| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$25,000.00 |
$16,640.00 |
$16,315.00 |
$24,150.00 |
$16,800.00 |
$31,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 26,018 | CY |
$9.00 |
$3.38 |
$3.30 |
$7.10 |
$3.41 |
$7.00 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 60,575 | CY |
$9.50 |
$4.42 |
$4.35 |
$9.00 |
$4.46 |
$8.00 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$20,000.00 |
$23,400.00 |
$22,945.00 |
$24,100.00 |
$23,625.00 |
$15,000.00 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 5,070 | LF |
$1.60 |
$1.09 |
$1.05 |
$1.15 |
$1.10 |
$1.50 |
| 6 | 221(F) 0100 |
TEMPORARY SILT DIKE | 336 | LF |
$7.90 |
$10.64 |
$10.40 |
$11.00 |
$10.74 |
$8.00 |
| 7 | 230(A) 2806 |
SOLID SLAB SODDING | 26,263 | SY |
$1.40 |
$1.12 |
$1.10 |
$1.13 |
$1.13 |
$1.50 |
| 8 | 232(B) 2814 |
SEEDING METHOD B | 1.17 | AC |
$400.00 |
$306.80 |
$301.00 |
$325.00 |
$309.75 |
$2,000.00 |
| 9 | 233(A) 2817 |
VEGETATIVE MULCHING | 1.17 | AC |
$290.00 |
$676.00 |
$663.00 |
$700.00 |
$682.50 |
$2,000.00 |
| 10 | 241 2832 |
MOWING | 32.76 | AC |
$67.00 |
$92.56 |
$90.80 |
$100.00 |
$93.45 |
$50.00 |
| 11 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 2,739 | CY |
$52.00 |
$58.24 |
$78.90 |
$57.15 |
$60.53 |
$48.00 |
| 12 | 307(K) 4300 |
STABILIZED SUBGRADE | 23,454 | SY |
$6.50 |
$4.42 |
$5.35 |
$4.35 |
$5.51 |
$4.50 |
| 13 | 325 5271 |
SEPARATOR FABRIC | 12,603 | SY |
$1.60 |
$1.30 |
$2.95 |
$1.31 |
$1.66 |
$1.25 |
| 14 | 326(B) 0100 |
GEOGRID REINFORCEMENT | 700 | SY |
$3.00 |
$5.20 |
$10.40 |
$3.00 |
$8.54 |
$5.00 |
| 15 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 2,081 | TON |
$31.00 |
$29.59 |
$21.10 |
$34.70 |
$29.21 |
$34.00 |
| 16 | 407(B) 0250 |
TACK COAT | 2,909 | GAL |
$3.30 |
$3.12 |
$4.60 |
$4.85 |
$3.15 |
$3.50 |
| 17 | 408 5774 |
PRIME COAT | 11,976 | GAL |
$4.50 |
$2.08 |
$7.20 |
$10.20 |
$4.20 |
$4.50 |
| 18 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 5,433 | TON |
$76.00 |
$70.72 |
$69.70 |
$80.10 |
$71.82 |
$70.00 |
| 19 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 2,876 | TON |
$88.00 |
$75.40 |
$79.50 |
$86.50 |
$81.80 |
$80.00 |
| 20 | 412 5267 |
COLD MILLING PAVEMENT | 6,267 | SY |
$3.30 |
$3.64 |
$4.05 |
$3.20 |
$2.62 |
$6.50 |
| 21 | 509(A) 0319 |
CLASS AA CONCRETE | 88 | CY |
$530.00 |
$390.00 |
$558.50 |
$600.00 |
$748.88 |
$600.00 |
| 22 | 509(D) 0325 |
CLASS C CONCRETE | 10 | CY |
$300.00 |
$395.20 |
$536.50 |
$250.00 |
$443.60 |
$650.00 |
| 23 | 511(A) 0332 |
REINFORCING STEEL | 11,038 | LB |
$0.8400 |
$1.15 |
$0.9800 |
$1.00 |
$1.04 |
$1.00 |
| 24 | 601(A) 0297 |
TYPE I PLAIN RIPRAP | 50 | TON |
$53.00 |
$49.06 |
$47.80 |
$45.00 |
$74.03 |
$48.00 |
| 25 | 613(B) 0689 |
18" CORR. GALV. STEEL PIPE | 28 | LF |
$35.00 |
$27.78 |
$27.00 |
$30.00 |
$28.05 |
$31.00 |
| 26 | 613(B) 0694 |
48" CORR. GALV. STEEL PIPE | 43 | LF |
$72.00 |
$57.92 |
$56.10 |
$102.00 |
$57.79 |
$68.00 |
| 27 | 613(B) 4819 |
96" CORR. GALV. STEEL PIPE | 280 | LF |
$140.00 |
$162.95 |
$162.00 |
$247.00 |
$166.10 |
$140.00 |
| 28 | 613(L) 5726 |
18" PREFAB. CULVERT END SECTION, ROUND | 2 | EA |
$740.00 |
$263.20 |
$255.00 |
$230.00 |
$258.14 |
$750.00 |
| 29 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$15,000.00 |
$3,120.00 |
$3,060.00 |
$18,600.00 |
$3,150.00 |
$15,000.00 |
| 30 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 7,469 | SY |
$4.60 |
$3.64 |
$7.50 |
$4.40 |
$3.68 |
$6.25 |
| 31 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 1,305 | LF |
$3.90 |
$2.60 |
$2.55 |
$4.00 |
$2.62 |
$2.00 |
| 32 | 619(C) 0924 |
SAWING PAVEMENT | 200 | LF |
$3.80 |
$5.20 |
$10.80 |
$7.25 |
$5.25 |
$9.50 |
| 33 | 623 0100 |
(PL)GUARDRAIL CURBING | 4 | EA |
$1,300.00 |
$1,560.00 |
$1,704.00 |
$1,200.00 |
$1,608.27 |
$1,100.00 |
| 34 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 463 | LF |
$18.00 |
$19.76 |
$15.80 |
$19.50 |
$17.85 |
$18.00 |
| 35 | 623(G) 8590 |
GUARDRAIL END TREATMENT (31") | 4 | EA |
$2,300.00 |
$2,548.00 |
$2,259.00 |
$2,500.00 |
$2,205.00 |
$2,300.00 |
| 36 | 623(I) 8700 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 4 | EA |
$1,900.00 |
$1,664.00 |
$1,825.00 |
$1,650.00 |
$1,545.75 |
$1,800.00 |
| 37 | 624(C) 4459 |
FENCE-STYLE SWF (5 BARBED WIRE) | 1,139 | LF |
$5.40 |
$3.95 |
$3.90 |
$6.25 |
$6.09 |
$7.25 |
| 38 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 80 | CY |
$60.00 |
$20.80 |
$27.50 |
$10.00 |
$24.20 |
$24.00 |
| 39 | 501(G) 6309 |
CLSM BACKFILL | 164 | CY |
$150.00 |
$220.22 |
$154.50 |
$170.00 |
$148.62 |
$130.00 |
| 40 | 503(A) 1312 |
PRESTRESSED CONCRETE BEAMS (TYPE III) | 737 | LF |
$230.00 |
$201.59 |
$200.00 |
$189.29 |
$228.83 |
$250.00 |
| 41 | 504(A) 1304 |
APPROACH SLAB | 224.8 | SY |
$205.00 |
$195.57 |
$271.50 |
$162.50 |
$260.94 |
$160.00 |
| 42 | 504(B) 1305 |
SAW-CUT GROOVING | 1,046.7 | SY |
$4.50 |
$4.16 |
$3.05 |
$3.26 |
$3.30 |
$4.00 |
| 43 | 504(D) 6245 |
CONCRETE RAIL (TR4) | 467 | LF |
$100.00 |
$86.71 |
$92.80 |
$78.00 |
$78.30 |
$70.00 |
| 44 | 506(A) 1322 |
STRUCTURAL STEEL | 1,050 | LB |
$5.00 |
$1.88 |
$4.20 |
$2.00 |
$3.63 |
$2.70 |
| 45 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 8 | EA |
$1,300.00 |
$568.15 |
$462.50 |
$296.00 |
$652.96 |
$320.00 |
| 46 | 507(B) 6174 |
STAINLESS STEEL EXPANSION BEARING ASSEMBLY | 16 | EA |
$1,800.00 |
$1,396.58 |
$1,254.00 |
$1,040.00 |
$1,512.96 |
$1,250.00 |
| 47 | 507(C) 6282 |
ELASTOMERIC BEARING PADS | 16 | EA |
$900.00 |
$416.00 |
$287.50 |
$243.00 |
$522.13 |
$600.00 |
| 48 | 509(A) 1326 |
CLASS AA CONCRETE | 247.6 | CY |
$600.00 |
$635.05 |
$483.00 |
$500.00 |
$576.51 |
$600.00 |
| 49 | 509(B) 1328 |
CLASS A CONCRETE | 118.8 | CY |
$700.00 |
$635.05 |
$580.50 |
$500.00 |
$576.51 |
$600.00 |
| 50 | 509(D) 1331 |
CLASS C CONCRETE | 10 | CY |
$600.00 |
$520.00 |
$536.50 |
$250.00 |
$464.72 |
$550.00 |
| 51 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 71,200 | LB |
$1.10 |
$1.07 |
$1.00 |
$0.9000 |
$1.02 |
$1.05 |
| 52 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 343 | LF |
$40.00 |
$26.98 |
$42.50 |
$28.00 |
$38.47 |
$56.00 |
| 53 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 343 | LF |
$17.00 |
$15.60 |
$26.20 |
$10.00 |
$13.20 |
$35.00 |
| 54 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 55 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 850 | SY |
$4.30 |
$4.98 |
$3.55 |
$3.75 |
$3.85 |
$4.00 |
| 56 | 516(A) 6094 |
DRILLED SHAFTS 48" DIAMETER | 126 | LF |
$700.00 |
$986.11 |
$875.00 |
$783.00 |
$1,145.02 |
$900.00 |
| 57 | 516(C) 6200 |
CROSSHOLE SONIC LOGGING | 4 | EA |
$3,200.00 |
$2,704.00 |
$1,530.00 |
$2,000.00 |
$3,410.00 |
$2,900.00 |
| 58 | 523(A) 6550 |
SEALER CRACK PREPARATION | 163 | LF |
$4.00 |
$5.55 |
$4.10 |
$4.50 |
$4.40 |
$4.50 |
| 59 | 523(B) 6560 |
SEALER RESIN | 1.8 | GAL |
$100.00 |
$179.66 |
$153.00 |
$200.00 |
$165.00 |
$150.00 |
| 60 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 1,405 | TON |
$43.00 |
$44.90 |
$46.70 |
$43.00 |
$55.96 |
$46.00 |
| 61 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 250 | TON |
$37.00 |
$37.70 |
$37.20 |
$41.00 |
$48.13 |
$44.00 |
| 62 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 84 | LF |
$30.00 |
$31.20 |
$37.00 |
$25.00 |
$37.83 |
$16.00 |
| 63 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 100 | LF |
$28.00 |
$31.20 |
$20.40 |
$20.00 |
$28.89 |
$16.00 |
| 64 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$60,000.00 |
$33,800.00 |
$17,335.00 |
$27,500.00 |
$18,700.00 |
$40,000.00 |
| 65 | 202(A) 1301 |
UNCLASSIFIED EXCAVATION | 4,900 | CY |
$10.00 |
$7.28 |
$7.15 |
$6.00 |
$7.70 |
$18.00 |
| 66 | 501(A) 1306 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 550 | CY |
$25.00 |
$36.40 |
$36.10 |
$10.00 |
$52.80 |
$12.00 |
| 67 | 509(A) 1326 |
CLASS AA CONCRETE | 1,187 | CY |
$600.00 |
$268.32 |
$305.50 |
$420.00 |
$604.01 |
$390.00 |
| 68 | 511(A) 1332 |
REINFORCING STEEL | 186,390 | LB |
$1.05 |
$0.9200 |
$0.9300 |
$0.8500 |
$0.9800 |
$0.8500 |
| 69 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$50,000.00 |
$17,680.00 |
$30,910.00 |
$27,500.00 |
$79,200.00 |
$20,000.00 |
| 70 | 805(A) 8724 |
(PL)REMOVAL OF EXISTING SIGNS | 7 | EA |
$60.00 |
$52.00 |
$81.60 |
$50.00 |
$63.00 |
$100.00 |
| 71 | 805(D) 8756 |
(PL)REMOVE & RESET EXISTING SIGNS | 3 | EA |
$200.00 |
$208.00 |
$127.50 |
$210.00 |
$157.50 |
$150.00 |
| 72 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 52 | SF |
$20.00 |
$15.60 |
$28.60 |
$16.00 |
$31.50 |
$30.00 |
| 73 | 851(C) 8324 |
2" SQUARE TUBE POST | 101 | LF |
$10.00 |
$8.32 |
$8.15 |
$8.10 |
$15.75 |
$9.00 |
| 74 | 853 9069 |
GUARDRAIL DELINEATORS(TYPE 2, CODE 1) | 14 | EA |
$16.00 |
$15.60 |
$12.90 |
$16.00 |
$15.75 |
$15.00 |
| 75 | 855(A) 8812 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 14,750 | LF |
$1.00 |
$0.5400 |
$0.4200 |
$0.5500 |
$0.4900 |
$0.4500 |
| 76 | 857(A) 8839 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) | 14,870 | LF |
$0.2500 |
$0.2600 |
$0.2400 |
$0.2600 |
$0.2300 |
$0.2800 |
| 77 | 857(E) 8887 |
(PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-1 | 2,100 | EA |
$1.20 |
$0.6800 |
$0.5300 |
$0.6700 |
$1.31 |
$0.5300 |
| 78 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 14,870 | LF |
$0.2500 |
$0.1600 |
$0.4800 |
$0.1700 |
$0.2600 |
$0.4700 |
| 79 | 871(B) 8705 |
(SP)CONST.ZONE IMPACT ATTEN. | 450 | SD |
$10.00 |
$10.40 |
$22.40 |
$10.50 |
$7.61 |
$23.00 |
| 80 | 877(B) 8484 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 1,900 | LF |
$21.00 |
$23.92 |
$27.50 |
$33.00 |
$36.75 |
$29.00 |
| 81 | 877(C) 8486 |
RELOCATION OF PORTABLE LONGITUDINAL BARRIER | 900 | LF |
$4.00 |
$4.16 |
$1.00 |
$4.20 |
$6.30 |
$3.00 |
| 82 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 4,200 | SD |
$0.4000 |
$1.04 |
$0.1000 |
$1.05 |
$0.0500 |
$0.1500 |
| 83 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 3,780 | SD |
$0.7500 |
$1.04 |
$1.55 |
$1.05 |
$0.1000 |
$1.55 |
| 84 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 3,150 | SD |
$1.50 |
$2.08 |
$2.30 |
$2.07 |
$0.2100 |
$2.30 |
| 85 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 3,780 | SD |
$1.10 |
$0.5200 |
$0.1000 |
$0.5500 |
$0.2600 |
$0.2000 |
| 86 | 880(C) 8848 |
WING BARRICADES | 840 | SD |
$1.40 |
$2.08 |
$0.3100 |
$2.20 |
$0.1600 |
$0.5000 |
| 87 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 7,560 | SD |
$0.2500 |
$0.1000 |
$0.3100 |
$0.1200 |
$0.0300 |
$0.3500 |
| 88 | 880(F) 8878 |
DRUMS | 6,510 | SD |
$0.2500 |
$0.1500 |
$0.1500 |
$0.1800 |
$0.1600 |
$0.2500 |
| 89 | 880(G) 8890 |
CHANNELIZER CONES | 8,820 | SD |
$0.3500 |
$0.1500 |
$0.0200 |
$0.2000 |
$0.0500 |
$0.1000 |
| 90 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 210 | SD |
$14.00 |
$10.40 |
$18.40 |
$10.30 |
$29.40 |
$25.00 |
| 91 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$35,000.00 |
$28,080.00 |
$40,030.00 |
$27,810.00 |
$41,212.50 |
$30,000.00 |
| 92 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$6,700.00 |
$3,120.00 |
$5,380.00 |
$4,000.00 |
$3,850.00 |
$20,000.00 |
| 93 | 640(A) 1398 |
FIELD OFFICE | 1 | EA |
$15,000.00 |
$4,680.00 |
$2,550.00 |
$4,500.00 |
$17,600.00 |
$20,000.00 |
| 94 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$248,600.00 |
$213,467.16 |
$274,208.14 |
$175,000.00 |
$229,454.52 |
$310,000.00 |