| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$40,000.00 |
$239,500.00 |
$69,200.00 |
$350,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 170,840 | CY |
$5.00 |
$10.79 |
$9.95 |
$12.25 |
| 3 | 202(C) 0182 |
ROCK EXCAVATION | 5,500 | CY |
$15.00 |
$19.64 |
$43.30 |
$42.50 |
| 4 | 202(D) 0184 |
UNCLASSIFIED BORROW | 165,883 | CY |
$7.00 |
$8.88 |
$12.40 |
$11.30 |
| 5 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$100,000.00 |
$139,500.00 |
$185,000.00 |
$465,000.00 |
| 6 | 221(C) 2801 |
TEMPORARY SILT FENCE | 13,360 | LF |
$2.00 |
$1.07 |
$1.35 |
$1.20 |
| 7 | 221(D) 2803 |
TEMPORARY SEDIMENT FILTER | 11 | EA |
$190.00 |
$90.00 |
$210.00 |
$97.00 |
| 8 | 221(F) 0100 |
TEMPORARY SILT DIKE | 3,381 | LF |
$7.00 |
$6.00 |
$7.30 |
$6.50 |
| 9 | 221(G) 0150 |
TEMPORARY ROCK FILTER DAM TYPE 1 | 140 | CY |
$100.00 |
$100.00 |
$250.00 |
$217.00 |
| 10 | 230(A) 2806 |
SOLID SLAB SODDING | 257,840 | SY |
$1.50 |
$1.14 |
$1.45 |
$1.25 |
| 11 | 233(A) 2817 |
VEGETATIVE MULCHING | 108 | AC |
$350.00 |
$275.00 |
$615.00 |
$298.00 |
| 12 | 241 2832 |
MOWING | 108 | AC |
$65.00 |
$49.00 |
$90.00 |
$53.00 |
| 13 | 303(A) 2200 |
(SP)AGGREGATE BASE TYPE A, PLANT MIXED | 22,137 | CY |
$50.00 |
$67.00 |
$55.25 |
$61.90 |
| 14 | 307(K) 4300 |
STABILIZED SUBGRADE | 109,726 | SY |
$4.00 |
$5.00 |
$3.60 |
$4.60 |
| 15 | 310(B) 0149 |
SUBGRADE, METHOD B | 16,405 | SY |
$1.50 |
$2.25 |
$2.05 |
$2.55 |
| 16 | 325 5271 |
SEPARATOR FABRIC | 109,726 | SY |
$1.25 |
$1.00 |
$1.35 |
$0.8500 |
| 17 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 10,999 | TON |
$25.00 |
$22.00 |
$25.25 |
$22.30 |
| 18 | 407(B) 0250 |
TACK COAT | 17,692 | GAL |
$3.00 |
$4.00 |
$3.00 |
$1.60 |
| 19 | 408 5774 |
PRIME COAT | 69,913 | GAL |
$4.00 |
$4.10 |
$3.75 |
$3.50 |
| 20 | 409(A) 4242 |
FABRIC REINFORCEMENT | 30,481 | SY |
$1.50 |
$2.03 |
$0.9500 |
$1.45 |
| 21 | 409(B) 4268 |
BITUMINOUS BINDER | 6,096 | GAL |
$4.00 |
$1.00 |
$3.45 |
$3.50 |
| 22 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 43,258 | TON |
$68.00 |
$59.22 |
$57.65 |
$71.10 |
| 23 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 13,597 | TON |
$80.00 |
$65.69 |
$67.40 |
$80.50 |
| 24 | 411(H) 6210 |
SUPERPAVE, TYPE S3(PATCH)(PG64-22OK) | 500 | TON |
$130.00 |
$133.38 |
$148.90 |
$170.56 |
| 25 | 412 5267 |
COLD MILLING PAVEMENT | 23,078 | SY |
$1.50 |
$1.50 |
$1.75 |
$3.50 |
| 26 | 501(A) 0313 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 408 | CY |
$15.00 |
$10.00 |
$33.25 |
$10.90 |
| 27 | 509(A) 0319 |
CLASS AA CONCRETE | 1,065 | CY |
$325.00 |
$295.00 |
$482.55 |
$319.00 |
| 28 | 509(D) 0325 |
CLASS C CONCRETE | 737 | CY |
$250.00 |
$240.00 |
$332.80 |
$260.00 |
| 29 | 511(A) 0332 |
REINFORCING STEEL | 158,363 | LB |
$0.9000 |
$0.9000 |
$1.00 |
$1.00 |
| 30 | 601(A) 0297 |
TYPE I PLAIN RIPRAP | 1,060 | TON |
$40.00 |
$40.00 |
$63.85 |
$43.30 |
| 31 | 611(A) 2658 |
MANHOLE (5' DIAMETER) | 1 | EA |
$2,500.00 |
$6,000.00 |
$3,680.00 |
$6,490.00 |
| 32 | 611(G) 6002 |
INLET (SMD-TYPE 2) | 6 | EA |
$2,000.00 |
$2,000.00 |
$2,410.00 |
$2,165.00 |
| 33 | 613(A) 0491 |
18" R.C.PIPE CLASS III | 689 | LF |
$50.00 |
$45.00 |
$60.85 |
$48.90 |
| 34 | 613(A) 0492 |
24" R.C.PIPE CLASS III | 22 | LF |
$60.00 |
$75.00 |
$86.65 |
$81.10 |
| 35 | 613(A) 0493 |
30" R.C.PIPE CLASS III | 544 | LF |
$75.00 |
$100.00 |
$92.85 |
$109.00 |
| 36 | 613(A) 0494 |
36" R.C.PIPE CLASS III | 64 | LF |
$95.00 |
$150.00 |
$126.40 |
$163.00 |
| 37 | 613(B) 0689 |
18" CORR. GALV. STEEL PIPE | 514 | LF |
$20.00 |
$21.00 |
$42.95 |
$23.00 |
| 38 | 613(B) 0690 |
24" CORR. GALV. STEEL PIPE | 228 | LF |
$25.00 |
$27.00 |
$45.75 |
$29.50 |
| 39 | 613(B) 0691 |
30" CORR. GALV. STEEL PIPE | 148 | LF |
$30.00 |
$35.00 |
$51.50 |
$38.00 |
| 40 | 613(B) 4527 |
21" X 15" CORR. GALV. STEEL PIPE ARCH | 120 | LF |
$35.00 |
$23.00 |
$50.70 |
$25.00 |
| 41 | 613(B) 4530 |
42" X 29" CORR. GALV. STEEL PIPE ARCH | 50 | LF |
$40.00 |
$52.00 |
$68.30 |
$56.50 |
| 42 | 613(H) 0450 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 500 | LF |
$18.00 |
$10.00 |
$34.55 |
$11.00 |
| 43 | 613(I) 1096 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 100 | LF |
$20.00 |
$10.00 |
$41.30 |
$11.00 |
| 44 | 613(M) 7186 |
TYPE A4 CULVERT END TREATMENT | 22 | EA |
$900.00 |
$800.00 |
$885.00 |
$870.00 |
| 45 | 613(M) 7187 |
TYPE B4 CULVERT END TREATMENT | 9 | EA |
$1,000.00 |
$900.00 |
$1,050.00 |
$975.00 |
| 46 | 613(M) 7188 |
TYPE C4 CULVERT END TREATMENT | 10 | EA |
$1,200.00 |
$1,100.00 |
$1,885.00 |
$1,200.00 |
| 47 | 613(M) 7189 |
TYPE D4 CULVERT END TREATMENT | 1 | EA |
$1,400.00 |
$1,500.00 |
$2,440.00 |
$1,630.00 |
| 48 | 613(M) 7191 |
TYPE AA4 CULVERT END TREATMENT | 2 | EA |
$2,200.00 |
$2,500.00 |
$1,605.00 |
$2,705.00 |
| 49 | 613(M) 7198 |
TYPE C6 CULVERT END TREATMENT | 1 | EA |
$1,500.00 |
$2,300.00 |
$1,995.00 |
$2,790.00 |
| 50 | 613(N) 7503 |
TYPE D4 SLOPED CONCRETE END SECTION | 1 | EA |
$1,500.00 |
$1,500.00 |
$1,830.00 |
$1,630.00 |
| 51 | 613(N) 7522 |
TYPE C6 SLOPED CONCRETE END SECTION | 1 | EA |
$1,500.00 |
$2,300.00 |
$1,830.00 |
$2,490.00 |
| 52 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$20,000.00 |
$13,750.00 |
$40,000.00 |
$125,000.00 |
| 53 | 619(B) 0291 |
REMOVAL OF HEADWALL | 22 | EA |
$800.00 |
$500.00 |
$725.00 |
$541.00 |
| 54 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 57,862 | SY |
$2.00 |
$4.50 |
$3.95 |
$9.20 |
| 55 | 619(B) 8610 |
REMOVE AND RESET CATTLE GUARD | 3 | EA |
$500.00 |
$1,100.00 |
$4,550.00 |
$7,000.00 |
| 56 | 624(A) 4281 |
FENCE-STYLE WWF | 1,496 | LF |
$5.00 |
$5.20 |
$6.65 |
$5.70 |
| 57 | 624(C) 4458 |
FENCE-STYLE SWF (4 BARBED WIRE) | 515 | LF |
$4.00 |
$4.65 |
$5.85 |
$5.10 |
| 58 | 624(C) 4459 |
FENCE-STYLE SWF (5 BARBED WIRE) | 8,890 | LF |
$5.00 |
$4.70 |
$6.10 |
$5.10 |
| 59 | 624(C) 7181 |
FENCE-STYLE SWF (6 BARBED WIRE) | 255 | LF |
$6.00 |
$4.75 |
$6.40 |
$5.20 |
| 60 | 624(D) 4470 |
GATE, GALVANIZED STEEL | 1 | EA |
$2,000.00 |
$600.00 |
$835.00 |
$649.00 |
| 61 | 629(B) 4959 |
MAILBOX INSTALLATION-MULTIPLE | 2 | EA |
$500.00 |
$195.00 |
$215.00 |
$211.00 |
| 62 | 629(C) 4960 |
MAILBOX | 10 | EA |
$500.00 |
$28.00 |
$30.80 |
$31.00 |
| 63 | 629(D) 4961 |
REMOVAL OF MAILBOX INSTALLATION | 6 | EA |
$200.00 |
$22.00 |
$24.20 |
$24.00 |
| 64 | 629(E) 5048 |
REMOVE AND RESET MAILBOX | 12 | EA |
$100.00 |
$100.00 |
$550.00 |
$81.00 |
| 65 | 629(A) 4958 |
MAILBOX INSTALLATION-SINGLE | 5 | EA |
$500.00 |
$100.00 |
$110.00 |
$109.00 |
| 66 | 202(A) 1301 |
UNCLASSIFIED EXCAVATION | 4,235 | CY |
$5.50 |
$10.00 |
$5.55 |
$5.40 |
| 67 | 501(A) 1306 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 300 | CY |
$16.00 |
$15.00 |
$33.25 |
$16.00 |
| 68 | 509(A) 1326 |
CLASS AA CONCRETE | 762.5 | CY |
$400.00 |
$295.00 |
$388.25 |
$319.00 |
| 69 | 511(A) 1332 |
REINFORCING STEEL | 105,980 | LB |
$1.00 |
$0.9000 |
$1.00 |
$1.00 |
| 70 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 894 | TON |
$40.00 |
$40.00 |
$65.95 |
$43.30 |
| 71 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 298 | TON |
$30.00 |
$40.00 |
$43.80 |
$43.30 |
| 72 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$15,000.00 |
$20,000.00 |
$13,865.00 |
$195,000.00 |
| 73 | 857(A) 8839 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) | 188,300 | LF |
$0.0500 |
$0.0800 |
$0.0900 |
$0.0900 |
| 74 | 857(E) 8887 |
(PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-1 | 1,000 | EA |
$0.7500 |
$0.7500 |
$0.8300 |
$0.8100 |
| 75 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 78,860 | LF |
$0.1000 |
$0.1800 |
$0.2000 |
$0.1900 |
| 76 | 871(B) 8705 |
(SP)CONST.ZONE IMPACT ATTEN. | 360 | SD |
$10.00 |
$15.00 |
$16.50 |
$16.30 |
| 77 | 877(B) 8484 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 1,600 | LF |
$25.00 |
$17.10 |
$27.75 |
$18.50 |
| 78 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 10,560 | SD |
$0.2500 |
$0.0300 |
$0.0300 |
$0.0300 |
| 79 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 21,600 | SD |
$0.3500 |
$0.0300 |
$0.0300 |
$0.0300 |
| 80 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 3,300 | SD |
$1.00 |
$3.00 |
$3.30 |
$3.25 |
| 81 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 14,340 | SD |
$0.2500 |
$0.2000 |
$0.2200 |
$0.2200 |
| 82 | 880(C) 8848 |
WING BARRICADES | 1,320 | SD |
$0.7500 |
$0.2000 |
$0.2200 |
$0.2200 |
| 83 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 27,420 | SD |
$0.0500 |
$0.3500 |
$0.3900 |
$0.3800 |
| 84 | 880(F) 8878 |
DRUMS | 18,810 | SD |
$0.1500 |
$1.25 |
$1.38 |
$1.35 |
| 85 | 880(G) 8890 |
CHANNELIZER CONES | 61,980 | SD |
$0.0500 |
$0.2000 |
$0.2200 |
$0.2200 |
| 86 | 880(I) 8902 |
FLAGGER | 60 | SD |
$500.00 |
$600.00 |
$270.00 |
$1,235.00 |
| 87 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 660 | SD |
$6.00 |
$14.00 |
$15.40 |
$15.15 |
| 88 | 413(B) 4863 |
RUMBLE STRIP-METHOD HMA-CYC | 44,600 | LF |
$0.2500 |
$0.1200 |
$0.2100 |
$0.1300 |
| 89 | 805(D) 8756 |
(PL)REMOVE & RESET EXISTING SIGNS | 4 | EA |
$100.00 |
$450.00 |
$495.00 |
$487.00 |
| 90 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 121 | SF |
$20.00 |
$24.00 |
$26.40 |
$26.00 |
| 91 | 851(C) 8324 |
2" SQUARE TUBE POST | 233 | LF |
$10.00 |
$10.00 |
$11.00 |
$10.80 |
| 92 | 855(A) 8812 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 82,730 | LF |
$0.5000 |
$0.4600 |
$0.5100 |
$0.5000 |
| 93 | 855(A) 8825 |
TRAFFIC STRIPE(PLASTIC)(24" WIDE) | 54 | LF |
$10.00 |
$5.00 |
$5.50 |
$5.40 |
| 94 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$95,000.00 |
$248,000.00 |
$94,500.00 |
$178,850.00 |
| 95 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$7,500.00 |
$10,000.00 |
$3,500.00 |
$30,000.00 |
| 96 | 640(A) 1426 |
FIELD OFFICE | 1 | EA |
$10,000.00 |
$7,000.00 |
$25,550.00 |
$35,000.00 |
| 97 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$450,000.00 |
$870,307.50 |
$415,000.00 |
$804,820.90 |