| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$30,000.00 |
$47,000.00 |
$30,000.00 |
$15,000.00 |
$35,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 18,198 | CY |
$5.00 |
$5.00 |
$7.10 |
$10.50 |
$7.00 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 12,723 | CY |
$7.00 |
$10.00 |
$7.00 |
$10.50 |
$6.00 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$25,000.00 |
$52,000.00 |
$40,500.00 |
$35,000.00 |
$36,000.00 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 4,311 | LF |
$2.00 |
$1.32 |
$1.35 |
$1.33 |
$1.30 |
| 6 | 221(F) 0100 |
TEMPORARY SILT DIKE | 192 | LF |
$6.00 |
$10.44 |
$7.15 |
$7.11 |
$7.00 |
| 7 | 221(G) 0151 |
TEMPORARY ROCK FILTER DAM TYPE 2 | 9 | CY |
$20.00 |
$76.39 |
$180.00 |
$102.24 |
$92.00 |
| 8 | 221(H) 0450 |
(PL)TEMPORARY INLET SEDIMENT FILTER | 3 | EA |
$215.00 |
$228.98 |
$180.00 |
$178.92 |
$175.00 |
| 9 | 229 4318 |
DITCH LINER PROTECTION | 100 | LF |
$3.00 |
$8.52 |
$1.60 |
$1.55 |
$1.55 |
| 10 | 230(A) 2806 |
SOLID SLAB SODDING | 42,042 | SY |
$1.60 |
$1.35 |
$1.45 |
$1.43 |
$1.42 |
| 11 | 232(A) 2813 |
SEEDING METHOD A | 1 | AC |
$500.00 |
$765.74 |
$1,854.00 |
$1,840.37 |
$800.00 |
| 12 | 233(A) 2817 |
VEGETATIVE MULCHING | 8 | AC |
$400.00 |
$604.92 |
$618.00 |
$613.46 |
$600.00 |
| 13 | 241 2832 |
MOWING | 18 | AC |
$100.00 |
$100.11 |
$72.00 |
$71.57 |
$70.00 |
| 14 | 307(B) 4210 |
CEMENT KILN DUST | 1,164 | TON |
$60.00 |
$32.00 |
$45.00 |
$65.00 |
$52.00 |
| 15 | 307(E) 4240 |
CEMENTITIOUS STABILIZED SUBGRADE | 26,424 | SY |
$4.00 |
$1.90 |
$1.75 |
$2.50 |
$3.25 |
| 16 | 408 5774 |
PRIME COAT | 7,770 | GAL |
$6.00 |
$2.50 |
$3.95 |
$2.25 |
$4.75 |
| 17 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 5,574 | TON |
$70.00 |
$58.33 |
$67.90 |
$76.42 |
$82.50 |
| 18 | 411(C) 5955 |
SUPERPAVE, TYPE S4(PG 70-28 OK) | 274 | TON |
$90.00 |
$100.00 |
$94.10 |
$113.60 |
$115.00 |
| 19 | 413(C) 4868 |
RUMBLE STRIP-METHOD PCC-CON | 1,476 | LF |
$10.00 |
$1.49 |
$1.50 |
$2.71 |
$2.25 |
| 20 | 414(A) 0210 |
P.C.CONCRETE PAVEMENT(PLACEMENT) | 6,476 | SY |
$15.00 |
$9.00 |
$19.05 |
$9.10 |
$19.50 |
| 21 | 414(B) 5725 |
DOWEL JOINTED P.C. CONCRETE PAVEMENT(PLACEMENT ) | 15,361 | SY |
$20.00 |
$14.00 |
$17.20 |
$17.45 |
$28.00 |
| 22 | 414(G) 5275 |
P.C. CONCRETE FOR PAVEMENT | 6,361 | CY |
$95.00 |
$122.00 |
$93.60 |
$114.00 |
$112.50 |
| 23 | 501(A) 0313 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 100 | CY |
$20.00 |
$12.12 |
$36.00 |
$20.87 |
$5.25 |
| 24 | 501(G) 6315 |
CLSM BACKFILL | 311 | CY |
$100.00 |
$107.33 |
$129.00 |
$177.36 |
$150.00 |
| 25 | 509(A) 0319 |
CLASS AA CONCRETE | 369 | CY |
$450.00 |
$375.00 |
$444.00 |
$365.15 |
$367.70 |
| 26 | 509(C) 0322 |
CLASS A CONCRETE, SMALL STRUCTURES | 8 | CY |
$720.00 |
$1,357.88 |
$484.00 |
$834.63 |
$800.00 |
| 27 | 509(D) 0325 |
CLASS C CONCRETE | 33 | CY |
$260.00 |
$266.25 |
$257.50 |
$260.82 |
$325.00 |
| 28 | 511(A) 0332 |
REINFORCING STEEL | 71,377 | LB |
$0.6000 |
$0.8300 |
$1.15 |
$1.04 |
$1.00 |
| 29 | 609(A) 0300 |
CONCRETE CURB (6" BARRIER-INTEGRAL) | 170 | LF |
$15.00 |
$3.63 |
$7.80 |
$5.65 |
$12.50 |
| 30 | 609(B) 1525 |
2'-8" COMB. CURB & GUTTER (6" BARRIER) | 131 | LF |
$25.00 |
$11.22 |
$37.30 |
$29.97 |
$28.00 |
| 31 | 611(A) 2657 |
MANHOLE (4' DIAMETER) | 2 | EA |
$1,500.00 |
$3,494.42 |
$4,120.00 |
$4,173.17 |
$2,200.00 |
| 32 | 611(A) 2658 |
MANHOLE (5' DIAMETER) | 1 | EA |
$2,500.00 |
$4,126.69 |
$7,210.00 |
$5,216.46 |
$3,000.00 |
| 33 | 611(B) 2680 |
ADD'L.DEPTH IN MANHOLE (4' DIAMETER) | 2 | VF |
$150.00 |
$498.01 |
$185.00 |
$156.49 |
$150.00 |
| 34 | 611(B) 2681 |
ADD'L.DEPTH IN MANHOLE (5' DIAMETER) | 3 | VF |
$370.00 |
$544.51 |
$284.00 |
$260.83 |
$210.00 |
| 35 | 611(C) 4215 |
REPLACEMENT OF MANHOLE FRAME & COVER | 7 | EA |
$350.00 |
$376.34 |
$639.00 |
$417.32 |
$500.00 |
| 36 | 611(G) 6002 |
INLET (SMD-TYPE 2) | 3 | EA |
$1,500.00 |
$2,867.85 |
$3,090.00 |
$2,608.23 |
$2,300.00 |
| 37 | 611(L) 0487 |
JUNCTION BOXES | 253 | CF |
$100.00 |
$80.71 |
$82.00 |
$57.38 |
$60.00 |
| 38 | 613(A) 0491 |
18" R.C.PIPE CLASS III | 74 | LF |
$46.00 |
$61.07 |
$85.50 |
$73.03 |
$55.00 |
| 39 | 613(A) 0492 |
24" R.C.PIPE CLASS III | 580 | LF |
$55.00 |
$70.40 |
$90.60 |
$125.20 |
$75.00 |
| 40 | 613(A) 0493 |
30" R.C.PIPE CLASS III | 619 | LF |
$70.00 |
$78.38 |
$103.00 |
$156.49 |
$120.00 |
| 41 | 613(A) 0494 |
36" R.C.PIPE CLASS III | 119 | LF |
$80.00 |
$91.99 |
$113.00 |
$177.36 |
$140.00 |
| 42 | 613(A) 0495 |
42" R.C.PIPE CLASS III | 487 | LF |
$110.00 |
$106.11 |
$129.00 |
$260.82 |
$165.00 |
| 43 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 200 | LF |
$30.00 |
$13.61 |
$11.30 |
$10.50 |
$10.00 |
| 44 | 613(I) 1096 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 50 | LF |
$25.00 |
$10.21 |
$8.20 |
$10.50 |
$10.00 |
| 45 | 613(L) 5730 |
24" PREFAB. CULVERT END SECTION, ROUND | 4 | EA |
$600.00 |
$2,305.84 |
$934.00 |
$1,564.94 |
$900.00 |
| 46 | 613(M) 7193 |
TYPE CC4 CULVERT END TREATMENT | 2 | EA |
$1,200.00 |
$1,597.50 |
$3,605.00 |
$3,129.88 |
$900.00 |
| 47 | 613(M) 7199 |
TYPE D6 CULVERT END TREATMENT | 1 | EA |
$1,600.00 |
$1,171.50 |
$3,605.00 |
$2,608.23 |
$3,000.00 |
| 48 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$20,000.00 |
$29,134.41 |
$25,000.00 |
$15,000.00 |
$40,000.00 |
| 49 | 619(B) 4727 |
REMOVAL OF CONCRETE PAVEMENT | 9,333 | SY |
$6.00 |
$3.69 |
$4.50 |
$4.85 |
$4.25 |
| 50 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 1,455 | SY |
$6.00 |
$4.80 |
$2.40 |
$4.00 |
$3.30 |
| 51 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 878 | LF |
$4.00 |
$3.40 |
$3.00 |
$3.07 |
$3.00 |
| 52 | 619(C) 0924 |
SAWING PAVEMENT | 5,545 | LF |
$3.00 |
$5.61 |
$3.60 |
$5.26 |
$4.00 |
| 53 | 624(A) 4281 |
FENCE-STYLE WWF | 5,624 | LF |
$7.00 |
$10.84 |
$8.00 |
$7.97 |
$7.00 |
| 54 | 624(D) 4470 |
GATE, GALVANIZED STEEL | 5 | EA |
$1,000.00 |
$724.20 |
$310.00 |
$306.73 |
$1,200.00 |
| 55 | 802(A) 8310 |
2" GALV. STEEL ELECTRICAL CONDUIT EXPOSED | 305 | LF |
$25.00 |
$19.17 |
$18.54 |
$18.51 |
$20.00 |
| 56 | 802(B) 8340 |
2" PVC SCH.40 PLASTIC CONDUIT BORED | 450 | LF |
$16.00 |
$15.98 |
$15.45 |
$15.43 |
$13.00 |
| 57 | 802(B) 8342 |
2" PVC SCH.40 PLASTIC CONDUIT TRENCHED | 1,185 | LF |
$5.00 |
$4.26 |
$4.12 |
$4.11 |
$4.02 |
| 58 | 802(B) 8344 |
3" PVC SCH.40 PLASTIC CONDUIT BORED | 180 | LF |
$18.00 |
$19.17 |
$18.54 |
$18.51 |
$15.75 |
| 59 | 802(B) 8346 |
3" PVC SCH.40 PLASTIC CONDUIT TRENCHED | 55 | LF |
$5.00 |
$8.52 |
$8.24 |
$8.23 |
$6.00 |
| 60 | 802(E) 8370 |
JUNCTION BOX(6" X 6" X 4") | 2 | EA |
$415.00 |
$532.50 |
$515.00 |
$514.30 |
$400.00 |
| 61 | 803(A) 8065 |
PULL BOX(SIZE I) | 11 | EA |
$500.00 |
$319.50 |
$309.00 |
$308.58 |
$280.00 |
| 62 | 803(A) 8066 |
PULL BOX(SIZE II) | 2 | EA |
$700.00 |
$372.75 |
$360.50 |
$360.01 |
$350.00 |
| 63 | 804(A) 2915 |
STRUCTURAL CONCRETE | 153 | CY |
$450.00 |
$426.00 |
$412.00 |
$411.44 |
$460.00 |
| 64 | 804(B) 2916 |
REINFORCING STEEL | 2,287 | LB |
$1.50 |
$1.33 |
$1.30 |
$1.29 |
$1.35 |
| 65 | 806(A) 8311 |
32'MH POLE 35'TS & 10'LMA(G.STL.) | 1 | EA |
$5,000.00 |
$6,207.89 |
$6,004.00 |
$5,995.69 |
$6,300.00 |
| 66 | 806(A) 8312 |
32'MH POLE 40'TS & 10'LMA(G.STL.) | 2 | EA |
$6,200.00 |
$7,033.26 |
$6,802.00 |
$6,792.86 |
$6,900.00 |
| 67 | 806(A) 8313 |
32'MH POLE 45'TS & 10'LMA(G.STL.) | 1 | EA |
$6,500.00 |
$8,646.74 |
$8,363.00 |
$8,351.18 |
$7,000.00 |
| 68 | 806(A) 8724 |
POLE & 20' TS MST.ARM(G.STL.) | 1 | EA |
$7,500.00 |
$3,084.24 |
$2,983.00 |
$2,978.82 |
$4,000.00 |
| 69 | 806(A) 8730 |
POLE & 35' TS MST.ARM(G.STL.) | 1 | EA |
$10,000.00 |
$5,301.57 |
$5,127.00 |
$5,120.36 |
$5,500.00 |
| 70 | 809(A) 8090 |
ROADWAY LUMINAIRE | 5 | EA |
$500.00 |
$372.75 |
$360.00 |
$360.01 |
$340.00 |
| 71 | 810(A) 3118 |
SERVICE POLE | 2 | EA |
$3,000.00 |
$532.50 |
$515.00 |
$514.30 |
$365.00 |
| 72 | 811 8040 |
1/C NO.6 ELECTRICAL CONDUCTOR | 2,175 | LF |
$1.00 |
$1.07 |
$1.03 |
$1.03 |
$1.05 |
| 73 | 811 8044 |
1/C NO.10 ELECTRICAL CONDUCTOR | 1,010 | LF |
$0.8000 |
$0.4300 |
$0.4100 |
$0.4100 |
$1.05 |
| 74 | 824(A) 8340 |
(SP)MASTER CONTROLLER | 1 | EA |
$8,000.00 |
$3,887.25 |
$3,759.50 |
$3,754.38 |
$3,700.00 |
| 75 | 825 8550 |
TRAFFIC SIGNAL CONTROLLER ASSEMBLY | 2 | EA |
$13,000.00 |
$26,897.64 |
$26,015.00 |
$25,978.25 |
$23,000.00 |
| 76 | 828 8132 |
(PL)DETECTION SYSTEM (VIDEO) | 1 | LSUM |
$9,000.00 |
$35,007.62 |
$33,860.00 |
$33,811.02 |
$27,000.00 |
| 77 | 831 8231 |
1WAY 3SEC. ADJ. SIG. HD. S-6 | 11 | EA |
$600.00 |
$532.50 |
$515.00 |
$514.30 |
$470.00 |
| 78 | 831 8262 |
1WAY 3SEC. ADJ. SIG. HD. S-10 | 2 | EA |
$650.00 |
$553.80 |
$535.00 |
$534.88 |
$470.00 |
| 79 | 831 8286 |
1WAY 5SEC. ADJ. SIG. HD. S-19 | 1 | EA |
$950.00 |
$905.25 |
$875.00 |
$874.30 |
$940.00 |
| 80 | 833 3030 |
BACKPLATE | 14 | EA |
$85.00 |
$74.55 |
$72.00 |
$72.00 |
$75.00 |
| 81 | 834(A) 8207 |
5/C TRAFFIC SIGNAL ELECTRICAL CABLE | 290 | LF |
$1.20 |
$1.33 |
$1.30 |
$1.29 |
$1.05 |
| 82 | 834(A) 8209 |
9/C TRAFFIC SIGNAL ELECTRICAL CABLE | 245 | LF |
$2.00 |
$1.86 |
$1.80 |
$1.80 |
$2.10 |
| 83 | 834(A) 8210 |
12/C TRAFFIC SIGNAL ELECTRICAL CABLE | 225 | LF |
$2.40 |
$2.40 |
$2.30 |
$2.31 |
$3.21 |
| 84 | 834(C) 8359 |
UNDERGROUND COMMUNICATION CABLE | 1,120 | LF |
$5.00 |
$1.28 |
$1.25 |
$1.23 |
$2.10 |
| 85 | 850(C) 8118 |
MAST ARM MOUNTED SIGNS(ALUMINUM) | 69 | SF |
$30.00 |
$42.60 |
$41.00 |
$41.14 |
$30.00 |
| 86 | 804(A) 2915 |
STRUCTURAL CONCRETE | 14 | CY |
$500.00 |
$319.50 |
$258.00 |
$258.19 |
$315.00 |
| 87 | 804(B) 2916 |
REINFORCING STEEL | 1,996 | LB |
$1.50 |
$1.28 |
$1.05 |
$1.03 |
$1.25 |
| 88 | 805(A) 8724 |
(PL)REMOVAL OF EXISTING SIGNS | 2 | EA |
$60.00 |
$69.23 |
$257.50 |
$258.19 |
$68.00 |
| 89 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 195 | SF |
$17.00 |
$14.91 |
$14.40 |
$14.46 |
$14.25 |
| 90 | 850(B) 8112 |
EXTRUDED ALUMINUM PANEL SIGNS | 377 | SF |
$22.00 |
$14.91 |
$26.00 |
$25.82 |
$14.25 |
| 91 | 851(A) 3206 |
4"@13 GALV.STEEL WIDE FLANGE BEAM POST | 45 | LF |
$20.00 |
$13.85 |
$29.00 |
$28.92 |
$13.25 |
| 92 | 851(A) 3208 |
6"@20 GALV.STEEL WIDE FLANGE BEAM POST | 260 | LF |
$28.00 |
$21.30 |
$35.00 |
$35.11 |
$21.00 |
| 93 | 851(B) 3217 |
2 1/2"@5.79 GALV.STEEL PIPE POST | 319 | LF |
$15.00 |
$14.91 |
$15.50 |
$15.49 |
$14.25 |
| 94 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 17,285 | LF |
$0.5000 |
$0.6600 |
$0.6200 |
$0.6200 |
$0.6400 |
| 95 | 856(A) 8535 |
TRAFFIC STRIPE(MULTI-POLY.)(6" WIDE) | 2,327 | LF |
$0.7500 |
$1.07 |
$0.8500 |
$0.8300 |
$1.05 |
| 96 | 856(A) 8540 |
TRAFFIC STRIPE(MULTI-POLY.)(8" WIDE) | 6,436 | LF |
$1.50 |
$1.49 |
$1.05 |
$1.03 |
$1.45 |
| 97 | 856(A) 8548 |
TRAFFIC STRIPE(MULTI-POLY)(12" WIDE) | 1,922 | LF |
$2.25 |
$2.13 |
$1.15 |
$1.14 |
$2.10 |
| 98 | 856(A) 8555 |
TRAFFIC STRIPE(MULTI-POLY.)(24" WIDE) | 147 | LF |
$7.00 |
$4.15 |
$10.30 |
$10.33 |
$4.00 |
| 99 | 856(B) 8860 |
TRAFFIC STRIPE(MULTI-POLY.)(ARROWS) | 9 | EA |
$85.00 |
$213.00 |
$103.00 |
$103.27 |
$210.00 |
| 100 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 11,746 | LF |
$0.2000 |
$0.5300 |
$0.2500 |
$0.2300 |
$0.5200 |
| 101 | 857(F) 8007 |
PAVEMENT MARKING REMOVAL(ARROWS) | 6 | EA |
$20.00 |
$37.28 |
$51.50 |
$51.64 |
$37.00 |
| 102 | 857(F) 8008 |
PAVEMENT MARKING REMOVAL(WORDS) | 3 | EA |
$45.00 |
$69.23 |
$51.50 |
$51.64 |
$67.00 |
| 103 | 802(B) 8340 |
2" PVC SCH.40 PLASTIC CONDUIT BORED | 80 | LF |
$18.00 |
$15.98 |
$15.45 |
$15.43 |
$13.00 |
| 104 | 802(B) 8342 |
2" PVC SCH.40 PLASTIC CONDUIT TRENCHED | 4,850 | LF |
$5.00 |
$4.26 |
$4.12 |
$4.11 |
$3.70 |
| 105 | 803(A) 8065 |
PULL BOX(SIZE I) | 3 | EA |
$500.00 |
$319.50 |
$309.00 |
$308.58 |
$315.00 |
| 106 | 804(A) 2915 |
STRUCTURAL CONCRETE | 21 | CY |
$450.00 |
$426.00 |
$412.00 |
$411.44 |
$470.00 |
| 107 | 804(B) 2916 |
REINFORCING STEEL | 1,236 | LB |
$2.00 |
$1.33 |
$1.30 |
$1.29 |
$1.35 |
| 108 | 806(D) 8997 |
38' MTG.HT.HL.PTP.(G.STL.) | 37 | EA |
$1,200.00 |
$1,361.07 |
$1,320.00 |
$1,314.55 |
$1,560.00 |
| 109 | 807 8092 |
BREAKAWAY BASE (DES. B) | 37 | EA |
$600.00 |
$426.00 |
$412.00 |
$411.44 |
$380.00 |
| 110 | 809(A) 8090 |
ROADWAY LUMINAIRE | 37 | EA |
$700.00 |
$958.50 |
$927.00 |
$925.74 |
$860.00 |
| 111 | 810(A) 3118 |
SERVICE POLE | 2 | EA |
$2,000.00 |
$3,727.50 |
$3,605.00 |
$3,600.09 |
$4,400.00 |
| 112 | 811 8040 |
1/C NO.6 ELECTRICAL CONDUCTOR | 10,000 | LF |
$1.00 |
$1.07 |
$1.03 |
$1.03 |
$1.55 |
| 113 | 811 8046 |
1/C NO.12 ELECTRICAL CONDUCTOR | 4,625 | LF |
$0.8000 |
$0.3700 |
$0.3600 |
$0.3600 |
$1.05 |
| 114 | 857(C) 8851 |
REMOVABLE PAVEMENT MARKING TAPE(4" WIDE) | 10,978 | LF |
$0.5000 |
$0.8000 |
$0.9000 |
$0.8800 |
$0.7700 |
| 115 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 10,978 | LF |
$0.2500 |
$0.3700 |
$0.2500 |
$0.2300 |
$0.3600 |
| 116 | 871(B) 8705 |
(SP)CONST.ZONE IMPACT ATTEN. | 225 | SD |
$10.00 |
$8.52 |
$5.15 |
$5.16 |
$8.20 |
| 117 | 876(A) 8482 |
(PL)TRUCK MOUNTED ATTENUATOR | 10 | SD |
$20.00 |
$42.60 |
$128.75 |
$129.09 |
$41.00 |
| 118 | 877(B) 8484 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 5,600 | LF |
$24.00 |
$30.55 |
$27.48 |
$15.75 |
$37.00 |
| 119 | 877(C) 8486 |
RELOCATION OF PORTABLE LONGITUDINAL BARRIER | 825 | LF |
$5.00 |
$18.26 |
$5.06 |
$2.25 |
$6.25 |
| 120 | 880(A) 8812 |
ARROW DISPLAY(TYPE C) | 150 | SD |
$7.00 |
$2.13 |
$5.15 |
$5.16 |
$2.10 |
| 121 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 3,975 | SD |
$0.5000 |
$0.5300 |
$0.2600 |
$0.2600 |
$0.5200 |
| 122 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 2,100 | SD |
$1.00 |
$1.07 |
$1.03 |
$1.03 |
$1.05 |
| 123 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 4,575 | SD |
$1.00 |
$1.07 |
$1.03 |
$1.03 |
$1.05 |
| 124 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 2,025 | SD |
$0.5000 |
$3.20 |
$0.5200 |
$0.5200 |
$3.15 |
| 125 | 880(C) 8848 |
WING BARRICADES | 675 | SD |
$1.00 |
$3.20 |
$1.03 |
$1.03 |
$3.15 |
| 126 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 2,175 | SD |
$0.2000 |
$0.6900 |
$0.5200 |
$0.5200 |
$0.6700 |
| 127 | 880(F) 8878 |
DRUMS | 14,850 | SD |
$0.1500 |
$0.0500 |
$0.2600 |
$0.2600 |
$0.0500 |
| 128 | 880(G) 8890 |
CHANNELIZER CONES | 750 | SD |
$0.1000 |
$0.0200 |
$0.2600 |
$0.2600 |
$0.0200 |
| 129 | 880(L) 8911 |
TRAFFIC SURVEILLANCE, POLICE | 300 | HOUR |
$60.00 |
$59.46 |
$55.98 |
$45.00 |
$64.00 |
| 130 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 750 | SD |
$30.00 |
$4.26 |
$10.30 |
$10.33 |
$4.00 |
| 131 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$50,000.00 |
$65,000.00 |
$37,000.00 |
$25,000.00 |
$20,000.00 |
| 132 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$6,000.00 |
$567.11 |
$4,100.00 |
$2,000.00 |
$4,000.00 |
| 133 | 640(A) 1426 |
FIELD OFFICE | 1 | EA |
$15,000.00 |
$9,479.25 |
$12,750.00 |
$7,500.00 |
$6,500.00 |
| 134 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$185,000.00 |
$200,000.00 |
$231,177.55 |
$155,000.00 |
$195,000.00 |