| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$20,000.00 |
$14,368.53 |
$15,000.00 |
$319,050.00 |
$50,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 39,935.4 | CY |
$7.00 |
$8.65 |
$6.00 |
$10.40 |
$12.00 |
| 3 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$7,500.00 |
$17,619.54 |
$6,500.00 |
$50,000.00 |
$60,000.00 |
| 4 | 221(C) 2801 |
TEMPORARY SILT FENCE | 5,308 | LF |
$1.25 |
$2.05 |
$1.30 |
$1.40 |
$1.69 |
| 5 | 221(D) 2803 |
TEMPORARY SEDIMENT FILTER | 7 | EA |
$200.00 |
$410.76 |
$150.00 |
$160.00 |
$186.38 |
| 6 | 221(F) 0100 |
TEMPORARY SILT DIKE | 72 | LF |
$7.00 |
$20.54 |
$6.50 |
$6.95 |
$16.51 |
| 7 | 221(G) 0150 |
TEMPORARY ROCK FILTER DAM TYPE 1 | 6.7 | CY |
$100.00 |
$128.36 |
$100.00 |
$85.00 |
$426.00 |
| 8 | 221(G) 0152 |
TEMPORARY ROCK FILTER DAM TYPE 3 | 29.7 | CY |
$100.00 |
$256.72 |
$100.00 |
$85.00 |
$426.00 |
| 9 | 229 4318 |
DITCH LINER PROTECTION | 20 | LF |
$3.00 |
$4.11 |
$1.80 |
$1.95 |
$26.63 |
| 10 | 230(A) 2806 |
SOLID SLAB SODDING | 25,800 | SY |
$1.25 |
$1.69 |
$2.30 |
$2.45 |
$4.26 |
| 11 | 231(E) 4625 |
(PL) LANDSCAPING | 1 | LSUM |
$10,000.00 |
$4,009.00 |
$2,500.00 |
$2,675.00 |
$5,325.00 |
| 12 | 233(A) 2817 |
VEGETATIVE MULCHING | 5.5 | AC |
$400.00 |
$821.52 |
$200.00 |
$214.00 |
$532.50 |
| 13 | 241 2832 |
MOWING | 11 | AC |
$80.00 |
$205.38 |
$100.00 |
$107.00 |
$133.13 |
| 14 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 21,414.3 | CY |
$50.00 |
$38.10 |
$40.00 |
$48.05 |
$54.93 |
| 15 | 307(K) 4300 |
STABILIZED SUBGRADE | 69,962.8 | SY |
$5.50 |
$4.28 |
$7.40 |
$9.30 |
$9.60 |
| 16 | 318 5112 |
ECONOCRETE BASE | 58,472.3 | SY |
$10.00 |
$11.00 |
$12.41 |
$14.80 |
$13.22 |
| 17 | 325 5271 |
SEPARATOR FABRIC | 64,849.6 | SY |
$1.25 |
$0.9200 |
$0.9500 |
$1.60 |
$2.16 |
| 18 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 500 | TON |
$35.00 |
$22.69 |
$25.00 |
$47.95 |
$39.32 |
| 19 | 407(B) 0250 |
TACK COAT | 969 | GAL |
$3.00 |
$1.54 |
$3.10 |
$0.0100 |
$3.30 |
| 20 | 408 5774 |
PRIME COAT | 10,619.1 | GAL |
$4.00 |
$2.57 |
$3.30 |
$0.0100 |
$3.51 |
| 21 | 411(B) 5940 |
SUPERPAVE, TYPE S3(PG 70-28 OK) | 798.9 | TON |
$85.00 |
$65.94 |
$70.00 |
$81.50 |
$74.55 |
| 22 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 2,476.8 | TON |
$80.00 |
$58.66 |
$65.00 |
$68.35 |
$69.23 |
| 23 | 411(C) 5955 |
SUPERPAVE, TYPE S4(PG 70-28 OK) | 532.6 | TON |
$95.00 |
$70.78 |
$90.00 |
$74.75 |
$95.85 |
| 24 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 572.7 | TON |
$90.00 |
$62.18 |
$80.00 |
$75.10 |
$85.20 |
| 25 | 414(B) 5725 |
DOWEL JOINTED P.C. CONCRETE PAVEMENT(PLACEMENT ) | 54,195.6 | SY |
$18.00 |
$13.61 |
$17.00 |
$14.40 |
$20.00 |
| 26 | 414(G) 5275 |
P.C. CONCRETE FOR PAVEMENT | 12,043.5 | CY |
$115.00 |
$100.00 |
$92.58 |
$100.00 |
$150.00 |
| 27 | 501(A) 0313 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 617 | CY |
$25.00 |
$19.77 |
$50.00 |
$21.80 |
$26.63 |
| 28 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 48.6 | CY |
$15.00 |
$19.77 |
$50.00 |
$30.00 |
$37.28 |
| 29 | 509(A) 0319 |
CLASS AA CONCRETE | 1,615 | CY |
$450.00 |
$431.63 |
$435.00 |
$37.00 |
$36.11 |
| 30 | 509(B) 0321 |
CLASS A CONCRETE | 151.1 | CY |
$450.00 |
$585.17 |
$800.00 |
$908.00 |
$383.40 |
| 31 | 509(C) 0322 |
CLASS A CONCRETE, SMALL STRUCTURES | 94.3 | CY |
$500.00 |
$501.74 |
$800.00 |
$1,060.00 |
$852.00 |
| 32 | 509(D) 0325 |
CLASS C CONCRETE | 31.6 | CY |
$300.00 |
$284.10 |
$350.00 |
$410.00 |
$213.00 |
| 33 | 510(D) 6341 |
MSE RETAINING WALL | 112.7 | SY |
$720.00 |
$383.40 |
$345.00 |
$75.00 |
$692.25 |
| 34 | 511(A) 0332 |
REINFORCING STEEL | 244,059.9 | LB |
$0.8000 |
$0.1000 |
$0.8500 |
$4.25 |
$4.19 |
| 35 | 601(B) 0536 |
TYPE I-A PLAIN RIPRAP | 255.8 | TON |
$40.00 |
$47.99 |
$50.00 |
$47.90 |
$50.06 |
| 36 | 601(C) 0538 |
TYPE I-A FILTER BLANKET | 85.3 | TON |
$40.00 |
$38.48 |
$35.00 |
$47.90 |
$50.06 |
| 37 | 609(A) 0300 |
CONCRETE CURB (6" BARRIER-INTEGRAL) | 1,417 | LF |
$7.00 |
$3.77 |
$6.91 |
$15.40 |
$4.92 |
| 38 | 609(A) 0380 |
CONCRETE CURB (8" BARRIER-INTEGRAL) | 14,434 | LF |
$7.00 |
$4.09 |
$6.00 |
$9.30 |
$4.00 |
| 39 | 609(B) 1513 |
1'-8" COMB. CURB & GUTTER (6" BARRIER) | 270 | LF |
$24.00 |
$28.18 |
$33.85 |
$25.15 |
$21.20 |
| 40 | 610(A) 0602 |
4" CONCRETE SIDEWALK | 8,253 | SY |
$40.00 |
$30.36 |
$63.74 |
$29.00 |
$67.88 |
| 41 | 610(B) 0399 |
6" CONCRETE DRIVEWAY (H.E.S.) | 4,508.6 | SY |
$55.00 |
$47.47 |
$65.34 |
$52.50 |
$69.59 |
| 42 | 610(B) 5016 |
8" CONCRETE DRIVEWAY | 109.1 | SY |
$80.00 |
$59.48 |
$91.88 |
$78.60 |
$97.85 |
| 43 | 610(C) 0608 |
4" CONCRETE DIVIDING STRIP | 27 | SY |
$40.00 |
$28.69 |
$150.00 |
$110.00 |
$159.75 |
| 44 | 610(I) 4610 |
TACTILE WARNING DEVICE-NEW | 1,044 | SF |
$20.00 |
$21.06 |
$20.00 |
$16.50 |
$21.30 |
| 45 | 611(A) 2657 |
MANHOLE (4' DIAMETER) | 11 | EA |
$2,000.00 |
$1,627.87 |
$1,500.00 |
$2,665.00 |
$2,797.61 |
| 46 | 611(A) 2658 |
MANHOLE (5' DIAMETER) | 3 | EA |
$3,500.00 |
$2,122.76 |
$4,000.00 |
$4,065.00 |
$3,966.08 |
| 47 | 611(A) 2659 |
MANHOLE (6' DIAMETER) | 2 | EA |
$5,000.00 |
$2,867.07 |
$7,500.00 |
$5,570.00 |
$5,433.90 |
| 48 | 611(B) 2680 |
ADD'L.DEPTH IN MANHOLE (4' DIAMETER) | 16.5 | VF |
$150.00 |
$178.95 |
$195.00 |
$92.15 |
$89.90 |
| 49 | 611(B) 2681 |
ADD'L.DEPTH IN MANHOLE (5' DIAMETER) | 3.6 | VF |
$200.00 |
$248.78 |
$275.00 |
$76.50 |
$74.59 |
| 50 | 611(B) 2682 |
ADD'L.DEPTH IN MANHOLE (6' DIAMETER) | 7.3 | VF |
$400.00 |
$317.22 |
$350.00 |
$76.50 |
$74.59 |
| 51 | 611(C) 4215 |
REPLACEMENT OF MANHOLE FRAME & COVER | 12 | EA |
$400.00 |
$454.24 |
$500.00 |
$875.00 |
$850.67 |
| 52 | 611(G) 5112 |
INLET CI DES. 2 (STD) | 4 | EA |
$4,000.00 |
$2,467.47 |
$3,250.00 |
$12,175.00 |
$11,871.47 |
| 53 | 611(G) 5113 |
INLET CI DES. 2 (B) | 3 | EA |
$4,500.00 |
$3,736.45 |
$3,550.00 |
$6,115.00 |
$5,961.56 |
| 54 | 611(G) 5115 |
INLET CI DES. 2 (D) | 2 | EA |
$5,000.00 |
$5,042.05 |
$4,500.00 |
$6,625.00 |
$6,466.38 |
| 55 | 611(G) 5120 |
INLET CI DES. 3 (STD) | 8 | EA |
$5,500.00 |
$4,744.50 |
$4,500.00 |
$7,010.00 |
$6,839.32 |
| 56 | 611(G) 5121 |
INLET CI DES. 3 (B) | 1 | EA |
$6,000.00 |
$5,709.80 |
$4,750.00 |
$8,255.00 |
$8,050.08 |
| 57 | 611(G) 5122 |
INLET CI DES. 3 (D) | 4 | EA |
$6,500.00 |
$7,104.57 |
$5,000.00 |
$7,890.00 |
$7,694.44 |
| 58 | 611(G) 5124 |
INLET CI DES. 3 (B-D) | 1 | EA |
$7,500.00 |
$4,566.42 |
$5,500.00 |
$7,445.00 |
$7,260.22 |
| 59 | 611(G) 5125 |
INLET CI DES. 3 (2D) | 1 | EA |
$8,000.00 |
$9,387.28 |
$5,000.00 |
$8,345.00 |
$8,141.98 |
| 60 | 611(G) 5706 |
INLET CDI RCP DES. 3 | 1 | EA |
$2,500.00 |
$2,407.49 |
$3,000.00 |
$7,770.00 |
$7,583.07 |
| 61 | 611(G) 6000 |
INLET (SMD-TYPE 1) | 2 | EA |
$2,500.00 |
$2,394.76 |
$3,000.00 |
$3,605.00 |
$3,519.25 |
| 62 | 611(G) 6004 |
INLET (SMD-TYPE 2A) | 1 | EA |
$3,500.00 |
$2,387.65 |
$2,500.00 |
$3,975.00 |
$3,875.72 |
| 63 | 611(H) 5325 |
ADD'L DEPTH IN INLET CI DES. 2 | 21.8 | VF |
$300.00 |
$492.22 |
$205.00 |
$76.50 |
$74.59 |
| 64 | 611(H) 5330 |
ADD'L DEPTH IN INLET CI DES. 3 | 40.7 | VF |
$500.00 |
$579.02 |
$205.00 |
$76.50 |
$74.59 |
| 65 | 611(L) 0487 |
JUNCTION BOXES | 444.7 | CF |
$65.00 |
$125.10 |
$85.00 |
$210.20 |
$47.39 |
| 66 | 611(N) 3610 |
WELDED STEEL GRATE (36" SQ.) | 64 | EA |
$3,129.55 |
$2,115.01 |
$1,075.00 |
$695.00 |
$1,373.85 |
| 67 | 612(A) 0641 |
MANHOLES ADJUST TO GRADE | 9 | EA |
$800.00 |
$1,540.34 |
$500.00 |
$1,960.00 |
$1,913.10 |
| 68 | 612(E) 0647 |
VALVE BOXES ADJUST TO GRADE | 8 | EA |
$250.00 |
$308.07 |
$125.00 |
$1,960.00 |
$1,913.10 |
| 69 | 612(F) 0648 |
METER BOXES ADJUST TO GRADE | 10 | EA |
$325.00 |
$1,026.90 |
$500.00 |
$1,960.00 |
$1,913.10 |
| 70 | 613(A) 0491 |
18" R.C.PIPE CLASS III | 1,215 | LF |
$55.00 |
$36.49 |
$55.00 |
$56.00 |
$54.70 |
| 71 | 613(A) 0492 |
24" R.C.PIPE CLASS III | 1,237 | LF |
$65.00 |
$54.85 |
$60.00 |
$70.00 |
$68.64 |
| 72 | 613(A) 0493 |
30" R.C.PIPE CLASS III | 342 | LF |
$80.00 |
$64.42 |
$85.00 |
$87.40 |
$85.27 |
| 73 | 613(A) 0494 |
36" R.C.PIPE CLASS III | 358 | LF |
$110.00 |
$93.86 |
$110.00 |
$107.60 |
$104.99 |
| 74 | 613(A) 0495 |
42" R.C.PIPE CLASS III | 325 | LF |
$150.00 |
$126.23 |
$130.00 |
$128.25 |
$125.06 |
| 75 | 613(A) 4496 |
28" X 18" R.C.PIPE ARCH CLASS A-III | 160 | LF |
$125.00 |
$96.57 |
$90.00 |
$98.50 |
$96.04 |
| 76 | 613(A) 4500 |
58" X 36" R.C.PIPE ARCH CLASS A-III | 473 | LF |
$200.00 |
$246.77 |
$235.00 |
$212.35 |
$207.14 |
| 77 | 613(A) 4502 |
73" X 45" R.C.PIPE ARCH CLASS A-III | 91 | LF |
$400.00 |
$368.42 |
$360.00 |
$302.65 |
$295.22 |
| 78 | 613(H) 0450 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 420 | LF |
$8.00 |
$13.63 |
$8.00 |
$27.00 |
$8.52 |
| 79 | 613(I) 1096 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 100 | LF |
$10.00 |
$16.95 |
$10.00 |
$27.00 |
$10.65 |
| 80 | 613(J) 5915 |
EDGE DRAIN CONDUIT-PERFORATED | 14,223 | LF |
$10.00 |
$11.49 |
$10.00 |
$12.00 |
$10.65 |
| 81 | 613(K) 5916 |
EDGE DRAIN OUTLET LATERAL-NONPERFORATED | 270 | LF |
$12.00 |
$15.30 |
$12.00 |
$12.00 |
$12.78 |
| 82 | 613(L) 5730 |
24" PREFAB. CULVERT END SECTION, ROUND | 2 | EA |
$700.00 |
$728.16 |
$1,100.00 |
$1,330.00 |
$1,297.59 |
| 83 | 613(L) 5734 |
36" PREFAB. CULVERT END SECTION, ROUND | 1 | EA |
$1,400.00 |
$1,271.74 |
$2,250.00 |
$2,040.00 |
$1,990.94 |
| 84 | 613(L) 5736 |
42" PREFAB. CULVERT END SECTION, ROUND | 1 | EA |
$2,000.00 |
$1,673.54 |
$3,000.00 |
$2,590.00 |
$2,525.33 |
| 85 | 613(O) 4804 |
SPECIAL END SECTION OF 28" X 18" RCP ARCH | 1 | EA |
$1,200.00 |
$1,056.51 |
$1,250.00 |
$1,365.00 |
$1,448.40 |
| 86 | 613(Q) 5946 |
OUTLET LATERAL HEADWALL | 3 | EA |
$750.00 |
$530.27 |
$1,200.00 |
$695.00 |
$455.41 |
| 87 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$10,000.00 |
$11,305.94 |
$10,000.00 |
$13,245.00 |
$15,000.00 |
| 88 | 619(B) 4725 |
REMOVAL OF FENCE | 4,600 | LF |
$2.00 |
$1.03 |
$2.00 |
$2.95 |
$1.07 |
| 89 | 619(B) 4726 |
REMOVAL OF CURB AND GUTTER | 3,980 | LF |
$4.00 |
$2.43 |
$4.00 |
$7.80 |
$10.72 |
| 90 | 619(B) 4727 |
REMOVAL OF CONCRETE PAVEMENT | 7,400 | SY |
$8.00 |
$7.30 |
$8.00 |
$4.70 |
$4.00 |
| 91 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 32,300 | SY |
$4.00 |
$3.08 |
$4.00 |
$3.75 |
$4.00 |
| 92 | 619(B) 4792 |
REMOVAL OF SIDEWALK | 422 | SY |
$8.00 |
$9.08 |
$8.00 |
$9.90 |
$7.00 |
| 93 | 619(C) 0924 |
SAWING PAVEMENT | 3,093.5 | LF |
$4.00 |
$3.12 |
$5.00 |
$6.00 |
$4.31 |
| 94 | 624(C) 4459 |
FENCE-STYLE SWF (5 BARBED WIRE) | 418.2 | LF |
$5.00 |
$5.13 |
$7.40 |
$5.35 |
$7.46 |
| 95 | 629(A) 4958 |
MAILBOX INSTALLATION-SINGLE | 9 | EA |
$150.00 |
$205.38 |
$200.00 |
$210.00 |
$213.00 |
| 96 | 629(C) 4960 |
MAILBOX | 9 | EA |
$50.00 |
$102.69 |
$100.00 |
$110.00 |
$106.50 |
| 97 | 629(D) 4961 |
REMOVAL OF MAILBOX INSTALLATION | 9 | EA |
$50.00 |
$102.69 |
$10.00 |
$110.00 |
$106.50 |
| 98 | 631(A) 0200 |
(SP)STATIONARY BOLLARD | 6 | EA |
$1,000.00 |
$365.60 |
$1,000.00 |
$1,500.00 |
$639.00 |
| 99 | 857(A) 8839 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) | 31,095 | LF |
$0.2000 |
$0.1200 |
$0.1200 |
$0.1300 |
$0.1300 |
| 100 | 857(C) 8851 |
REMOVABLE PAVEMENT MARKING TAPE(4" WIDE) | 21,565 | LF |
$0.8000 |
$0.7200 |
$0.7000 |
$0.7500 |
$0.7500 |
| 101 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 21,565 | LF |
$0.2000 |
$0.1500 |
$0.1500 |
$0.1500 |
$0.1600 |
| 102 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 3,240 | SD |
$0.3500 |
$3.08 |
$3.00 |
$3.20 |
$3.20 |
| 103 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 12,420 | SD |
$0.4500 |
$0.2600 |
$0.2500 |
$0.2500 |
$0.2700 |
| 104 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 3,780 | SD |
$1.30 |
$3.08 |
$4.00 |
$3.20 |
$3.20 |
| 105 | 880(C) 8836 |
CONSTRUCTION BARRICADES(TYPE II) | 2,160 | SD |
$0.1500 |
$2.57 |
$2.50 |
$2.65 |
$2.66 |
| 106 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 9,720 | SD |
$0.4500 |
$2.05 |
$2.00 |
$2.15 |
$2.13 |
| 107 | 880(C) 8848 |
WING BARRICADES | 8,640 | SD |
$0.2000 |
$0.1000 |
$0.1000 |
$0.1100 |
$0.1100 |
| 108 | 880(D) 8854 |
VERTICAL PANELS | 43,200 | SD |
$0.2000 |
$0.0500 |
$0.0500 |
$0.0500 |
$0.0500 |
| 109 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 42,120 | SD |
$0.1500 |
$0.0500 |
$0.0500 |
$0.0500 |
$0.0500 |
| 110 | 880(E) 8872 |
WARNING LIGHTS(TYPE C) | 8,640 | SD |
$0.1500 |
$0.0200 |
$0.0200 |
$0.0200 |
$0.0200 |
| 111 | 880(F) 8878 |
DRUMS | 43,200 | SD |
$0.1500 |
$0.5100 |
$0.5000 |
$0.5500 |
$0.5300 |
| 112 | 802(B) 8342 |
2" PVC SCH.40 PLASTIC CONDUIT TRENCHED | 539 | LF |
$7.00 |
$7.70 |
$7.50 |
$10.70 |
$7.99 |
| 113 | 802(B) 8344 |
3" PVC SCH.40 PLASTIC CONDUIT BORED | 597 | LF |
$25.00 |
$25.67 |
$25.00 |
$32.10 |
$26.63 |
| 114 | 802(B) 8346 |
3" PVC SCH.40 PLASTIC CONDUIT TRENCHED | 276 | LF |
$12.00 |
$13.09 |
$12.75 |
$16.05 |
$13.58 |
| 115 | 803(A) 8065 |
PULL BOX(SIZE I) | 8 | EA |
$450.00 |
$539.12 |
$5.25 |
$481.50 |
$559.13 |
| 116 | 804(A) 2915 |
STRUCTURAL CONCRETE | 34 | CY |
$600.00 |
$770.17 |
$750.00 |
$642.00 |
$798.75 |
| 117 | 804(B) 2916 |
REINFORCING STEEL | 4,277.5 | LB |
$1.70 |
$2.16 |
$2.10 |
$1.28 |
$2.24 |
| 118 | 805(A) 8724 |
(PL)REMOVAL OF EXISTING SIGNS | 40 | EA |
$50.00 |
$51.34 |
$50.00 |
$53.50 |
$53.25 |
| 119 | 805(A) 8726 |
(PL)REMOVAL OF TRAFFIC SIGNAL EQUIPMENT | 1 | LSUM |
$5,000.00 |
$2,926.65 |
$2,850.00 |
$3,210.00 |
$3,035.25 |
| 120 | 805(D) 8756 |
(PL)REMOVE & RESET EXISTING SIGNS | 5 | EA |
$200.00 |
$205.38 |
$200.00 |
$214.00 |
$213.00 |
| 121 | 806(A) 8314 |
32'MH POLE 50'TS & 10'LMA(G.STL.) | 2 | EA |
$18,000.00 |
$14,037.67 |
$13,670.00 |
$16,830.00 |
$14,558.55 |
| 122 | 806(A) 8353 |
32'MH POLE,55'TS & 10'LMA(G.STL.) | 3 | EA |
$18,000.00 |
$14,946.47 |
$14,555.00 |
$17,210.00 |
$15,501.08 |
| 123 | 806(A) 8738 |
POLE & 55'T.S.MST.ARM(G.STL.) | 2 | EA |
$20,000.00 |
$12,666.76 |
$12,335.00 |
$16,265.00 |
$13,136.78 |
| 124 | 806(B) 8896 |
12' MTG.HT.TS PED.POLE(G.STL.) | 1 | EA |
$1,000.00 |
$636.68 |
$620.00 |
$856.00 |
$660.30 |
| 125 | 809(A) 8090 |
ROADWAY LUMINAIRE | 5 | EA |
$1,000.00 |
$631.54 |
$615.00 |
$650.00 |
$654.98 |
| 126 | 810(A) 3118 |
SERVICE POLE | 2 | EA |
$3,000.00 |
$1,288.76 |
$1,255.00 |
$265.00 |
$1,336.58 |
| 127 | 811 8040 |
1/C NO.6 ELECTRICAL CONDUCTOR | 470 | LF |
$1.50 |
$2.62 |
$2.55 |
$2.15 |
$2.72 |
| 128 | 811 8044 |
1/C NO.10 ELECTRICAL CONDUCTOR | 3,320 | LF |
$1.00 |
$1.08 |
$1.05 |
$0.8500 |
$1.12 |
| 129 | 825 8550 |
TRAFFIC SIGNAL CONTROLLER ASSEMBLY | 2 | EA |
$30,000.00 |
$21,698.31 |
$21,130.00 |
$28,000.00 |
$22,503.45 |
| 130 | 828 8132 |
(PL)DETECTION SYSTEM (VIDEO) | 1 | LSUM |
$40,000.00 |
$36,110.80 |
$35,165.00 |
$36,500.00 |
$37,450.73 |
| 131 | 830 8000 |
PEDESTRIAN PUSH BUTTON | 16 | EA |
$1,000.00 |
$344.01 |
$335.00 |
$425.00 |
$356.78 |
| 132 | 831 8231 |
1WAY 3SEC. ADJ. SIG. HD. S-6 | 16 | EA |
$600.00 |
$708.56 |
$690.00 |
$645.00 |
$734.85 |
| 133 | 831 8252 |
1WAY 3SEC. ADJ. SIG. HD. S-9 | 7 | EA |
$600.00 |
$718.83 |
$700.00 |
$645.00 |
$745.50 |
| 134 | 831 8277 |
1WAY 5SEC. ADJ. SIG. HD. S-17 | 2 | EA |
$1,200.00 |
$1,013.55 |
$987.00 |
$800.00 |
$1,051.16 |
| 135 | 831 8286 |
1WAY 5SEC. ADJ. SIG. HD. S-19 | 2 | EA |
$1,200.00 |
$1,149.10 |
$1,119.00 |
$875.00 |
$1,191.74 |
| 136 | 831 8295 |
1WAY 2SEC. ADJ. PED. SIG. HD. S-20 | 14 | EA |
$500.00 |
$528.85 |
$515.00 |
$425.00 |
$548.48 |
| 137 | 833 3030 |
BACKPLATE | 27 | EA |
$100.00 |
$184.84 |
$180.00 |
$135.00 |
$191.70 |
| 138 | 834(A) 8207 |
5/C TRAFFIC SIGNAL ELECTRICAL CABLE | 4,800 | LF |
$1.50 |
$1.75 |
$1.70 |
$3.20 |
$1.81 |
| 139 | 834(A) 8208 |
7/C TRAFFIC SIGNAL ELECTRICAL CABLE | 350 | LF |
$2.00 |
$2.16 |
$2.10 |
$3.50 |
$2.24 |
| 140 | 834(A) 8210 |
12/C TRAFFIC SIGNAL ELECTRICAL CABLE | 430 | LF |
$3.50 |
$3.59 |
$3.50 |
$3.75 |
$3.73 |
| 141 | 834(A) 8211 |
15/C TRAFFIC SIGNAL ELECTRICAL CABLE | 1,340 | LF |
$4.50 |
$4.11 |
$4.00 |
$4.25 |
$4.26 |
| 142 | 834(B) 8220 |
2/C SHIELDED LOOP DETECTOR LEAD-IN CABLE | 480 | LF |
$1.25 |
$1.54 |
$1.50 |
$1.05 |
$1.60 |
| 143 | 836 8425 |
REGULATORY OR WARNING SIGN ASSEMBLY | 1 | EA |
$4,000.00 |
$4,708.32 |
$4,585.00 |
$5,350.00 |
$4,883.03 |
| 144 | 840(B) 8593 |
E.P.S. OPTICAL DETECTOR | 6 | EA |
$600.00 |
$600.73 |
$585.00 |
$802.50 |
$623.03 |
| 145 | 840(C) 8594 |
E.P.S. OPTICAL DETECTOR CABLE | 1,850 | LF |
$1.50 |
$1.90 |
$1.85 |
$1.05 |
$1.97 |
| 146 | 840(D) 8595 |
E.P.S. 2 CHANNEL PHASE SELECTOR | 4 | EA |
$2,000.00 |
$1,704.65 |
$1,660.00 |
$171.20 |
$1,767.90 |
| 147 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 411.2 | SF |
$25.00 |
$14.38 |
$14.00 |
$15.00 |
$14.91 |
| 148 | 850(C) 8118 |
MAST ARM MOUNTED SIGNS(ALUMINUM) | 261.7 | SF |
$40.00 |
$33.89 |
$33.00 |
$53.50 |
$35.15 |
| 149 | 851(B) 3216 |
2"@3.65 GALV.STEEL PIPE POST | 486.8 | LF |
$10.00 |
$13.35 |
$13.00 |
$13.90 |
$13.85 |
| 150 | 851(B) 3217 |
2 1/2"@5.79 GALV.STEEL PIPE POST | 369.9 | LF |
$15.00 |
$16.43 |
$16.00 |
$17.10 |
$17.04 |
| 151 | 853 9024 |
DELINEATORS(TYPE 1, CODE 1) | 11 | EA |
$15.00 |
$20.54 |
$20.00 |
$21.40 |
$21.30 |
| 152 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 39,362 | LF |
$0.6000 |
$0.4100 |
$0.5000 |
$0.4500 |
$0.4300 |
| 153 | 856(A) 8540 |
TRAFFIC STRIPE(MULTI-POLY.)(8" WIDE) | 1,550 | LF |
$1.30 |
$1.03 |
$1.00 |
$1.05 |
$1.07 |
| 154 | 856(A) 8555 |
TRAFFIC STRIPE(MULTI-POLY.)(24" WIDE) | 2,346 | LF |
$4.00 |
$3.08 |
$3.00 |
$3.20 |
$3.20 |
| 155 | 856(B) 8860 |
TRAFFIC STRIPE(MULTI-POLY.)(ARROWS) | 53 | EA |
$150.00 |
$102.69 |
$100.00 |
$110.00 |
$106.50 |
| 156 | 856(B) 8870 |
TRAFFIC STRIPE(MULTI-POLY.)(SYMBOLS) | 31 | EA |
$250.00 |
$205.38 |
$200.00 |
$215.00 |
$213.00 |
| 157 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$4,500.00 |
$5,114.65 |
$5,000.00 |
$5,750.00 |
$1,221.46 |
| 158 | 640(A) 1398 |
FIELD OFFICE | 1 | EA |
$8,000.00 |
$10,922.22 |
$10,000.00 |
$23,500.00 |
$17,539.98 |
| 159 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$415,000.00 |
$347,300.00 |
$475,000.00 |
$305,000.00 |
$550,000.00 |
| 160 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$45,000.00 |
$119,530.68 |
$65,000.00 |
$35,000.00 |
$99,343.95 |
| 161 | 624 4100 |
(PL) ORNAMENTAL FENCE | 3,094 | LF |
$10.00 |
$23.11 |
$39.00 |
$24.10 |
$39.41 |
| 162 | 624(E) 4288 |
FENCE-STYLE CLF (4'HIGH, CLASS A) | 75 | LF |
$20.00 |
$7.19 |
$30.00 |
$7.50 |
$31.95 |
| 163 | 624(E) 4292 |
FENCE-STYLE CLF (6'HIGH, CLASS A) | 2,876 | LF |
$8.66 |
$17.46 |
$17.00 |
$18.20 |
$18.11 |
| 164 | 624(H) 5920 |
(PL) GATE | 11 | EA |
$500.00 |
$872.86 |
$1,600.00 |
$910.00 |
$1,171.50 |