| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$17,000.00 |
$9,135.00 |
$15,000.00 |
$22,400.00 |
$69,485.14 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 22,132 | CY |
$6.50 |
$5.48 |
$8.00 |
$8.96 |
$8.55 |
| 3 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$1,500.00 |
$19,488.00 |
$10,000.00 |
$3,920.00 |
$17,104.04 |
| 4 | 221(C) 2801 |
TEMPORARY SILT FENCE | 469 | LF |
$2.50 |
$2.74 |
$2.10 |
$1.74 |
$2.41 |
| 5 | 221(D) 2803 |
TEMPORARY SEDIMENT FILTER | 2 | EA |
$180.00 |
$334.95 |
$170.00 |
$84.00 |
$293.97 |
| 6 | 221(F) 0100 |
TEMPORARY SILT DIKE | 928 | LF |
$6.50 |
$9.93 |
$8.25 |
$8.96 |
$8.71 |
| 7 | 221(G) 0150 |
TEMPORARY ROCK FILTER DAM TYPE 1 | 8.6 | CY |
$110.00 |
$232.98 |
$185.00 |
$224.00 |
$534.50 |
| 8 | 230(A) 2806 |
SOLID SLAB SODDING | 15,214 | SY |
$1.80 |
$1.78 |
$1.35 |
$1.61 |
$1.56 |
| 9 | 233(A) 2817 |
VEGETATIVE MULCHING | 10 | AC |
$400.00 |
$548.10 |
$570.00 |
$336.00 |
$481.05 |
| 10 | 241 2832 |
MOWING | 14 | AC |
$100.00 |
$140.07 |
$95.00 |
$112.00 |
$122.94 |
| 11 | 307(E) 4240 |
CEMENTITIOUS STABILIZED SUBGRADE | 16,090 | SY |
$2.00 |
$8.49 |
$6.50 |
$8.04 |
$7.70 |
| 12 | 310(B) 0149 |
SUBGRADE, METHOD B | 452 | SY |
$5.55 |
$4.87 |
$2.50 |
$4.48 |
$5.93 |
| 13 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 31 | TON |
$38.00 |
$43.35 |
$45.00 |
$31.01 |
$40.63 |
| 14 | 407(B) 0250 |
TACK COAT | 4,378 | GAL |
$3.25 |
$5.33 |
$5.20 |
$5.60 |
$5.35 |
| 15 | 408 5774 |
PRIME COAT | 3,438 | GAL |
$5.00 |
$6.39 |
$6.25 |
$6.72 |
$6.41 |
| 16 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 5,328 | TON |
$75.00 |
$99.65 |
$98.00 |
$104.72 |
$99.95 |
| 17 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 1,672 | TON |
$90.00 |
$131.09 |
$128.00 |
$137.76 |
$131.49 |
| 18 | 501(A) 0313 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 18 | CY |
$20.00 |
$12.18 |
$40.00 |
$22.40 |
$5.00 |
| 19 | 509(A) 0319 |
CLASS AA CONCRETE | 78 | CY |
$700.00 |
$314.88 |
$650.00 |
$582.00 |
$820.41 |
| 20 | 509(D) 0325 |
CLASS C CONCRETE | 33 | CY |
$300.00 |
$304.50 |
$300.00 |
$546.95 |
$481.05 |
| 21 | 511(A) 0332 |
REINFORCING STEEL | 10,934 | LB |
$1.00 |
$1.52 |
$1.00 |
$0.9700 |
$0.9000 |
| 22 | 611(G) 6000 |
INLET (SMD-TYPE 1) | 2 | EA |
$2,500.00 |
$2,429.40 |
$2,500.00 |
$2,551.26 |
$2,672.51 |
| 23 | 613(A) 0491 |
18" R.C.PIPE CLASS III | 34 | LF |
$58.00 |
$36.59 |
$65.00 |
$63.62 |
$62.00 |
| 24 | 613(A) 0492 |
24" R.C.PIPE CLASS III | 24 | LF |
$61.00 |
$47.29 |
$90.00 |
$103.13 |
$65.21 |
| 25 | 613(A) 0493 |
30" R.C.PIPE CLASS III | 22 | LF |
$90.00 |
$62.53 |
$110.00 |
$141.45 |
$96.21 |
| 26 | 613(B) 0690 |
24" CORR. GALV. STEEL PIPE | 316 | LF |
$30.00 |
$32.44 |
$30.00 |
$32.45 |
$32.07 |
| 27 | 613(L) 5726 |
18" PREFAB. CULVERT END SECTION, ROUND | 2 | EA |
$270.00 |
$597.43 |
$700.00 |
$968.01 |
$288.63 |
| 28 | 613(L) 5730 |
24" PREFAB. CULVERT END SECTION, ROUND | 2 | EA |
$800.00 |
$677.09 |
$900.00 |
$1,188.44 |
$855.20 |
| 29 | 613(L) 5732 |
30" PREFAB. CULVERT END SECTION, ROUND | 2 | EA |
$850.00 |
$743.47 |
$1,000.00 |
$1,823.92 |
$908.65 |
| 30 | 613(T) 1187 |
STANDARD BEDDING MATERIAL, CLASS C | 123 | CY |
$35.00 |
$91.64 |
$50.00 |
$34.96 |
$48.11 |
| 31 | 613(V) 1180 |
TRENCH EXCAVATION | 236 | CY |
$9.00 |
$14.62 |
$4.00 |
$13.44 |
$9.62 |
| 32 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$11,500.00 |
$7,917.00 |
$4,750.00 |
$7,280.00 |
$12,293.53 |
| 33 | 619(B) 0291 |
REMOVAL OF HEADWALL | 2 | EA |
$1,000.00 |
$1,827.00 |
$1,000.00 |
$952.00 |
$2,672.51 |
| 34 | 619(B) 4725 |
REMOVAL OF FENCE | 6,799 | LF |
$1.00 |
$2.44 |
$1.50 |
$3.36 |
$2.41 |
| 35 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 7,678 | SY |
$3.50 |
$3.65 |
$3.25 |
$5.66 |
$4.49 |
| 36 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 660 | LF |
$2.00 |
$7.31 |
$3.00 |
$3.36 |
$2.14 |
| 37 | 619(B) 5918 |
REMOVAL OF EXISTING PIPE | 46 | LF |
$10.00 |
$14.62 |
$25.00 |
$8.96 |
$10.69 |
| 38 | 619(C) 0924 |
SAWING PAVEMENT | 46 | LF |
$5.00 |
$12.18 |
$8.00 |
$6.72 |
$5.35 |
| 39 | 624(C) 4459 |
FENCE-STYLE SWF (5 BARBED WIRE) | 4,008 | LF |
$5.00 |
$7.53 |
$3.50 |
$4.51 |
$4.81 |
| 40 | 626(A) 1257 |
MONUMENTS | 1 | EA |
$1,000.00 |
$4,872.00 |
$1,250.00 |
$1,680.00 |
$1,069.01 |
| 41 | 805(A) 8724 |
(PL)REMOVAL OF EXISTING SIGNS | 4 | EA |
$150.00 |
$42.63 |
$53.00 |
$39.20 |
$53.45 |
| 42 | 855(A) 8812 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 13,200 | LF |
$1.00 |
$0.5100 |
$0.5700 |
$0.5200 |
$0.5900 |
| 43 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 13,320 | SD |
$0.2500 |
$0.2400 |
$0.2100 |
$0.2200 |
$0.2100 |
| 44 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 720 | SD |
$1.00 |
$2.44 |
$2.10 |
$2.24 |
$2.14 |
| 45 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 720 | SD |
$3.00 |
$2.44 |
$2.10 |
$2.24 |
$2.14 |
| 46 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 1,440 | SD |
$0.4000 |
$0.2400 |
$0.8900 |
$0.2200 |
$0.9100 |
| 47 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 3,600 | SD |
$0.3000 |
$0.2400 |
$0.3700 |
$0.2200 |
$0.3700 |
| 48 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 56 | SD |
$22.00 |
$55.83 |
$53.00 |
$56.00 |
$53.45 |
| 49 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$20,000.00 |
$7,917.00 |
$14,750.00 |
$16,240.00 |
$15,500.53 |
| 50 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$3,654.00 |
$1,968.00 |
$4,480.00 |
$7,483.01 |
| 51 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$132,288.66 |
$72,724.75 |
$130,000.00 |
$129,468.28 |
$445,848.74 |
| 52 | 202(A) 1301 |
UNCLASSIFIED EXCAVATION | 1,470 | CY |
$7.25 |
|
|
$56.70 |
|
| 53 | 501(A) 1306 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 883 | CY |
$13.65 |
|
|
$16.80 |
|
| 54 | 501(G) 6309 |
CLSM BACKFILL | 50 | CY |
$135.00 |
|
|
$130.84 |
|
| 55 | 506(A) 1322 |
STRUCTURAL STEEL | 1,060 | LB |
$3.55 |
|
|
$39.57 |
|
| 56 | 509(A) 1326 |
CLASS AA CONCRETE | 1,037.1 | CY |
$550.00 |
|
|
$698.87 |
|
| 57 | 511(A) 1332 |
REINFORCING STEEL | 174,030 | LB |
$1.10 |
|
|
$1.19 |
|
| 58 | 525(A) 0100 |
(SP)NEST PREVENTION - NETTING | 1 | LSUM |
$10,000.00 |
|
|
$16,800.00 |
|
| 59 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$50,000.00 |
|
|
$56,000.00 |
|
| 60 | 202(A) 1301 |
UNCLASSIFIED EXCAVATION | 1,570 | CY |
$7.25 |
$9.38 |
$20.00 |
|
$7.75 |
| 61 | 501(A) 1306 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 462 | CY |
$13.65 |
$12.18 |
$30.00 |
|
$5.00 |
| 62 | 509(A) 1326 |
CLASS AA CONCRETE | 961.8 | CY |
$550.00 |
$341.04 |
$435.00 |
|
$885.99 |
| 63 | 511(A) 1332 |
REINFORCING STEEL | 170,448 | LB |
$1.10 |
$0.8300 |
$1.00 |
|
$0.9000 |
| 64 | 525(A) 0100 |
(SP)NEST PREVENTION - NETTING | 1 | LSUM |
$10,000.00 |
$5,481.00 |
$2,000.00 |
|
$9,086.52 |
| 65 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$50,000.00 |
$14,514.50 |
$20,750.00 |
|
$80,175.16 |