| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$10,000.00 |
$17,850.00 |
$43,500.00 |
$20,000.00 |
$5,784.76 |
$5,200.00 |
$8,500.00 |
$17,627.53 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 3,719 | CY |
$8.00 |
$13.70 |
$7.50 |
$10.00 |
$6.45 |
$9.36 |
$5.72 |
$9.55 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 10,628 | CY |
$9.50 |
$13.70 |
$11.00 |
$10.00 |
$7.40 |
$10.40 |
$9.16 |
$15.42 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$16,000.00 |
$27,000.00 |
$11,250.00 |
$5,000.00 |
$4,958.37 |
$3,640.00 |
$16,000.00 |
$12,393.62 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 1,352 | LF |
$2.00 |
$1.90 |
$1.85 |
$2.50 |
$1.49 |
$2.08 |
$1.70 |
$1.60 |
| 6 | 221(F) 0100 |
TEMPORARY SILT DIKE | 40 | LF |
$9.50 |
$17.00 |
$17.50 |
$8.50 |
$14.00 |
$17.68 |
$16.00 |
$10.42 |
| 7 | 221(G) 0153 |
TEMPORARY ROCK FILTER DAM TYPE 4 | 22.6 | CY |
$150.00 |
$266.00 |
$215.00 |
$150.00 |
$100.00 |
$72.80 |
$67.00 |
$150.85 |
| 8 | 230(A) 2806 |
SOLID SLAB SODDING | 15,848 | SY |
$2.00 |
$1.50 |
$1.50 |
$1.15 |
$1.11 |
$1.66 |
$1.27 |
$1.91 |
| 9 | 233(A) 2817 |
VEGETATIVE MULCHING | 3.2 | AC |
$220.00 |
$585.00 |
$375.00 |
$305.00 |
$299.00 |
$598.00 |
$350.00 |
$146.90 |
| 10 | 241 2832 |
MOWING | 7 | AC |
$120.00 |
$122.00 |
$85.00 |
$70.00 |
$69.00 |
$124.80 |
$79.00 |
$146.90 |
| 11 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 1,285 | CY |
$65.00 |
$58.50 |
$73.50 |
$50.00 |
$50.00 |
$57.20 |
$57.23 |
$54.35 |
| 12 | 307(K) 4300 |
STABILIZED SUBGRADE | 4,000 | SY |
$8.00 |
$6.80 |
$6.85 |
$7.25 |
$6.35 |
$7.12 |
$7.71 |
$12.49 |
| 13 | 325 5271 |
SEPARATOR FABRIC | 1,745 | SY |
$2.00 |
$1.05 |
$1.50 |
$1.50 |
$1.25 |
$1.40 |
$0.7200 |
$1.62 |
| 14 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 135 | TON |
$34.00 |
$53.00 |
$42.00 |
$30.00 |
$50.00 |
$33.28 |
$43.50 |
$38.19 |
| 15 | 407(B) 0250 |
TACK COAT | 811 | GAL |
$4.00 |
$3.00 |
$4.70 |
$2.05 |
$4.90 |
$3.12 |
$5.61 |
$4.41 |
| 16 | 408 5774 |
PRIME COAT | 2,325 | GAL |
$6.00 |
$3.50 |
$6.75 |
$2.05 |
$11.75 |
$3.12 |
$13.45 |
$5.14 |
| 17 | 411(B) 5940 |
SUPERPAVE, TYPE S3(PG 70-28 OK) | 135 | TON |
$90.00 |
$114.70 |
$102.00 |
$82.00 |
$118.00 |
$87.46 |
$135.00 |
$168.93 |
| 18 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 1,250 | TON |
$85.00 |
$66.50 |
$80.00 |
$71.00 |
$90.10 |
$82.16 |
$103.02 |
$121.92 |
| 19 | 411(C) 5955 |
SUPERPAVE, TYPE S4(PG 70-28 OK) | 90 | TON |
$100.00 |
$90.30 |
$113.00 |
$91.00 |
$158.00 |
$100.36 |
$180.86 |
$138.08 |
| 20 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 626 | TON |
$95.00 |
$81.40 |
$81.00 |
$78.00 |
$110.50 |
$86.32 |
$126.49 |
$121.92 |
| 21 | 412 5267 |
COLD MILLING PAVEMENT | 2,134 | SY |
$5.00 |
$3.60 |
$6.50 |
$3.15 |
$4.85 |
$4.16 |
$5.55 |
$12.05 |
| 22 | 509(D) 0325 |
CLASS C CONCRETE | 10 | CY |
$400.00 |
$357.00 |
$400.00 |
$320.00 |
$400.00 |
$260.00 |
$300.00 |
$367.24 |
| 23 | 613(A) 0492 |
24" R.C.PIPE CLASS III | 172 | LF |
$75.00 |
$66.30 |
$62.00 |
$86.00 |
$59.04 |
$71.76 |
$84.71 |
$69.04 |
| 24 | 613(A) 0493 |
30" R.C.PIPE CLASS III | 60 | LF |
$90.00 |
$108.70 |
$82.00 |
$125.00 |
$79.50 |
$82.16 |
$100.73 |
$92.54 |
| 25 | 613(B) 0689 |
18" CORR. GALV. STEEL PIPE | 48 | LF |
$40.00 |
$42.90 |
$42.40 |
$33.00 |
$28.12 |
$25.27 |
$46.93 |
$44.07 |
| 26 | 613(L) 5730 |
24" PREFAB. CULVERT END SECTION, ROUND | 3 | EA |
$650.00 |
$1,620.00 |
$1,177.00 |
$1,100.00 |
$865.30 |
$1,237.60 |
$801.00 |
$1,395.51 |
| 27 | 613(L) 5732 |
30" PREFAB. CULVERT END SECTION, ROUND | 1 | EA |
$1,200.00 |
$1,770.00 |
$1,391.00 |
$1,200.00 |
$940.00 |
$1,809.60 |
$1,430.00 |
$1,608.51 |
| 28 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$8,000.00 |
$15,795.00 |
$8,200.00 |
$5,000.00 |
$3,922.62 |
$3,640.00 |
$7,500.00 |
$17,267.63 |
| 29 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 3,066 | SY |
$5.00 |
$4.95 |
$6.50 |
$4.25 |
$10.00 |
$8.32 |
$11.45 |
$5.88 |
| 30 | 619(C) 0924 |
SAWING PAVEMENT | 400 | LF |
$5.00 |
$2.70 |
$5.00 |
$3.50 |
$10.00 |
$6.24 |
$4.58 |
$5.14 |
| 31 | 624(C) 4459 |
FENCE-STYLE SWF (5 BARBED WIRE) | 609 | LF |
$6.50 |
$10.60 |
$9.75 |
$10.50 |
$8.00 |
$8.32 |
$11.45 |
$11.75 |
| 32 | 629(E) 5048 |
REMOVE AND RESET MAILBOX | 1 | EA |
$180.00 |
$160.00 |
$55.00 |
$255.00 |
$200.00 |
$156.00 |
$115.00 |
$183.62 |
| 33 | 202(A) 1301 |
UNCLASSIFIED EXCAVATION | 5,410 | CY |
$8.00 |
$13.70 |
$3.50 |
$10.00 |
$6.70 |
$5.20 |
$10.30 |
$9.55 |
| 34 | 501(A) 1306 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 920 | CY |
$12.00 |
$13.70 |
$28.90 |
$40.00 |
$5.00 |
$7.28 |
$7.36 |
$12.49 |
| 35 | 509(A) 1326 |
CLASS AA CONCRETE | 956.9 | CY |
$500.00 |
$337.00 |
$315.00 |
$400.00 |
$418.84 |
$471.12 |
$460.00 |
$565.55 |
| 36 | 511(A) 1332 |
REINFORCING STEEL | 168,460 | LB |
$0.9500 |
$0.5900 |
$0.9200 |
$1.00 |
$0.9000 |
$0.9800 |
$0.8000 |
$0.9400 |
| 37 | 525(C) 1000 |
(SP)NEST PREVENTION | 1 | LSUM |
$8,000.00 |
$1,920.00 |
$5,780.00 |
$3,235.00 |
$1,500.00 |
$2,600.00 |
$8,000.00 |
$5,141.36 |
| 38 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$15,000.00 |
$26,815.00 |
$14,450.00 |
$20,000.00 |
$12,230.64 |
$34,320.00 |
$40,000.00 |
$29,379.21 |
| 39 | 853 9030 |
DELINEATORS(TYPE 1, CODE 3) | 2 | EA |
$30.00 |
$26.65 |
$40.00 |
$28.50 |
$25.00 |
$31.20 |
$28.70 |
$36.73 |
| 40 | 855(A) 8812 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 2,494 | LF |
$0.7000 |
$0.4500 |
$1.65 |
$1.60 |
$0.4000 |
$0.4500 |
$0.5000 |
$0.5900 |
| 41 | 857(A) 8839 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) | 3,751 | LF |
$0.4000 |
$0.1500 |
$0.5500 |
$0.4500 |
$0.1200 |
$0.1500 |
$0.1500 |
$0.1800 |
| 42 | 857(E) 8887 |
(PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-1 | 880 | EA |
$1.00 |
$0.4500 |
$1.65 |
$1.05 |
$0.4000 |
$0.4500 |
$0.5000 |
$0.5900 |
| 43 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 1,300 | LF |
$0.6000 |
$0.1100 |
$0.5500 |
$1.25 |
$0.1000 |
$0.1500 |
$0.1100 |
$0.1500 |
| 44 | 871(B) 8705 |
(SP)CONST.ZONE IMPACT ATTEN. | 240 | SD |
$7.00 |
$4.25 |
$19.00 |
$17.50 |
$4.00 |
$5.20 |
$4.60 |
$5.88 |
| 45 | 877(B) 8484 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 1,475 | LF |
$25.00 |
$22.40 |
$36.00 |
$20.00 |
$21.00 |
$23.15 |
$24.00 |
$30.85 |
| 46 | 877(C) 8486 |
RELOCATION OF PORTABLE LONGITUDINAL BARRIER | 350 | LF |
$5.00 |
$5.35 |
$4.00 |
$2.50 |
$5.00 |
$5.46 |
$5.75 |
$7.34 |
| 47 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 1,440 | SD |
$0.4000 |
$0.2700 |
$0.5500 |
$0.0500 |
$0.2500 |
$0.2900 |
$0.3000 |
$0.3700 |
| 48 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 720 | SD |
$0.8000 |
$2.13 |
$1.05 |
$1.25 |
$2.00 |
$2.24 |
$2.30 |
$2.94 |
| 49 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 1,520 | SD |
$1.50 |
$0.2700 |
$2.00 |
$1.30 |
$0.2500 |
$0.2900 |
$0.3000 |
$0.3700 |
| 50 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 120 | SD |
$1.50 |
$4.26 |
$2.00 |
$5.25 |
$4.00 |
$4.37 |
$4.60 |
$5.88 |
| 51 | 880(C) 8848 |
WING BARRICADES | 480 | SD |
$1.10 |
$1.07 |
$1.50 |
$0.2100 |
$1.00 |
$1.10 |
$1.15 |
$1.47 |
| 52 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 480 | SD |
$0.5000 |
$7.46 |
$0.6500 |
$0.5200 |
$7.00 |
$7.72 |
$8.00 |
$10.28 |
| 53 | 880(F) 8878 |
DRUMS | 2,880 | SD |
$0.4000 |
$0.2700 |
$0.6500 |
$0.7500 |
$0.2500 |
$0.2900 |
$0.3000 |
$0.3700 |
| 54 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 240 | SD |
$15.00 |
$10.66 |
$22.00 |
$16.50 |
$10.00 |
$10.92 |
$11.40 |
$14.69 |
| 55 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$10,000.00 |
$14,925.00 |
$12,500.00 |
$6,100.00 |
$12,775.00 |
$7,436.00 |
$11,000.00 |
$8,813.76 |
| 56 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$9,400.00 |
$3,500.00 |
$1,744.00 |
$5,000.00 |
$3,640.00 |
$3,500.00 |
$12,118.92 |
| 57 | 640(A) 1398 |
FIELD OFFICE | 1 | EA |
$8,000.00 |
$6,210.00 |
$4,500.00 |
$5,750.00 |
$1,500.00 |
$5,304.00 |
$10,000.00 |
$2,203.44 |
| 58 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$95,500.00 |
$65,338.40 |
$89,500.00 |
$92,000.00 |
$132,281.94 |
$82,089.07 |
$100,000.00 |
$95,482.43 |