| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$19,089.80 |
$15,000.00 |
$11,000.00 |
$9,010.00 |
$10,427.50 |
$25,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 21,237 | CY |
$8.00 |
$8.00 |
$8.70 |
$11.50 |
$7.83 |
$10.00 |
| 3 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$20,056.50 |
$21,000.00 |
$21,735.00 |
$15,900.00 |
$19,869.60 |
$41,000.00 |
| 4 | 221(C) 2801 |
TEMPORARY SILT FENCE | 387 | LF |
$1.80 |
$3.50 |
$3.00 |
$1.40 |
$3.23 |
$2.00 |
| 5 | 221(F) 0100 |
TEMPORARY SILT DIKE | 182 | LF |
$8.20 |
$8.85 |
$8.70 |
$7.70 |
$8.60 |
$10.00 |
| 6 | 221(G) 0150 |
TEMPORARY ROCK FILTER DAM TYPE 1 | 46 | CY |
$98.00 |
$100.00 |
$100.00 |
$79.50 |
$86.00 |
$85.00 |
| 7 | 229 4318 |
DITCH LINER PROTECTION | 2,183 | LF |
$1.50 |
$1.63 |
$1.80 |
$1.50 |
$1.08 |
$3.00 |
| 8 | 230(A) 2806 |
SOLID SLAB SODDING | 27,440 | SY |
$1.40 |
$1.69 |
$1.56 |
$1.60 |
$1.61 |
$2.00 |
| 9 | 233(A) 2817 |
VEGETATIVE MULCHING | 7 | AC |
$341.80 |
$247.00 |
$500.00 |
$517.00 |
$537.50 |
$240.00 |
| 10 | 241 2832 |
MOWING | 14 | AC |
$72.00 |
$132.00 |
$150.00 |
$97.50 |
$107.50 |
$85.00 |
| 11 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 1,375 | CY |
$57.70 |
$70.00 |
$70.00 |
$71.00 |
$66.37 |
$86.00 |
| 12 | 307(K) 4300 |
STABILIZED SUBGRADE | 13,585 | SY |
$7.60 |
$6.25 |
$6.82 |
$6.90 |
$6.99 |
$6.00 |
| 13 | 325 5271 |
SEPARATOR FABRIC | 6,995 | SY |
$1.50 |
$2.00 |
$1.22 |
$2.40 |
$1.33 |
$1.00 |
| 14 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 482 | TON |
$34.50 |
$35.00 |
$35.00 |
$39.00 |
$37.65 |
$35.00 |
| 15 | 407(B) 0250 |
TACK COAT | 1,870 | GAL |
$3.50 |
$4.00 |
$3.83 |
$2.70 |
$3.92 |
$4.00 |
| 16 | 408 5774 |
PRIME COAT | 6,696 | GAL |
$5.10 |
$6.40 |
$6.15 |
$8.00 |
$6.29 |
$13.00 |
| 17 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 3,069 | TON |
$85.80 |
$87.40 |
$83.42 |
$84.50 |
$85.41 |
$96.00 |
| 18 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 1,774 | TON |
$99.90 |
$95.50 |
$91.14 |
$87.50 |
$93.31 |
$113.00 |
| 19 | 412 5267 |
COLD MILLING PAVEMENT | 3,556 | SY |
$5.00 |
$7.50 |
$7.70 |
$5.30 |
$6.45 |
$14.00 |
| 20 | 413(B) 4863 |
RUMBLE STRIP-METHOD HMA-CYC | 2,429 | LF |
$0.2000 |
$1.00 |
$1.00 |
$3.30 |
$1.83 |
$0.5500 |
| 21 | 501(A) 0313 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 24 | CY |
$18.60 |
$25.00 |
$20.80 |
$23.00 |
$16.13 |
$30.00 |
| 22 | 509(A) 0319 |
CLASS AA CONCRETE | 47 | CY |
$839.20 |
$550.00 |
$600.00 |
$839.00 |
$571.53 |
$1,350.00 |
| 23 | 509(D) 0325 |
CLASS C CONCRETE | 141 | CY |
$282.30 |
$300.00 |
$350.00 |
$366.00 |
$435.01 |
$350.00 |
| 24 | 511(A) 0332 |
REINFORCING STEEL | 8,136 | LB |
$1.20 |
$0.7000 |
$1.15 |
$2.00 |
$0.9100 |
$1.00 |
| 25 | 601(B) 0536 |
TYPE I-A PLAIN RIPRAP | 122 | TON |
$53.80 |
$48.00 |
$45.20 |
$50.00 |
$50.70 |
$50.00 |
| 26 | 601(C) 0538 |
TYPE I-A FILTER BLANKET | 16 | TON |
$46.10 |
$38.00 |
$37.16 |
$42.50 |
$42.99 |
$45.00 |
| 27 | 613(B) 0692 |
36" CORR. GALV. STEEL PIPE | 70 | LF |
$68.00 |
$40.00 |
$60.00 |
$52.50 |
$50.38 |
$60.00 |
| 28 | 613(B) 0693 |
42" CORR. GALV. STEEL PIPE | 72 | LF |
$68.00 |
$50.00 |
$70.00 |
$63.50 |
$58.90 |
$100.00 |
| 29 | 613(B) 0698 |
72" CORR. GALV. STEEL PIPE | 324 | LF |
$100.00 |
$100.00 |
$90.00 |
$107.00 |
$99.98 |
$200.00 |
| 30 | 613(M) 7199 |
TYPE D6 CULVERT END TREATMENT | 2 | EA |
$1,900.00 |
$1,685.00 |
$2,800.00 |
$2,070.00 |
$1,229.40 |
$3,250.00 |
| 31 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$10,506.90 |
$8,500.00 |
$5,000.00 |
$3,180.00 |
$5,375.00 |
$20,000.00 |
| 32 | 619(B) 0291 |
REMOVAL OF HEADWALL | 2 | EA |
$1,382.70 |
$1,200.00 |
$2,500.00 |
$691.00 |
$1,075.00 |
$2,000.00 |
| 33 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 10,410 | SY |
$4.30 |
$6.50 |
$7.50 |
$2.30 |
$4.84 |
$6.00 |
| 34 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 863 | LF |
$3.40 |
$5.00 |
$3.00 |
$3.70 |
$3.23 |
$11.00 |
| 35 | 619(C) 0924 |
SAWING PAVEMENT | 1,360 | LF |
$4.20 |
$5.00 |
$4.12 |
$5.60 |
$3.76 |
$5.00 |
| 36 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 350 | LF |
$18.80 |
$16.60 |
$16.80 |
$18.50 |
$18.81 |
$21.00 |
| 37 | 623(G) 8590 |
GUARDRAIL END TREATMENT (31") | 4 | EA |
$2,373.70 |
$2,220.00 |
$2,163.00 |
$2,010.00 |
$2,042.50 |
$2,700.00 |
| 38 | 623(I) 8700 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 4 | EA |
$1,996.10 |
$2,030.00 |
$2,300.00 |
$1,480.00 |
$1,505.00 |
$2,000.00 |
| 39 | 624(C) 4459 |
FENCE-STYLE SWF (5 BARBED WIRE) | 4,565 | LF |
$5.80 |
$4.20 |
$4.20 |
$4.00 |
$4.09 |
$5.00 |
| 40 | 853 9069 |
GUARDRAIL DELINEATORS(TYPE 2, CODE 1) | 16 | EA |
$12.40 |
$13.00 |
$15.00 |
$10.50 |
$10.75 |
$18.00 |
| 41 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 80 | CY |
$10.00 |
$15.00 |
$15.75 |
$17.50 |
$21.50 |
$20.00 |
| 42 | 501(G) 6309 |
CLSM BACKFILL | 122 | CY |
$145.00 |
$150.00 |
$126.10 |
$177.00 |
$148.46 |
$175.00 |
| 43 | 503(A) 1311 |
PRESTRESSED CONCRETE BEAMS (TYPE II) | 318 | LF |
$205.00 |
$185.00 |
$194.71 |
$187.00 |
$208.38 |
$250.00 |
| 44 | 503(A) 1312 |
PRESTRESSED CONCRETE BEAMS (TYPE III) | 299 | LF |
$230.00 |
$200.00 |
$208.81 |
$194.00 |
$247.90 |
$250.00 |
| 45 | 504(A) 1304 |
APPROACH SLAB | 187.4 | SY |
$170.00 |
$200.00 |
$143.94 |
$253.00 |
$197.71 |
$220.00 |
| 46 | 504(B) 1305 |
SAW-CUT GROOVING | 877.7 | SY |
$5.00 |
$5.00 |
$5.00 |
$4.20 |
$4.30 |
$5.00 |
| 47 | 504(D) 6245 |
CONCRETE RAIL (TR4) | 391 | LF |
$100.00 |
$80.00 |
$79.50 |
$92.00 |
$92.42 |
$155.00 |
| 48 | 506(A) 1322 |
STRUCTURAL STEEL | 1,050 | LB |
$4.00 |
$2.00 |
$3.05 |
$6.70 |
$3.12 |
$3.50 |
| 49 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 8 | EA |
$861.60 |
$275.00 |
$400.00 |
$521.00 |
$1,139.38 |
$450.00 |
| 50 | 507(B) 6174 |
STAINLESS STEEL EXPANSION BEARING ASSEMBLY | 16 | EA |
$2,500.00 |
$1,450.00 |
$1,285.00 |
$1,400.00 |
$1,848.08 |
$1,300.00 |
| 51 | 507(C) 6282 |
ELASTOMERIC BEARING PADS | 16 | EA |
$610.00 |
$350.00 |
$284.23 |
$557.00 |
$244.25 |
$175.00 |
| 52 | 509(A) 1326 |
CLASS AA CONCRETE | 206 | CY |
$600.00 |
$600.00 |
$530.00 |
$556.00 |
$679.03 |
$1,000.00 |
| 53 | 509(B) 1328 |
CLASS A CONCRETE | 106.2 | CY |
$620.00 |
$600.00 |
$528.00 |
$824.00 |
$673.35 |
$750.00 |
| 54 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 63,870 | LB |
$1.10 |
$0.9000 |
$1.10 |
$1.00 |
$1.21 |
$1.15 |
| 55 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 400 | LF |
$50.00 |
$25.00 |
$30.15 |
$43.50 |
$34.97 |
$30.00 |
| 56 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 400 | LF |
$15.00 |
$15.00 |
$10.00 |
$21.00 |
$16.13 |
$20.00 |
| 57 | 514(K) 6260 |
(PL)PILOT HOLES | 120 | LF |
$150.00 |
$125.00 |
$115.00 |
$112.00 |
$92.85 |
$100.00 |
| 58 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 59 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 712 | SY |
$5.00 |
$3.25 |
$3.83 |
$3.70 |
$3.76 |
$4.20 |
| 60 | 516(A) 6094 |
DRILLED SHAFTS 48" DIAMETER | 150 | LF |
$700.00 |
$700.00 |
$640.00 |
$711.00 |
$795.04 |
$1,200.00 |
| 61 | 516(C) 6200 |
CROSSHOLE SONIC LOGGING | 1 | EA |
$3,500.00 |
$3,300.00 |
$3,500.00 |
$1,750.00 |
$1,505.00 |
$4,500.00 |
| 62 | 523(A) 6550 |
SEALER CRACK PREPARATION | 163 | LF |
$5.00 |
$5.00 |
$4.20 |
$4.20 |
$4.30 |
$5.00 |
| 63 | 523(B) 6560 |
SEALER RESIN | 1.8 | GAL |
$130.00 |
$200.00 |
$144.00 |
$127.00 |
$129.00 |
$150.00 |
| 64 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 700 | TON |
$45.00 |
$45.00 |
$43.10 |
$49.50 |
$50.70 |
$60.00 |
| 65 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 160 | TON |
$35.00 |
$38.00 |
$41.00 |
$47.50 |
$25.52 |
$50.00 |
| 66 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 84 | LF |
$35.00 |
$25.00 |
$50.00 |
$45.50 |
$28.91 |
$24.00 |
| 67 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 42 | LF |
$21.00 |
$25.00 |
$22.75 |
$26.00 |
$26.63 |
$20.00 |
| 68 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$40,000.00 |
$30,000.00 |
$45,000.00 |
$32,900.00 |
$43,000.00 |
$150,000.00 |
| 69 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 26 | SF |
$23.70 |
$24.00 |
$27.50 |
$19.00 |
$23.10 |
$25.00 |
| 70 | 851(C) 8330 |
2 1/2" SQUARE TUBE POST | 72 | LF |
$7.20 |
$8.00 |
$15.00 |
$12.50 |
$7.35 |
$15.00 |
| 71 | 855(A) 8812 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 7,514 | LF |
$0.8000 |
$0.6400 |
$0.6500 |
$0.9500 |
$0.6300 |
$1.00 |
| 72 | 857(A) 8839 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) | 8,600 | LF |
$0.2000 |
$0.1900 |
$0.2500 |
$0.2500 |
$0.1800 |
$0.3000 |
| 73 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 2,400 | LF |
$0.6000 |
$0.6400 |
$0.7500 |
$0.2500 |
$0.6300 |
$0.5000 |
| 74 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 840 | SD |
$0.5000 |
$1.60 |
$2.00 |
$0.3500 |
$1.63 |
$0.5000 |
| 75 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 2,100 | SD |
$0.6000 |
$1.60 |
$2.00 |
$0.9000 |
$1.63 |
$1.00 |
| 76 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 2,940 | SD |
$1.50 |
$1.60 |
$2.00 |
$1.60 |
$1.63 |
$2.00 |
| 77 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 840 | SD |
$0.6000 |
$3.15 |
$3.25 |
$1.60 |
$3.15 |
$2.00 |
| 78 | 880(C) 8848 |
WING BARRICADES | 840 | SD |
$0.9000 |
$0.1200 |
$0.2000 |
$1.10 |
$0.1100 |
$1.50 |
| 79 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 2,520 | SD |
$0.2000 |
$0.3200 |
$0.3500 |
$0.0500 |
$0.3200 |
$0.1000 |
| 80 | 880(F) 8878 |
DRUMS | 5,880 | SD |
$0.2000 |
$0.1200 |
$0.1500 |
$0.1500 |
$0.1100 |
$0.2000 |
| 81 | 880(G) 8890 |
CHANNELIZER CONES | 5,400 | SD |
$0.3000 |
$0.0400 |
$0.1000 |
$0.1500 |
$0.0200 |
$0.2000 |
| 82 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 420 | SD |
$11.70 |
$8.50 |
$9.00 |
$10.50 |
$8.40 |
$15.00 |
| 83 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$25,000.00 |
$19,500.00 |
$19,500.00 |
$18,800.00 |
$18,606.00 |
$37,000.00 |
| 84 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$3,682.10 |
$4,000.00 |
$4,500.00 |
$2,910.00 |
$3,675.00 |
$7,000.00 |
| 85 | 640(A) 1398 |
FIELD OFFICE | 1 | EA |
$8,785.70 |
$5,000.00 |
$5,300.00 |
$3,680.00 |
$15,750.00 |
$15,000.00 |
| 86 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$130,000.00 |
$100,000.00 |
$120,000.00 |
$63,467.91 |
$133,477.75 |
$169,000.00 |