858.75 |
| 190 | 619(B) 2500 |
REMOVAL OF BRIDGE ITEMS | 1 | LSUM |
$20,000.00 |
$7,500.00 |
$7,630.00 |
$20,000.00 |
$19,293.75 |