| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$5,000.00 |
$17,510.00 |
$10,000.00 |
$12,000.00 |
$15,610.00 |
$7,734.30 |
$6,154.80 |
$17,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 3,305 | CY |
$8.00 |
$11.33 |
$10.00 |
$20.00 |
$9.25 |
$12.18 |
$8.21 |
$9.00 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 500 | CY |
$9.50 |
$16.48 |
$4.00 |
$20.00 |
$32.10 |
$16.75 |
$9.92 |
$8.00 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$5,000.00 |
$5,768.00 |
$6,000.00 |
$6,000.00 |
$36,250.00 |
$14,616.00 |
$6,154.80 |
$13,000.00 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 1,420 | LF |
$2.00 |
$1.59 |
$1.70 |
$2.00 |
$1.90 |
$2.44 |
$1.63 |
$1.65 |
| 6 | 221(F) 0100 |
TEMPORARY SILT DIKE | 190 | LF |
$9.50 |
$8.24 |
$8.40 |
$10.00 |
$8.80 |
$14.62 |
$9.56 |
$8.00 |
| 7 | 221(G) 0153 |
TEMPORARY ROCK FILTER DAM TYPE 4 | 22.6 | CY |
$150.00 |
$77.25 |
$165.00 |
$60.00 |
$129.50 |
$54.81 |
$140.33 |
$300.00 |
| 8 | 230(A) 2806 |
SOLID SLAB SODDING | 7,317 | SY |
$4.00 |
$1.39 |
$1.50 |
$1.80 |
$2.10 |
$2.44 |
$2.19 |
$1.65 |
| 9 | 233(A) 2817 |
VEGETATIVE MULCHING | 0.7 | AC |
$220.00 |
$103.00 |
$150.00 |
$1,000.00 |
$517.50 |
$609.00 |
$136.77 |
$125.00 |
| 10 | 241 2832 |
MOWING | 1.6 | AC |
$120.00 |
$103.00 |
$150.00 |
$150.00 |
$207.00 |
$152.25 |
$136.78 |
$125.00 |
| 11 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 800 | CY |
$65.00 |
$49.03 |
$52.00 |
$56.80 |
$55.20 |
$61.58 |
$60.18 |
$62.00 |
| 12 | 307(K) 4300 |
STABILIZED SUBGRADE | 4,708 | SY |
$8.00 |
$5.51 |
$6.55 |
$11.60 |
$10.10 |
$6.71 |
$7.93 |
$7.00 |
| 13 | 325 5271 |
SEPARATOR FABRIC | 2,238 | SY |
$2.00 |
$1.39 |
$1.25 |
$3.70 |
$3.70 |
$3.49 |
$1.37 |
$4.50 |
| 14 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 338 | TON |
$34.00 |
$26.06 |
$28.00 |
$25.00 |
$57.60 |
$35.28 |
$30.09 |
$36.00 |
| 15 | 407(B) 0250 |
TACK COAT | 762 | GAL |
$4.00 |
$2.06 |
$3.00 |
$5.00 |
$4.65 |
$5.43 |
$4.10 |
$6.00 |
| 16 | 408 5774 |
PRIME COAT | 2,879 | GAL |
$6.50 |
$2.58 |
$1.35 |
$7.85 |
$7.35 |
$8.53 |
$4.79 |
$8.50 |
| 17 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 1,462 | TON |
$90.00 |
$75.71 |
$82.50 |
$87.00 |
$70.00 |
$97.14 |
$100.25 |
$108.00 |
| 18 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 660 | TON |
$105.00 |
$87.55 |
$88.40 |
$102.00 |
$86.70 |
$113.88 |
$107.37 |
$127.00 |
| 19 | 412 5267 |
COLD MILLING PAVEMENT | 1,406 | SY |
$5.50 |
$4.64 |
$14.00 |
$5.50 |
$11.10 |
$6.70 |
$13.68 |
$6.75 |
| 20 | 509(D) 0325 |
CLASS C CONCRETE | 10 | CY |
$400.00 |
$381.10 |
$300.00 |
$500.00 |
$490.50 |
$334.95 |
$376.13 |
$250.00 |
| 21 | 613(A) 0492 |
24" R.C.PIPE CLASS III | 228 | LF |
$75.00 |
$64.89 |
$71.00 |
$40.00 |
$113.00 |
$68.55 |
$90.16 |
$75.00 |
| 22 | 613(B) 0696 |
60" CORR. GALV. STEEL PIPE | 280 | LF |
$200.00 |
$110.21 |
$95.00 |
$80.00 |
$114.50 |
$139.38 |
$211.93 |
$165.00 |
| 23 | 613(B) 4533 |
64" X 43" CORR. GALV. STEEL PIPE ARCH | 127 | LF |
$250.00 |
$124.63 |
$125.00 |
$100.00 |
$77.80 |
$150.40 |
$269.17 |
$100.00 |
| 24 | 613(L) 5730 |
24" PREFAB. CULVERT END SECTION, ROUND | 4 | EA |
$650.00 |
$772.50 |
$925.00 |
$1,200.00 |
$3,883.00 |
$1,378.53 |
$690.71 |
$1,015.00 |
| 25 | 613(M) 7189 |
TYPE D4 CULVERT END TREATMENT | 1 | EA |
$2,300.00 |
$2,575.00 |
$4,100.00 |
$1,500.00 |
$2,476.00 |
$3,191.16 |
$2,051.60 |
$2,150.00 |
| 26 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$5,000.00 |
$2,781.00 |
$4,000.00 |
$4,000.00 |
$9,583.00 |
$6,090.00 |
$1,641.28 |
$12,000.00 |
| 27 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 3,836 | SY |
$5.00 |
$3.60 |
$6.00 |
$5.55 |
$7.65 |
$7.31 |
$7.59 |
$6.75 |
| 28 | 619(C) 0924 |
SAWING PAVEMENT | 269 | LF |
$6.00 |
$6.18 |
$7.00 |
$10.00 |
$8.15 |
$12.37 |
$1.37 |
$3.00 |
| 29 | 624(C) 4459 |
FENCE-STYLE SWF (5 BARBED WIRE) | 1,109 | LF |
$6.50 |
$3.76 |
$4.15 |
$3.65 |
$3.80 |
$8.72 |
$6.98 |
$4.50 |
| 30 | 202(A) 1301 |
UNCLASSIFIED EXCAVATION | 1,840 | CY |
$7.00 |
$12.36 |
$7.75 |
$20.00 |
$5.85 |
$12.18 |
$8.21 |
$12.00 |
| 31 | 501(A) 1306 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 470 | CY |
$12.00 |
$20.60 |
$10.00 |
$20.00 |
$14.70 |
$12.18 |
$12.99 |
$24.00 |
| 32 | 509(A) 1326 |
CLASS AA CONCRETE | 394.4 | CY |
$525.00 |
$421.27 |
$473.00 |
$352.00 |
$467.50 |
$373.10 |
$752.25 |
$795.00 |
| 33 | 511(A) 1332 |
REINFORCING STEEL | 69,420 | LB |
$1.10 |
$1.15 |
$0.7800 |
$0.8800 |
$1.10 |
$0.9200 |
$0.6900 |
$0.9000 |
| 34 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$15,000.00 |
$3,399.00 |
$12,000.00 |
$3,500.00 |
$4,723.00 |
$15,834.00 |
$5,470.93 |
$20,000.00 |
| 35 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$10,000.00 |
$7,931.00 |
$8,500.00 |
$3,500.00 |
$4,723.00 |
$15,834.00 |
$5,470.93 |
$20,000.00 |
| 36 | 853 9030 |
DELINEATORS(TYPE 1, CODE 3) | 2 | EA |
$50.00 |
$20.60 |
$20.00 |
$35.00 |
$36.20 |
$42.63 |
$27.36 |
$43.39 |
| 37 | 855(A) 8812 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 2,154 | LF |
$0.6000 |
$0.4600 |
$0.5000 |
$0.9400 |
$0.9700 |
$1.14 |
$0.6200 |
$1.17 |
| 38 | 857(A) 8839 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) | 3,800 | LF |
$0.6000 |
$0.1600 |
$0.2000 |
$0.4400 |
$0.4600 |
$0.5400 |
$0.2100 |
$0.5500 |
| 39 | 857(E) 8887 |
(PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-1 | 760 | EA |
$1.00 |
$0.3600 |
$0.4000 |
$0.6500 |
$0.6700 |
$0.7900 |
$0.4800 |
$0.8100 |
| 40 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 750 | LF |
$2.20 |
$1.03 |
$1.10 |
$2.00 |
$2.05 |
$2.44 |
$1.37 |
$2.48 |
| 41 | 871(B) 8705 |
(SP)CONST.ZONE IMPACT ATTEN. | 240 | SD |
$7.00 |
$4.12 |
$4.40 |
$6.00 |
$6.20 |
$7.31 |
$5.47 |
$7.44 |
| 42 | 877(B) 8484 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 1,587.5 | LF |
$25.00 |
$19.57 |
$19.00 |
$12.00 |
$22.00 |
$45.98 |
$29.06 |
$29.49 |
| 43 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 1,680 | SD |
$0.4000 |
$0.1000 |
$0.1500 |
$0.0300 |
$0.0300 |
$0.0400 |
$0.1400 |
$0.0400 |
| 44 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 960 | SD |
$1.00 |
$4.12 |
$4.40 |
$2.50 |
$2.60 |
$3.05 |
$5.47 |
$3.10 |
| 45 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 1,520 | SD |
$1.50 |
$1.03 |
$1.10 |
$2.50 |
$2.60 |
$3.05 |
$1.37 |
$3.10 |
| 46 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 120 | SD |
$2.00 |
$10.30 |
$16.00 |
$5.00 |
$5.20 |
$6.09 |
$13.68 |
$6.20 |
| 47 | 880(C) 8848 |
WING BARRICADES | 480 | SD |
$1.00 |
$1.03 |
$3.30 |
$0.4000 |
$0.4100 |
$0.4900 |
$1.37 |
$0.5000 |
| 48 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 800 | SD |
$0.7000 |
$7.21 |
$6.00 |
$0.6000 |
$0.6200 |
$0.7300 |
$9.57 |
$0.7400 |
| 49 | 880(F) 8878 |
DRUMS | 2,960 | SD |
$0.4000 |
$0.2600 |
$1.10 |
$0.4000 |
$0.4100 |
$0.4900 |
$0.3400 |
$0.5000 |
| 50 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 240 | SD |
$15.00 |
$4.12 |
$27.50 |
$16.00 |
$16.60 |
$19.49 |
$5.47 |
$19.83 |
| 51 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$13,000.00 |
$6,901.00 |
$8,200.00 |
$15,000.00 |
$6,935.00 |
$11,571.00 |
$9,163.81 |
$8,300.00 |
| 52 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$2,060.00 |
$3,000.00 |
$2,000.00 |
$2,950.00 |
$5,456.64 |
$12,651.53 |
$9,600.00 |
| 53 | 640(A) 1398 |
FIELD OFFICE | 1 | EA |
$8,000.00 |
$2,500.00 |
$6,600.00 |
$2,000.00 |
$3,623.00 |
$18,513.60 |
$8,206.40 |
$6,500.00 |
| 54 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$80,000.00 |
$64,165.78 |
$77,000.00 |
$57,000.00 |
$66,080.99 |
$67,548.25 |
$82,063.99 |
$29,000.00 |