| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$24,961.48 |
$75,000.00 |
$25,000.00 |
$50,000.00 |
$18,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 103,310 | CY |
$4.91 |
$4.14 |
$6.00 |
$5.08 |
$8.00 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 8,307 | CY |
$7.57 |
$4.14 |
$7.00 |
$5.08 |
$12.00 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$10,365.83 |
$38,818.44 |
$200,000.00 |
$182,000.00 |
$48,373.00 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 4,218 | LF |
$2.00 |
$2.75 |
$2.00 |
$2.39 |
$3.14 |
| 6 | 221(F) 0100 |
TEMPORARY SILT DIKE | 700 | LF |
$7.40 |
$7.59 |
$9.00 |
$7.55 |
$16.33 |
| 7 | 221(G) 0152 |
TEMPORARY ROCK FILTER DAM TYPE 3 | 402 | CY |
$80.00 |
$31.08 |
$20.00 |
$97.78 |
$100.86 |
| 8 | 230(A) 2806 |
SOLID SLAB SODDING | 189,769 | SY |
$1.50 |
$1.65 |
$1.50 |
$1.43 |
$1.69 |
| 9 | 233(A) 2817 |
VEGETATIVE MULCHING | 39 | AC |
$316.70 |
$240.38 |
$200.00 |
$207.68 |
$245.84 |
| 10 | 241 2832 |
MOWING | 78 | AC |
$68.24 |
$97.39 |
$85.00 |
$84.14 |
$99.60 |
| 11 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 2,576 | CY |
$37.80 |
$32.32 |
$30.00 |
$21.64 |
$38.00 |
| 12 | 307(A) 4200 |
FLY ASH | 3,201 | TON |
$52.80 |
$65.41 |
$60.00 |
$35.00 |
$55.00 |
| 13 | 307(D) 4230 |
LIME | 257 | TON |
$175.00 |
$211.80 |
$165.00 |
$147.00 |
$150.00 |
| 14 | 307(G) 4260 |
LIME PRETREATMENT | 21,374 | SY |
$3.00 |
$2.07 |
$1.00 |
$1.75 |
$3.50 |
| 15 | 307(K) 4300 |
STABILIZED SUBGRADE | 62,128 | SY |
$4.57 |
$1.82 |
$2.00 |
$3.50 |
$3.50 |
| 16 | 317 4270 |
CEMENT TREATED BASE | 44,741 | SY |
$11.38 |
$11.87 |
$12.00 |
$11.75 |
$12.00 |
| 17 | 325 5271 |
SEPARATOR FABRIC | 11,966 | SY |
$1.52 |
$1.17 |
$1.25 |
$1.48 |
$1.30 |
| 18 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 1,580 | TON |
$18.81 |
$14.15 |
$15.00 |
$10.56 |
$18.00 |
| 19 | 405 5200 |
PERMEABLE FRICTION COURSE | 557 | TON |
$120.00 |
$134.01 |
$120.00 |
$153.19 |
$190.00 |
| 20 | 408 5774 |
PRIME COAT | 5,565 | GAL |
$4.00 |
$0.7100 |
$3.00 |
$2.50 |
$6.30 |
| 21 | 411(B) 5935 |
SUPERPAVE, TYPE S3(PG 76-28 OK) | 2,398 | TON |
$78.00 |
$76.21 |
$58.00 |
$89.20 |
$102.00 |
| 22 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 3,089 | TON |
$72.00 |
$69.03 |
$56.00 |
$77.17 |
$88.00 |
| 23 | 411(C) 5950 |
SUPERPAVE, TYPE S4(PG 76-28 OK) | 1,960 | TON |
$100.76 |
$78.92 |
$75.00 |
$101.36 |
$120.00 |
| 24 | 414(A) 0210 |
P.C.CONCRETE PAVEMENT(PLACEMENT) | 9,434 | SY |
$12.33 |
$12.26 |
$10.00 |
$10.00 |
$13.00 |
| 25 | 414(B) 5725 |
DOWEL JOINTED P.C. CONCRETE PAVEMENT(PLACEMENT ) | 33,065 | SY |
$15.95 |
$15.05 |
$15.00 |
$15.00 |
$16.00 |
| 26 | 414(E) 0225 |
FULL DEPTH P.C. CONCRETE PATCHING(PLACEMENT ONLY) | 250 | SY |
$86.22 |
$85.90 |
$75.00 |
$69.68 |
$26.00 |
| 27 | 414(G) 5275 |
P.C. CONCRETE FOR PAVEMENT | 11,649 | CY |
$105.00 |
$98.39 |
$100.00 |
$110.00 |
$100.00 |
| 28 | 501(A) 0313 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 295 | CY |
$12.87 |
$14.80 |
$10.00 |
$15.98 |
$13.00 |
| 29 | 509(A) 0319 |
CLASS AA CONCRETE | 678 | CY |
$400.00 |
$392.93 |
$375.00 |
$372.75 |
$325.00 |
| 30 | 509(B) 1328 |
CLASS A CONCRETE | 22 | CY |
$487.36 |
$683.74 |
$1,000.00 |
$702.90 |
$520.00 |
| 31 | 509(D) 0325 |
CLASS C CONCRETE | 356 | CY |
$287.16 |
$342.65 |
$330.00 |
$298.20 |
$400.00 |
| 32 | 511(A) 0332 |
REINFORCING STEEL | 90,001 | LB |
$1.01 |
$0.8700 |
$0.8500 |
$0.8000 |
$1.00 |
| 33 | 609(A) 0380 |
CONCRETE CURB (8" BARRIER-INTEGRAL) | 1,790 | LF |
$7.22 |
$2.34 |
$8.00 |
$1.22 |
$3.60 |
| 34 | 613(A) 0492 |
24" R.C.PIPE CLASS III | 483 | LF |
$60.00 |
$70.43 |
$60.00 |
$30.80 |
$38.00 |
| 35 | 613(L) 5730 |
24" PREFAB. CULVERT END SECTION, ROUND | 8 | EA |
$598.31 |
$569.74 |
$750.00 |
$1,339.20 |
$740.00 |
| 36 | 613(S) 1186 |
STANDARD BEDDING MATERIAL, CLASS B | 187 | CY |
$32.12 |
$20.00 |
$40.00 |
$33.26 |
$25.00 |
| 37 | 613(V) 1180 |
TRENCH EXCAVATION | 347 | CY |
$11.88 |
$1.00 |
$15.00 |
$6.72 |
$14.00 |
| 38 | 619(B) 4727 |
REMOVAL OF CONCRETE PAVEMENT | 4,915 | SY |
$6.99 |
$3.97 |
$6.00 |
$3.42 |
$7.00 |
| 39 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 1,919 | SY |
$5.44 |
$3.21 |
$4.00 |
$2.34 |
$6.00 |
| 40 | 619(B) 4763 |
REMOVAL OF CONCRETE PAVEMENT W/ASPHALT OVERLAY | 55,926 | SY |
$4.13 |
$6.44 |
$4.00 |
$3.58 |
$7.00 |
| 41 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 2,496 | LF |
$2.16 |
$2.47 |
$2.00 |
$1.63 |
$2.50 |
| 42 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 425 | LF |
$16.63 |
$18.37 |
$16.00 |
$18.11 |
$19.00 |
| 43 | 623(F) 8300 |
GUARDRAIL TRAIL END TURNDOWN (31") | 3 | EA |
$757.51 |
$739.63 |
$650.00 |
$745.50 |
$750.00 |
| 44 | 623(G) 8590 |
GUARDRAIL END TREATMENT (31") | 5 | EA |
$2,055.08 |
$2,372.96 |
$2,100.00 |
$2,343.00 |
$2,400.00 |
| 45 | 623(I) 8700 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 2 | EA |
$1,831.76 |
$1,972.33 |
$1,750.00 |
$1,278.00 |
$2,000.00 |
| 46 | 853 9024 |
DELINEATORS(TYPE 1, CODE 1) | 9 | EA |
$14.08 |
$19.73 |
$20.00 |
$10.65 |
$20.00 |
| 47 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 140 | CY |
$15.00 |
$16.96 |
$10.00 |
$22.78 |
$13.00 |
| 48 | 501(G) 6309 |
CLSM BACKFILL | 260 | CY |
$150.00 |
$107.51 |
$85.00 |
$200.04 |
$88.00 |
| 49 | 502 6116 |
(PL)FALSEWORK JACKING | 1 | LSUM |
$55,000.00 |
$35,609.81 |
$30,000.00 |
$30,143.02 |
$45,000.00 |
| 50 | 504(A) 1304 |
APPROACH SLAB | 386.8 | SY |
$175.00 |
$156.30 |
$180.00 |
$133.82 |
$135.00 |
| 51 | 504(B) 1305 |
SAW-CUT GROOVING | 2,581.2 | SY |
$5.00 |
$4.19 |
$4.00 |
$3.62 |
$4.30 |
| 52 | 504(E) 6190 |
42" F-SHAPED PARAPET | 553 | LF |
$80.00 |
$58.74 |
$75.00 |
$117.08 |
$85.00 |
| 53 | 506(A) 1322 |
STRUCTURAL STEEL | 451,930 | LB |
$1.85 |
$1.55 |
$1.50 |
$1.77 |
$1.83 |
| 54 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 20 | EA |
$500.00 |
$239.05 |
$240.00 |
$826.46 |
$260.00 |
| 55 | 507(B) 6174 |
STAINLESS STEEL EXPANSION BEARING ASSEMBLY | 60 | EA |
$2,500.00 |
$1,177.45 |
$1,100.00 |
$1,574.44 |
$1,500.00 |
| 56 | 507(C) 6282 |
ELASTOMERIC BEARING PADS | 60 | EA |
$400.00 |
$621.97 |
$250.00 |
$826.37 |
$210.00 |
| 57 | 509(A) 1326 |
CLASS AA CONCRETE | 571.6 | CY |
$550.00 |
$517.64 |
$400.00 |
$645.59 |
$700.00 |
| 58 | 509(B) 1328 |
CLASS A CONCRETE | 354.2 | CY |
$550.00 |
$566.18 |
$550.00 |
$660.09 |
$530.00 |
| 59 | 509(D) 1331 |
CLASS C CONCRETE | 22 | CY |
$300.00 |
$271.19 |
$500.00 |
$343.68 |
$500.00 |
| 60 | 510(C) 6138 |
SLOPE WALL (5") | 1,318 | SY |
$90.00 |
$86.30 |
$100.00 |
$25.55 |
$80.00 |
| 61 | 511(A) 1332 |
REINFORCING STEEL | 4,790 | LB |
$1.00 |
$0.8700 |
$0.8500 |
$0.4600 |
$1.05 |
| 62 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 221,450 | LB |
$1.00 |
$1.02 |
$1.00 |
$1.07 |
$1.15 |
| 63 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 530 | LF |
$35.00 |
$30.81 |
$35.00 |
$34.51 |
$30.00 |
| 64 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 530 | LF |
$15.00 |
$29.22 |
$22.00 |
$31.37 |
$25.00 |
| 65 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 1,175 | SY |
$4.00 |
$4.32 |
$4.00 |
$3.73 |
$4.40 |
| 66 | 516(A) 6098 |
DRILLED SHAFTS 72" DIAMETER | 260 | LF |
$805.00 |
$1,031.29 |
$800.00 |
$1,231.82 |
$1,600.00 |
| 67 | 516(C) 6200 |
CROSSHOLE SONIC LOGGING | 12 | EA |
$3,000.00 |
$2,427.54 |
$1,000.00 |
$692.25 |
$2,700.00 |
| 68 | 523(A) 6550 |
SEALER CRACK PREPARATION | 741 | LF |
$4.00 |
$4.93 |
$5.00 |
$4.26 |
$5.00 |
| 69 | 523(B) 6560 |
SEALER RESIN | 9 | GAL |
$100.00 |
$123.27 |
$110.00 |
$106.50 |
$125.00 |
| 70 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 364 | LF |
$25.00 |
$20.55 |
$25.00 |
$19.91 |
$15.00 |
| 71 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 152 | LF |
$25.00 |
$11.18 |
$15.00 |
$17.90 |
$15.00 |
| 72 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$140,000.00 |
$51,413.61 |
$223,000.00 |
$33,760.17 |
$135,000.00 |
| 73 | 857(A) 8839 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) | 19,340 | LF |
$0.1400 |
$0.1800 |
$0.1700 |
$0.1600 |
$0.1900 |
| 74 | 857(C) 8851 |
REMOVABLE PAVEMENT MARKING TAPE(4" WIDE) | 9,588 | LF |
$0.7900 |
$0.9200 |
$0.8300 |
$0.8000 |
$0.9500 |
| 75 | 857(E) 8887 |
(PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-1 | 617 | EA |
$0.9500 |
$1.23 |
$1.10 |
$1.07 |
$1.26 |
| 76 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 9,720 | LF |
$0.3600 |
$0.6200 |
$0.5500 |
$0.5300 |
$0.6300 |
| 77 | 871(B) 8705 |
(SP)CONST.ZONE IMPACT ATTEN. | 480 | SD |
$4.64 |
$6.17 |
$5.50 |
$5.33 |
$6.30 |
| 78 | 876(A) 8482 |
(PL)TRUCK MOUNTED ATTENUATOR | 480 | SD |
$9.65 |
$6.17 |
$5.50 |
$5.33 |
$6.30 |
| 79 | 877(B) 8484 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 7,538 | LF |
$25.00 |
$6.48 |
$20.00 |
$30.00 |
$17.86 |
| 80 | 877(C) 8486 |
RELOCATION OF PORTABLE LONGITUDINAL BARRIER | 10,550 | LF |
$5.00 |
$3.62 |
$4.00 |
$1.71 |
$3.96 |
| 81 | 880(A) 8812 |
ARROW DISPLAY(TYPE C) | 1,005 | SD |
$6.30 |
$1.23 |
$1.10 |
$1.07 |
$1.26 |
| 82 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 20,670 | SD |
$0.1800 |
$0.0600 |
$0.0600 |
$0.0500 |
$0.0600 |
| 83 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 14,730 | SD |
$0.2500 |
$2.47 |
$2.20 |
$2.13 |
$2.52 |
| 84 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 19,620 | SD |
$0.5400 |
$1.85 |
$1.65 |
$1.60 |
$1.89 |
| 85 | 880(B) 8827 |
CONSTRUCTION SIGNS 33.0 SF & OVER | 1,500 | SD |
$3.02 |
$8.63 |
$7.70 |
$7.46 |
$8.82 |
| 86 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 11,025 | SD |
$0.1800 |
$0.1200 |
$0.1100 |
$0.1100 |
$0.1300 |
| 87 | 880(C) 8848 |
WING BARRICADES | 2,880 | SD |
$0.4600 |
$0.3100 |
$0.3000 |
$0.2700 |
$0.3200 |
| 88 | 880(D) 8854 |
VERTICAL PANELS | 7,860 | SD |
$0.1100 |
$0.0600 |
$0.0600 |
$0.0500 |
$0.0600 |
| 89 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 34,170 | SD |
$0.0700 |
$0.0600 |
$0.0600 |
$0.0500 |
$0.0600 |
| 90 | 880(F) 8878 |
DRUMS | 35,745 | SD |
$0.0900 |
$0.1200 |
$0.1100 |
$0.1100 |
$0.1300 |
| 91 | 880(G) 8884 |
TUBE CHANNELIZERS | 28,170 | SD |
$0.2700 |
$0.1200 |
$0.1100 |
$0.1100 |
$0.1300 |
| 92 | 880(G) 8890 |
CHANNELIZER CONES | 12,870 | SD |
$0.3700 |
$0.1200 |
$0.1100 |
$0.1100 |
$0.1300 |
| 93 | 880(L) 8911 |
TRAFFIC SURVEILLANCE, POLICE | 600 | HOUR |
$63.15 |
$67.80 |
$60.00 |
$58.04 |
$71.87 |
| 94 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 60 | SD |
$31.53 |
$61.63 |
$55.00 |
$53.25 |
$63.04 |
| 95 | 804(A) 2915 |
STRUCTURAL CONCRETE | 5.8 | CY |
$488.75 |
$369.81 |
$330.00 |
$319.50 |
$378.21 |
| 96 | 804(B) 2916 |
REINFORCING STEEL | 1,040 | LB |
$0.9300 |
$2.47 |
$2.20 |
$2.13 |
$2.52 |
| 97 | 805(A) 8724 |
(PL)REMOVAL OF EXISTING SIGNS | 118 | EA |
$33.15 |
$30.82 |
$27.50 |
$26.63 |
$31.52 |
| 98 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 232 | SF |
$13.09 |
$12.33 |
$11.00 |
$10.65 |
$12.61 |
| 99 | 850(B) 8112 |
EXTRUDED ALUMINUM PANEL SIGNS | 380 | SF |
$21.05 |
$22.18 |
$20.00 |
$19.17 |
$22.69 |
| 100 | 850(B) 8114 |
EXTRUDED ALUMINUM PANEL SIGNS(OVERHEAD SIGNS) | 383 | SF |
$21.66 |
$22.18 |
$20.00 |
$19.17 |
$22.69 |
| 101 | 851(A) 3206 |
4"@13 GALV.STEEL WIDE FLANGE BEAM POST | 272 | LF |
$24.04 |
$22.18 |
$20.00 |
$19.17 |
$22.69 |
| 102 | 851(C) 8324 |
2" SQUARE TUBE POST | 475 | LF |
$8.35 |
$9.86 |
$9.00 |
$8.52 |
$10.09 |
| 103 | 854(A) 8800 |
TRAFFIC STRIPE(PAINT)(4" WIDE) | 3,975 | LF |
$0.4300 |
$0.3100 |
$0.2800 |
$0.2700 |
$0.3200 |
| 104 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 16,138 | LF |
$0.6700 |
$0.6200 |
$0.5500 |
$0.5300 |
$0.6300 |
| 105 | 856(A) 8535 |
TRAFFIC STRIPE(MULTI-POLY.)(6" WIDE) | 18,721 | LF |
$0.8300 |
$0.6800 |
$0.6000 |
$0.5900 |
$0.6900 |
| 106 | 856(A) 8540 |
TRAFFIC STRIPE(MULTI-POLY.)(8" WIDE) | 5,171 | LF |
$1.11 |
$1.23 |
$1.10 |
$1.07 |
$1.26 |
| 107 | 856(A) 8548 |
TRAFFIC STRIPE(MULTI-POLY)(12" WIDE) | 864 | LF |
$1.73 |
$1.85 |
$1.65 |
$1.60 |
$1.89 |
| 108 | 856(A) 8555 |
TRAFFIC STRIPE(MULTI-POLY.)(24" WIDE) | 52 | LF |
$10.05 |
$24.65 |
$22.00 |
$21.30 |
$25.21 |
| 109 | 856(B) 8860 |
TRAFFIC STRIPE(MULTI-POLY.)(ARROWS) | 14 | EA |
$129.50 |
$123.27 |
$110.00 |
$106.50 |
$126.07 |
| 110 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$55,000.00 |
$69,744.91 |
$100,000.00 |
$69,022.12 |
$73,372.86 |
| 111 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$6,000.00 |
$3,081.77 |
$5,000.00 |
$1,000.00 |
$7,602.99 |
| 112 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$295,000.00 |
$333,380.95 |
$400,000.00 |
$376,000.00 |
$375,000.00 |