| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$30,000.00 |
$6,060.00 |
$5,000.00 |
$7,000.00 |
$15,975.00 |
$20,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 6,637 | CY |
$5.00 |
$6.06 |
$5.00 |
$8.30 |
$4.79 |
$6.00 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 5,313 | CY |
$7.00 |
$8.08 |
$8.00 |
$11.40 |
$6.92 |
$8.00 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$30,000.00 |
$8,080.00 |
$10,000.00 |
$7,550.00 |
$17,040.00 |
$20,000.00 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 1,934 | LF |
$2.00 |
$1.23 |
$1.22 |
$2.00 |
$1.30 |
$1.50 |
| 6 | 221(D) 2803 |
TEMPORARY SEDIMENT FILTER | 4 | EA |
$150.00 |
$151.50 |
$150.00 |
$150.00 |
$159.75 |
$327.19 |
| 7 | 221(F) 0100 |
TEMPORARY SILT DIKE | 231 | LF |
$8.00 |
$7.97 |
$7.89 |
$9.00 |
$8.40 |
$10.00 |
| 8 | 230(A) 2806 |
SOLID SLAB SODDING | 13,031 | SY |
$1.50 |
$1.28 |
$1.27 |
$1.27 |
$1.35 |
$1.50 |
| 9 | 233(A) 2817 |
VEGETATIVE MULCHING | 2.7 | AC |
$400.00 |
$151.50 |
$150.00 |
$150.00 |
$159.75 |
$175.00 |
| 10 | 241 2832 |
MOWING | 6 | AC |
$75.00 |
$69.69 |
$69.00 |
$69.00 |
$73.49 |
$80.00 |
| 11 | 402(A) 0217 |
TRAFFIC BOUND SURFACE COURSE TYPE A | 4,436 | TON |
$35.00 |
$38.21 |
$45.00 |
$38.00 |
$47.93 |
$52.00 |
| 12 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 18 | TON |
$50.00 |
$38.21 |
$50.00 |
$62.00 |
$53.25 |
$58.00 |
| 13 | 407(B) 0250 |
TACK COAT | 1,020 | GAL |
$3.00 |
$5.05 |
$5.00 |
$5.00 |
$5.33 |
$6.00 |
| 14 | 408 5774 |
PRIME COAT | 2,395 | GAL |
$4.50 |
$6.06 |
$6.00 |
$6.00 |
$6.39 |
$7.00 |
| 15 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 2,491 | TON |
$70.00 |
$111.10 |
$110.00 |
$110.00 |
$117.15 |
$127.00 |
| 16 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 857 | TON |
$85.00 |
$123.22 |
$122.00 |
$122.00 |
$129.93 |
$140.00 |
| 17 | 412 5267 |
COLD MILLING PAVEMENT | 771 | SY |
$10.00 |
$14.14 |
$15.00 |
$10.00 |
$10.65 |
$13.00 |
| 18 | 509(D) 0325 |
CLASS C CONCRETE | 165 | CY |
$325.00 |
$308.29 |
$350.00 |
$375.00 |
$346.13 |
$310.00 |
| 19 | 601(B) 0536 |
TYPE I-A PLAIN RIPRAP | 26 | TON |
$65.00 |
$58.04 |
$62.00 |
$53.00 |
$63.90 |
$57.00 |
| 20 | 601(C) 0538 |
TYPE I-A FILTER BLANKET | 9 | TON |
$54.90 |
$43.55 |
$51.00 |
$43.50 |
$53.25 |
$49.00 |
| 21 | 613(A) 0491 |
18" R.C.PIPE CLASS III | 62 | LF |
$50.00 |
$40.45 |
$70.00 |
$46.00 |
$53.25 |
$58.00 |
| 22 | 613(A) 0492 |
24" R.C.PIPE CLASS III | 80 | LF |
$65.00 |
$57.82 |
$92.00 |
$63.00 |
$69.23 |
$75.00 |
| 23 | 613(A) 0494 |
36" R.C.PIPE CLASS III | 80 | LF |
$100.00 |
$79.02 |
$140.00 |
$83.00 |
$106.50 |
$180.00 |
| 24 | 613(M) 7186 |
TYPE A4 CULVERT END TREATMENT | 2 | EA |
$1,500.00 |
$913.89 |
$1,200.00 |
$1,500.00 |
$1,704.00 |
$1,300.00 |
| 25 | 613(M) 7197 |
TYPE B6 CULVERT END TREATMENT | 2 | EA |
$1,800.00 |
$1,347.05 |
$1,500.00 |
$1,700.00 |
$2,023.50 |
$1,500.00 |
| 26 | 613(M) 7199 |
TYPE D6 CULVERT END TREATMENT | 2 | EA |
$2,500.00 |
$2,301.58 |
$2,400.00 |
$2,300.00 |
$2,769.00 |
$2,700.00 |
| 27 | 613(T) 1187 |
STANDARD BEDDING MATERIAL, CLASS C | 91 | CY |
$30.00 |
$50.69 |
$80.00 |
$80.00 |
$34.08 |
$105.00 |
| 28 | 613(V) 1180 |
TRENCH EXCAVATION | 28 | CY |
$5.00 |
$6.06 |
$7.00 |
$13.00 |
$5.33 |
$6.00 |
| 29 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$10,000.00 |
$3,030.00 |
$4,000.00 |
$7,000.00 |
$7,987.50 |
$10,000.00 |
| 30 | 619(B) 4725 |
REMOVAL OF FENCE | 1,273 | LF |
$2.00 |
$1.01 |
$5.00 |
$2.00 |
$3.04 |
$3.00 |
| 31 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 3,379 | SY |
$4.00 |
$4.04 |
$5.25 |
$4.50 |
$4.42 |
$10.00 |
| 32 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 302 | LF |
$4.00 |
$2.02 |
$4.00 |
$3.00 |
$4.26 |
$15.00 |
| 33 | 619(C) 0924 |
SAWING PAVEMENT | 252 | LF |
$4.00 |
$2.02 |
$4.50 |
$5.00 |
$3.73 |
$5.00 |
| 34 | 623 0100 |
(PL)GUARDRAIL CURBING | 2 | EA |
$1,000.00 |
$981.47 |
$800.00 |
$1,000.00 |
$3,237.75 |
$527.00 |
| 35 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 275 | LF |
$18.00 |
$16.67 |
$18.00 |
$14.00 |
$17.57 |
$21.00 |
| 36 | 623(G) 8590 |
GUARDRAIL END TREATMENT (31") | 4 | EA |
$2,250.00 |
$2,222.00 |
$2,300.00 |
$1,850.00 |
$2,343.00 |
$2,700.00 |
| 37 | 623(I) 8700 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 4 | EA |
$1,750.00 |
$1,565.50 |
$1,400.00 |
$1,550.00 |
$1,650.75 |
$1,700.00 |
| 38 | 624(C) 4459 |
FENCE-STYLE SWF (5 BARBED WIRE) | 1,114 | LF |
$7.00 |
$4.85 |
$4.00 |
$4.80 |
$5.11 |
$9.00 |
| 39 | 853 9033 |
DELINEATORS(TYPE 2, CODE 1) | 26 | EA |
$20.00 |
$12.63 |
$10.00 |
$14.00 |
$13.31 |
$12.00 |
| 40 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 85 | CY |
$20.00 |
$15.75 |
$15.00 |
$23.00 |
$21.66 |
$26.00 |
| 41 | 501(G) 6309 |
CLSM BACKFILL | 182 | CY |
$150.00 |
$144.29 |
$165.00 |
$180.00 |
$141.32 |
$200.00 |
| 42 | 503(A) 1312 |
PRESTRESSED CONCRETE BEAMS (TYPE III) | 219 | LF |
$195.00 |
$213.08 |
$250.00 |
$315.00 |
$265.00 |
$250.00 |
| 43 | 503(A) 1313 |
PRESTRESSED CONCRETE BEAMS (TYPE IV) | 758 | LF |
$215.00 |
$221.83 |
$260.00 |
$325.00 |
$280.00 |
$240.00 |
| 44 | 504(A) 1304 |
APPROACH SLAB | 224.8 | SY |
$180.00 |
$220.72 |
$210.00 |
$180.00 |
$220.00 |
$250.00 |
| 45 | 504(B) 1305 |
SAW-CUT GROOVING | 1,313.4 | SY |
$4.50 |
$4.25 |
$4.05 |
$5.50 |
$4.31 |
$5.00 |
| 46 | 504(D) 6245 |
CONCRETE RAIL (TR4) | 587 | LF |
$100.00 |
$89.12 |
$85.00 |
$88.00 |
$76.15 |
$82.00 |
| 47 | 506(A) 1322 |
STRUCTURAL STEEL | 1,050 | LB |
$2.50 |
$2.17 |
$3.00 |
$3.50 |
$2.43 |
$2.00 |
| 48 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 8 | EA |
$1,000.00 |
$430.24 |
$350.00 |
$400.00 |
$800.00 |
$500.00 |
| 49 | 507(B) 6174 |
STAINLESS STEEL EXPANSION BEARING ASSEMBLY | 16 | EA |
$2,000.00 |
$1,404.06 |
$1,400.00 |
$1,750.00 |
$1,500.00 |
$1,100.00 |
| 50 | 507(C) 6282 |
ELASTOMERIC BEARING PADS | 16 | EA |
$650.00 |
$588.97 |
$400.00 |
$500.00 |
$1,000.00 |
$300.00 |
| 51 | 509(A) 1326 |
CLASS AA CONCRETE | 320.4 | CY |
$600.00 |
$477.23 |
$600.00 |
$575.00 |
$450.00 |
$800.00 |
| 52 | 509(B) 1328 |
CLASS A CONCRETE | 141.8 | CY |
$650.00 |
$524.87 |
$550.00 |
$650.00 |
$785.31 |
$500.00 |
| 53 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 89,830 | LB |
$1.10 |
$0.9800 |
$1.10 |
$1.00 |
$2.00 |
$1.00 |
| 54 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 496 | LF |
$38.00 |
$34.79 |
$35.00 |
$49.00 |
$35.00 |
$24.00 |
| 55 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 496 | LF |
$12.00 |
$8.40 |
$10.00 |
$9.00 |
$16.55 |
$16.00 |
| 56 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 57 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 1,112 | SY |
$4.00 |
$3.36 |
$3.65 |
$3.60 |
$3.89 |
$5.00 |
| 58 | 516(A) 6096 |
DRILLED SHAFTS 60" DIAMETER | 164 | LF |
$800.00 |
$791.02 |
$800.00 |
$800.00 |
$850.00 |
$755.00 |
| 59 | 516(C) 6200 |
CROSSHOLE SONIC LOGGING | 1 | EA |
$3,000.00 |
$1,995.00 |
$3,500.00 |
$3,000.00 |
$1,491.00 |
$2,000.00 |
| 60 | 523(A) 6550 |
SEALER CRACK PREPARATION | 163 | LF |
$4.00 |
$5.25 |
$5.00 |
$4.15 |
$5.33 |
$6.00 |
| 61 | 523(B) 6560 |
SEALER RESIN | 1.8 | GAL |
$110.00 |
$157.50 |
$150.00 |
$155.00 |
$159.75 |
$200.00 |
| 62 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 2,300 | TON |
$65.00 |
$52.99 |
$64.00 |
$55.00 |
$51.58 |
$60.00 |
| 63 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 350 | TON |
$55.00 |
$41.08 |
$51.00 |
$45.00 |
$44.85 |
$50.00 |
| 64 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 84 | LF |
$25.00 |
$22.68 |
$30.00 |
$26.00 |
$24.46 |
$11.00 |
| 65 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 60 | LF |
$25.00 |
$12.18 |
$30.00 |
$26.00 |
$18.06 |
$8.00 |
| 66 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$50,000.00 |
$47,250.00 |
$50,000.00 |
$18,500.00 |
$125,000.00 |
$85,000.00 |
| 67 | 805(A) 8724 |
(PL)REMOVAL OF EXISTING SIGNS | 10 | EA |
$150.00 |
$80.80 |
$100.00 |
$100.00 |
$85.20 |
$120.00 |
| 68 | 805(D) 8756 |
(PL)REMOVE & RESET EXISTING SIGNS | 4 | EA |
$250.00 |
$126.25 |
$150.00 |
$150.00 |
$133.13 |
$200.00 |
| 69 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 67.5 | SF |
$40.00 |
$35.35 |
$18.00 |
$18.00 |
$37.27 |
$21.00 |
| 70 | 851(C) 8327 |
2 1/4" SQUARE TUBE POST | 124.9 | LF |
$10.20 |
$9.09 |
$10.00 |
$10.00 |
$9.59 |
$12.00 |
| 71 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 7,520 | LF |
$1.00 |
$0.8900 |
$0.7500 |
$0.7500 |
$0.9400 |
$1.00 |
| 72 | 856(A) 8555 |
TRAFFIC STRIPE(MULTI-POLY.)(24" WIDE) | 51 | LF |
$3.00 |
$11.11 |
$10.00 |
$10.00 |
$11.72 |
$12.00 |
| 73 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 153 | LF |
$0.5000 |
$4.04 |
$2.00 |
$2.00 |
$4.26 |
$2.50 |
| 74 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 3,300 | SD |
$1.50 |
$0.8600 |
$0.5000 |
$0.5000 |
$0.9100 |
$1.00 |
| 75 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 3,300 | SD |
$1.75 |
$0.8600 |
$0.1000 |
$0.1000 |
$0.9100 |
$0.2000 |
| 76 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 1,950 | SD |
$2.25 |
$0.8600 |
$1.50 |
$1.50 |
$0.9100 |
$2.00 |
| 77 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 600 | SD |
$0.5000 |
$2.53 |
$4.00 |
$4.00 |
$2.66 |
$5.00 |
| 78 | 880(C) 8848 |
WING BARRICADES | 300 | SD |
$0.7500 |
$0.5100 |
$3.00 |
$3.00 |
$0.5300 |
$4.00 |
| 79 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 3,000 | SD |
$0.7500 |
$0.4000 |
$1.00 |
$1.00 |
$0.4300 |
$1.50 |
| 80 | 880(F) 8878 |
DRUMS | 7,500 | SD |
$0.7500 |
$0.0200 |
$0.1500 |
$0.1500 |
$0.0200 |
$0.2500 |
| 81 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 28 | SD |
$25.00 |
$20.20 |
$50.00 |
$50.00 |
$21.30 |
$60.00 |
| 82 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$12,000.00 |
$8,787.00 |
$11,000.00 |
$8,850.00 |
$5,218.50 |
$17,000.00 |
| 83 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$20,000.00 |
$3,090.00 |
$1,275.00 |
$7,000.00 |
$733.13 |
$3,500.00 |
| 84 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$115,000.00 |
$99,491.64 |
$135,000.00 |
$118,000.00 |
$129,500.00 |
$145,000.00 |