BRIDGE AND APPROACHES SH -30: OVER SALT FORK OF RED RIVER , 3.9 MILES SOUTH OF SH-9 NEAR HOLLIS. PROJECT LENGTH = 0.931 MILE

Let date
Thursday, November 16, 2017
Contract
170260
J/P numbers
28768(04)
District
Division 5
County
Harmon
Highway
Limits
BRIDGE AND APPROACHES SH -30: OVER SALT FORK OF RED RIVER , 3.9 MILES SOUTH OF SH-9 NEAR HOLLIS. PROJECT LENGTH = 0.931 MILE
Project number
SSP-229C(010)SS

Bidders 6

#ContractorTotal bidvs estimatevs low
EEEngineer's estimate$7,837,553
1 SEWELL BROS., INC. Low bidder $7,279,068 -7.1%
2 OVERLAND CORPORATION $7,884,386 +0.6% +8.3%
3 L & N BRIDGE, LLC $8,054,427 +2.8% +10.7%
4 FRONTIER BRIDGE, INC. / BRIDGECO CONTRACTORS, INC. $8,117,605 +3.6% +11.5%
5 K & R BUILDERS, INC. $8,592,330 +9.6% +18.0%
6 EARTH BUILDERS, L.P. $8,768,819 +11.9% +20.5%

Bid tab: unit prices 99 items

ExcelCSV
SeqBid codeDescriptionQtyUnitEstimate #1 SEWELL BROS., I…#2 OVERLAND CORPOR…#3 L & N BRIDGE, L…#4 FRONTIER BRIDGE…#5 K & R BUILDERS,…#6 EARTH BUILDERS,…
1201(A) 0102 CLEARING AND GRUBBING1LSUM $30,000.00 $20,000.00 $100,000.00 $59,750.00 $56,160.00 $46,750.00 $200,000.00
2202(A) 0183 UNCLASSIFIED EXCAVATION58,631CY $6.00 $5.00 $6.35 $5.81 $6.48 $6.70 $7.00
3202(D) 0184 UNCLASSIFIED BORROW37,242CY $8.00 $6.00 $7.40 $7.08 $7.56 $12.75 $10.00
4205(A) 4229 TYPE A-SALVAGED TOPSOIL1LSUM $25,000.00 $35,000.00 $55,000.00 $71,745.51 $54,000.00 $66,000.00 $60,000.00
5221(C) 2801 TEMPORARY SILT FENCE4,025LF $1.50 $1.35 $1.30 $1.14 $1.23 $1.37 $1.50
6221(F) 0100 TEMPORARY SILT DIKE924LF $7.50 $8.35 $8.00 $7.88 $8.51 $8.36 $9.00
7230(A) 2806 SOLID SLAB SODDING119,169SY $1.30 $1.50 $1.45 $1.49 $1.61 $1.50 $1.80
8233(A) 2817 VEGETATIVE MULCHING19AC $300.00 $250.00 $140.00 $150.00 $162.00 $200.00 $180.00
9241 2832 MOWING50AC $50.00 $66.00 $63.60 $55.00 $59.40 $60.00 $60.00
10310(B) 0149 SUBGRADE, METHOD B35,874SY $1.50 $1.25 $1.05 $1.42 $1.08 $3.50 $2.00
11402(E) 0225 TRAFFIC BOUND SURFACE COURSE TYPE E339TON $35.00 $36.00 $45.20 $35.00 $30.54 $38.00 $38.00
12407(B) 0250 TACK COAT7,819GAL $4.00 $5.00 $3.25 $4.59 $4.27 $5.06 $5.00
13408 5774 PRIME COAT12,987GAL $5.00 $8.00 $5.65 $7.27 $5.51 $8.00 $8.00
14411(B) 5945 SUPERPAVE, TYPE S3(PG 64-22 OK)10,703TON $72.00 $85.00 $71.00 $80.06 $100.44 $90.07 $90.00
15411(C) 5960 SUPERPAVE, TYPE S4(PG 64-22 OK)3,794TON $80.00 $93.00 $82.00 $85.44 $106.92 $96.12 $70.00
16413(B) 4863 RUMBLE STRIP-METHOD HMA-CYC7,718LF $0.5000 $2.00 $0.6000 $0.6500 $1.19 $1.00 $0.5000
17509(D) 0325 CLASS C CONCRETE15CY $300.00 $300.00 $450.00 $400.00 $334.20 $335.00 $400.00
18601(B) 0536 TYPE I-A PLAIN RIPRAP25TON $60.00 $46.00 $65.00 $60.00 $51.03 $75.00 $65.00
19601(C) 0538 TYPE I-A FILTER BLANKET8TON $50.00 $36.00 $73.00 $40.00 $38.42 $75.00 $40.00
20613(A) 0492 24" R.C.PIPE CLASS III90LF $95.00 $60.00 $58.30 $54.57 $59.40 $74.00 $90.00
21613(A) 0493 30" R.C.PIPE CLASS III176LF $90.00 $84.00 $81.60 $79.94 $83.16 $91.00 $140.00
22613(B) 0689 18" CORR. GALV. STEEL PIPE262LF $30.00 $25.00 $20.20 $91.18 $20.52 $23.00 $50.00
23613(B) 0690 24" CORR. GALV. STEEL PIPE172LF $40.00 $30.00 $26.50 $37.21 $27.00 $29.00 $55.00
24613(B) 0691 30" CORR. GALV. STEEL PIPE24LF $55.00 $50.00 $32.90 $43.21 $33.48 $42.00 $70.00
25613(H) 0450 6" PERFORATED PIPE UNDERDRAIN ROUND375LF $20.00 $15.00 $42.00 $8.00 $20.85 $34.00 $20.00
26613(I) 1096 6" NON-PERF.PIPE UNDERDRAIN RND.125LF $20.00 $15.00 $32.00 $7.00 $20.69 $36.00 $20.00
27613(L) 5732 30" PREFAB. CULVERT END SECTION, ROUND2EA $1,200.00 $1,300.00 $1,880.00 $1,414.80 $1,917.00 $1,600.00 $4,000.00
28613(M) 7197 TYPE B6 CULVERT END TREATMENT2EA $1,600.00 $1,200.00 $3,200.00 $1,400.00 $1,596.52 $2,000.00 $1,000.00
29613(M) 7198 TYPE C6 CULVERT END TREATMENT4EA $1,900.00 $1,200.00 $3,300.00 $1,700.00 $1,941.31 $2,600.00 $1,500.00
30619(A) 0920 REMOVAL OF STRUCTURES & OBSTRUCTIONS1LSUM $15,000.00 $10,000.00 $4,250.00 $38,055.00 $4,320.00 $15,250.00 $80,000.00
31619(B) 4727 REMOVAL OF CONCRETE PAVEMENT6SY $5.00 $100.00 $106.00 $10.00 $108.00 $110.00 $20.00
32619(B) 4728 REMOVAL OF ASPHALT PAVEMENT26,249SY $4.00 $5.25 $3.00 $3.00 $3.89 $6.00 $7.00
33619(B) 4780 REMOVAL OF GUARDRAIL526LF $4.00 $5.00 $5.00 $4.80 $4.32 $4.70 $5.00
34619(C) 0924 SAWING PAVEMENT5,811LF $4.00 $5.00 $4.25 $3.00 $4.32 $4.50 $6.00
35623(A) 0932 BEAM GUARDRAIL W-BEAM SINGLE850LF $20.00 $17.35 $17.90 $16.90 $17.01 $16.50 $19.00
36623(G) 8590 GUARDRAIL END TREATMENT (31")4EA $2,200.00 $1,975.00 $2,500.00 $2,350.00 $1,938.60 $2,000.00 $2,500.00
37623(I) 8700 GUARDRAIL BRIDGE CONN-THRIE BEAM (31")4EA $2,000.00 $1,400.00 $2,300.00 $2,150.00 $1,377.00 $1,415.00 $2,500.00
38624(C) 4459 FENCE-STYLE SWF (5 BARBED WIRE)5,197LF $5.00 $4.35 $4.20 $3.95 $5.35 $4.40 $5.00
39853 9033 DELINEATORS(TYPE 2, CODE 1)28EA $15.00 $20.00 $13.00 $12.36 $14.04 $14.00 $30.00
40501(B) 1307 SUBSTRUCTURE EXCAVATION COMMON202CY $15.00 $10.00 $21.00 $15.00 $12.60 $29.50 $25.00
41501(G) 6309 CLSM BACKFILL188CY $180.00 $140.00 $190.00 $135.00 $119.18 $153.00 $150.00
42503(A) 1313 PRESTRESSED CONCRETE BEAMS (TYPE IV)4,983.3LF $200.00 $195.00 $245.00 $261.50 $221.14 $212.22 $250.00
43504(A) 1304 APPROACH SLAB281.2SY $210.00 $200.00 $187.00 $150.00 $176.87 $192.00 $150.00
44504(B) 1305 SAW-CUT GROOVING4,718.6SY $5.00 $3.50 $2.00 $3.40 $4.01 $3.74 $2.50
45504(C) 6250 SEALED EXPANSION JOINT172.8LF $330.00 $255.00 $200.00 $175.00 $278.74 $285.00 $180.00
46504(D) 6245 CONCRETE RAIL (TR4)2,139.4LF $90.00 $75.00 $80.00 $85.00 $66.73 $88.00 $100.00
47506(A) 1322 STRUCTURAL STEEL4,500LB $2.50 $1.60 $1.00 $1.40 $2.48 $2.60 $3.00
48507(A) 6170 STAINLESS STEEL FIXED BEARING ASSEMBLY40EA $2,500.00 $1,150.00 $1,600.00 $2,000.00 $1,627.50 $1,550.00 $1,500.00
49507(B) 6174 STAINLESS STEEL EXPANSION BEARING ASSEMBLY60EA $2,500.00 $1,150.00 $1,600.00 $2,000.00 $1,601.25 $1,550.00 $1,500.00
50509(A) 1326 CLASS AA CONCRETE1,144.9CY $600.00 $450.00 $680.00 $750.00 $497.28 $577.50 $450.00
51509(B) 1328 CLASS A CONCRETE607.8CY $600.00 $500.00 $650.00 $738.80 $527.49 $602.00 $480.00
52509(D) 1331 CLASS C CONCRETE23.1CY $300.00 $350.00 $430.00 $600.00 $341.25 $600.00 $400.00
53511(A) 1332 REINFORCING STEEL4,970LB $0.9000 $1.00 $1.30 $1.20 $1.00 $1.50 $0.8000
54511(B) 6010 EPOXY COATED REINFORCING STEEL423,390LB $1.10 $0.9500 $1.00 $1.00 $1.07 $0.9900 $1.10
55513(B) 6019 CLASS B BRIDGE DECK REPAIR75SY $400.00 $400.00 $500.00 $200.00 $387.71 $410.00 $50.00
56513(C) 6020 CLASS C BRIDGE DECK REPAIR25SY $750.00 $550.00 $550.00 $500.00 $462.42 $500.00 $50.00
57514(A) 6010 PILES, FURNISHED (HP 10X42)274LF $35.00 $30.00 $30.00 $23.00 $28.81 $28.00 $25.00
58514(A) 6011 PILES, FURNISHED (HP 12X53)907LF $45.00 $30.00 $35.00 $28.00 $27.99 $35.00 $35.00
59514(B) 6292 PILES, DRIVEN (HP 10X42)274LF $15.00 $15.00 $16.00 $9.00 $12.60 $12.00 $20.00
60514(B) 6294 PILES, DRIVEN (HP 12X53)907LF $15.00 $15.00 $21.00 $12.00 $12.60 $15.00 $20.00
61514(K) 6260 (PL)PILOT HOLES196LF $120.00 $150.00 $115.00 $130.00 $193.76 $140.00 $120.00
62514(L) 6220 PILE SPLICE, H-PILE (NON-BIDDABLE)1EA $400.00 $400.00 $400.00 $400.00 $400.00 $400.00 $400.00
63515(A) 6013 WATER REPELLENT (VISUALLY INSPECTED)4,588SY $4.00 $3.30 $3.00 $3.20 $3.31 $3.52 $5.00
64516(A) 6098 DRILLED SHAFTS 72" DIAMETER878LF $1,000.00 $850.00 $965.00 $975.00 $1,000.49 $995.00 $800.00
65516(C) 6200 CROSSHOLE SONIC LOGGING4EA $5,000.00 $2,000.00 $6,700.00 $2,000.00 $2,572.50 $2,700.00 $3,000.00
66523(A) 6550 SEALER CRACK PREPARATION204LF $5.00 $4.40 $6.00 $4.00 $4.45 $4.40 $5.00
67523(B) 6560 SEALER RESIN3GAL $150.00 $160.00 $150.00 $150.00 $206.85 $165.00 $200.00
68601(B) 1353 TYPE I-A PLAIN RIPRAP3,590TON $50.00 $46.00 $50.00 $40.00 $48.04 $48.25 $65.00
69601(C) 1355 TYPE I-A FILTER BLANKET680TON $35.00 $36.00 $45.00 $25.00 $39.90 $38.00 $40.00
70613(H) 6204 6" PERFORATED PIPE UNDERDRAIN ROUND84LF $30.00 $25.00 $44.00 $25.00 $36.75 $38.00 $20.00
71613(I) 6207 6" NON-PERF.PIPE UNDERDRAIN RND.80LF $30.00 $25.00 $40.00 $19.00 $36.75 $40.00 $20.00
72619(D) 1397 REMOVAL OF EXISTING BRIDGE STRUCTURE1LSUM $200,000.00 $190,000.00 $120,000.00 $65,000.00 $199,500.00 $242,000.00 $570,000.00
73850(A) 8110 SHEET ALUMINUM SIGNS58.22SF $25.00 $22.00 $41.35 $39.00 $22.00 $22.00 $50.00
74851(C) 8324 2" SQUARE TUBE POST146LF $9.00 $11.00 $5.30 $5.00 $11.00 $11.00 $6.00
75855(A) 8812 TRAFFIC STRIPE(PLASTIC)(4" WIDE)11,535LF $0.8000 $1.12 $0.9500 $0.9000 $1.21 $1.21 $1.20
76855(A) 8825 TRAFFIC STRIPE(PLASTIC)(24" WIDE)63LF $9.00 $18.00 $10.60 $10.00 $18.70 $18.70 $12.00
77857(A) 8839 CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE)25,000LF $0.2000 $0.2700 $0.0100 $0.1900 $0.00 $0.2800 $0.2200
78857(C) 8851 REMOVABLE PAVEMENT MARKING TAPE(4" WIDE)56,150LF $0.3000 $0.7200 $0.0100 $1.00 $0.7400 $0.7700 $1.20
79857(E) 8887 (PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-111,230EA $0.5000 $0.5200 $0.0100 $0.4800 $0.5200 $0.5500 $0.6000
80857(F) 8006 PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE)15,000LF $0.3000 $0.2800 $0.6500 $0.6000 $0.2600 $0.2800 $0.8000
81871(B) 8705 (SP)CONST.ZONE IMPACT ATTEN.1,305SD $15.00 $5.05 $16.96 $16.00 $5.25 $5.50 $18.00
82871(C) 8709 (SP) RELOCATION OF IMPACT ATTENUATOR16EA $1,100.00 $525.00 $690.00 $650.00 $525.00 $550.00 $750.00
83877(B) 8484 DELIVER PORTABLE LONGITUDINAL BARRIER5,950LF $20.00 $26.00 $16.85 $15.90 $26.50 $34.00 $18.00
84877(C) 8486 RELOCATION OF PORTABLE LONGITUDINAL BARRIER11,625LF $5.00 $2.50 $0.5300 $0.5000 $2.10 $2.60 $0.6000
85880(B) 8818 CONSTRUCTION SIGNS 0 TO 6.25 SF4,370SD $0.5000 $1.10 $0.0200 $0.0200 $1.05 $1.10 $0.0300
86880(B) 8821 CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF5,040SD $1.00 $1.10 $0.0200 $0.0200 $1.05 $1.10 $0.0300
87880(B) 8824 CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF3,880SD $1.50 $2.55 $3.70 $3.50 $2.62 $2.75 $4.00
88880(C) 8842 CONSTRUCTION BARRICADES(TYPE III)2,610SD $0.4000 $1.05 $5.30 $5.00 $1.05 $1.10 $6.00
89880(C) 8848 WING BARRICADES1,280SD $0.6000 $1.05 $5.30 $5.00 $1.05 $1.10 $6.00
90880(E) 8860 WARNING LIGHTS(TYPE A)9,100SD $0.3000 $0.5200 $0.4200 $0.4000 $0.5200 $0.5500 $0.5000
91880(F) 8878 DRUMS2,275SD $0.3000 $1.05 $1.05 $1.00 $1.05 $1.10 $1.20
92880(G) 8890 CHANNELIZER CONES2,750SD $0.4000 $1.05 $0.0200 $0.0200 $1.05 $1.10 $0.0400
93880(I) 8902 FLAGGER50SD $110.00 $150.00 $293.18 $120.00 $315.00 $196.00 $200.00
94880(K) 8908 SURVEILLANCE TRAFFIC CONTROL320SD $300.00 $250.00 $50.00 $55.00 $315.00 $475.00 $100.00
95882(A) 8306 PORT.CHANGEABLE MESSAGE SIGN640SD $14.00 $12.00 $15.90 $15.00 $10.50 $11.00 $40.00
96642(B) 0096 CONSTRUCTION STAKING LEVEL II1LSUM $55,000.00 $38,000.00 $75,000.00 $20,000.00 $51,135.00 $50,000.00 $50,000.00
97220 2800 SWPPP DOCUMENTATION AND MANAGEMENT1LSUM $5,000.00 $4,000.00 $5,000.00 $4,000.00 $7,875.00 $10,000.00 $5,000.00
98640(A) 1426 FIELD OFFICE1EA $10,000.00 $7,000.00 $40,000.00 $10,800.00 $15,750.00 $12,500.00 $35,000.00
99641 1552 MOBILIZATION1LSUM $360,000.00 $375,000.00 $375,000.00 $385,000.00 $387,123.46 $348,000.00 $420,000.00