| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Nov 17, 2023 | 64S40 | WhitesideDistrict 2 | Bridge deck overlay, joint replacement, and miscellaneous repairs on SN 098-0091, carrying US 30 over I-88, 3 miles east of Rock Falls. | — | Executed | Martin & Company Excavating $1,248,487 · | ||
| Nov 17, 2023 | 64S43 | Rock IslandDistrict 2 | Bridge washing of SN 081-0011 over the Mississippi River in Rock Island County. | — | Executed | Interstate Maintenance, Incorporated $149,550 · | ||
| Nov 17, 2023 | 64S44 | Rock IslandDistrict 2 | Bridge washing of SN 081-0106 over the Mississippi River in Rock Island County. | — | Executed | Interstate Maintenance, Incorporated $59,340 · | ||
| Nov 17, 2023 | 64S45 | VariousDistrict 2 | Bridge washing of SN 008-0052, 098-6003 and 081-9905 over the Mississippi River in various counties. | — | Executed | Interstate Maintenance, Incorporated $123,440 · | ||
| Nov 17, 2023 | 66N39 | VariousDistrict 3 | This project consists on performing Bridge Deck Concrete Sealing with the parapets/curbs on various routes at various locations throughout Ford, Iroquois, and Kankakee Counties. | — | Executed | All States Painting, Inc. $196,144 · | ||
| Nov 17, 2023 | 66N83 | VariousDistrict 3 | Tree Removal located within Bureau, DeKalb, Ford, Grundy, La Salle, and Livings on counties. | — | Executed | Clean Cut Tree Service, Inc. $210,216 · | ||
| Nov 17, 2023 | 66N99 | VariousDistrict 3 | Repairing and maintaining traffic signals, flashing beacons, and roadway lighting in Ford, Iroquois, and Livin This project consists of repairing and maintaining traffic signals, flashing beacons, and roadway lighting in Ford, Iroquois, and Livingston Counties. | — | Executed | Leo P. Kelly Electric, Incorporated $350,818 · | ||
| Nov 17, 2023 | 68C00 | TazewellDistrict 4 | 3R project has a length of 0.58 miles extending from the east end of the Cedar St Bridge over the Illinois River to just east of Center St, including the Edmund St interchange. Work includes pavement patching, milling, resurfacing, and bridge rehabilitation. | — | Executed | ICC Group Inc. $14,978,000 · | ||
| Nov 17, 2023 | 68D36 | McDonoughDistrict 4 | Stream stabilization with riprap placement at various locations along Spring Creek, northwest of Macomb bypass. | — | Executed | Laverdiere Construction, Inc. $355,897 · | ||
| Nov 17, 2023 | 68G39 | MarshallDistrict 4 | Bridge repair and bridge deck overlay to S.N. 062-0056 over Thenius Creek 1/4 mi. N. of Sparland; S.N. 062-0057 over Gimlet Creek at the IL 29/IL 17 junction and S.N. 062-0059 over Senachwine Creek, 4 mi. W. of Sparland. | — | Executed | Stark Excavating, Inc. $2,030,255 · | ||
| Nov 17, 2023 | 68H77 | VariousDistrict 4 | District-wide replacement of pedestrian pushbuttons with APS push buttons. | — | Executed | Laser Electric, Inc. $1,741,480 · | ||
| Nov 17, 2023 | 68H79 | VariousDistrict 4 | Bridge painting: S.N. 072-0106 SB IL 6, S.N. 072-0107 NB I-474 Ramp 109, S.N. 072-0108 SB I-474 Ramp, 072-0109 NB I-474 Ramp 109, S.N. 048-0078 W. Knox Rd., S.N. 094-0028 Cameron Rd., S.N. 055-0021 CH 8, S.N. 048-0080 IL 180, S.N. 090-0043 US 150, S.N. 072-0228 US 24/IL 9. | — | Executed | Eagle Painting & Maintenance Company, Inc. $1,961,212 · | ||
| Nov 17, 2023 | 70G12 | McLeanDistrict 5 | Bridge painting of 3 structures on FAI 55 (I-55) and FAP 704 (I-55 Busn). | — | Executed | Eagle Painting & Maintenance Company, Inc. $1,273,331 · | ||
| Nov 17, 2023 | 72717 | BrownPikeDistrict 6 | Spray-applied pipe liner on IL 107 in Brown and Pike Counties. | — | Executed | Hoerr Construction, Inc. $567,640 · | ||
| Nov 17, 2023 | 72719 | SangamonDistrict 6 | Lot improvements to the Riverton Maintenance Yard. | — | Executed | Illinois Valley Paving, a div of UCM, Inc. $160,583 · | ||
| Nov 17, 2023 | 72807 | MontgomeryDistrict 6 | Tree removal at the Coalfield Rest Area. | — | Executed | Clean Cut Tree Service, Inc. $97,200 · | ||
| Nov 17, 2023 | 72F14 | SchuylerDistrict 6 | 7.3 miles of milling, resurfacing, bridge overlay (SN 085-0004), slope stabilization and guardrail replacement on IL 103 from 0.1 miles east of US 24 to 1.7 miles west of US 67. | — | Executed | Illinois Valley Paving, a div of UCM, Inc. $11,920,700 · | ||
| Nov 17, 2023 | 72F26 | AdamsDistrict 6 | Culvert replacement on IL 96 over a ditch, 1 mile north of Kochs Lane, north of Qunicy. | — | Executed | Laverdiere Construction, Inc. $1,932,532 · | ||
| Nov 17, 2023 | 72F59 | CassDistrict 6 | Culvert replacement (SN 009-7002) carrying IL 125 over a ditch 0.6 miles east of Warrior Hill Road. | — | Executed | Otto Baum Company, Inc. $1,524,200 · | ||
| Nov 17, 2023 | 72H57 | HancockDistrict 6 | Hydro-scarification, microsilica concrete overlay, expansion joint replacement and steel repairs on SN 034-0062 carrying US 136 over the Mississippi River from Hamilton, IL to Keokuk, IA. | — | Executed | Freesen, a div of UCM, Inc. $8,876,670 · | ||
| Nov 17, 2023 | 72K83 | SangamonDistrict 6 | Culvert replacement on IL 104 at Little Panther Creek, 1.9 miles west of IL 4 (SN 084-7061). | — | Executed | Kinney Contractors, Inc. $952,366 · | ||
| Nov 17, 2023 | 72K96 | MorganDistrict 6 | 5.2 miles of resurfacing on IL 78 from the Cass County line to just north of Snake Creek. | — | Executed | K. E. Vas Company $5,770,272 · | ||
| Nov 17, 2023 | 72M34 | MorganDistrict 6 | Painting portions of 7 bridges near Jacksonville. | — | Executed | Eagle Painting & Maintenance Company, Inc. $1,103,400 · | ||
| Nov 17, 2023 | 72M71 | BrownDistrict 6 | 4.8 miles of milling, patching, resurfacing and shoulders on US 24 from 0.5 miles east of Timewell Road to 0.3 miles west of Buckhorn / Damon Road in Mount Sterling. | — | Executed | Diamond Construction Company $4,650,700 · | ||
| Nov 17, 2023 | 74471 | FayetteDistrict 7 | 3.4 miles of resurfacing on US 40 from 0.5 miles west of the I-70 interchange to IL 185 in Vandalia, resurfacing the I-70 / US 40 ramps at the Vandalia Vandalia interchange and joint repairs and overlay to SN 026-0087. | — | Executed | Howell Paving, Inc. $5,506,589 · | ||
| Nov 17, 2023 | 74B29 | MaconDistrict 7 | Bridge deck overlay, joint replacement / repair and other bridge deck repairs on 3 structures: 1) SN 058-0060 carrying TR 4 (South Acom Road) over I-72; 2) SN 058-0062 carrying CH 27 (Lincoln Memorial Parkway) over I-72; 3) SN 058-0065 carrying Twin Lakes Road over I-72 just west of Decatur. | — | Executed | Freesen, a div of UCM, Inc. $1,224,997 · | ||
| Nov 17, 2023 | 74B30 | MaconDistrict 7 | Bridge deck overlay, joint repair and approach pavement on I-72 over Spring Creek, 1.3 miles east of Forsyth. | — | Executed | Freesen, a div of UCM, Inc. $1,953,030 · | ||
| Nov 17, 2023 | 74B31 | FayetteDistrict 7 | Bridge repairs on SN 026-0071 carrying IL 185 over I-57 in Farina. | — | Executed | Samron Midwest Contracting, Inc. $1,077,997 · | ||
| Nov 17, 2023 | 74B33 | MaconDistrict 7 | Bridge deck repair and overlay on SN 058-0129 carrying IL 121 over South Fork Creek, 0.7 miles east of the Logan County line. | — | Executed | Freesen, a div of UCM, Inc. $498,028 · | ||
| Nov 17, 2023 | 74B34 | EffinghamDistrict 7 | Bridge deck overlay, bridge joint replacement, deck drain replacement, bridge deck patching on SN 025-0089 carrying IL 37 over the Little Wabash River, 0.5 miles south of I-57. | — | Executed | Sangamo Construction Company $761,969 · | ||
| Nov 17, 2023 | 74B35 | ClarkDistrict 7 | Bridge deck overlay and joint replacement and repairs on SN 012-0025 carrying US 40 over I-70. | — | Executed | Sangamo Construction Company $1,282,944 · | ||
| Nov 17, 2023 | 74B37 | WabashDistrict 7 | Washing the bridge deck on SN 093-0021 carrying IL 15 over the Wabash River in Mt. Carmel. | — | Executed | |||
| Nov 17, 2023 | 74B39 | MaconDistrict 7 | Bridge deck overlay, joint replacement, deck patching, structural concrete repair, crashwall extensions and HMA approaches on SN 058-0087 carrying Kirby Road over I-72, northeast of Decatur. | — | Executed | Freesen, a div of UCM, Inc. $638,193 · | ||
| Nov 17, 2023 | 74C65 | CumberlandDistrict 7 | Bridge joint replacement / repair, bridge deck repairs and bridge deck overlay on SN 018-0003 and 018-0004 carrying I-57 over US 45 and SN 018-0001 and 018-0002 carrying I-57 over the Decatur and Eastern Illinois Railroad, all located northeast of Neoga. | — | Executed | Path Construction Company, Inc. $1,994,773 · | ||
| Nov 17, 2023 | 76M88 | WashingtonDistrict 8 | Culvert replacement on IL 127 at South Middle Tributary of Locust Creek, 6.7 miles south of IL 15 and the town of Nashville. (SN 095-2496) | — | Executed | E. T. Simonds Construction Company $747,934 · | ||
| Nov 17, 2023 | 76M90 | WashingtonDistrict 8 | Culvert replacement on IL 177 at West Tributary to Grand Point, 0.5 miles east of Hoyleton. (SN 095-2496) | — | Executed | Guinzy Construction,Inc. $490,747 · | ||
| Nov 17, 2023 | 76N16 | MadisonDistrict 8 | Bridge repairs, flood wall work and pavement reconstruction on IL 11 over Cahokia Diversion Channel (SN 060-0121), 3 miles north of I-270. | — | Executed | The Kilian Corporation $1,832,257 · | ||
| Nov 17, 2023 | 76N43 | MadisonDistrict 8 | Intersection reconstruction and ADA upgrades on IL 3 at 20th Street in Granite City. | — | Executed | Baxmeyer Construction, Inc. $7,285,268 · | ||
| Nov 17, 2023 | 76T01 | VariousDistrict 8 | Traffic signal modernization at various locations within District 8. | — | Executed | Gerstner Electric, Inc. $1,564,128 · | ||
| Nov 17, 2023 | 76T39 | St. ClairDistrict 8 | 1.96 miles of patching and a standard overlay on I-55/64/US 40 from 0.9 miles east of the Mississippi River to I-64 (Tri-Level) Interchange in East St. Louis | — | Executed | The Kilian Corporation $5,220,980 · | ||
| Nov 17, 2023 | 78199 | PerryDistrict 9 | Replacement of a bridge with a double reinforced concrete box culvert on US 51 north of Tamaroa. (SN 073-0002) | — | Executed | E. T. Simonds Construction Company $924,177 · | ||
| Nov 17, 2023 | 78771 | SalineDistrict 9 | Intersection reconstruction at the intersection of US 45 and Poplar (Old IL 13) in Harrisburg. | — | Executed | E. T. Simonds Construction Company $1,369,045 · | ||
| Nov 17, 2023 | 78809 | GallatinDistrict 9 | Slope stabilization at SN 030-0021 carrying IL 1 over the Saline River, 2.5 miles south of IL 13, southeast of Equality. | — | Executed | E. T. Simonds Construction Company $399,347 · | ||
| Nov 17, 2023 | 78929 | JacksonDistrict 9 | 0.75 miles of resurfacing on North 6th Street in Murphysboro. | — | Executed | Samron Midwest Contracting, Inc. $339,339 · | ||
| Nov 17, 2023 | 78A02 | AlexanderJacksonUnionDistrict 9 | 25.4 miles of patching, milling, resurfacing and shoulders on IL 3 from Howardton Road, near Grand Tower, to the Cape T intersection. | — | Executed | E. T. Simonds Construction Company $11,663,246 · | ||
| Nov 17, 2023 | 85727 | WinnebagoDistrict 2 | Sidewalk construction along Parkview Avenue from Spring Creek Road to Birchwood Drive in Rockford. | — | Executed | N-Trak Group LLC $489,794 · | ||
| Nov 17, 2023 | 89815 | PeoriaDistrict 4 | Structure rehabilitation with replacement of approach slabs, bridge deck, parapets, beams, expansion joints, bearings, concrete slope walls. Also included will be PCC pavement with curb and gutter, and storm sewers on Maxwell Road over the Union Pacific Railroad, 0.2 miles south of IL 116. | — | Executed | Stark Excavating, Inc. $4,569,990 · | ||
| Nov 17, 2023 | 89824 | TazewellDistrict 4 | Resurfacing Fischer Road from IL 29 to Creve Coeur Avenue in Creve Coeur. | — | Executed | R. A. Cullinan and Son, a div of UCM, Inc. $408,195 · | ||
| Nov 17, 2023 | 93775 | MenardDistrict 6 | Widening and HMA resurfacing with aggregate shoulders and pipe culverts on Athens Blacktop from Cantrall Road to Kent Street. | — | Executed | K. E. Vas Company $3,709,353 · | ||
| Nov 17, 2023 | 93812 | SangamonDistrict 6 | HMA resurfacing with pavement markings on Cardinal Hill Road from New City Road to north of IL 104. | — | Executed | P. H. Broughton & Sons, Inc. $1,082,697 · | ||
| Nov 17, 2023 | 95941 | MoultrieDistrict 7 | Sidewalk Construction on various routes within the City of Sullivan. | — | Executed | A & R Mechanical Service, Inc. $288,741 · | ||
| Nov 17, 2023 | 97790 | MadisonDistrict 8 | Reconstruction of Lebanon Road on new alignment to facilitate closure of two underpass structures. Work includes structure removal, construction of a 6-span steel plate girder bridge, construction of a 1-span PC slabl bridge, box culverts, pavement removal, building removal, processing lime modified soil, PPC Pavement, HMA Pavement, HMA shoulders, combination curb and gutter, and storm sewer. Located 0.19 miles east of Clay School Road to 0.16 miles of Locmann Road over the CSX Railroad. | — | Executed | Keller Construction, Inc. $17,444,384 · | ||
| Nov 17, 2023 | 97793 | MadisonDistrict 8 | Reconstruction of the IL 159 and Glen Carbon Road intersection to establish north bound and east bound right turn lanes. Includes, HMA resurfacing, sidewalks, ADA ramps, traffic signal modifications, and drainage improvements. Located in Glen Carbon. | — | Rejected | Keller Construction, Inc. $1,439,471 · | ||
| Nov 17, 2023 | 97815 | St. ClairDistrict 8 | Resurfacing Jerome Lane from Nash Street to Range Lane in Cahokia. | — | Executed | Christ Bros. Asphalt, Inc. $897,940 · | ||
| Nov 17, 2023 | 97817 | St. ClairDistrict 8 | Construction of a PCC sidewalk from the Boul Avenue Trailhead entrance to the intersection of Boul Avenue and IL 159 in Swansea. | — | Rejected | |||
| Nov 17, 2023 | 97822 | MadisonDistrict 8 | Resurfacing West Airline Drive from Main Street to 9th Street in East Alton. | — | Executed | Charles E. Mahoney Co. $858,985 · | ||
| Nov 17, 2023 | 99673 | WilliamsonDistrict 9 | Resurfacing East Grand Avenue from Hurricane Road to IL 148. | — | Executed | Samron Midwest Contracting, Inc. $402,402 · | ||
| Nov 17, 2023 | 99711 | JacksonDistrict 9 | Resurfacing North Marion Street from East Fischer Street to Dillinger Road. | — | Executed | E. T. Simonds Construction Company $658,507 · | ||
| Nov 17, 2023 | 99713 | JacksonDistrict 9 | Replace existing structure with a precast concrete box culvert with pre-cast box culvert end sections, PCC pavement, sidewalk, curb and gutter, on East College Street over Piles Fork Creek in Carbondale. | — | Executed | E. T. Simonds Construction Company $553,288 · | ||
| Nov 17, 2023 | 99716 | WilliamsonDistrict 9 | Remove and replace sidewalks, ADA ramps and crosswalks along North 18 Street from East Herrin Street to West Monroe Street in Herrin. | — | Executed | E. T. Simonds Construction Company $290,697 · | ||
| Nov 17, 2023 | 99720 | WilliamsonDistrict 9 | HMA resurfacing on Lake of Egypt Road from IL 37 to South Market Road, and on Power Plant Road from Lake of Egypt Road to County Club Road. Includes HMA and aggregate shoulders, guardrail adjustments and replacements, and raised pavement markers. | — | Executed | Samron Midwest Contracting, Inc. $1,664,664 · |
801–861 of 861‹ Prev
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.