| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$20,000.00 |
$34,230.00 |
$20,000.00 |
$44,000.00 |
$50,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 18,967 | CY |
$7.00 |
$9.40 |
$8.00 |
$7.65 |
$6.50 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 1,000 | CY |
$15.00 |
$10.20 |
$9.00 |
$8.75 |
$8.00 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$59,600.00 |
$31,630.00 |
$18,000.00 |
$35,000.00 |
$45,000.00 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 6,034 | LF |
$2.00 |
$1.20 |
$1.55 |
$1.65 |
$3.00 |
| 6 | 221(F) 0100 |
TEMPORARY SILT DIKE | 308 | LF |
$7.50 |
$8.75 |
$7.00 |
$7.70 |
$12.00 |
| 7 | 230(A) 2806 |
SOLID SLAB SODDING | 36,699 | SY |
$1.50 |
$1.30 |
$1.15 |
$1.27 |
$1.50 |
| 8 | 233(A) 2817 |
VEGETATIVE MULCHING | 15.18 | AC |
$400.00 |
$159.00 |
$100.00 |
$100.00 |
$130.00 |
| 9 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 7,117 | CY |
$45.00 |
$57.60 |
$61.00 |
$68.86 |
$57.00 |
| 10 | 310(B) 0149 |
SUBGRADE, METHOD B | 37,604 | SY |
$1.50 |
$1.40 |
$2.50 |
$1.80 |
$2.00 |
| 11 | 325 5271 |
SEPARATOR FABRIC | 42,472 | SY |
$1.50 |
$1.20 |
$1.00 |
$1.85 |
$1.00 |
| 12 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 5,904 | TON |
$25.00 |
$34.00 |
$30.00 |
$34.18 |
$27.00 |
| 13 | 408 5774 |
PRIME COAT | 23,172 | GAL |
$5.00 |
$2.35 |
$7.00 |
$4.50 |
$5.00 |
| 14 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 5,878 | TON |
$75.00 |
$65.10 |
$68.60 |
$78.00 |
$91.00 |
| 15 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 2,940 | TON |
$80.00 |
$74.70 |
$78.60 |
$90.00 |
$100.00 |
| 16 | 412 5267 |
COLD MILLING PAVEMENT | 23,140 | SY |
$2.00 |
$3.25 |
$3.25 |
$2.25 |
$2.00 |
| 17 | 501(A) 0313 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 41 | CY |
$20.00 |
$23.70 |
$13.00 |
$19.00 |
$16.00 |
| 18 | 509(A) 0319 |
CLASS AA CONCRETE | 91.3 | CY |
$500.00 |
$569.50 |
$500.00 |
$725.00 |
$830.00 |
| 19 | 509(D) 0325 |
CLASS C CONCRETE | 20 | CY |
$300.00 |
$319.00 |
$300.00 |
$300.00 |
$310.00 |
| 20 | 511(A) 0332 |
REINFORCING STEEL | 14,866 | LB |
$1.00 |
$1.40 |
$1.00 |
$0.9700 |
$0.9400 |
| 21 | 601(A) 0297 |
TYPE I PLAIN RIPRAP | 1,060 | TON |
$40.00 |
$50.30 |
$56.00 |
$52.50 |
$52.00 |
| 22 | 601(B) 0536 |
TYPE I-A PLAIN RIPRAP | 188 | TON |
$55.00 |
$54.60 |
$56.00 |
$52.50 |
$52.00 |
| 23 | 601(C) 0538 |
TYPE I-A FILTER BLANKET | 61 | TON |
$50.00 |
$49.60 |
$43.00 |
$39.00 |
$40.00 |
| 24 | 613(A) 4496 |
28" X 18" R.C.PIPE ARCH CLASS A-III | 312 | LF |
$110.00 |
$122.50 |
$105.00 |
$105.00 |
$160.00 |
| 25 | 613(A) 4497 |
36" X 22" R.C.PIPE ARCH CLASS A-III | 40 | LF |
$130.00 |
$159.50 |
$150.00 |
$142.00 |
$430.00 |
| 26 | 613(A) 4499 |
51" X 31" R.C.PIPE ARCH CLASS A-III | 46 | LF |
$200.00 |
$245.00 |
$220.00 |
$214.00 |
$460.00 |
| 27 | 613(B) 0689 |
18" CORR. GALV. STEEL PIPE | 50 | LF |
$35.00 |
$29.40 |
$30.00 |
$25.60 |
$61.00 |
| 28 | 613(B) 4527 |
21" X 15" CORR. GALV. STEEL PIPE ARCH | 438 | LF |
$40.00 |
$30.70 |
$32.00 |
$30.65 |
$41.00 |
| 29 | 613(B) 4528 |
28" X 20" CORR. GALV. STEEL PIPE ARCH | 368 | LF |
$50.00 |
$39.30 |
$40.00 |
$33.50 |
$46.00 |
| 30 | 613(B) 4529 |
35" X 24" CORR. GALV. STEEL PIPE ARCH | 32 | LF |
$45.00 |
$43.80 |
$45.00 |
$40.20 |
$140.00 |
| 31 | 613(L) 4504 |
21" X 15" PREFAB. CULVERT END SECTION, ARCH | 22 | EA |
$300.00 |
$424.00 |
$275.00 |
$280.00 |
$100.00 |
| 32 | 613(L) 4515 |
28" X 18" PREFAB. CULVERT END SECTION, ARCH | 8 | EA |
$1,000.00 |
$1,150.00 |
$1,100.00 |
$1,073.00 |
$890.00 |
| 33 | 613(L) 4516 |
28" X 20" PREFAB. CULVERT END SECTION, ARCH | 18 | EA |
$300.00 |
$450.50 |
$330.00 |
$318.00 |
$140.00 |
| 34 | 613(L) 4522 |
35" X 24" PREFAB. CULVERT END SECTION, ARCH | 2 | EA |
$450.00 |
$964.50 |
$450.00 |
$414.00 |
$250.00 |
| 35 | 613(L) 4526 |
36" X 22" PREFAB. CULVERT END SECTION, ARCH | 2 | EA |
$1,300.00 |
$1,245.00 |
$1,300.00 |
$1,270.00 |
$990.00 |
| 36 | 613(L) 4540 |
51" X 31" PREFAB. CULVERT END SECTION, ARCH | 2 | EA |
$2,000.00 |
$2,331.00 |
$2,100.00 |
$2,120.00 |
$2,100.00 |
| 37 | 613(L) 5726 |
18" PREFAB. CULVERT END SECTION, ROUND | 2 | EA |
$550.00 |
$1,680.00 |
$300.00 |
$320.00 |
$120.00 |
| 38 | 613(M) 7192 |
TYPE BB4 CULVERT END TREATMENT | 2 | EA |
$2,000.00 |
$2,226.00 |
$2,600.00 |
$2,400.00 |
$1,500.00 |
| 39 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$30,000.00 |
$14,940.00 |
$12,000.00 |
$38,500.00 |
$22,000.00 |
| 40 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 100 | LF |
$19.00 |
$19.90 |
$18.75 |
$20.63 |
$24.00 |
| 41 | 623(F) 5686 |
GUARDRAIL ANCHOR UNIT (TYPE D-BF) | 4 | EA |
$1,500.00 |
$1,484.00 |
$1,400.00 |
$1,540.00 |
$1,800.00 |
| 42 | 623(G) 8571 |
GUARDRAIL END TREATMENT (GET) | 4 | EA |
$2,400.00 |
$1,876.00 |
$1,770.00 |
$1,947.00 |
$2,300.00 |
| 43 | 624(C) 4458 |
FENCE-STYLE SWF (4 BARBED WIRE) | 230 | LF |
$5.00 |
$12.20 |
$11.00 |
$12.65 |
$16.00 |
| 44 | 624(C) 4459 |
FENCE-STYLE SWF (5 BARBED WIRE) | 727 | LF |
$6.00 |
$13.30 |
$8.00 |
$13.75 |
$12.00 |
| 45 | 629(E) 5048 |
REMOVE AND RESET MAILBOX | 12 | EA |
$165.00 |
$25.00 |
$275.00 |
$165.00 |
$190.00 |
| 46 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 230 | CY |
$20.00 |
$14.90 |
$15.00 |
$10.00 |
$16.00 |
| 47 | 501(F) 6352 |
GRANULAR BACKFILL | 138 | CY |
$70.00 |
$100.50 |
$80.00 |
$65.00 |
$65.00 |
| 48 | 503(A) 6290 |
PRESTRESSED CONCRETE BEAMS (TYPE J BT) | 359 | LF |
$300.00 |
$281.00 |
$300.00 |
$342.00 |
$320.00 |
| 49 | 504(B) 1305 |
SAW-CUT GROOVING | 303.3 | SY |
$5.00 |
$9.75 |
$9.20 |
$10.12 |
$12.00 |
| 50 | 504(D) 6239 |
CONCRETE RAIL (TR3) | 334.5 | LF |
$80.00 |
$74.80 |
$75.00 |
$74.00 |
$96.00 |
| 51 | 506(A) 1322 |
STRUCTURAL STEEL | 1,100 | LB |
$5.00 |
$4.10 |
$3.00 |
$3.50 |
$5.00 |
| 52 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 3 | EA |
$1,100.00 |
$1,699.00 |
$1,800.00 |
$1,525.00 |
$1,900.00 |
| 53 | 507(B) 6176 |
WEATHERING STEEL EXPANSION BEARING ASSEMBLY | 3 | EA |
$1,200.00 |
$1,699.00 |
$1,800.00 |
$1,525.00 |
$1,900.00 |
| 54 | 509(A) 1326 |
CLASS AA CONCRETE | 109 | CY |
$600.00 |
$499.00 |
$550.00 |
$635.00 |
$660.00 |
| 55 | 509(B) 1328 |
CLASS A CONCRETE | 93.6 | CY |
$650.00 |
$675.50 |
$550.00 |
$655.00 |
$860.00 |
| 56 | 511(A) 1332 |
REINFORCING STEEL | 40,020 | LB |
$1.00 |
$0.9900 |
$0.8500 |
$0.8500 |
$0.8100 |
| 57 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 234 | LF |
$35.00 |
$40.30 |
$38.00 |
$28.00 |
$26.00 |
| 58 | 514(A) 6011 |
PILES, FURNISHED (HP 12X53) | 736 | LF |
$40.00 |
$40.10 |
$48.00 |
$30.10 |
$34.00 |
| 59 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 234 | LF |
$20.00 |
$21.00 |
$10.00 |
$12.00 |
$23.00 |
| 60 | 514(B) 6294 |
PILES, DRIVEN (HP 12X53) | 736 | LF |
$20.00 |
$20.10 |
$10.00 |
$12.90 |
$25.00 |
| 61 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 62 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 1,001 | TON |
$40.00 |
$50.90 |
$50.00 |
$52.50 |
$45.00 |
| 63 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 274 | TON |
$35.00 |
$40.50 |
$45.00 |
$39.00 |
$34.00 |
| 64 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 60 | LF |
$30.00 |
$46.90 |
$35.00 |
$33.00 |
$21.00 |
| 65 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 120 | LF |
$30.00 |
$25.90 |
$35.00 |
$30.00 |
$11.00 |
| 66 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$10,000.00 |
$20,120.00 |
$6,500.00 |
$15,000.00 |
$20,000.00 |
| 67 | 805(D) 8756 |
(PL)REMOVE & RESET EXISTING SIGNS | 7 | EA |
$50.00 |
$212.00 |
$200.00 |
$220.00 |
$260.00 |
| 68 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 51.08 | SF |
$20.00 |
$31.80 |
$30.00 |
$33.00 |
$39.00 |
| 69 | 851(C) 8327 |
2 1/4" SQUARE TUBE POST | 140 | LF |
$10.00 |
$6.35 |
$6.00 |
$6.60 |
$8.00 |
| 70 | 854(A) 8800 |
TRAFFIC STRIPE(PAINT)(4" WIDE) | 40,254 | LF |
$0.2500 |
$0.1300 |
$0.1200 |
$0.1400 |
$0.1600 |
| 71 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$15,000.00 |
$5,193.00 |
$6,340.00 |
$7,000.00 |
$8,200.00 |
| 72 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$20,090.00 |
$40,800.00 |
$25,183.00 |
$34,000.00 |
$39,000.00 |
| 73 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$3,709.00 |
$1,275.00 |
$6,300.00 |
$2,500.00 |
| 74 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$125,000.00 |
$148,508.30 |
$162,000.00 |
$131,000.00 |
$124,000.00 |