GRADE, DRAIN, SURFACE , AND BRIDGE SH-32: BEGIN 0.41 MILES WEST OF SH -96, EXTEND EAST NEAR BURNEYVILLE. PROJECT LENGTH = 4.303 MILES

Let date
Thursday, October 15, 2015
Contract
150337
J/P numbers
10147(04)
District
Division 7
County
Love
Highway
Limits
GRADE, DRAIN, SURFACE , AND BRIDGE SH-32: BEGIN 0.41 MILES WEST OF SH -96, EXTEND EAST NEAR BURNEYVILLE. PROJECT LENGTH = 4.303 MILES
Project number
STP-043C(141)SS

Bidders 3

#ContractorTotal bidvs estimatevs low
EEEngineer's estimate$11,621,177
1 THE CUMMINS CONSTRUCTION CO., INC. Low bidder $13,594,552 +17.0%
2 OVERLAND CORPORATION $13,667,781 +17.6% +0.5%
3 Silver Star Construction Company, Inc. $16,026,300 +37.9% +17.9%

Bid tab: unit prices 97 items

ExcelCSV
SeqBid codeDescriptionQtyUnitEstimate #1 THE CUMMINS CON…#2 OVERLAND CORPOR…#3 Silver Star Con…
1201(A) 0102 CLEARING AND GRUBBING1LSUM $40,000.00 $239,500.00 $69,200.00 $350,000.00
2202(A) 0183 UNCLASSIFIED EXCAVATION170,840CY $5.00 $10.79 $9.95 $12.25
3202(C) 0182 ROCK EXCAVATION5,500CY $15.00 $19.64 $43.30 $42.50
4202(D) 0184 UNCLASSIFIED BORROW165,883CY $7.00 $8.88 $12.40 $11.30
5205(A) 4229 TYPE A-SALVAGED TOPSOIL1LSUM $100,000.00 $139,500.00 $185,000.00 $465,000.00
6221(C) 2801 TEMPORARY SILT FENCE13,360LF $2.00 $1.07 $1.35 $1.20
7221(D) 2803 TEMPORARY SEDIMENT FILTER11EA $190.00 $90.00 $210.00 $97.00
8221(F) 0100 TEMPORARY SILT DIKE3,381LF $7.00 $6.00 $7.30 $6.50
9221(G) 0150 TEMPORARY ROCK FILTER DAM TYPE 1140CY $100.00 $100.00 $250.00 $217.00
10230(A) 2806 SOLID SLAB SODDING257,840SY $1.50 $1.14 $1.45 $1.25
11233(A) 2817 VEGETATIVE MULCHING108AC $350.00 $275.00 $615.00 $298.00
12241 2832 MOWING108AC $65.00 $49.00 $90.00 $53.00
13303(A) 2200 (SP)AGGREGATE BASE TYPE A, PLANT MIXED22,137CY $50.00 $67.00 $55.25 $61.90
14307(K) 4300 STABILIZED SUBGRADE109,726SY $4.00 $5.00 $3.60 $4.60
15310(B) 0149 SUBGRADE, METHOD B16,405SY $1.50 $2.25 $2.05 $2.55
16325 5271 SEPARATOR FABRIC109,726SY $1.25 $1.00 $1.35 $0.8500
17402(E) 0225 TRAFFIC BOUND SURFACE COURSE TYPE E10,999TON $25.00 $22.00 $25.25 $22.30
18407(B) 0250 TACK COAT17,692GAL $3.00 $4.00 $3.00 $1.60
19408 5774 PRIME COAT69,913GAL $4.00 $4.10 $3.75 $3.50
20409(A) 4242 FABRIC REINFORCEMENT30,481SY $1.50 $2.03 $0.9500 $1.45
21409(B) 4268 BITUMINOUS BINDER6,096GAL $4.00 $1.00 $3.45 $3.50
22411(B) 5945 SUPERPAVE, TYPE S3(PG 64-22 OK)43,258TON $68.00 $59.22 $57.65 $71.10
23411(C) 5960 SUPERPAVE, TYPE S4(PG 64-22 OK)13,597TON $80.00 $65.69 $67.40 $80.50
24411(H) 6210 SUPERPAVE, TYPE S3(PATCH)(PG64-22OK)500TON $130.00 $133.38 $148.90 $170.56
25412 5267 COLD MILLING PAVEMENT23,078SY $1.50 $1.50 $1.75 $3.50
26501(A) 0313 STRUCTURAL EXCAVATION UNCLASSIFIED408CY $15.00 $10.00 $33.25 $10.90
27509(A) 0319 CLASS AA CONCRETE1,065CY $325.00 $295.00 $482.55 $319.00
28509(D) 0325 CLASS C CONCRETE737CY $250.00 $240.00 $332.80 $260.00
29511(A) 0332 REINFORCING STEEL158,363LB $0.9000 $0.9000 $1.00 $1.00
30601(A) 0297 TYPE I PLAIN RIPRAP1,060TON $40.00 $40.00 $63.85 $43.30
31611(A) 2658 MANHOLE (5' DIAMETER)1EA $2,500.00 $6,000.00 $3,680.00 $6,490.00
32611(G) 6002 INLET (SMD-TYPE 2)6EA $2,000.00 $2,000.00 $2,410.00 $2,165.00
33613(A) 0491 18" R.C.PIPE CLASS III689LF $50.00 $45.00 $60.85 $48.90
34613(A) 0492 24" R.C.PIPE CLASS III22LF $60.00 $75.00 $86.65 $81.10
35613(A) 0493 30" R.C.PIPE CLASS III544LF $75.00 $100.00 $92.85 $109.00
36613(A) 0494 36" R.C.PIPE CLASS III64LF $95.00 $150.00 $126.40 $163.00
37613(B) 0689 18" CORR. GALV. STEEL PIPE514LF $20.00 $21.00 $42.95 $23.00
38613(B) 0690 24" CORR. GALV. STEEL PIPE228LF $25.00 $27.00 $45.75 $29.50
39613(B) 0691 30" CORR. GALV. STEEL PIPE148LF $30.00 $35.00 $51.50 $38.00
40613(B) 4527 21" X 15" CORR. GALV. STEEL PIPE ARCH120LF $35.00 $23.00 $50.70 $25.00
41613(B) 4530 42" X 29" CORR. GALV. STEEL PIPE ARCH50LF $40.00 $52.00 $68.30 $56.50
42613(H) 0450 6" PERFORATED PIPE UNDERDRAIN ROUND500LF $18.00 $10.00 $34.55 $11.00
43613(I) 1096 6" NON-PERF.PIPE UNDERDRAIN RND.100LF $20.00 $10.00 $41.30 $11.00
44613(M) 7186 TYPE A4 CULVERT END TREATMENT22EA $900.00 $800.00 $885.00 $870.00
45613(M) 7187 TYPE B4 CULVERT END TREATMENT9EA $1,000.00 $900.00 $1,050.00 $975.00
46613(M) 7188 TYPE C4 CULVERT END TREATMENT10EA $1,200.00 $1,100.00 $1,885.00 $1,200.00
47613(M) 7189 TYPE D4 CULVERT END TREATMENT1EA $1,400.00 $1,500.00 $2,440.00 $1,630.00
48613(M) 7191 TYPE AA4 CULVERT END TREATMENT2EA $2,200.00 $2,500.00 $1,605.00 $2,705.00
49613(M) 7198 TYPE C6 CULVERT END TREATMENT1EA $1,500.00 $2,300.00 $1,995.00 $2,790.00
50613(N) 7503 TYPE D4 SLOPED CONCRETE END SECTION1EA $1,500.00 $1,500.00 $1,830.00 $1,630.00
51613(N) 7522 TYPE C6 SLOPED CONCRETE END SECTION1EA $1,500.00 $2,300.00 $1,830.00 $2,490.00
52619(A) 0920 REMOVAL OF STRUCTURES & OBSTRUCTIONS1LSUM $20,000.00 $13,750.00 $40,000.00 $125,000.00
53619(B) 0291 REMOVAL OF HEADWALL22EA $800.00 $500.00 $725.00 $541.00
54619(B) 4728 REMOVAL OF ASPHALT PAVEMENT57,862SY $2.00 $4.50 $3.95 $9.20
55619(B) 8610 REMOVE AND RESET CATTLE GUARD3EA $500.00 $1,100.00 $4,550.00 $7,000.00
56624(A) 4281 FENCE-STYLE WWF1,496LF $5.00 $5.20 $6.65 $5.70
57624(C) 4458 FENCE-STYLE SWF (4 BARBED WIRE)515LF $4.00 $4.65 $5.85 $5.10
58624(C) 4459 FENCE-STYLE SWF (5 BARBED WIRE)8,890LF $5.00 $4.70 $6.10 $5.10
59624(C) 7181 FENCE-STYLE SWF (6 BARBED WIRE)255LF $6.00 $4.75 $6.40 $5.20
60624(D) 4470 GATE, GALVANIZED STEEL1EA $2,000.00 $600.00 $835.00 $649.00
61629(B) 4959 MAILBOX INSTALLATION-MULTIPLE2EA $500.00 $195.00 $215.00 $211.00
62629(C) 4960 MAILBOX10EA $500.00 $28.00 $30.80 $31.00
63629(D) 4961 REMOVAL OF MAILBOX INSTALLATION6EA $200.00 $22.00 $24.20 $24.00
64629(E) 5048 REMOVE AND RESET MAILBOX12EA $100.00 $100.00 $550.00 $81.00
65629(A) 4958 MAILBOX INSTALLATION-SINGLE5EA $500.00 $100.00 $110.00 $109.00
66202(A) 1301 UNCLASSIFIED EXCAVATION4,235CY $5.50 $10.00 $5.55 $5.40
67501(A) 1306 STRUCTURAL EXCAVATION UNCLASSIFIED300CY $16.00 $15.00 $33.25 $16.00
68509(A) 1326 CLASS AA CONCRETE762.5CY $400.00 $295.00 $388.25 $319.00
69511(A) 1332 REINFORCING STEEL105,980LB $1.00 $0.9000 $1.00 $1.00
70601(B) 1353 TYPE I-A PLAIN RIPRAP894TON $40.00 $40.00 $65.95 $43.30
71601(C) 1355 TYPE I-A FILTER BLANKET298TON $30.00 $40.00 $43.80 $43.30
72619(D) 1397 REMOVAL OF EXISTING BRIDGE STRUCTURE1LSUM $15,000.00 $20,000.00 $13,865.00 $195,000.00
73857(A) 8839 CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE)188,300LF $0.0500 $0.0800 $0.0900 $0.0900
74857(E) 8887 (PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-11,000EA $0.7500 $0.7500 $0.8300 $0.8100
75857(F) 8006 PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE)78,860LF $0.1000 $0.1800 $0.2000 $0.1900
76871(B) 8705 (SP)CONST.ZONE IMPACT ATTEN.360SD $10.00 $15.00 $16.50 $16.30
77877(B) 8484 DELIVER PORTABLE LONGITUDINAL BARRIER1,600LF $25.00 $17.10 $27.75 $18.50
78880(B) 8818 CONSTRUCTION SIGNS 0 TO 6.25 SF10,560SD $0.2500 $0.0300 $0.0300 $0.0300
79880(B) 8821 CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF21,600SD $0.3500 $0.0300 $0.0300 $0.0300
80880(B) 8824 CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF3,300SD $1.00 $3.00 $3.30 $3.25
81880(C) 8842 CONSTRUCTION BARRICADES(TYPE III)14,340SD $0.2500 $0.2000 $0.2200 $0.2200
82880(C) 8848 WING BARRICADES1,320SD $0.7500 $0.2000 $0.2200 $0.2200
83880(E) 8860 WARNING LIGHTS(TYPE A)27,420SD $0.0500 $0.3500 $0.3900 $0.3800
84880(F) 8878 DRUMS18,810SD $0.1500 $1.25 $1.38 $1.35
85880(G) 8890 CHANNELIZER CONES61,980SD $0.0500 $0.2000 $0.2200 $0.2200
86880(I) 8902 FLAGGER60SD $500.00 $600.00 $270.00 $1,235.00
87882(A) 8306 PORT.CHANGEABLE MESSAGE SIGN660SD $6.00 $14.00 $15.40 $15.15
88413(B) 4863 RUMBLE STRIP-METHOD HMA-CYC44,600LF $0.2500 $0.1200 $0.2100 $0.1300
89805(D) 8756 (PL)REMOVE & RESET EXISTING SIGNS4EA $100.00 $450.00 $495.00 $487.00
90850(A) 8110 SHEET ALUMINUM SIGNS121SF $20.00 $24.00 $26.40 $26.00
91851(C) 8324 2" SQUARE TUBE POST233LF $10.00 $10.00 $11.00 $10.80
92855(A) 8812 TRAFFIC STRIPE(PLASTIC)(4" WIDE)82,730LF $0.5000 $0.4600 $0.5100 $0.5000
93855(A) 8825 TRAFFIC STRIPE(PLASTIC)(24" WIDE)54LF $10.00 $5.00 $5.50 $5.40
94642(B) 0096 CONSTRUCTION STAKING LEVEL II1LSUM $95,000.00 $248,000.00 $94,500.00 $178,850.00
95220 2800 SWPPP DOCUMENTATION AND MANAGEMENT1LSUM $7,500.00 $10,000.00 $3,500.00 $30,000.00
96640(A) 1426 FIELD OFFICE1EA $10,000.00 $7,000.00 $25,550.00 $35,000.00
97641 1552 MOBILIZATION1LSUM $450,000.00 $870,307.50 $415,000.00 $804,820.90