| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$80,000.00 |
$75,000.00 |
$48,146.80 |
$55,000.00 |
$15,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 13,867 | CY |
$10.00 |
$9.00 |
$9.21 |
$8.00 |
$9.00 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 20,648 | CY |
$12.00 |
$9.00 |
$8.08 |
$13.95 |
$11.00 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$28,000.00 |
$36,000.00 |
$35,204.00 |
$80,000.00 |
$17,000.00 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 1,834 | LF |
$1.50 |
$2.38 |
$1.29 |
$2.00 |
$1.24 |
| 6 | 221(F) 0100 |
TEMPORARY SILT DIKE | 168 | LF |
$7.00 |
$4.75 |
$9.49 |
$10.00 |
$9.12 |
| 7 | 221(G) 0151 |
TEMPORARY ROCK FILTER DAM TYPE 2 | 37 | CY |
$65.00 |
$118.85 |
$62.40 |
$30.00 |
$41.02 |
| 8 | 229 4318 |
DITCH LINER PROTECTION | 244 | LF |
$1.10 |
$11.89 |
$2.08 |
$4.00 |
$2.00 |
| 9 | 230(A) 2806 |
SOLID SLAB SODDING | 14,068 | SY |
$1.50 |
$1.80 |
$1.64 |
$1.85 |
$1.58 |
| 10 | 232(B) 2814 |
SEEDING METHOD B | 5.65 | AC |
$400.00 |
$426.69 |
$373.36 |
$350.00 |
$359.00 |
| 11 | 233(A) 2817 |
VEGETATIVE MULCHING | 8.56 | AC |
$250.00 |
$508.70 |
$445.12 |
$500.00 |
$428.00 |
| 12 | 241 2832 |
MOWING | 17.12 | AC |
$55.00 |
$77.26 |
$93.60 |
$100.00 |
$90.00 |
| 13 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 5,021 | CY |
$48.00 |
$38.00 |
$41.60 |
$37.00 |
$46.50 |
| 14 | 307(K) 4300 |
STABILIZED SUBGRADE | 12,934 | SY |
$5.50 |
$6.98 |
$7.71 |
$4.00 |
$5.70 |
| 15 | 325 5271 |
SEPARATOR FABRIC | 14,918 | SY |
$1.00 |
$1.27 |
$1.46 |
$1.50 |
$1.35 |
| 16 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 3,928 | TON |
$22.00 |
$19.04 |
$19.76 |
$20.00 |
$30.00 |
| 17 | 407(B) 0250 |
TACK COAT | 3,062 | GAL |
$5.00 |
$2.00 |
$3.90 |
$3.95 |
$3.75 |
| 18 | 408 5774 |
PRIME COAT | 11,398 | GAL |
$5.00 |
$1.50 |
$1.93 |
$1.95 |
$1.86 |
| 19 | 411(B) 5940 |
SUPERPAVE, TYPE S3(PG 70-28 OK) | 1,058 | TON |
$80.00 |
$58.88 |
$83.19 |
$85.00 |
$79.99 |
| 20 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 3,671 | TON |
$70.00 |
$52.66 |
$79.24 |
$80.00 |
$76.19 |
| 21 | 411(C) 5955 |
SUPERPAVE, TYPE S4(PG 70-28 OK) | 694 | TON |
$85.00 |
$67.40 |
$86.88 |
$90.00 |
$83.54 |
| 22 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 1,179 | TON |
$85.00 |
$57.08 |
$89.64 |
$92.00 |
$86.19 |
| 23 | 501(A) 0313 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 47 | CY |
$25.00 |
$35.66 |
$20.80 |
$300.00 |
$15.00 |
| 24 | 509(A) 0319 |
CLASS AA CONCRETE | 214 | CY |
$600.00 |
$485.00 |
$532.48 |
$380.00 |
$540.00 |
| 25 | 509(D) 0325 |
CLASS C CONCRETE | 44 | CY |
$275.00 |
$357.40 |
$428.48 |
$420.00 |
$350.00 |
| 26 | 511(A) 0332 |
REINFORCING STEEL | 30,667 | LB |
$1.10 |
$1.00 |
$1.18 |
$1.00 |
$0.8000 |
| 27 | 613(A) 0491 |
18" R.C.PIPE CLASS III | 20 | LF |
$44.00 |
$129.25 |
$98.13 |
$60.00 |
$60.00 |
| 28 | 613(B) 0689 |
18" CORR. GALV. STEEL PIPE | 185 | LF |
$43.50 |
$36.52 |
$30.47 |
$30.00 |
$45.00 |
| 29 | 613(B) 0690 |
24" CORR. GALV. STEEL PIPE | 91 | LF |
$48.20 |
$37.12 |
$35.63 |
$35.00 |
$50.00 |
| 30 | 613(B) 4527 |
21" X 15" CORR. GALV. STEEL PIPE ARCH | 157 | LF |
$54.00 |
$31.75 |
$31.15 |
$40.00 |
$45.00 |
| 31 | 613(B) 4528 |
28" X 20" CORR. GALV. STEEL PIPE ARCH | 199 | LF |
$38.00 |
$52.67 |
$39.54 |
$50.00 |
$45.00 |
| 32 | 613(H) 0450 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 164 | LF |
$16.15 |
$2.27 |
$20.80 |
$20.00 |
$15.00 |
| 33 | 613(I) 1096 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 55 | LF |
$12.00 |
$5.59 |
$20.80 |
$20.00 |
$20.00 |
| 34 | 613(M) 7196 |
TYPE A6 CULVERT END TREATMENT | 3 | EA |
$1,581.50 |
$1,105.35 |
$1,664.00 |
$1,500.00 |
$1,400.00 |
| 35 | 613(M) 7197 |
TYPE B6 CULVERT END TREATMENT | 4 | EA |
$1,400.00 |
$1,253.92 |
$1,560.00 |
$1,500.00 |
$1,500.00 |
| 36 | 613(M) 7201 |
TYPE AA6 CULVERT END TREATMENT | 2 | EA |
$1,335.00 |
$1,509.46 |
$1,508.00 |
$3,000.00 |
$1,800.00 |
| 37 | 613(M) 7202 |
TYPE BB6 CULVERT END TREATMENT | 4 | EA |
$2,845.50 |
$1,782.82 |
$3,016.00 |
$4,000.00 |
$2,200.00 |
| 38 | 613(Q) 5946 |
OUTLET LATERAL HEADWALL | 1 | EA |
$765.00 |
$2,971.36 |
$832.00 |
$850.00 |
$500.00 |
| 39 | 613(T) 1187 |
STANDARD BEDDING MATERIAL, CLASS C | 28 | CY |
$70.55 |
$61.25 |
$66.78 |
$55.00 |
$45.00 |
| 40 | 613(V) 1180 |
TRENCH EXCAVATION | 44 | CY |
$16.00 |
$49.91 |
$10.50 |
$14.00 |
$9.00 |
| 41 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$20,000.00 |
$50,000.00 |
$18,077.28 |
$10,000.00 |
$8,500.00 |
| 42 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 11,415 | SY |
$3.15 |
$2.79 |
$3.64 |
$7.00 |
$5.00 |
| 43 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 669 | LF |
$3.70 |
$5.35 |
$4.16 |
$4.00 |
$7.00 |
| 44 | 619(C) 0924 |
SAWING PAVEMENT | 2,110 | LF |
$3.85 |
$1.29 |
$5.20 |
$5.00 |
$5.00 |
| 45 | 624(C) 4459 |
FENCE-STYLE SWF (5 BARBED WIRE) | 4,088 | LF |
$4.80 |
$10.16 |
$4.37 |
$6.00 |
$4.20 |
| 46 | 624(E) 4288 |
FENCE-STYLE CLF (4'HIGH, CLASS A) | 298 | LF |
$17.55 |
$28.53 |
$23.92 |
$30.00 |
$23.00 |
| 47 | 624(F) 5839 |
GATES-STYLE CLF (4'HIGH X 4'LONG) | 1 | EA |
$750.00 |
$774.93 |
$728.00 |
$300.00 |
$700.00 |
| 48 | 629(A) 4958 |
MAILBOX INSTALLATION-SINGLE | 4 | EA |
$100.00 |
$71.31 |
$62.40 |
$150.00 |
$60.00 |
| 49 | 629(C) 4960 |
MAILBOX | 4 | EA |
$50.00 |
$23.77 |
$20.80 |
$60.00 |
$20.00 |
| 50 | 629(D) 4961 |
REMOVAL OF MAILBOX INSTALLATION | 4 | EA |
$50.00 |
$5.94 |
$5.20 |
$150.00 |
$250.00 |
| 51 | 202(A) 1301 |
UNCLASSIFIED EXCAVATION | 1,970 | CY |
$12.00 |
$10.50 |
$15.60 |
$15.00 |
$13.00 |
| 52 | 501(A) 1306 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 495 | CY |
$22.50 |
$35.66 |
$15.60 |
$20.00 |
$15.00 |
| 53 | 509(A) 1326 |
CLASS AA CONCRETE | 984.6 | CY |
$595.00 |
$360.43 |
$428.48 |
$360.00 |
$550.00 |
| 54 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 154,440 | LB |
$1.05 |
$1.37 |
$1.06 |
$0.9000 |
$0.9000 |
| 55 | 619(B) 2500 |
REMOVAL OF BRIDGE ITEMS | 1 | LSUM |
$25,000.00 |
$45,000.00 |
$26,000.00 |
$60,000.00 |
$30,000.00 |
| 56 | 857(A) 8839 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) | 10,500 | LF |
$0.1500 |
$0.1000 |
$0.0800 |
$0.1500 |
$0.0800 |
| 57 | 857(E) 8887 |
(PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-1 | 750 | EA |
$0.5000 |
$0.4800 |
$0.4200 |
$0.5000 |
$0.4000 |
| 58 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 4,500 | LF |
$0.2500 |
$1.19 |
$1.04 |
$1.25 |
$1.00 |
| 59 | 876(A) 8482 |
(PL)TRUCK MOUNTED ATTENUATOR | 60 | SD |
$20.00 |
$5.94 |
$5.20 |
$6.00 |
$5.00 |
| 60 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 4,320 | SD |
$0.3500 |
$0.0200 |
$0.0200 |
$0.1000 |
$0.0200 |
| 61 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 3,600 | SD |
$0.6000 |
$0.0200 |
$0.0200 |
$0.1000 |
$0.0200 |
| 62 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 5,400 | SD |
$1.30 |
$0.0200 |
$0.0200 |
$0.1000 |
$0.0200 |
| 63 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 2,160 | SD |
$1.00 |
$0.0200 |
$0.0200 |
$0.1000 |
$0.0200 |
| 64 | 880(C) 8848 |
WING BARRICADES | 520 | SD |
$1.10 |
$11.89 |
$10.40 |
$12.00 |
$10.00 |
| 65 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 7,920 | SD |
$0.3000 |
$0.0200 |
$0.0200 |
$0.0400 |
$0.0200 |
| 66 | 880(F) 8878 |
DRUMS | 5,400 | SD |
$0.2500 |
$0.1200 |
$0.1000 |
$0.2000 |
$0.1000 |
| 67 | 880(G) 8890 |
CHANNELIZER CONES | 6,300 | SD |
$0.3000 |
$0.1200 |
$0.1000 |
$0.2000 |
$0.1000 |
| 68 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 288 | SD |
$11.00 |
$5.94 |
$5.20 |
$7.00 |
$5.00 |
| 69 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 36.25 | SF |
$22.50 |
$11.89 |
$10.40 |
$18.00 |
$10.00 |
| 70 | 851(C) 8324 |
2" SQUARE TUBE POST | 74 | LF |
$8.50 |
$5.94 |
$5.20 |
$10.00 |
$5.00 |
| 71 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 9,400 | LF |
$0.4500 |
$0.5800 |
$0.5100 |
$0.6000 |
$0.4900 |
| 72 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$49,000.00 |
$17,828.18 |
$15,080.00 |
$20,000.00 |
$13,810.00 |
| 73 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$10,000.00 |
$2,000.00 |
$8,320.00 |
$15,000.00 |
$1,200.00 |
| 74 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$150,000.00 |
$125,000.00 |
$140,540.30 |
$100,000.00 |
$159,300.00 |