| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$25,000.00 |
$8,000.00 |
$9,500.00 |
$14,000.00 |
$10,300.00 |
$36,556.00 |
$24,500.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 15,213 | CY |
$12.50 |
$5.50 |
$6.95 |
$8.50 |
$8.30 |
$8.15 |
$10.25 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 10,098 | CY |
$15.00 |
$7.30 |
$8.99 |
$10.00 |
$8.10 |
$7.97 |
$12.25 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$15,000.00 |
$6,000.00 |
$8,500.00 |
$20,000.00 |
$15,750.00 |
$15,496.00 |
$22,000.00 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 893 | LF |
$3.25 |
$2.00 |
$1.41 |
$1.29 |
$1.40 |
$1.34 |
$1.50 |
| 6 | 221(F) 0100 |
TEMPORARY SILT DIKE | 126 | LF |
$9.00 |
$7.35 |
$7.43 |
$6.67 |
$7.10 |
$6.94 |
$6.75 |
| 7 | 221(G) 0150 |
TEMPORARY ROCK FILTER DAM TYPE 1 | 24 | CY |
$125.00 |
$90.00 |
$105.00 |
$80.00 |
$130.00 |
$104.00 |
$175.00 |
| 8 | 230(A) 2806 |
SOLID SLAB SODDING | 20,738 | SY |
$1.50 |
$1.25 |
$1.18 |
$1.07 |
$1.10 |
$1.11 |
$1.30 |
| 9 | 230(F) 2812 |
WATERING | 830 | KGAL |
$7.25 |
$2.20 |
$2.20 |
$2.00 |
$2.10 |
$2.08 |
$2.25 |
| 10 | 233(A) 2817 |
VEGETATIVE MULCHING | 4.28 | AC |
$350.00 |
$170.00 |
$150.00 |
$150.00 |
$160.00 |
$156.00 |
$175.00 |
| 11 | 234(A) 2824 |
FERTILIZING (10-20-10) | 2.1 | TON |
$750.00 |
$530.00 |
$500.00 |
$501.00 |
$530.00 |
$521.04 |
$600.00 |
| 12 | 234(A) 4409 |
FERTILIZING (18-46-0) | 1 | TON |
$1,180.00 |
$650.00 |
$1,615.00 |
$501.00 |
$795.00 |
$1,560.00 |
$1,000.00 |
| 13 | 241 2832 |
MOWING | 4.28 | AC |
$65.00 |
$100.00 |
$80.00 |
$78.00 |
$82.50 |
$81.12 |
$100.00 |
| 14 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 583 | CY |
$60.00 |
$70.50 |
$69.00 |
$55.00 |
$71.00 |
$69.75 |
$95.00 |
| 15 | 307(K) 4300 |
STABILIZED SUBGRADE | 2,869 | SY |
$8.00 |
$8.25 |
$7.25 |
$6.65 |
$8.00 |
$7.82 |
$10.50 |
| 16 | 325 5271 |
SEPARATOR FABRIC | 3,030 | SY |
$1.50 |
$2.40 |
$2.00 |
$1.35 |
$1.40 |
$1.40 |
$3.55 |
| 17 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 900 | TON |
$39.00 |
$33.70 |
$36.50 |
$30.00 |
$32.00 |
$31.48 |
$50.00 |
| 18 | 407(B) 0250 |
TACK COAT | 1,090 | GAL |
$3.00 |
$5.10 |
$5.25 |
$5.00 |
$4.50 |
$5.20 |
$5.80 |
| 19 | 408 5774 |
PRIME COAT | 3,738 | GAL |
$4.50 |
$11.05 |
$6.30 |
$7.50 |
$4.50 |
$10.92 |
$11.50 |
| 20 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 2,185 | TON |
$83.00 |
$70.00 |
$73.25 |
$65.65 |
$69.00 |
$83.72 |
$95.00 |
| 21 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 1,276 | TON |
$100.00 |
$81.00 |
$84.59 |
$76.90 |
$79.00 |
$94.12 |
$107.00 |
| 22 | 509(D) 0325 |
CLASS C CONCRETE | 223 | CY |
$350.00 |
$340.00 |
$372.25 |
$300.00 |
$275.00 |
$327.60 |
$250.00 |
| 23 | 613(A) 0493 |
30" R.C.PIPE CLASS III | 56 | LF |
$100.00 |
$98.00 |
$92.98 |
$100.00 |
$110.00 |
$110.03 |
$120.00 |
| 24 | 613(A) 0496 |
48" R.C.PIPE CLASS III | 108 | LF |
$170.00 |
$145.00 |
$167.00 |
$130.00 |
$220.00 |
$214.47 |
$200.00 |
| 25 | 613(B) 0689 |
18" CORR. GALV. STEEL PIPE | 114 | LF |
$30.00 |
$27.00 |
$22.00 |
$45.00 |
$30.00 |
$29.67 |
$30.00 |
| 26 | 613(B) 0698 |
72" CORR. GALV. STEEL PIPE | 292 | LF |
$123.00 |
$114.00 |
$72.00 |
$100.00 |
$120.00 |
$119.48 |
$140.00 |
| 27 | 613(L) 5732 |
30" PREFAB. CULVERT END SECTION, ROUND | 2 | EA |
$1,300.00 |
$1,300.00 |
$1,200.00 |
$1,100.00 |
$1,380.00 |
$1,352.00 |
$1,600.00 |
| 28 | 613(L) 5738 |
48" PREFAB. CULVERT END SECTION, ROUND | 2 | EA |
$2,140.00 |
$2,140.00 |
$2,000.00 |
$2,300.00 |
$2,700.00 |
$2,652.00 |
$2,600.00 |
| 29 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$10,000.00 |
$5,000.00 |
$5,075.00 |
$5,000.00 |
$7,510.00 |
$7,384.00 |
$15,000.00 |
| 30 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 5,845 | SY |
$9.00 |
$4.50 |
$4.70 |
$5.00 |
$8.30 |
$6.24 |
$3.00 |
| 31 | 619(C) 0924 |
SAWING PAVEMENT | 478 | LF |
$8.00 |
$5.00 |
$6.00 |
$5.00 |
$6.00 |
$8.32 |
$7.00 |
| 32 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 526 | LF |
$20.00 |
$19.00 |
$16.80 |
$16.00 |
$17.00 |
$16.64 |
$20.15 |
| 33 | 623(G) 8590 |
GUARDRAIL END TREATMENT (31") | 3 | EA |
$2,500.00 |
$2,350.00 |
$2,310.00 |
$2,100.00 |
$2,220.00 |
$2,184.00 |
$2,600.00 |
| 34 | 623(I) 8700 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 4 | EA |
$1,600.00 |
$1,850.00 |
$1,815.00 |
$1,650.00 |
$1,750.00 |
$1,716.00 |
$2,600.00 |
| 35 | 624(C) 4459 |
FENCE-STYLE SWF (5 BARBED WIRE) | 1,348 | LF |
$5.11 |
$5.00 |
$4.10 |
$3.20 |
$4.10 |
$4.00 |
$4.75 |
| 36 | 853 9069 |
GUARDRAIL DELINEATORS(TYPE 2, CODE 1) | 19 | EA |
$11.50 |
$12.00 |
$15.00 |
$15.00 |
$16.00 |
$15.60 |
$15.00 |
| 37 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 70 | CY |
$50.00 |
$10.00 |
$10.00 |
$13.00 |
$25.00 |
$18.72 |
$15.00 |
| 38 | 501(G) 6309 |
CLSM BACKFILL | 116 | CY |
$140.00 |
$120.00 |
$149.00 |
$130.00 |
$150.00 |
$222.56 |
$160.00 |
| 39 | 504(A) 1304 |
APPROACH SLAB | 187.4 | SY |
$180.00 |
$148.00 |
$170.00 |
$235.00 |
$220.00 |
$252.72 |
$295.00 |
| 40 | 504(B) 1305 |
SAW-CUT GROOVING | 833.4 | SY |
$4.00 |
$4.50 |
$4.40 |
$4.05 |
$4.30 |
$5.25 |
$7.00 |
| 41 | 504(D) 6245 |
CONCRETE RAIL (TR4) | 371 | LF |
$60.00 |
$79.00 |
$85.50 |
$75.00 |
$83.00 |
$85.28 |
$110.00 |
| 42 | 506(A) 1322 |
STRUCTURAL STEEL | 87,670 | LB |
$1.70 |
$1.70 |
$1.79 |
$1.72 |
$1.80 |
$1.90 |
$2.08 |
| 43 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 8 | EA |
$500.00 |
$180.00 |
$400.00 |
$400.00 |
$485.00 |
$554.32 |
$400.00 |
| 44 | 507(B) 6174 |
STAINLESS STEEL EXPANSION BEARING ASSEMBLY | 16 | EA |
$1,800.00 |
$1,250.00 |
$1,050.00 |
$1,600.00 |
$1,450.00 |
$1,534.00 |
$1,700.00 |
| 45 | 507(C) 6282 |
ELASTOMERIC BEARING PADS | 16 | EA |
$300.00 |
$136.90 |
$300.00 |
$300.00 |
$385.00 |
$540.80 |
$475.00 |
| 46 | 509(A) 1326 |
CLASS AA CONCRETE | 179.9 | CY |
$600.00 |
$540.00 |
$627.50 |
$530.00 |
$480.00 |
$644.80 |
$715.00 |
| 47 | 509(B) 1328 |
CLASS A CONCRETE | 112.4 | CY |
$600.00 |
$525.00 |
$635.50 |
$550.00 |
$560.00 |
$639.60 |
$620.00 |
| 48 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 73,240 | LB |
$1.10 |
$0.9700 |
$0.9600 |
$1.00 |
$1.10 |
$1.12 |
$1.15 |
| 49 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 684 | LF |
$35.00 |
$23.45 |
$26.60 |
$31.00 |
$30.50 |
$29.12 |
$38.00 |
| 50 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 684 | LF |
$20.00 |
$10.00 |
$11.40 |
$10.00 |
$15.50 |
$17.68 |
$15.00 |
| 51 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 52 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 531 | SY |
$4.00 |
$4.50 |
$4.18 |
$3.80 |
$4.00 |
$5.00 |
$4.51 |
| 53 | 516(A) 6095 |
DRILLED SHAFTS 54" DIAMETER | 254 | LF |
$650.00 |
$526.00 |
$564.00 |
$575.00 |
$580.00 |
$487.76 |
$600.00 |
| 54 | 516(C) 6200 |
CROSSHOLE SONIC LOGGING | 4 | EA |
$3,000.00 |
$1,975.00 |
$2,550.00 |
$2,500.00 |
$1,670.00 |
$3,198.00 |
$2,500.00 |
| 55 | 523(A) 6550 |
SEALER CRACK PREPARATION | 163 | LF |
$5.00 |
$5.00 |
$4.40 |
$4.00 |
$4.20 |
$4.16 |
$5.00 |
| 56 | 523(B) 6560 |
SEALER RESIN | 1.8 | GAL |
$250.00 |
$115.00 |
$165.00 |
$150.00 |
$160.00 |
$156.00 |
$200.00 |
| 57 | 525(C) 1000 |
(SP)NEST PREVENTION | 1 | LSUM |
$4,000.00 |
$4,000.00 |
$1,000.00 |
$1,500.00 |
$1,590.00 |
$520.00 |
$3,800.00 |
| 58 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 1,690 | TON |
$40.00 |
$46.18 |
$51.00 |
$55.00 |
$51.50 |
$39.52 |
$60.00 |
| 59 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 405 | TON |
$40.00 |
$34.45 |
$38.00 |
$36.00 |
$37.00 |
$34.32 |
$40.00 |
| 60 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 84 | LF |
$30.00 |
$40.00 |
$29.00 |
$25.00 |
$48.50 |
$31.20 |
$20.00 |
| 61 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 20 | LF |
$30.00 |
$20.00 |
$56.00 |
$20.00 |
$20.50 |
$31.20 |
$20.00 |
| 62 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$30,000.00 |
$25,000.00 |
$25,000.00 |
$30,000.00 |
$35,500.00 |
$70,330.00 |
$48,500.00 |
| 63 | 857(A) 8839 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) | 7,600 | LF |
$0.1800 |
$0.2000 |
$0.2000 |
$0.1800 |
$0.2000 |
$0.2100 |
$0.2600 |
| 64 | 857(E) 8890 |
(PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-2 | 45 | EA |
$0.5000 |
$6.00 |
$5.25 |
$5.00 |
$1.10 |
$1.04 |
$2.97 |
| 65 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 500 | LF |
$0.2400 |
$0.5500 |
$0.5500 |
$0.5000 |
$1.10 |
$1.04 |
$3.14 |
| 66 | 871(B) 8705 |
(SP)CONST.ZONE IMPACT ATTEN. | 840 | SD |
$11.35 |
$3.15 |
$3.30 |
$3.00 |
$5.30 |
$5.20 |
$4.75 |
| 67 | 877(B) 8484 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 500 | LF |
$24.00 |
$33.60 |
$26.00 |
$50.00 |
$37.50 |
$24.96 |
$35.00 |
| 68 | 877(C) 8486 |
RELOCATION OF PORTABLE LONGITUDINAL BARRIER | 500 | LF |
$4.50 |
$0.2700 |
$1.00 |
$5.00 |
$7.70 |
$5.20 |
$4.75 |
| 69 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 2,730 | SD |
$0.3200 |
$1.05 |
$1.10 |
$1.00 |
$0.5500 |
$0.5200 |
$0.1200 |
| 70 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 3,570 | SD |
$0.8300 |
$2.10 |
$2.20 |
$2.00 |
$0.9000 |
$0.8800 |
$0.1200 |
| 71 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 3,360 | SD |
$1.50 |
$1.60 |
$1.65 |
$1.50 |
$2.10 |
$2.08 |
$0.1200 |
| 72 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 2,520 | SD |
$0.8000 |
$0.5300 |
$0.5500 |
$0.5000 |
$1.60 |
$1.56 |
$1.19 |
| 73 | 880(C) 8848 |
WING BARRICADES | 840 | SD |
$1.20 |
$1.05 |
$1.10 |
$1.00 |
$4.20 |
$4.16 |
$5.93 |
| 74 | 880(D) 8854 |
VERTICAL PANELS | 10,500 | SD |
$0.2500 |
$0.0400 |
$0.0300 |
$0.0200 |
$0.1500 |
$0.1600 |
$0.1200 |
| 75 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 7,770 | SD |
$0.3000 |
$0.2700 |
$0.2700 |
$0.2500 |
$0.1500 |
$0.1600 |
$0.5900 |
| 76 | 880(F) 8878 |
DRUMS | 7,350 | SD |
$0.2800 |
$0.2700 |
$0.2200 |
$0.2000 |
$0.1500 |
$0.1600 |
$2.37 |
| 77 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 448 | SD |
$14.00 |
$8.40 |
$8.80 |
$8.00 |
$16.00 |
$15.60 |
$23.73 |
| 78 | 805(A) 8724 |
(PL)REMOVAL OF EXISTING SIGNS | 9 | EA |
$50.00 |
$52.50 |
$55.00 |
$50.00 |
$53.00 |
$52.00 |
$100.84 |
| 79 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 31.18 | SF |
$25.00 |
$22.00 |
$22.00 |
$20.00 |
$16.00 |
$15.60 |
$23.73 |
| 80 | 851(C) 8330 |
2 1/2" SQUARE TUBE POST | 77.5 | LF |
$10.00 |
$11.00 |
$11.00 |
$10.00 |
$10.50 |
$10.40 |
$10.68 |
| 81 | 855(A) 8812 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 7,200 | LF |
$0.7500 |
$0.4200 |
$0.4400 |
$0.4000 |
$0.5500 |
$0.5200 |
$0.9300 |
| 82 | 855(A) 8825 |
TRAFFIC STRIPE(PLASTIC)(24" WIDE) | 12 | LF |
$5.00 |
$11.00 |
$11.00 |
$10.00 |
$5.30 |
$5.20 |
$11.86 |
| 83 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$26,500.00 |
$11,800.00 |
$8,000.00 |
$5,800.00 |
$9,730.00 |
$9,568.00 |
$9,000.00 |
| 84 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$3,000.00 |
$2,800.00 |
$1,200.00 |
$3,700.00 |
$4,160.00 |
$6,000.00 |
| 85 | 640(A) 1398 |
FIELD OFFICE | 1 | EA |
$15,000.00 |
$5,100.00 |
$8,000.00 |
$5,000.00 |
$10,600.00 |
$8,320.00 |
$7,500.00 |
| 86 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$127,500.00 |
$99,500.00 |
$63,500.00 |
$119,000.00 |
$126,715.04 |
$101,884.02 |
$53,000.00 |