| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$25,000.00 |
$65,000.00 |
$86,566.99 |
$200,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 65,481 | CY |
$6.00 |
$4.01 |
$6.75 |
$10.00 |
| 3 | 202(B) 0105 |
MUCK EXCAVATION | 10,500 | CY |
$10.00 |
$15.57 |
$6.75 |
$5.00 |
| 4 | 202(D) 0184 |
UNCLASSIFIED BORROW | 97,527 | CY |
$7.00 |
$10.40 |
$6.75 |
$10.00 |
| 5 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$45,000.00 |
$45,000.00 |
$62,770.55 |
$50,000.00 |
| 6 | 221(C) 2801 |
TEMPORARY SILT FENCE | 18,005 | LF |
$2.00 |
$1.43 |
$1.98 |
$2.00 |
| 7 | 221(D) 2803 |
TEMPORARY SEDIMENT FILTER | 6 | EA |
$205.00 |
$90.53 |
$92.53 |
$100.00 |
| 8 | 221(F) 0100 |
TEMPORARY SILT DIKE | 777 | LF |
$8.00 |
$7.40 |
$7.57 |
$7.00 |
| 9 | 221(G) 0150 |
TEMPORARY ROCK FILTER DAM TYPE 1 | 11 | CY |
$80.00 |
$79.88 |
$146.82 |
$100.00 |
| 10 | 221(G) 0151 |
TEMPORARY ROCK FILTER DAM TYPE 2 | 56 | CY |
$105.00 |
$85.20 |
$48.50 |
$100.00 |
| 11 | 230(A) 2806 |
SOLID SLAB SODDING | 91,218 | SY |
$2.00 |
$1.01 |
$1.03 |
$1.00 |
| 12 | 232(B) 2814 |
SEEDING METHOD B | 18.91 | AC |
$500.00 |
$207.68 |
$212.28 |
$200.00 |
| 13 | 233(A) 2817 |
VEGETATIVE MULCHING | 18.91 | AC |
$450.00 |
$101.18 |
$103.42 |
$100.00 |
| 14 | 241 2832 |
MOWING | 37.82 | AC |
$80.00 |
$41.54 |
$42.45 |
$40.00 |
| 15 | 242 0400 |
(PL)STABILIZED CONSTRUCTION EXIT | 2 | EA |
$3,000.00 |
$2,916.91 |
$865.77 |
$5,000.00 |
| 16 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 31,399 | CY |
$40.00 |
$18.00 |
$28.90 |
$30.00 |
| 17 | 307(K) 4300 |
STABILIZED SUBGRADE | 155,595 | SY |
$4.50 |
$4.50 |
$3.49 |
$6.00 |
| 18 | 317 4270 |
CEMENT TREATED BASE | 129,337 | SY |
$11.50 |
$9.00 |
$10.42 |
$9.00 |
| 19 | 325 5271 |
SEPARATOR FABRIC | 156,104 | SY |
$1.25 |
$2.00 |
$0.9600 |
$1.50 |
| 20 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 15,344 | TON |
$25.00 |
$11.99 |
$12.09 |
$15.00 |
| 21 | 408 5774 |
PRIME COAT | 94,845 | GAL |
$4.00 |
$1.00 |
$0.2500 |
$0.7000 |
| 22 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 5,427 | TON |
$75.00 |
$57.94 |
$58.07 |
$57.00 |
| 23 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 1,956 | TON |
$85.00 |
$61.41 |
$63.35 |
$68.00 |
| 24 | 411(I) 6310 |
SUPERPAVE, TYPE S4(PATCH)(PG64-22OK) | 300 | TON |
$190.00 |
$78.84 |
$114.30 |
$70.00 |
| 25 | 414(A) 0210 |
P.C.CONCRETE PAVEMENT(PLACEMENT) | 25,001 | SY |
$10.00 |
$12.00 |
$8.00 |
$13.00 |
| 26 | 414(B) 5725 |
DOWEL JOINTED P.C. CONCRETE PAVEMENT(PLACEMENT ) | 98,036 | SY |
$15.00 |
$14.62 |
$11.83 |
$15.00 |
| 27 | 414(E) 0225 |
FULL DEPTH P.C. CONCRETE PATCHING(PLACEMENT ONLY) | 100 | SY |
$90.00 |
$105.00 |
$76.92 |
$70.00 |
| 28 | 414(G) 5275 |
P.C. CONCRETE FOR PAVEMENT | 34,177 | CY |
$100.00 |
$105.00 |
$97.69 |
$93.00 |
| 29 | 501(A) 0313 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 189 | CY |
$10.00 |
$7.39 |
$27.17 |
$25.00 |
| 30 | 501(G) 6315 |
CLSM BACKFILL | 10 | CY |
$130.00 |
$224.16 |
$163.29 |
$80.00 |
| 31 | 504(E) 6190 |
42" F-SHAPED PARAPET | 140 | LF |
$80.00 |
$91.04 |
$113.08 |
$128.00 |
| 32 | 509(A) 0319 |
CLASS AA CONCRETE | 581.1 | CY |
$450.00 |
$601.11 |
$569.17 |
$800.00 |
| 33 | 509(D) 0325 |
CLASS C CONCRETE | 251 | CY |
$540.00 |
$242.53 |
$217.98 |
$400.00 |
| 34 | 510(A) 6338 |
TEMPORARY RETAINING WALL | 800 | SY |
$100.00 |
$50.28 |
$100.03 |
$100.00 |
| 35 | 511(A) 0332 |
REINFORCING STEEL | 81,050 | LB |
$1.00 |
$0.2700 |
$0.8600 |
$1.30 |
| 36 | 601(B) 0536 |
TYPE I-A PLAIN RIPRAP | 204 | TON |
$40.00 |
$52.09 |
$61.90 |
$50.00 |
| 37 | 601(C) 0538 |
TYPE I-A FILTER BLANKET | 48 | TON |
$26.00 |
$55.77 |
$50.24 |
$35.00 |
| 38 | 601(I) 6312 |
FILTER FABRIC (RIPRAP) | 178 | SY |
$2.00 |
$5.09 |
$1.82 |
$1.50 |
| 39 | 609(A) 0288 |
CONCRETE CURB (6" MNTBLE-INTEGRAL) | 707 | LF |
$5.00 |
$6.72 |
$1.57 |
$6.00 |
| 40 | 610(C) 0610 |
8" CONCRETE DIVIDING STRIP | 376 | SY |
$85.00 |
$35.08 |
$32.23 |
$60.00 |
| 41 | 611(G) 6002 |
INLET (SMD-TYPE 2) | 1 | EA |
$2,500.00 |
$4,085.14 |
$870.89 |
$4,000.00 |
| 42 | 613(A) 0491 |
18" R.C.PIPE CLASS III | 544.4 | LF |
$55.00 |
$105.29 |
$54.01 |
$80.00 |
| 43 | 613(A) 0493 |
30" R.C.PIPE CLASS III | 87.4 | LF |
$80.00 |
$101.80 |
$88.43 |
$110.00 |
| 44 | 613(B) 0689 |
18" CORR. GALV. STEEL PIPE | 220 | LF |
$25.00 |
$71.41 |
$32.77 |
$50.00 |
| 45 | 613(B) 0691 |
30" CORR. GALV. STEEL PIPE | 100 | LF |
$40.00 |
$97.21 |
$100.55 |
$60.00 |
| 46 | 613(B) 0692 |
36" CORR. GALV. STEEL PIPE | 32 | LF |
$55.00 |
$103.92 |
$105.78 |
$70.00 |
| 47 | 613(L) 5726 |
18" PREFAB. CULVERT END SECTION, ROUND | 10 | EA |
$550.00 |
$1,461.12 |
$479.47 |
$750.00 |
| 48 | 613(L) 5732 |
30" PREFAB. CULVERT END SECTION, ROUND | 4 | EA |
$1,000.00 |
$1,677.82 |
$725.71 |
$1,000.00 |
| 49 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$50,000.00 |
$14,157.28 |
$43,322.34 |
$225,000.00 |
| 50 | 619(B) 4727 |
REMOVAL OF CONCRETE PAVEMENT | 42,932 | SY |
$5.00 |
$4.25 |
$2.19 |
$6.00 |
| 51 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 13,669 | SY |
$3.50 |
$3.25 |
$5.00 |
$4.00 |
| 52 | 619(B) 4763 |
REMOVAL OF CONCRETE PAVEMENT W/ASPHALT OVERLAY | 32,801 | SY |
$6.25 |
$1.25 |
$1.00 |
$9.00 |
| 53 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 1,721 | LF |
$2.00 |
$1.91 |
$3.81 |
$6.00 |
| 54 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 1,075 | LF |
$16.00 |
$16.51 |
$16.88 |
$19.00 |
| 55 | 623(G) 8590 |
GUARDRAIL END TREATMENT (31") | 12 | EA |
$2,500.00 |
$2,076.75 |
$2,122.80 |
$2,500.00 |
| 56 | 623(I) 8700 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 12 | EA |
$1,800.00 |
$1,608.15 |
$1,643.81 |
$2,000.00 |
| 57 | 624(E) 4293 |
FENCE-STYLE CLF (6'HIGH, CLASS B) | 402 | LF |
$20.00 |
$53.25 |
$54.43 |
$25.00 |
| 58 | 871(A) 8330 |
(PL) IMPACT ATTENUATOR | 4 | EA |
$1,000.00 |
$21,300.00 |
$16,873.58 |
$30,000.00 |
| 59 | 202(A) 1301 |
UNCLASSIFIED EXCAVATION | 274 | CY |
$15.00 |
$19.00 |
$37.55 |
$25.00 |
| 60 | 501(A) 1306 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 201 | CY |
$20.00 |
$39.00 |
$51.07 |
$25.00 |
| 61 | 509(A) 1326 |
CLASS AA CONCRETE | 355.9 | CY |
$550.00 |
$550.00 |
$568.19 |
$800.00 |
| 62 | 511(A) 1332 |
REINFORCING STEEL | 76,080 | LB |
$1.00 |
$1.00 |
$0.8600 |
$1.30 |
| 63 | 514(J) 6390 |
TEMPORARY SHEET PILING | 1 | LSUM |
$30,000.00 |
$21,000.00 |
$10,000.00 |
$30,000.00 |
| 64 | 619(B) 2500 |
REMOVAL OF BRIDGE ITEMS | 1 | LSUM |
$10,000.00 |
$27,000.00 |
$37,476.88 |
$87,386.85 |
| 65 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 402.2 | CY |
$21.00 |
$14.31 |
$113.54 |
$25.00 |
| 66 | 501(G) 6309 |
CLSM BACKFILL | 634 | CY |
$135.00 |
$107.93 |
$119.22 |
$80.00 |
| 67 | 503(A) 1313 |
PRESTRESSED CONCRETE BEAMS (TYPE IV) | 4,287 | LF |
$250.00 |
$175.00 |
$238.45 |
$205.00 |
| 68 | 504(A) 1304 |
APPROACH SLAB | 844.8 | SY |
$200.00 |
$188.63 |
$164.64 |
$165.00 |
| 69 | 504(B) 1305 |
SAW-CUT GROOVING | 5,170.3 | SY |
$5.00 |
$3.35 |
$3.92 |
$4.00 |
| 70 | 504(C) 6250 |
SEALED EXPANSION JOINT | 369.2 | LF |
$325.00 |
$246.62 |
$278.18 |
$235.00 |
| 71 | 504(E) 6190 |
42" F-SHAPED PARAPET | 1,136.6 | LF |
$100.00 |
$149.00 |
$56.77 |
$70.00 |
| 72 | 506(A) 1322 |
STRUCTURAL STEEL | 5,099 | LB |
$4.00 |
$3.45 |
$2.84 |
$2.00 |
| 73 | 507(A) 6170 |
STAINLESS STEEL FIXED BEARING ASSEMBLY | 45 | EA |
$2,100.00 |
$1,428.30 |
$1,873.50 |
$1,500.00 |
| 74 | 507(B) 6174 |
STAINLESS STEEL EXPANSION BEARING ASSEMBLY | 45 | EA |
$2,100.00 |
$1,676.00 |
$1,873.50 |
$1,500.00 |
| 75 | 509 6152 |
SPECIAL CONCRETE FINISH | 626 | SY |
$100.00 |
$53.26 |
$96.51 |
$60.00 |
| 76 | 509(A) 1326 |
CLASS AA CONCRETE | 1,177.2 | CY |
$550.00 |
$575.00 |
$482.57 |
$600.00 |
| 77 | 509(B) 1328 |
CLASS A CONCRETE | 883.2 | CY |
$600.00 |
$655.67 |
$681.28 |
$600.00 |
| 78 | 509(D) 1331 |
CLASS C CONCRETE | 14.4 | CY |
$600.00 |
$428.60 |
$681.28 |
$600.00 |
| 79 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 512,300 | LB |
$1.10 |
$1.03 |
$1.14 |
$0.8500 |
| 80 | 513(B) 6019 |
CLASS B BRIDGE DECK REPAIR | 10 | SY |
$330.00 |
$400.04 |
$851.59 |
$200.00 |
| 81 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 574 | LF |
$35.00 |
$24.47 |
$39.74 |
$22.00 |
| 82 | 514(A) 6011 |
PILES, FURNISHED (HP 12X53) | 2,604 | LF |
$40.00 |
$26.28 |
$45.42 |
$35.00 |
| 83 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 574 | LF |
$20.00 |
$27.21 |
$11.36 |
$22.00 |
| 84 | 514(B) 6294 |
PILES, DRIVEN (HP 12X53) | 2,604 | LF |
$20.00 |
$22.31 |
$11.36 |
$22.00 |
| 85 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 86 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 2,536 | SY |
$4.00 |
$3.30 |
$3.81 |
$4.00 |
| 87 | 516(A) 6097 |
DRILLED SHAFTS 66" DIAMETER | 1,175 | LF |
$1,000.00 |
$749.25 |
$879.97 |
$500.00 |
| 88 | 516(C) 6200 |
CROSSHOLE SONIC LOGGING | 12 | EA |
$1,500.00 |
$958.60 |
$2,838.64 |
$6,500.00 |
| 89 | 523(A) 6550 |
SEALER CRACK PREPARATION | 480.9 | LF |
$5.00 |
$4.26 |
$4.36 |
$4.00 |
| 90 | 523(B) 6560 |
SEALER RESIN | 3.9 | GAL |
$110.00 |
$106.51 |
$108.86 |
$110.00 |
| 91 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 2,884 | TON |
$50.00 |
$22.17 |
$29.52 |
$40.00 |
| 92 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 427 | TON |
$40.00 |
$18.64 |
$24.98 |
$30.00 |
| 93 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 184 | LF |
$20.00 |
$33.74 |
$22.71 |
$30.00 |
| 94 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 49 | LF |
$20.00 |
$35.68 |
$22.71 |
$30.00 |
| 95 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$225,482.62 |
$235,703.49 |
$85,159.02 |
$425,000.00 |
| 96 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 384.4 | CY |
$21.00 |
$14.31 |
$113.54 |
$25.00 |
| 97 | 501(G) 6309 |
CLSM BACKFILL | 571.8 | CY |
$135.00 |
$107.93 |
$124.90 |
$80.00 |
| 98 | 503(A) 6290 |
PRESTRESSED CONCRETE BEAMS (TYPE J BT) | 5,610 | LF |
$275.00 |
$215.00 |
$295.22 |
$265.00 |
| 99 | 504(A) 1304 |
APPROACH SLAB | 603.2 | SY |
$200.00 |
$183.77 |
$164.64 |
$165.00 |
| 100 | 504(B) 1305 |
SAW-CUT GROOVING | 6,333.4 | SY |
$5.00 |
$3.35 |
$3.92 |
$4.00 |
| 101 | 504(C) 6250 |
SEALED EXPANSION JOINT | 352 | LF |
$325.00 |
$246.62 |
$278.18 |
$235.00 |
| 102 | 504(E) 6190 |
42" F-SHAPED PARAPET | 1,379.2 | LF |
$100.00 |
$149.00 |
$56.77 |
$70.00 |
| 103 | 506(A) 1322 |
STRUCTURAL STEEL | 13,468 | LB |
$4.00 |
$3.45 |
$2.84 |
$2.00 |
| 104 | 507(A) 6170 |
STAINLESS STEEL FIXED BEARING ASSEMBLY | 45 | EA |
$2,100.00 |
$1,428.30 |
$1,873.50 |
$1,500.00 |
| 105 | 507(B) 6174 |
STAINLESS STEEL EXPANSION BEARING ASSEMBLY | 45 | EA |
$2,100.00 |
$1,676.00 |
$1,873.50 |
$1,500.00 |
| 106 | 509 6152 |
SPECIAL CONCRETE FINISH | 450 | SY |
$100.00 |
$53.26 |
$96.51 |
$60.00 |
| 107 | 509(A) 1326 |
CLASS AA CONCRETE | 1,802.1 | CY |
$550.00 |
$575.00 |
$482.57 |
$600.00 |
| 108 | 509(B) 1328 |
CLASS A CONCRETE | 698.2 | CY |
$600.00 |
$601.92 |
$681.28 |
$600.00 |
| 109 | 509(D) 1331 |
CLASS C CONCRETE | 24.4 | CY |
$600.00 |
$428.59 |
$681.28 |
$600.00 |
| 110 | 511(A) 1332 |
REINFORCING STEEL | 3,353 | LB |
$1.00 |
$0.9300 |
$1.70 |
$1.30 |
| 111 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 601,973 | LB |
$1.10 |
$1.03 |
$1.14 |
$0.8500 |
| 112 | 513(B) 6019 |
CLASS B BRIDGE DECK REPAIR | 10 | SY |
$330.00 |
$400.04 |
$851.59 |
$200.00 |
| 113 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 462 | LF |
$35.00 |
$24.64 |
$39.74 |
$22.00 |
| 114 | 514(A) 6011 |
PILES, FURNISHED (HP 12X53) | 2,713 | LF |
$40.00 |
$26.52 |
$45.42 |
$35.00 |
| 115 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 462 | LF |
$20.00 |
$27.21 |
$11.36 |
$22.00 |
| 116 | 514(B) 6294 |
PILES, DRIVEN (HP 12X53) | 2,713 | LF |
$20.00 |
$22.31 |
$11.36 |
$22.00 |
| 117 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 118 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 3,302 | SY |
$4.00 |
$3.30 |
$3.81 |
$4.00 |
| 119 | 516(A) 6098 |
DRILLED SHAFTS 72" DIAMETER | 1,040 | LF |
$1,100.00 |
$800.34 |
$902.69 |
$550.00 |
| 120 | 516(C) 6200 |
CROSSHOLE SONIC LOGGING | 4 | EA |
$1,500.00 |
$958.60 |
$2,838.64 |
$6,500.00 |
| 121 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 1,786 | TON |
$50.00 |
$22.17 |
$29.52 |
$40.00 |
| 122 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 213 | TON |
$40.00 |
$18.65 |
$24.98 |
$30.00 |
| 123 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 174 | LF |
$20.00 |
$33.74 |
$22.71 |
$30.00 |
| 124 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 52 | LF |
$20.00 |
$35.68 |
$22.71 |
$30.00 |
| 125 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$298,748.75 |
$235,703.49 |
$113,545.36 |
$500,000.00 |
| 126 | 413(B) 4862 |
RUMBLE STRIP-METHOD HMA-CYC GROUP | 8 | EAGP |
$500.00 |
$639.00 |
$653.17 |
$600.00 |
| 127 | 413(D) 4869 |
RUMBLE STRIP METHOD PCC-CYC | 18,312 | LF |
$1.20 |
$0.2900 |
$0.2900 |
$2.50 |
| 128 | 805(A) 8724 |
(PL)REMOVAL OF EXISTING SIGNS | 49 | EA |
$50.00 |
$53.25 |
$54.43 |
$55.00 |
| 129 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 545.2 | SF |
$18.00 |
$17.57 |
$16.33 |
$20.00 |
| 130 | 851(C) 8330 |
2 1/2" SQUARE TUBE POST | 940 | LF |
$10.00 |
$10.65 |
$8.17 |
$11.00 |
| 131 | 853 9069 |
GUARDRAIL DELINEATORS(TYPE 2, CODE 1) | 53 | EA |
$11.50 |
$12.78 |
$13.07 |
$13.00 |
| 132 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 71,933 | LF |
$0.5000 |
$0.4300 |
$0.5400 |
$0.4500 |
| 133 | 856(A) 8535 |
TRAFFIC STRIPE(MULTI-POLY.)(6" WIDE) | 13,271 | LF |
$0.7500 |
$0.5300 |
$0.8200 |
$0.5500 |
| 134 | 856(A) 8540 |
TRAFFIC STRIPE(MULTI-POLY.)(8" WIDE) | 437 | LF |
$1.25 |
$1.07 |
$5.44 |
$1.10 |
| 135 | 856(A) 8548 |
TRAFFIC STRIPE(MULTI-POLY)(12" WIDE) | 2,484 | LF |
$2.25 |
$2.13 |
$8.17 |
$2.20 |
| 136 | 856(A) 8555 |
TRAFFIC STRIPE(MULTI-POLY.)(24" WIDE) | 168 | LF |
$4.50 |
$14.91 |
$16.33 |
$15.00 |
| 137 | 856(B) 8860 |
TRAFFIC STRIPE(MULTI-POLY.)(ARROWS) | 28 | EA |
$150.00 |
$90.53 |
$163.29 |
$100.00 |
| 138 | 856(B) 8870 |
TRAFFIC STRIPE(MULTI-POLY.)(SYMBOLS) | 6 | EA |
$200.00 |
$426.00 |
$108.86 |
$440.00 |
| 139 | 856(B) 8880 |
TRAFFIC STRIPE(MULTI-POLY.)(WORDS) | 2 | EA |
$200.00 |
$159.75 |
$544.31 |
$200.00 |
| 140 | 880(C) 8850 |
PERMANENT BARRICADE UNIT | 1 | EA |
$1,000.00 |
$798.75 |
$1,360.77 |
$1,500.00 |
| 141 | 104 0955 |
(SP) RAILROAD FLAGGING(NON-BIDDABLE) | 180 | DAY |
$300.00 |
$300.00 |
$300.00 |
$300.00 |
| 142 | 857(A) 8839 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) | 30,337 | LF |
$0.2500 |
$0.1600 |
$0.4900 |
$0.2000 |
| 143 | 857(C) 8851 |
REMOVABLE PAVEMENT MARKING TAPE(4" WIDE) | 95,994 | LF |
$0.7500 |
$0.8000 |
$0.4900 |
$0.8000 |
| 144 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 25,295 | LF |
$0.2500 |
$0.2100 |
$0.4900 |
$0.2000 |
| 145 | 871(B) 8705 |
(SP)CONST.ZONE IMPACT ATTEN. | 2,410 | SD |
$10.00 |
$10.65 |
$2.18 |
$11.00 |
| 146 | 877(B) 8484 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 12,662.5 | LF |
$35.00 |
$10.00 |
$10.13 |
$7.00 |
| 147 | 877(C) 8486 |
RELOCATION OF PORTABLE LONGITUDINAL BARRIER | 16,887.5 | LF |
$5.00 |
$0.8500 |
$3.00 |
$2.00 |
| 148 | 880(A) 8812 |
ARROW DISPLAY(TYPE C) | 350 | SD |
$4.00 |
$5.33 |
$2.18 |
$6.00 |
| 149 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 24,175 | SD |
$0.2500 |
$0.2700 |
$0.2700 |
$0.3000 |
| 150 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 22,900 | SD |
$0.6500 |
$0.3700 |
$1.09 |
$0.4000 |
| 151 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 17,125 | SD |
$1.00 |
$1.33 |
$2.72 |
$1.40 |
| 152 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 12,970 | SD |
$0.5000 |
$0.5300 |
$1.63 |
$0.5500 |
| 153 | 880(C) 8848 |
WING BARRICADES | 5,900 | SD |
$1.00 |
$0.5300 |
$0.2200 |
$0.5500 |
| 154 | 880(D) 8854 |
VERTICAL PANELS | 22,595 | SD |
$0.1000 |
$0.1600 |
$0.2700 |
$0.2000 |
| 155 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 39,520 | SD |
$0.2000 |
$0.0500 |
$0.2700 |
$0.1000 |
| 156 | 880(F) 8878 |
DRUMS | 61,120 | SD |
$0.0500 |
$0.1600 |
$0.3800 |
$0.2000 |
| 157 | 880(K) 8908 |
SURVEILLANCE TRAFFIC CONTROL | 450 | SD |
$350.00 |
$51.12 |
$52.25 |
$100.00 |
| 158 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 1,180 | SD |
$12.00 |
$10.65 |
$10.89 |
$11.00 |
| 159 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$90,000.00 |
$77,000.00 |
$60,375.55 |
$85,000.00 |
| 160 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$3,000.00 |
$1,025.65 |
$2,721.54 |
$5,000.00 |
| 161 | 640(A) 1426 |
FIELD OFFICE | 1 | EA |
$5,000.00 |
$18,000.00 |
$6,531.71 |
$9,000.00 |
| 162 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$995,301.33 |
|
$937,340.40 |
|