| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$25,000.00 |
$27,000.00 |
$32,000.00 |
$100,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 92,993 | CY |
$7.00 |
$7.50 |
$10.20 |
$12.00 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 22,331 | CY |
$8.50 |
$9.10 |
$12.40 |
$15.00 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$32,000.00 |
$34,400.00 |
$105,000.00 |
$44,000.00 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 17,546 | LF |
$1.70 |
$1.05 |
$1.10 |
$0.9800 |
| 6 | 221(D) 2803 |
TEMPORARY SEDIMENT FILTER | 9 | EA |
$180.00 |
$125.00 |
$127.50 |
$115.00 |
| 7 | 221(F) 0100 |
TEMPORARY SILT DIKE | 1,725 | LF |
$7.00 |
$6.45 |
$6.60 |
$5.99 |
| 8 | 221(G) 0152 |
TEMPORARY ROCK FILTER DAM TYPE 3 | 50 | CY |
$92.00 |
$119.00 |
$220.00 |
$200.00 |
| 9 | 230(A) 2806 |
SOLID SLAB SODDING | 118,438 | SY |
$1.50 |
$1.00 |
$0.9800 |
$0.8900 |
| 10 | 233(A) 2817 |
VEGETATIVE MULCHING | 30 | AC |
$480.00 |
$269.00 |
$275.00 |
$250.00 |
| 11 | 241 2832 |
MOWING | 49 | AC |
$60.00 |
$53.00 |
$55.00 |
$50.00 |
| 12 | 307(K) 4300 |
STABILIZED SUBGRADE | 82,263 | SY |
$5.50 |
$4.90 |
$8.00 |
$6.50 |
| 13 | 402(A) 0217 |
TRAFFIC BOUND SURFACE COURSE TYPE A | 1,696 | TON |
$30.00 |
$32.25 |
$36.00 |
$45.00 |
| 14 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 404 | TON |
$35.00 |
$40.00 |
$36.00 |
$45.00 |
| 15 | 407(B) 0250 |
TACK COAT | 13,421 | GAL |
$4.00 |
$4.50 |
$3.00 |
$7.00 |
| 16 | 408 5774 |
PRIME COAT | 38,839 | GAL |
$4.75 |
$5.25 |
$3.00 |
$10.00 |
| 17 | 411(B) 5940 |
SUPERPAVE, TYPE S3(PG 70-28 OK) | 7,018 | TON |
$78.00 |
$70.75 |
$74.76 |
$85.00 |
| 18 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 28,659 | TON |
$70.00 |
$66.50 |
$67.82 |
$82.00 |
| 19 | 411(C) 5955 |
SUPERPAVE, TYPE S4(PG 70-28 OK) | 4,945 | TON |
$83.00 |
$85.00 |
$78.60 |
$95.00 |
| 20 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 7,170 | TON |
$80.00 |
$81.75 |
$68.93 |
$90.00 |
| 21 | 411(I) 6310 |
SUPERPAVE, TYPE S4(PATCH)(PG64-22OK) | 100 | TON |
$135.00 |
$150.00 |
$125.00 |
$1,000.00 |
| 22 | 412 5267 |
COLD MILLING PAVEMENT | 3,014 | SY |
$11.50 |
$6.50 |
$12.00 |
$20.00 |
| 23 | 501(A) 0313 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 82 | CY |
$22.00 |
$19.95 |
$33.00 |
$18.53 |
| 24 | 501(G) 6315 |
CLSM BACKFILL | 75 | CY |
$215.00 |
$125.00 |
$138.00 |
$116.52 |
| 25 | 502 1000 |
TEMPORARY EARTH RETAINAGE | 1 | LSUM |
$100,000.00 |
$149,900.00 |
$145,000.00 |
$250,000.00 |
| 26 | 504(D) 6245 |
CONCRETE RAIL (TR4) | 427 | LF |
$92.00 |
$89.75 |
$97.00 |
$83.34 |
| 27 | 509(A) 0319 |
CLASS AA CONCRETE | 159 | CY |
$575.00 |
$422.75 |
$694.00 |
$393.12 |
| 28 | 509(D) 0325 |
CLASS C CONCRETE | 94 | CY |
$390.00 |
$237.00 |
$351.00 |
$220.45 |
| 29 | 510(A) 6334 |
RETAINING WALL | 1,092 | SY |
$850.00 |
$729.00 |
$916.50 |
$678.20 |
| 30 | 511(A) 0332 |
REINFORCING STEEL | 21,282 | LB |
$1.00 |
$0.9500 |
$1.05 |
$0.8600 |
| 31 | 601(A) 0297 |
TYPE I PLAIN RIPRAP | 7,115 | TON |
$55.00 |
$44.50 |
$45.00 |
$41.36 |
| 32 | 609(D) 0398 |
BITUMINOUS CURBING | 3,033 | LF |
$20.00 |
$22.25 |
$27.50 |
$20.59 |
| 33 | 610(A) 0605 |
6" CONCRETE SIDEWALK | 65 | SY |
$150.00 |
$85.00 |
$110.00 |
$79.04 |
| 34 | 610(B) 0604 |
6" CONCRETE DRIVEWAY | 687 | SY |
$68.00 |
$53.00 |
$71.50 |
$49.27 |
| 35 | 611(A) 2657 |
MANHOLE (4' DIAMETER) | 1 | EA |
$2,600.00 |
$1,925.00 |
$2,469.50 |
$1,787.41 |
| 36 | 611(G) 6002 |
INLET (SMD-TYPE 2) | 7 | EA |
$2,400.00 |
$2,375.00 |
$2,986.50 |
$2,209.67 |
| 37 | 613(A) 0491 |
18" R.C.PIPE CLASS III | 832 | LF |
$68.00 |
$58.00 |
$76.35 |
$53.52 |
| 38 | 613(A) 0492 |
24" R.C.PIPE CLASS III | 572 | LF |
$76.00 |
$61.00 |
$87.45 |
$55.90 |
| 39 | 613(A) 0493 |
30" R.C.PIPE CLASS III | 326 | LF |
$95.00 |
$92.00 |
$102.40 |
$85.37 |
| 40 | 613(A) 0494 |
36" R.C.PIPE CLASS III | 150 | LF |
$138.00 |
$131.00 |
$121.80 |
$121.74 |
| 41 | 613(A) 0496 |
48" R.C.PIPE CLASS III | 98 | LF |
$176.00 |
$215.00 |
$167.53 |
$198.34 |
| 42 | 613(A) 4495 |
22" X 13" R.C.PIPE ARCH CLASS A-III | 406 | LF |
$85.00 |
$71.00 |
$106.05 |
$65.55 |
| 43 | 613(A) 4496 |
28" X 18" R.C.PIPE ARCH CLASS A-III | 52 | LF |
$150.00 |
$86.00 |
$123.40 |
$80.20 |
| 44 | 613(B) 0689 |
18" CORR. GALV. STEEL PIPE | 296 | LF |
$32.00 |
$27.00 |
$37.70 |
$25.18 |
| 45 | 613(B) 0690 |
24" CORR. GALV. STEEL PIPE | 142 | LF |
$40.00 |
$26.00 |
$41.35 |
$23.95 |
| 46 | 613(B) 0691 |
30" CORR. GALV. STEEL PIPE | 4 | LF |
$44.00 |
$38.00 |
$100.00 |
$35.43 |
| 47 | 613(B) 0692 |
36" CORR. GALV. STEEL PIPE | 4 | LF |
$60.00 |
$49.00 |
$100.00 |
$45.35 |
| 48 | 613(B) 4527 |
21" X 15" CORR. GALV. STEEL PIPE ARCH | 992 | LF |
$35.00 |
$29.00 |
$39.35 |
$26.69 |
| 49 | 613(H) 0450 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 1,250 | LF |
$14.00 |
$13.50 |
$14.00 |
$12.66 |
| 50 | 613(I) 1096 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 250 | LF |
$26.00 |
$13.50 |
$14.00 |
$12.34 |
| 51 | 613(L) 5730 |
24" PREFAB. CULVERT END SECTION, ROUND | 5 | EA |
$900.00 |
$780.00 |
$891.00 |
$719.38 |
| 52 | 613(L) 5734 |
36" PREFAB. CULVERT END SECTION, ROUND | 4 | EA |
$1,360.00 |
$1,140.00 |
$1,314.50 |
$1,061.33 |
| 53 | 613(M) 7186 |
TYPE A4 CULVERT END TREATMENT | 46 | EA |
$985.00 |
$845.00 |
$1,072.50 |
$785.48 |
| 54 | 613(M) 7187 |
TYPE B4 CULVERT END TREATMENT | 2 | EA |
$1,160.00 |
$1,025.00 |
$830.50 |
$950.34 |
| 55 | 613(M) 7188 |
TYPE C4 CULVERT END TREATMENT | 4 | EA |
$1,450.00 |
$1,410.00 |
$1,485.00 |
$1,311.17 |
| 56 | 613(M) 7190 |
TYPE E4 CULVERT END TREATMENT | 2 | EA |
$2,540.00 |
$1,916.00 |
$2,112.00 |
$1,782.86 |
| 57 | 613(M) 7192 |
TYPE BB4 CULVERT END TREATMENT | 2 | EA |
$2,000.00 |
$2,185.00 |
$2,535.50 |
$2,030.80 |
| 58 | 613(M) 7193 |
TYPE CC4 CULVERT END TREATMENT | 2 | EA |
$2,400.00 |
$1,667.00 |
$2,640.00 |
$1,550.25 |
| 59 | 613(W) 4500 |
24" JACKED CONDUIT | 64 | LF |
$500.00 |
$1,000.00 |
$500.00 |
$2,000.00 |
| 60 | 613(W) 4508 |
48" JACKED CONDUIT | 54 | LF |
$1,000.00 |
$1,650.00 |
$1,000.00 |
$3,000.00 |
| 61 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$50,000.00 |
$48,375.00 |
$50,000.00 |
$75,000.00 |
| 62 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 71,673 | SY |
$4.00 |
$3.25 |
$4.00 |
$5.25 |
| 63 | 619(B) 8610 |
REMOVE AND RESET CATTLE GUARD | 3 | EA |
$1,100.00 |
$1,185.00 |
$900.00 |
$2,000.00 |
| 64 | 619(C) 0924 |
SAWING PAVEMENT | 2,412 | LF |
$4.00 |
$4.30 |
$4.00 |
$7.00 |
| 65 | 624 4100 |
(PL) ORNAMENTAL FENCE | 654 | LF |
$30.00 |
$23.25 |
$34.30 |
$31.19 |
| 66 | 624(A) 4281 |
FENCE-STYLE WWF | 3,199 | LF |
$5.00 |
$5.60 |
$5.40 |
$4.92 |
| 67 | 624(B) 4464 |
GATES-STYLE WWF (4.5'HIGH X 14'LONG) | 9 | EA |
$600.00 |
$755.00 |
$657.00 |
$596.79 |
| 68 | 624(B) 4466 |
GATES-STYLE WWF (4.5'HIGH X 16'LONG) | 3 | EA |
$900.00 |
$968.00 |
$830.00 |
$754.09 |
| 69 | 624(B) 4468 |
GATES-STYLE WWF (4.5'HIGH X 20'LONG) | 7 | EA |
$1,500.00 |
$1,182.00 |
$1,105.00 |
$1,004.92 |
| 70 | 624(C) 4459 |
FENCE-STYLE SWF (5 BARBED WIRE) | 19,727 | LF |
$5.50 |
$5.05 |
$9.60 |
$8.74 |
| 71 | 629(A) 4958 |
MAILBOX INSTALLATION-SINGLE | 6 | EA |
$110.00 |
$102.00 |
$104.50 |
$100.00 |
| 72 | 629(B) 4959 |
MAILBOX INSTALLATION-MULTIPLE | 1 | EA |
$200.00 |
$210.00 |
$214.50 |
$200.00 |
| 73 | 629(C) 4960 |
MAILBOX | 9 | EA |
$35.00 |
$32.25 |
$33.00 |
$75.00 |
| 74 | 804(A) 2915 |
STRUCTURAL CONCRETE | 4 | CY |
$495.00 |
$210.00 |
$214.50 |
$350.00 |
| 75 | 805(D) 8744 |
(PL)REMOVE & RESET LIGHT POLE | 2 | EA |
$3,855.00 |
$2,762.00 |
$5,500.00 |
$5,000.00 |
| 76 | 805(D) 8756 |
(PL)REMOVE & RESET EXISTING SIGNS | 17 | EA |
$150.00 |
$64.50 |
$66.00 |
$200.00 |
| 77 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 219 | SF |
$24.00 |
$23.65 |
$24.20 |
$20.00 |
| 78 | 851(C) 8327 |
2 1/4" SQUARE TUBE POST | 312 | LF |
$9.30 |
$9.15 |
$9.35 |
$9.00 |
| 79 | 851(C) 8330 |
2 1/2" SQUARE TUBE POST | 268 | LF |
$10.50 |
$9.15 |
$9.35 |
$10.00 |
| 80 | 853 9033 |
DELINEATORS(TYPE 2, CODE 1) | 13 | EA |
$12.50 |
$19.40 |
$19.80 |
$25.00 |
| 81 | 853 9039 |
DELINEATORS(TYPE 2, CODE 3) | 45 | EA |
$18.00 |
$23.65 |
$24.20 |
$25.00 |
| 82 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 68,167 | LF |
$0.5400 |
$0.4000 |
$0.3700 |
$0.4800 |
| 83 | 856(A) 8540 |
TRAFFIC STRIPE(MULTI-POLY.)(8" WIDE) | 1,606 | LF |
$2.79 |
$0.4000 |
$0.3900 |
$1.00 |
| 84 | 856(A) 8555 |
TRAFFIC STRIPE(MULTI-POLY.)(24" WIDE) | 93 | LF |
$7.87 |
$5.50 |
$5.50 |
$15.00 |
| 85 | 856(B) 8860 |
TRAFFIC STRIPE(MULTI-POLY.)(ARROWS) | 11 | EA |
$130.53 |
$269.00 |
$275.00 |
$150.00 |
| 86 | 855(A) 8840 |
TRAFFIC STRIPE(PLASTIC)(THIN LINE)(4" WIDE) | 5,942 | LF |
$1.00 |
$0.8000 |
$0.7800 |
$0.6800 |
| 87 | 857(A) 8839 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) | 61,126 | LF |
$0.0900 |
$0.2000 |
$0.1900 |
$0.1400 |
| 88 | 857(C) 8851 |
REMOVABLE PAVEMENT MARKING TAPE(4" WIDE) | 3,500 | LF |
$1.33 |
$1.85 |
$1.87 |
$1.00 |
| 89 | 857(E) 8887 |
(PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-1 | 13,500 | EA |
$0.4800 |
$0.5500 |
$0.5300 |
$0.5000 |
| 90 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 4,800 | LF |
$0.3900 |
$0.8000 |
$0.8300 |
$0.5000 |
| 91 | 871(B) 8705 |
(SP)CONST.ZONE IMPACT ATTEN. | 2,000 | SD |
$4.80 |
$5.50 |
$5.50 |
$8.00 |
| 92 | 877(B) 8484 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 6,225 | LF |
$22.60 |
$43.00 |
$25.00 |
$35.00 |
| 93 | 877(C) 8486 |
RELOCATION OF PORTABLE LONGITUDINAL BARRIER | 10,637.5 | LF |
$4.80 |
$9.10 |
$5.00 |
$15.00 |
| 94 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 54,800 | SD |
$0.2500 |
$0.0200 |
$0.0300 |
$0.1000 |
| 95 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 24,400 | SD |
$0.5000 |
$0.0500 |
$0.0600 |
$0.5000 |
| 96 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 16,000 | SD |
$1.09 |
$0.5000 |
$0.5000 |
$0.5000 |
| 97 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 7,200 | SD |
$0.3500 |
$5.95 |
$6.05 |
$4.00 |
| 98 | 880(C) 8848 |
WING BARRICADES | 1,600 | SD |
$0.4000 |
$5.95 |
$6.05 |
$5.00 |
| 99 | 880(D) 8854 |
VERTICAL PANELS | 68,800 | SD |
$0.1500 |
$0.0200 |
$0.0300 |
$0.1000 |
| 100 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 21,600 | SD |
$0.4500 |
$0.6500 |
$0.6600 |
$3.00 |
| 101 | 880(F) 8878 |
DRUMS | 134,800 | SD |
$0.3000 |
$0.0500 |
$0.0600 |
$0.1000 |
| 102 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 800 | SD |
$25.00 |
$27.00 |
$27.50 |
$20.00 |
| 103 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$105,000.00 |
$85,000.00 |
$107,250.00 |
$175,000.00 |
| 104 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$10,000.00 |
$22,000.00 |
$45,000.00 |
$35,000.00 |
| 105 | 640(A) 1426 |
FIELD OFFICE | 1 | EA |
$10,000.00 |
$16,350.00 |
$36,500.00 |
$20,000.00 |
| 106 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$572,905.95 |
$750,000.00 |
$448,869.73 |
$700,000.00 |