IDOT Jobs

2023 · 861 jobs · — Sign up free
★ My Jobs

861 jobs · — estimated

ExcelCSV
Let date Contract / PPS County / Division Highway Description Estimate Status Added Low bidder
Nov 17, 2023 64S40 WhitesideDistrict 2 Bridge deck overlay, joint replacement, and miscellaneous repairs on SN 098-0091, carrying US 30 over I-88, 3 miles east of Rock Falls. — Executed Nov 26 New Martin & Company Excavating $1,248,487 ·
Nov 17, 2023 64S43 Rock IslandDistrict 2 Bridge washing of SN 081-0011 over the Mississippi River in Rock Island County. — Executed Nov 26 New Interstate Maintenance, Incorporated $149,550 ·
Nov 17, 2023 64S44 Rock IslandDistrict 2 Bridge washing of SN 081-0106 over the Mississippi River in Rock Island County. — Executed Nov 26 New Interstate Maintenance, Incorporated $59,340 ·
Nov 17, 2023 64S45 VariousDistrict 2 Bridge washing of SN 008-0052, 098-6003 and 081-9905 over the Mississippi River in various counties. — Executed Nov 26 New Interstate Maintenance, Incorporated $123,440 ·
Nov 17, 2023 66N39 VariousDistrict 3 This project consists on performing Bridge Deck Concrete Sealing with the parapets/curbs on various routes at various locations throughout Ford, Iroquois, and Kankakee Counties. — Executed Nov 26 New All States Painting, Inc. $196,144 ·
Nov 17, 2023 66N83 VariousDistrict 3 Tree Removal located within Bureau, DeKalb, Ford, Grundy, La Salle, and Livings on counties. — Executed Nov 26 New Clean Cut Tree Service, Inc. $210,216 ·
Nov 17, 2023 66N99 VariousDistrict 3 Repairing and maintaining traffic signals, flashing beacons, and roadway lighting in Ford, Iroquois, and Livin This project consists of repairing and maintaining traffic signals, flashing beacons, and roadway lighting in Ford, Iroquois, and Livingston Counties. — Executed Nov 26 New Leo P. Kelly Electric, Incorporated $350,818 ·
Nov 17, 2023 68C00 TazewellDistrict 4 3R project has a length of 0.58 miles extending from the east end of the Cedar St Bridge over the Illinois River to just east of Center St, including the Edmund St interchange. Work includes pavement patching, milling, resurfacing, and bridge rehabilitation. — Executed Nov 26 New ICC Group Inc. $14,978,000 ·
Nov 17, 2023 68D36 McDonoughDistrict 4 Stream stabilization with riprap placement at various locations along Spring Creek, northwest of Macomb bypass. — Executed Nov 26 New Laverdiere Construction, Inc. $355,897 ·
Nov 17, 2023 68G39 MarshallDistrict 4 Bridge repair and bridge deck overlay to S.N. 062-0056 over Thenius Creek 1/4 mi. N. of Sparland; S.N. 062-0057 over Gimlet Creek at the IL 29/IL 17 junction and S.N. 062-0059 over Senachwine Creek, 4 mi. W. of Sparland. — Executed Nov 26 New Stark Excavating, Inc. $2,030,255 ·
Nov 17, 2023 68H77 VariousDistrict 4 District-wide replacement of pedestrian pushbuttons with APS push buttons. — Executed Nov 26 New Laser Electric, Inc. $1,741,480 ·
Nov 17, 2023 68H79 VariousDistrict 4 Bridge painting: S.N. 072-0106 SB IL 6, S.N. 072-0107 NB I-474 Ramp 109, S.N. 072-0108 SB I-474 Ramp, 072-0109 NB I-474 Ramp 109, S.N. 048-0078 W. Knox Rd., S.N. 094-0028 Cameron Rd., S.N. 055-0021 CH 8, S.N. 048-0080 IL 180, S.N. 090-0043 US 150, S.N. 072-0228 US 24/IL 9. — Executed Nov 26 New Eagle Painting & Maintenance Company, Inc. $1,961,212 ·
Nov 17, 2023 70G12 McLeanDistrict 5 Bridge painting of 3 structures on FAI 55 (I-55) and FAP 704 (I-55 Busn). — Executed Nov 26 New Eagle Painting & Maintenance Company, Inc. $1,273,331 ·
Nov 17, 2023 72717 BrownPikeDistrict 6 Spray-applied pipe liner on IL 107 in Brown and Pike Counties. — Executed Nov 26 New Hoerr Construction, Inc. $567,640 ·
Nov 17, 2023 72719 SangamonDistrict 6 Lot improvements to the Riverton Maintenance Yard. — Executed Nov 26 New Illinois Valley Paving, a div of UCM, Inc. $160,583 ·
Nov 17, 2023 72807 MontgomeryDistrict 6 Tree removal at the Coalfield Rest Area. — Executed Nov 26 New Clean Cut Tree Service, Inc. $97,200 ·
Nov 17, 2023 72F14 SchuylerDistrict 6 7.3 miles of milling, resurfacing, bridge overlay (SN 085-0004), slope stabilization and guardrail replacement on IL 103 from 0.1 miles east of US 24 to 1.7 miles west of US 67. — Executed Nov 26 New Illinois Valley Paving, a div of UCM, Inc. $11,920,700 ·
Nov 17, 2023 72F26 AdamsDistrict 6 Culvert replacement on IL 96 over a ditch, 1 mile north of Kochs Lane, north of Qunicy. — Executed Nov 26 New Laverdiere Construction, Inc. $1,932,532 ·
Nov 17, 2023 72F59 CassDistrict 6 Culvert replacement (SN 009-7002) carrying IL 125 over a ditch 0.6 miles east of Warrior Hill Road. — Executed Nov 26 New Otto Baum Company, Inc. $1,524,200 ·
Nov 17, 2023 72H57 HancockDistrict 6 Hydro-scarification, microsilica concrete overlay, expansion joint replacement and steel repairs on SN 034-0062 carrying US 136 over the Mississippi River from Hamilton, IL to Keokuk, IA. — Executed Nov 26 New Freesen, a div of UCM, Inc. $8,876,670 ·
Nov 17, 2023 72K83 SangamonDistrict 6 Culvert replacement on IL 104 at Little Panther Creek, 1.9 miles west of IL 4 (SN 084-7061). — Executed Nov 26 New Kinney Contractors, Inc. $952,366 ·
Nov 17, 2023 72K96 MorganDistrict 6 5.2 miles of resurfacing on IL 78 from the Cass County line to just north of Snake Creek. — Executed Nov 26 New K. E. Vas Company $5,770,272 ·
Nov 17, 2023 72M34 MorganDistrict 6 Painting portions of 7 bridges near Jacksonville. — Executed Nov 26 New Eagle Painting & Maintenance Company, Inc. $1,103,400 ·
Nov 17, 2023 72M71 BrownDistrict 6 4.8 miles of milling, patching, resurfacing and shoulders on US 24 from 0.5 miles east of Timewell Road to 0.3 miles west of Buckhorn / Damon Road in Mount Sterling. — Executed Nov 26 New Diamond Construction Company $4,650,700 ·
Nov 17, 2023 74471 FayetteDistrict 7 3.4 miles of resurfacing on US 40 from 0.5 miles west of the I-70 interchange to IL 185 in Vandalia, resurfacing the I-70 / US 40 ramps at the Vandalia Vandalia interchange and joint repairs and overlay to SN 026-0087. — Executed Nov 26 New Howell Paving, Inc. $5,506,589 ·
Nov 17, 2023 74B29 MaconDistrict 7 Bridge deck overlay, joint replacement / repair and other bridge deck repairs on 3 structures: 1) SN 058-0060 carrying TR 4 (South Acom Road) over I-72; 2) SN 058-0062 carrying CH 27 (Lincoln Memorial Parkway) over I-72; 3) SN 058-0065 carrying Twin Lakes Road over I-72 just west of Decatur. — Executed Nov 26 New Freesen, a div of UCM, Inc. $1,224,997 ·
Nov 17, 2023 74B30 MaconDistrict 7 Bridge deck overlay, joint repair and approach pavement on I-72 over Spring Creek, 1.3 miles east of Forsyth. — Executed Nov 26 New Freesen, a div of UCM, Inc. $1,953,030 ·
Nov 17, 2023 74B31 FayetteDistrict 7 Bridge repairs on SN 026-0071 carrying IL 185 over I-57 in Farina. — Executed Nov 26 New Samron Midwest Contracting, Inc. $1,077,997 ·
Nov 17, 2023 74B33 MaconDistrict 7 Bridge deck repair and overlay on SN 058-0129 carrying IL 121 over South Fork Creek, 0.7 miles east of the Logan County line. — Executed Nov 26 New Freesen, a div of UCM, Inc. $498,028 ·
Nov 17, 2023 74B34 EffinghamDistrict 7 Bridge deck overlay, bridge joint replacement, deck drain replacement, bridge deck patching on SN 025-0089 carrying IL 37 over the Little Wabash River, 0.5 miles south of I-57. — Executed Nov 26 New Sangamo Construction Company $761,969 ·
Nov 17, 2023 74B35 ClarkDistrict 7 Bridge deck overlay and joint replacement and repairs on SN 012-0025 carrying US 40 over I-70. — Executed Nov 26 New Sangamo Construction Company $1,282,944 ·
Nov 17, 2023 74B37 WabashDistrict 7 Washing the bridge deck on SN 093-0021 carrying IL 15 over the Wabash River in Mt. Carmel. — Executed Nov 26 New
Nov 17, 2023 74B39 MaconDistrict 7 Bridge deck overlay, joint replacement, deck patching, structural concrete repair, crashwall extensions and HMA approaches on SN 058-0087 carrying Kirby Road over I-72, northeast of Decatur. — Executed Nov 26 New Freesen, a div of UCM, Inc. $638,193 ·
Nov 17, 2023 74C65 CumberlandDistrict 7 Bridge joint replacement / repair, bridge deck repairs and bridge deck overlay on SN 018-0003 and 018-0004 carrying I-57 over US 45 and SN 018-0001 and 018-0002 carrying I-57 over the Decatur and Eastern Illinois Railroad, all located northeast of Neoga. — Executed Nov 26 New Path Construction Company, Inc. $1,994,773 ·
Nov 17, 2023 76M88 WashingtonDistrict 8 Culvert replacement on IL 127 at South Middle Tributary of Locust Creek, 6.7 miles south of IL 15 and the town of Nashville. (SN 095-2496) — Executed Nov 26 New E. T. Simonds Construction Company $747,934 ·
Nov 17, 2023 76M90 WashingtonDistrict 8 Culvert replacement on IL 177 at West Tributary to Grand Point, 0.5 miles east of Hoyleton. (SN 095-2496) — Executed Nov 26 New Guinzy Construction,Inc. $490,747 ·
Nov 17, 2023 76N16 MadisonDistrict 8 Bridge repairs, flood wall work and pavement reconstruction on IL 11 over Cahokia Diversion Channel (SN 060-0121), 3 miles north of I-270. — Executed Nov 26 New The Kilian Corporation $1,832,257 ·
Nov 17, 2023 76N43 MadisonDistrict 8 Intersection reconstruction and ADA upgrades on IL 3 at 20th Street in Granite City. — Executed Nov 26 New Baxmeyer Construction, Inc. $7,285,268 ·
Nov 17, 2023 76T01 VariousDistrict 8 Traffic signal modernization at various locations within District 8. — Executed Nov 26 New Gerstner Electric, Inc. $1,564,128 ·
Nov 17, 2023 76T39 St. ClairDistrict 8 1.96 miles of patching and a standard overlay on I-55/64/US 40 from 0.9 miles east of the Mississippi River to I-64 (Tri-Level) Interchange in East St. Louis — Executed Nov 26 New The Kilian Corporation $5,220,980 ·
Nov 17, 2023 78199 PerryDistrict 9 Replacement of a bridge with a double reinforced concrete box culvert on US 51 north of Tamaroa. (SN 073-0002) — Executed Nov 26 New E. T. Simonds Construction Company $924,177 ·
Nov 17, 2023 78771 SalineDistrict 9 Intersection reconstruction at the intersection of US 45 and Poplar (Old IL 13) in Harrisburg. — Executed Nov 26 New E. T. Simonds Construction Company $1,369,045 ·
Nov 17, 2023 78809 GallatinDistrict 9 Slope stabilization at SN 030-0021 carrying IL 1 over the Saline River, 2.5 miles south of IL 13, southeast of Equality. — Executed Nov 26 New E. T. Simonds Construction Company $399,347 ·
Nov 17, 2023 78929 JacksonDistrict 9 0.75 miles of resurfacing on North 6th Street in Murphysboro. — Executed Nov 26 New Samron Midwest Contracting, Inc. $339,339 ·
Nov 17, 2023 78A02 AlexanderJacksonUnionDistrict 9 25.4 miles of patching, milling, resurfacing and shoulders on IL 3 from Howardton Road, near Grand Tower, to the Cape T intersection. — Executed Nov 26 New E. T. Simonds Construction Company $11,663,246 ·
Nov 17, 2023 85727 WinnebagoDistrict 2 Sidewalk construction along Parkview Avenue from Spring Creek Road to Birchwood Drive in Rockford. — Executed Nov 26 New N-Trak Group LLC $489,794 ·
Nov 17, 2023 89815 PeoriaDistrict 4 Structure rehabilitation with replacement of approach slabs, bridge deck, parapets, beams, expansion joints, bearings, concrete slope walls. Also included will be PCC pavement with curb and gutter, and storm sewers on Maxwell Road over the Union Pacific Railroad, 0.2 miles south of IL 116. — Executed Nov 26 New Stark Excavating, Inc. $4,569,990 ·
Nov 17, 2023 89824 TazewellDistrict 4 Resurfacing Fischer Road from IL 29 to Creve Coeur Avenue in Creve Coeur. — Executed Nov 26 New R. A. Cullinan and Son, a div of UCM, Inc. $408,195 ·
Nov 17, 2023 93775 MenardDistrict 6 Widening and HMA resurfacing with aggregate shoulders and pipe culverts on Athens Blacktop from Cantrall Road to Kent Street. — Executed Nov 26 New K. E. Vas Company $3,709,353 ·
Nov 17, 2023 93812 SangamonDistrict 6 HMA resurfacing with pavement markings on Cardinal Hill Road from New City Road to north of IL 104. — Executed Nov 26 New P. H. Broughton & Sons, Inc. $1,082,697 ·
Nov 17, 2023 95941 MoultrieDistrict 7 Sidewalk Construction on various routes within the City of Sullivan. — Executed Nov 26 New A & R Mechanical Service, Inc. $288,741 ·
Nov 17, 2023 97790 MadisonDistrict 8 Reconstruction of Lebanon Road on new alignment to facilitate closure of two underpass structures. Work includes structure removal, construction of a 6-span steel plate girder bridge, construction of a 1-span PC slabl bridge, box culverts, pavement removal, building removal, processing lime modified soil, PPC Pavement, HMA Pavement, HMA shoulders, combination curb and gutter, and storm sewer. Located 0.19 miles east of Clay School Road to 0.16 miles of Locmann Road over the CSX Railroad. — Executed Nov 26 New Keller Construction, Inc. $17,444,384 ·
Nov 17, 2023 97793 MadisonDistrict 8 Reconstruction of the IL 159 and Glen Carbon Road intersection to establish north bound and east bound right turn lanes. Includes, HMA resurfacing, sidewalks, ADA ramps, traffic signal modifications, and drainage improvements. Located in Glen Carbon. — Rejected Nov 25 New Keller Construction, Inc. $1,439,471 ·
Nov 17, 2023 97815 St. ClairDistrict 8 Resurfacing Jerome Lane from Nash Street to Range Lane in Cahokia. — Executed Nov 26 New Christ Bros. Asphalt, Inc. $897,940 ·
Nov 17, 2023 97817 St. ClairDistrict 8 Construction of a PCC sidewalk from the Boul Avenue Trailhead entrance to the intersection of Boul Avenue and IL 159 in Swansea. — Rejected Nov 26 New
Nov 17, 2023 97822 MadisonDistrict 8 Resurfacing West Airline Drive from Main Street to 9th Street in East Alton. — Executed Nov 26 New Charles E. Mahoney Co. $858,985 ·
Nov 17, 2023 99673 WilliamsonDistrict 9 Resurfacing East Grand Avenue from Hurricane Road to IL 148. — Executed Nov 26 New Samron Midwest Contracting, Inc. $402,402 ·
Nov 17, 2023 99711 JacksonDistrict 9 Resurfacing North Marion Street from East Fischer Street to Dillinger Road. — Executed Nov 26 New E. T. Simonds Construction Company $658,507 ·
Nov 17, 2023 99713 JacksonDistrict 9 Replace existing structure with a precast concrete box culvert with pre-cast box culvert end sections, PCC pavement, sidewalk, curb and gutter, on East College Street over Piles Fork Creek in Carbondale. — Executed Nov 26 New E. T. Simonds Construction Company $553,288 ·
Nov 17, 2023 99716 WilliamsonDistrict 9 Remove and replace sidewalks, ADA ramps and crosswalks along North 18 Street from East Herrin Street to West Monroe Street in Herrin. — Executed Nov 26 New E. T. Simonds Construction Company $290,697 ·
Nov 17, 2023 99720 WilliamsonDistrict 9 HMA resurfacing on Lake of Egypt Road from IL 37 to South Market Road, and on Power Plant Road from Lake of Egypt Road to County Club Road. Includes HMA and aggregate shoulders, guardrail adjustments and replacements, and raised pavement markers. — Executed Nov 26 New Samron Midwest Contracting, Inc. $1,664,664 ·
801–861 of 861‹ Prev

Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.