| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$30,000.00 |
$79,436.74 |
$250,000.00 |
$110,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 33,828 | CY |
$6.50 |
$13.97 |
$9.41 |
$17.00 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 1,452 | CY |
$7.50 |
$13.97 |
$10.81 |
$17.00 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$50,000.00 |
$28,129.08 |
$65,000.00 |
$40,000.00 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 21,220 | LF |
$1.25 |
$2.46 |
$1.27 |
$1.19 |
| 6 | 221(F) 0100 |
TEMPORARY SILT DIKE | 322 | LF |
$7.50 |
$8.01 |
$6.91 |
$6.49 |
| 7 | 230(A) 2806 |
SOLID SLAB SODDING | 169,871 | SY |
$0.9000 |
$1.07 |
$0.9400 |
$0.9400 |
| 8 | 233(A) 2817 |
VEGETATIVE MULCHING | 36.56 | AC |
$70.00 |
$220.99 |
$207.68 |
$195.00 |
| 9 | 241 2832 |
MOWING | 73.12 | AC |
$48.70 |
$55.52 |
$52.19 |
$49.00 |
| 10 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 37,820 | CY |
$42.00 |
$52.45 |
$47.71 |
$45.00 |
| 11 | 307(K) 4300 |
STABILIZED SUBGRADE | 5,111 | SY |
$5.75 |
$5.37 |
$6.25 |
$11.00 |
| 12 | 317 4270 |
CEMENT TREATED BASE | 113,392 | SY |
$10.00 |
$14.30 |
$13.72 |
$11.50 |
| 13 | 325 5271 |
SEPARATOR FABRIC | 156,055 | SY |
$1.00 |
$0.9600 |
$0.6000 |
$0.0100 |
| 14 | 326(B) 0100 |
GEOGRID REINFORCEMENT | 165,055 | SY |
$2.00 |
$5.25 |
$4.18 |
$5.50 |
| 15 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 13,765 | TON |
$22.00 |
$22.12 |
$26.17 |
$24.00 |
| 16 | 407(B) 0250 |
TACK COAT | 234 | GAL |
$3.05 |
$5.67 |
$7.46 |
$3.00 |
| 17 | 408 5774 |
PRIME COAT | 34,259 | GAL |
$2.15 |
$5.00 |
$1.50 |
$2.00 |
| 18 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 469 | TON |
$100.00 |
$163.81 |
$133.13 |
$150.00 |
| 19 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 175 | TON |
$165.00 |
$206.28 |
$133.13 |
$160.00 |
| 20 | 412 5267 |
COLD MILLING PAVEMENT | 250 | SY |
$20.00 |
$30.00 |
$2.25 |
$20.00 |
| 21 | 414(A) 0210 |
P.C.CONCRETE PAVEMENT(PLACEMENT) | 80,987 | SY |
$11.00 |
$8.04 |
$10.50 |
$10.90 |
| 22 | 414(B) 5725 |
DOWEL JOINTED P.C. CONCRETE PAVEMENT(PLACEMENT ) | 67,628 | SY |
$15.00 |
$11.94 |
$17.00 |
$12.25 |
| 23 | 414(G) 5275 |
P.C. CONCRETE FOR PAVEMENT | 32,370 | CY |
$98.00 |
$117.69 |
$130.00 |
$95.00 |
| 24 | 611(G) 6002 |
INLET (SMD-TYPE 2) | 25 | EA |
$1,200.00 |
$2,300.42 |
$3,547.31 |
$2,790.00 |
| 25 | 613(A) 0492 |
24" R.C.PIPE CLASS III | 2,128 | LF |
$70.00 |
$80.37 |
$44.90 |
$59.00 |
| 26 | 613(A) 4495 |
22" X 13" R.C.PIPE ARCH CLASS A-III | 879 | LF |
$84.00 |
$80.61 |
$67.73 |
$74.00 |
| 27 | 613(A) 4500 |
58" X 36" R.C.PIPE ARCH CLASS A-III | 328 | LF |
$89.65 |
$297.71 |
$163.59 |
$262.00 |
| 28 | 613(B) 0690 |
24" CORR. GALV. STEEL PIPE | 145 | LF |
$43.05 |
$48.20 |
$33.73 |
$30.00 |
| 29 | 613(B) 4527 |
21" X 15" CORR. GALV. STEEL PIPE ARCH | 127 | LF |
$29.40 |
$54.27 |
$33.63 |
$40.00 |
| 30 | 613(B) 4530 |
42" X 29" CORR. GALV. STEEL PIPE ARCH | 155 | LF |
$50.00 |
$93.26 |
$44.84 |
$65.00 |
| 31 | 613(J) 5915 |
EDGE DRAIN CONDUIT-PERFORATED | 11,956 | LF |
$5.50 |
$8.29 |
$8.94 |
$9.85 |
| 32 | 613(K) 5916 |
EDGE DRAIN OUTLET LATERAL-NONPERFORATED | 2,720 | LF |
$8.75 |
$11.12 |
$9.63 |
$6.00 |
| 33 | 613(M) 7187 |
TYPE B4 CULVERT END TREATMENT | 29 | EA |
$1,000.00 |
$736.61 |
$1,667.38 |
$1,500.00 |
| 34 | 613(M) 7188 |
TYPE C4 CULVERT END TREATMENT | 4 | EA |
$1,300.00 |
$1,019.92 |
$2,185.28 |
$1,800.00 |
| 35 | 613(M) 7194 |
TYPE DD4 CULVERT END TREATMENT | 2 | EA |
$2,000.00 |
$1,643.19 |
$3,259.73 |
$2,800.00 |
| 36 | 613(Q) 5946 |
OUTLET LATERAL HEADWALL | 40 | EA |
$500.00 |
$764.93 |
$947.41 |
$485.00 |
| 37 | 613(S) 1186 |
STANDARD BEDDING MATERIAL, CLASS B | 1,988 | CY |
$30.00 |
$20.00 |
$62.61 |
$12.00 |
| 38 | 613(V) 1180 |
TRENCH EXCAVATION | 1,988 | CY |
$11.50 |
$1.00 |
$29.01 |
$50.00 |
| 39 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$10,000.00 |
$6,928.95 |
$38,764.00 |
$50,000.00 |
| 40 | 619(B) 4725 |
REMOVAL OF FENCE | 21,379 | LF |
$1.50 |
$1.84 |
$0.0500 |
$3.50 |
| 41 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 75,519 | SY |
$1.90 |
$3.11 |
$4.34 |
$4.25 |
| 42 | 619(B) 4763 |
REMOVAL OF CONCRETE PAVEMENT W/ASPHALT OVERLAY | 28,185 | SY |
$9.00 |
$5.23 |
$8.39 |
$13.80 |
| 43 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 9,302 | LF |
$2.35 |
$3.68 |
$2.27 |
$1.75 |
| 44 | 619(C) 0924 |
SAWING PAVEMENT | 1,294 | LF |
$4.90 |
$3.81 |
$3.23 |
$10.00 |
| 45 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 8,163 | LF |
$17.50 |
$17.83 |
$23.75 |
$13.75 |
| 46 | 623(F) 8300 |
GUARDRAIL TRAIL END TURNDOWN (31") | 2 | EA |
$1,500.00 |
$1,285.73 |
$596.40 |
$750.00 |
| 47 | 623(G) 8590 |
GUARDRAIL END TREATMENT (31") | 31 | EA |
$2,000.00 |
$2,896.38 |
$2,368.77 |
$1,951.00 |
| 48 | 623(I) 8700 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 35 | EA |
$1,700.00 |
$2,472.10 |
$1,437.75 |
$1,950.00 |
| 49 | 624(A) 4281 |
FENCE-STYLE WWF | 14,877 | LF |
$6.00 |
$4.59 |
$6.55 |
$4.05 |
| 50 | 624(C) 4458 |
FENCE-STYLE SWF (4 BARBED WIRE) | 6,931 | LF |
$5.00 |
$4.19 |
$5.28 |
$3.70 |
| 51 | 627(A) 4317 |
CONCRETE LONGITUDINAL BARRIER, DESIGN 1 | 845 | LF |
$55.00 |
$44.86 |
$40.70 |
$79.00 |
| 52 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 90 | CY |
$21.00 |
$14.85 |
$19.10 |
$31.30 |
| 53 | 501(G) 6309 |
CLSM BACKFILL | 146.8 | CY |
$130.00 |
$154.01 |
$117.54 |
$155.06 |
| 54 | 504(A) 1304 |
APPROACH SLAB | 235.6 | SY |
$190.00 |
$193.53 |
$220.35 |
$179.03 |
| 55 | 504(B) 1305 |
SAW-CUT GROOVING | 960.4 | SY |
$4.00 |
$4.53 |
$4.26 |
$4.00 |
| 56 | 504(E) 6190 |
42" F-SHAPED PARAPET | 381 | LF |
$80.00 |
$75.94 |
$86.48 |
$114.00 |
| 57 | 506(A) 4050 |
STRUCTURAL STEEL M270 GRADE 50W | 115,540 | LB |
$2.20 |
$1.53 |
$1.77 |
$1.94 |
| 58 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 12 | EA |
$900.00 |
$211.83 |
$246.51 |
$702.73 |
| 59 | 507(B) 6174 |
STAINLESS STEEL EXPANSION BEARING ASSEMBLY | 24 | EA |
$2,200.00 |
$1,187.45 |
$951.35 |
$1,742.07 |
| 60 | 507(C) 6282 |
ELASTOMERIC BEARING PADS | 24 | EA |
$465.00 |
$191.51 |
$218.70 |
$311.92 |
| 61 | 509(A) 1326 |
CLASS AA CONCRETE | 228.2 | CY |
$450.00 |
$711.90 |
$590.61 |
$790.42 |
| 62 | 509(B) 1328 |
CLASS A CONCRETE | 138.4 | CY |
$525.00 |
$640.94 |
$723.24 |
$607.42 |
| 63 | 509(D) 1331 |
CLASS C CONCRETE | 12.8 | CY |
$400.00 |
$309.51 |
$355.16 |
$829.87 |
| 64 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 77,460 | LB |
$1.10 |
$0.9300 |
$1.02 |
$0.9900 |
| 65 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 392 | LF |
$38.00 |
$23.49 |
$25.06 |
$36.75 |
| 66 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 392 | LF |
$18.00 |
$17.84 |
$27.24 |
$8.62 |
| 67 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 68 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 623 | SY |
$4.00 |
$3.97 |
$3.73 |
$3.50 |
| 69 | 516(A) 6096 |
DRILLED SHAFTS 60" DIAMETER | 183 | LF |
$900.00 |
$786.68 |
$661.89 |
$947.41 |
| 70 | 516(C) 6200 |
CROSSHOLE SONIC LOGGING | 2 | EA |
$1,500.00 |
$2,736.77 |
$959.46 |
$2,145.00 |
| 71 | 523(A) 6550 |
SEALER CRACK PREPARATION | 212 | LF |
$4.00 |
$3.40 |
$3.20 |
$3.00 |
| 72 | 523(B) 6560 |
SEALER RESIN | 1.5 | GAL |
$100.00 |
$113.33 |
$106.61 |
$100.00 |
| 73 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 470 | TON |
$37.00 |
$52.05 |
$38.86 |
$53.56 |
| 74 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 80 | TON |
$35.00 |
$36.74 |
$32.07 |
$41.33 |
| 75 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 108 | LF |
$30.00 |
$20.52 |
$31.72 |
$28.29 |
| 76 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 22 | LF |
$25.00 |
$10.91 |
$32.06 |
$34.51 |
| 77 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$45,000.00 |
$36,147.52 |
$46,803.03 |
$76,350.00 |
| 78 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 80 | CY |
$21.00 |
$14.85 |
$19.10 |
$31.30 |
| 79 | 501(G) 6309 |
CLSM BACKFILL | 122.6 | CY |
$130.00 |
$154.01 |
$117.54 |
$155.06 |
| 80 | 504(A) 1304 |
APPROACH SLAB | 182.4 | SY |
$190.00 |
$193.53 |
$195.04 |
$176.89 |
| 81 | 504(B) 1305 |
SAW-CUT GROOVING | 709.7 | SY |
$4.00 |
$4.53 |
$4.26 |
$4.00 |
| 82 | 504(E) 6190 |
42" F-SHAPED PARAPET | 381 | LF |
$80.00 |
$75.94 |
$86.48 |
$114.00 |
| 83 | 506(A) 4050 |
STRUCTURAL STEEL M270 GRADE 50W | 88,210 | LB |
$2.80 |
$1.53 |
$1.89 |
$1.94 |
| 84 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 10 | EA |
$900.00 |
$211.83 |
$246.51 |
$702.73 |
| 85 | 507(B) 6174 |
STAINLESS STEEL EXPANSION BEARING ASSEMBLY | 20 | EA |
$2,200.00 |
$1,187.45 |
$951.35 |
$1,742.07 |
| 86 | 507(C) 6282 |
ELASTOMERIC BEARING PADS | 20 | EA |
$465.00 |
$191.51 |
$218.70 |
$311.92 |
| 87 | 509(A) 1326 |
CLASS AA CONCRETE | 180.6 | CY |
$450.00 |
$711.90 |
$598.26 |
$792.78 |
| 88 | 509(B) 1328 |
CLASS A CONCRETE | 115 | CY |
$525.00 |
$640.94 |
$730.94 |
$645.91 |
| 89 | 509(D) 1331 |
CLASS C CONCRETE | 13.5 | CY |
$400.00 |
$309.51 |
$355.16 |
$806.90 |
| 90 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 58,450 | LB |
$1.10 |
$0.9300 |
$1.02 |
$0.9900 |
| 91 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 252 | LF |
$38.00 |
$23.49 |
$25.67 |
$39.05 |
| 92 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 252 | LF |
$18.00 |
$17.84 |
$27.24 |
$8.62 |
| 93 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 94 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 568 | SY |
$4.00 |
$3.97 |
$3.73 |
$3.50 |
| 95 | 516(A) 6096 |
DRILLED SHAFTS 60" DIAMETER | 116 | LF |
$900.00 |
$786.68 |
$818.14 |
$1,066.40 |
| 96 | 516(C) 6200 |
CROSSHOLE SONIC LOGGING | 2 | EA |
$1,500.00 |
$2,736.77 |
$959.46 |
$2,145.00 |
| 97 | 523(A) 6550 |
SEALER CRACK PREPARATION | 304 | LF |
$4.00 |
$3.40 |
$3.20 |
$3.00 |
| 98 | 523(B) 6560 |
SEALER RESIN | 2.1 | GAL |
$100.00 |
$113.33 |
$106.61 |
$100.00 |
| 99 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 400 | TON |
$37.00 |
$52.05 |
$38.86 |
$53.56 |
| 100 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 70 | TON |
$35.00 |
$36.74 |
$32.07 |
$41.33 |
| 101 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 84 | LF |
$30.00 |
$20.52 |
$31.72 |
$28.59 |
| 102 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 22 | LF |
$25.00 |
$10.91 |
$32.06 |
$34.51 |
| 103 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$45,000.00 |
$40,637.16 |
$46,803.03 |
$295,000.00 |
| 104 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 80 | CY |
$21.00 |
$14.85 |
$19.10 |
$31.30 |
| 105 | 501(G) 6309 |
CLSM BACKFILL | 122.6 | CY |
$130.00 |
$154.01 |
$117.54 |
$155.06 |
| 106 | 504(A) 1304 |
APPROACH SLAB | 182.4 | SY |
$190.00 |
$193.53 |
$195.04 |
$179.91 |
| 107 | 504(B) 1305 |
SAW-CUT GROOVING | 561.8 | SY |
$4.00 |
$4.53 |
$4.26 |
$4.00 |
| 108 | 504(E) 6190 |
42" F-SHAPED PARAPET | 421 | LF |
$80.00 |
$75.94 |
$86.49 |
$114.00 |
| 109 | 506(A) 4050 |
STRUCTURAL STEEL M270 GRADE 50W | 127,790 | LB |
$2.20 |
$1.53 |
$1.70 |
$1.94 |
| 110 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 10 | EA |
$900.00 |
$211.83 |
$246.51 |
$702.73 |
| 111 | 507(B) 6174 |
STAINLESS STEEL EXPANSION BEARING ASSEMBLY | 20 | EA |
$2,200.00 |
$1,187.45 |
$951.35 |
$1,742.07 |
| 112 | 507(C) 6282 |
ELASTOMERIC BEARING PADS | 20 | EA |
$465.00 |
$191.51 |
$218.70 |
$311.92 |
| 113 | 509(A) 1326 |
CLASS AA CONCRETE | 201 | CY |
$450.00 |
$711.90 |
$594.16 |
$795.82 |
| 114 | 509(B) 1328 |
CLASS A CONCRETE | 113.8 | CY |
$525.00 |
$640.94 |
$735.91 |
$646.10 |
| 115 | 509(D) 1331 |
CLASS C CONCRETE | 13.6 | CY |
$400.00 |
$309.51 |
$355.16 |
$802.18 |
| 116 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 63,340 | LB |
$1.10 |
$0.9300 |
$1.02 |
$0.9900 |
| 117 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 732 | LF |
$38.00 |
$23.49 |
$24.21 |
$37.93 |
| 118 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 732 | LF |
$18.00 |
$17.84 |
$27.24 |
$8.62 |
| 119 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 120 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 469 | SY |
$4.00 |
$3.97 |
$3.73 |
$3.50 |
| 121 | 516(A) 6096 |
DRILLED SHAFTS 60" DIAMETER | 260 | LF |
$900.00 |
$786.68 |
$643.72 |
$972.18 |
| 122 | 516(C) 6200 |
CROSSHOLE SONIC LOGGING | 2 | EA |
$1,500.00 |
$2,736.77 |
$959.46 |
$2,145.00 |
| 123 | 523(A) 6550 |
SEALER CRACK PREPARATION | 304 | LF |
$4.00 |
$3.40 |
$3.20 |
$3.00 |
| 124 | 523(B) 6560 |
SEALER RESIN | 2.1 | GAL |
$100.00 |
$113.33 |
$106.61 |
$100.00 |
| 125 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 300 | TON |
$37.00 |
$52.05 |
$38.86 |
$53.56 |
| 126 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 45 | TON |
$35.00 |
$36.74 |
$32.07 |
$41.33 |
| 127 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 84 | LF |
$30.00 |
$20.52 |
$31.72 |
$28.59 |
| 128 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 22 | LF |
$25.00 |
$10.91 |
$32.06 |
$34.51 |
| 129 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$55,000.00 |
$40,566.14 |
$46,803.03 |
$290,000.00 |
| 130 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 80 | CY |
$21.00 |
$14.85 |
$19.10 |
$31.30 |
| 131 | 501(G) 6309 |
CLSM BACKFILL | 122.6 | CY |
$130.00 |
$154.01 |
$117.54 |
$155.06 |
| 132 | 504(A) 1304 |
APPROACH SLAB | 182.4 | SY |
$190.00 |
$193.53 |
$195.04 |
$176.89 |
| 133 | 504(B) 1305 |
SAW-CUT GROOVING | 561.8 | SY |
$4.00 |
$4.53 |
$4.26 |
$4.00 |
| 134 | 504(E) 6190 |
42" F-SHAPED PARAPET | 421 | LF |
$80.00 |
$75.94 |
$86.49 |
$114.00 |
| 135 | 506(A) 4050 |
STRUCTURAL STEEL M270 GRADE 50W | 127,790 | LB |
$2.20 |
$1.53 |
$1.70 |
$1.94 |
| 136 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 10 | EA |
$900.00 |
$211.83 |
$246.51 |
$702.73 |
| 137 | 507(B) 6174 |
STAINLESS STEEL EXPANSION BEARING ASSEMBLY | 20 | EA |
$2,200.00 |
$1,187.45 |
$951.35 |
$1,742.07 |
| 138 | 507(C) 6282 |
ELASTOMERIC BEARING PADS | 20 | EA |
$465.00 |
$191.51 |
$218.70 |
$311.92 |
| 139 | 509(A) 1326 |
CLASS AA CONCRETE | 201 | CY |
$450.00 |
$711.90 |
$594.16 |
$787.45 |
| 140 | 509(B) 1328 |
CLASS A CONCRETE | 113.8 | CY |
$525.00 |
$640.94 |
$735.91 |
$646.10 |
| 141 | 509(D) 1331 |
CLASS C CONCRETE | 13.6 | CY |
$400.00 |
$309.51 |
$355.16 |
$802.18 |
| 142 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 63,340 | LB |
$1.10 |
$0.9300 |
$1.02 |
$0.9900 |
| 143 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 744 | LF |
$38.00 |
$23.49 |
$24.19 |
$36.87 |
| 144 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 744 | LF |
$18.00 |
$17.84 |
$27.24 |
$8.62 |
| 145 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 146 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 469 | SY |
$4.00 |
$3.97 |
$3.73 |
$3.50 |
| 147 | 516(A) 6096 |
DRILLED SHAFTS 60" DIAMETER | 264 | LF |
$900.00 |
$786.68 |
$641.11 |
$978.25 |
| 148 | 516(C) 6200 |
CROSSHOLE SONIC LOGGING | 2 | EA |
$1,500.00 |
$2,736.77 |
$959.46 |
$2,145.00 |
| 149 | 523(A) 6550 |
SEALER CRACK PREPARATION | 304 | LF |
$4.00 |
$3.40 |
$3.20 |
$3.00 |
| 150 | 523(B) 6560 |
SEALER RESIN | 2.1 | GAL |
$100.00 |
$113.33 |
$106.61 |
$100.00 |
| 151 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 300 | TON |
$37.00 |
$52.05 |
$38.86 |
$53.56 |
| 152 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 45 | TON |
$35.00 |
$36.74 |
$32.07 |
$41.33 |
| 153 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 84 | LF |
$30.00 |
$20.52 |
$31.72 |
$28.59 |
| 154 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 22 | LF |
$25.00 |
$10.91 |
$32.06 |
$34.51 |
| 155 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$55,000.00 |
$46,262.52 |
$46,803.03 |
$79,350.00 |
| 156 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 80 | CY |
$21.00 |
$14.85 |
$19.10 |
$31.30 |
| 157 | 501(G) 6309 |
CLSM BACKFILL | 122 | CY |
$130.00 |
$154.01 |
$117.54 |
$155.06 |
| 158 | 504(A) 1304 |
APPROACH SLAB | 182.4 | SY |
$190.00 |
$193.53 |
$195.04 |
$179.91 |
| 159 | 504(B) 1305 |
SAW-CUT GROOVING | 747.5 | SY |
$4.00 |
$4.53 |
$4.26 |
$4.00 |
| 160 | 504(E) 6190 |
42" F-SHAPED PARAPET | 401 | LF |
$80.00 |
$75.94 |
$86.49 |
$114.00 |
| 161 | 506(A) 4050 |
STRUCTURAL STEEL M270 GRADE 50W | 95,810 | LB |
$2.80 |
$1.53 |
$1.84 |
$1.94 |
| 162 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 10 | EA |
$900.00 |
$211.83 |
$246.51 |
$702.73 |
| 163 | 507(B) 6174 |
STAINLESS STEEL EXPANSION BEARING ASSEMBLY | 20 | EA |
$2,200.00 |
$1,187.45 |
$951.35 |
$1,742.07 |
| 164 | 507(C) 6282 |
ELASTOMERIC BEARING PADS | 20 | EA |
$465.00 |
$191.51 |
$218.70 |
$311.92 |
| 165 | 509(A) 1326 |
CLASS AA CONCRETE | 188.5 | CY |
$450.00 |
$711.90 |
$597.90 |
$804.76 |
| 166 | 509(B) 1328 |
CLASS A CONCRETE | 111.8 | CY |
$525.00 |
$640.94 |
$745.42 |
$646.42 |
| 167 | 509(D) 1331 |
CLASS C CONCRETE | 12.8 | CY |
$400.00 |
$309.51 |
$355.16 |
$842.29 |
| 168 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 61,350 | LB |
$1.10 |
$0.9300 |
$1.02 |
$0.9900 |
| 169 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 300 | LF |
$38.00 |
$23.49 |
$25.31 |
$38.38 |
| 170 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 300 | LF |
$18.00 |
$17.84 |
$27.24 |
$8.62 |
| 171 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 172 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 585 | SY |
$4.00 |
$3.97 |
$3.73 |
$3.50 |
| 173 | 516(A) 6096 |
DRILLED SHAFTS 60" DIAMETER | 146 | LF |
$900.00 |
$786.68 |
$726.74 |
$1,009.74 |
| 174 | 516(C) 6200 |
CROSSHOLE SONIC LOGGING | 2 | EA |
$1,500.00 |
$2,736.77 |
$959.46 |
$2,145.00 |
| 175 | 523(A) 6550 |
SEALER CRACK PREPARATION | 304 | LF |
$4.00 |
$3.40 |
$3.20 |
$3.00 |
| 176 | 523(B) 6560 |
SEALER RESIN | 2.1 | GAL |
$100.00 |
$113.33 |
$106.61 |
$100.00 |
| 177 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 340 | TON |
$37.00 |
$52.05 |
$38.86 |
$53.56 |
| 178 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 55 | TON |
$35.00 |
$36.74 |
$32.07 |
$41.33 |
| 179 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 84 | LF |
$30.00 |
$20.52 |
$31.72 |
$28.59 |
| 180 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 22 | LF |
$25.00 |
$10.91 |
$32.06 |
$34.51 |
| 181 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$45,000.00 |
$36,147.52 |
$46,803.03 |
$76,350.00 |
| 182 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 80 | CY |
$21.00 |
$14.85 |
$19.10 |
$33.54 |
| 183 | 501(G) 6309 |
CLSM BACKFILL | 122 | CY |
$130.00 |
$154.01 |
$117.54 |
$155.06 |
| 184 | 504(A) 1304 |
APPROACH SLAB | 182.4 | SY |
$190.00 |
$193.53 |
$195.04 |
$176.89 |
| 185 | 504(B) 1305 |
SAW-CUT GROOVING | 747.5 | SY |
$4.00 |
$4.53 |
$4.26 |
$4.00 |
| 186 | 504(E) 6190 |
42" F-SHAPED PARAPET | 401 | LF |
$80.00 |
$75.94 |
$86.49 |
$114.00 |
| 187 | 506(A) 4050 |
STRUCTURAL STEEL M270 GRADE 50W | 95,810 | LB |
$2.80 |
$1.53 |
$1.84 |
$1.94 |
| 188 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 10 | EA |
$900.00 |
$211.83 |
$246.51 |
$702.73 |
| 189 | 507(B) 6174 |
STAINLESS STEEL EXPANSION BEARING ASSEMBLY | 20 | EA |
$2,200.00 |
$1,187.45 |
$951.35 |
$1,742.07 |
| 190 | 507(C) 6282 |
ELASTOMERIC BEARING PADS | 20 | EA |
$465.00 |
$191.51 |
$218.70 |
$311.92 |
| 191 | 509(A) 1326 |
CLASS AA CONCRETE | 188.5 | CY |
$450.00 |
$711.90 |
$597.90 |
$796.40 |
| 192 | 509(B) 1328 |
CLASS A CONCRETE | 111.8 | CY |
$525.00 |
$640.94 |
$745.42 |
$646.42 |
| 193 | 509(D) 1331 |
CLASS C CONCRETE | 12.8 | CY |
$400.00 |
$309.51 |
$355.16 |
$842.29 |
| 194 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 61,350 | LB |
$1.10 |
$0.9300 |
$1.02 |
$0.9900 |
| 195 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 330 | LF |
$38.00 |
$23.49 |
$25.31 |
$37.42 |
| 196 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 330 | LF |
$18.00 |
$17.84 |
$27.24 |
$8.62 |
| 197 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 198 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 585 | SY |
$4.00 |
$3.97 |
$3.73 |
$3.50 |
| 199 | 516(A) 6096 |
DRILLED SHAFTS 60" DIAMETER | 138 | LF |
$900.00 |
$786.68 |
$713.95 |
$1,028.08 |
| 200 | 516(C) 6200 |
CROSSHOLE SONIC LOGGING | 2 | EA |
$1,500.00 |
$2,736.77 |
$959.46 |
$2,145.00 |
| 201 | 523(A) 6550 |
SEALER CRACK PREPARATION | 304 | LF |
$4.00 |
$3.40 |
$3.20 |
$3.00 |
| 202 | 523(B) 6560 |
SEALER RESIN | 2.1 | GAL |
$100.00 |
$113.33 |
$106.61 |
$100.00 |
| 203 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 340 | TON |
$37.00 |
$52.05 |
$38.86 |
$53.56 |
| 204 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 55 | TON |
$35.00 |
$36.74 |
$32.07 |
$41.33 |
| 205 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 84 | LF |
$30.00 |
$20.52 |
$31.72 |
$31.26 |
| 206 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 22 | LF |
$25.00 |
$10.91 |
$32.06 |
$34.51 |
| 207 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$57,000.00 |
$40,637.16 |
$46,803.03 |
$290,000.00 |
| 208 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 160 | CY |
$21.00 |
$52.64 |
$19.10 |
$31.30 |
| 209 | 501(G) 6309 |
CLSM BACKFILL | 173.4 | CY |
$130.00 |
$126.34 |
$117.54 |
$155.06 |
| 210 | 504(A) 1304 |
APPROACH SLAB | 273.4 | SY |
$190.00 |
$152.66 |
$196.19 |
$179.67 |
| 211 | 504(B) 1305 |
SAW-CUT GROOVING | 2,206.8 | SY |
$4.00 |
$4.53 |
$4.26 |
$4.00 |
| 212 | 504(C) 6250 |
SEALED EXPANSION JOINT | 84 | LF |
$255.00 |
$236.89 |
$252.49 |
$289.59 |
| 213 | 504(E) 6190 |
42" F-SHAPED PARAPET | 1,173.4 | LF |
$80.00 |
$52.64 |
$86.49 |
$114.00 |
| 214 | 506(A) 4050 |
STRUCTURAL STEEL M270 GRADE 50W | 474,210 | LB |
$2.00 |
$1.84 |
$1.55 |
$1.94 |
| 215 | 507(A) 6170 |
STAINLESS STEEL FIXED BEARING ASSEMBLY | 20 | EA |
$2,200.00 |
$1,263.40 |
$1,007.28 |
$1,805.43 |
| 216 | 507(B) 6174 |
STAINLESS STEEL EXPANSION BEARING ASSEMBLY | 50 | EA |
$2,200.00 |
$1,263.40 |
$1,007.28 |
$1,805.43 |
| 217 | 509(A) 1326 |
CLASS AA CONCRETE | 545.5 | CY |
$450.00 |
$510.62 |
$626.44 |
$790.21 |
| 218 | 509(B) 1328 |
CLASS A CONCRETE | 276.4 | CY |
$525.00 |
$700.13 |
$731.31 |
$639.54 |
| 219 | 509(D) 1331 |
CLASS C CONCRETE | 10.7 | CY |
$400.00 |
$605.38 |
$355.16 |
$976.10 |
| 220 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 156,970 | LB |
$1.00 |
$1.05 |
$1.02 |
$0.9900 |
| 221 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 232 | LF |
$38.00 |
$36.85 |
$24.33 |
$32.15 |
| 222 | 514(A) 6011 |
PILES, FURNISHED (HP 12X53) | 778 | LF |
$44.00 |
$42.11 |
$26.06 |
$40.03 |
| 223 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 232 | LF |
$18.00 |
$10.53 |
$27.24 |
$7.04 |
| 224 | 514(B) 6294 |
PILES, DRIVEN (HP 12X53) | 778 | LF |
$20.00 |
$10.53 |
$22.33 |
$7.04 |
| 225 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 226 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 1,516 | SY |
$4.00 |
$3.97 |
$3.73 |
$3.50 |
| 227 | 516(A) 6096 |
DRILLED SHAFTS 60" DIAMETER | 768 | LF |
$900.00 |
$736.98 |
$651.02 |
$968.74 |
| 228 | 516(C) 6200 |
CROSSHOLE SONIC LOGGING | 6 | EA |
$1,500.00 |
$3,158.49 |
$959.46 |
$2,145.00 |
| 229 | 523(A) 6550 |
SEALER CRACK PREPARATION | 492 | LF |
$4.00 |
$3.40 |
$3.20 |
$3.00 |
| 230 | 523(B) 6560 |
SEALER RESIN | 3.3 | GAL |
$100.00 |
$113.33 |
$106.61 |
$100.00 |
| 231 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 280 | TON |
$37.00 |
$47.38 |
$38.86 |
$53.56 |
| 232 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 40 | TON |
$35.00 |
$36.85 |
$32.07 |
$41.33 |
| 233 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 84 | LF |
$30.00 |
$21.06 |
$31.72 |
$28.59 |
| 234 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 40 | LF |
$25.00 |
$21.06 |
$32.06 |
$34.34 |
| 235 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$195,000.00 |
$89,490.49 |
$153,193.16 |
$213,350.00 |
| 236 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 160 | CY |
$21.00 |
$52.64 |
$19.10 |
$31.30 |
| 237 | 501(G) 6309 |
CLSM BACKFILL | 173.4 | CY |
$130.00 |
$126.34 |
$117.54 |
$155.06 |
| 238 | 504(A) 1304 |
APPROACH SLAB | 273.4 | SY |
$190.00 |
$152.66 |
$196.19 |
$176.65 |
| 239 | 504(B) 1305 |
SAW-CUT GROOVING | 2,206.8 | SY |
$4.00 |
$4.53 |
$4.26 |
$4.00 |
| 240 | 504(C) 6250 |
SEALED EXPANSION JOINT | 84 | LF |
$255.00 |
$236.89 |
$252.49 |
$289.59 |
| 241 | 504(E) 6190 |
42" F-SHAPED PARAPET | 1,173.4 | LF |
$80.00 |
$52.64 |
$86.49 |
$114.00 |
| 242 | 506(A) 4050 |
STRUCTURAL STEEL M270 GRADE 50W | 474,210 | LB |
$2.00 |
$2.00 |
$1.55 |
$1.94 |
| 243 | 507(A) 6170 |
STAINLESS STEEL FIXED BEARING ASSEMBLY | 20 | EA |
$2,200.00 |
$1,263.40 |
$1,007.28 |
$1,805.43 |
| 244 | 507(B) 6174 |
STAINLESS STEEL EXPANSION BEARING ASSEMBLY | 50 | EA |
$2,200.00 |
$1,263.40 |
$1,007.28 |
$1,805.43 |
| 245 | 509(A) 1326 |
CLASS AA CONCRETE | 545.5 | CY |
$450.00 |
$510.62 |
$626.44 |
$781.85 |
| 246 | 509(B) 1328 |
CLASS A CONCRETE | 276.4 | CY |
$525.00 |
$700.13 |
$731.31 |
$639.54 |
| 247 | 509(D) 1331 |
CLASS C CONCRETE | 10.7 | CY |
$400.00 |
$605.38 |
$355.16 |
$976.10 |
| 248 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 156,970 | LB |
$1.00 |
$1.16 |
$1.02 |
$0.9900 |
| 249 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 236 | LF |
$38.00 |
$36.85 |
$24.31 |
$31.61 |
| 250 | 514(A) 6011 |
PILES, FURNISHED (HP 12X53) | 792 | LF |
$44.00 |
$42.11 |
$26.05 |
$40.88 |
| 251 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 236 | LF |
$18.00 |
$10.53 |
$27.24 |
$7.04 |
| 252 | 514(B) 6294 |
PILES, DRIVEN (HP 12X53) | 792 | LF |
$20.00 |
$10.53 |
$22.33 |
$7.04 |
| 253 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 254 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 1,516 | SY |
$4.00 |
$3.97 |
$3.73 |
$3.50 |
| 255 | 516(A) 6096 |
DRILLED SHAFTS 60" DIAMETER | 768 | LF |
$900.00 |
$842.26 |
$651.02 |
$968.74 |
| 256 | 516(C) 6200 |
CROSSHOLE SONIC LOGGING | 6 | EA |
$1,500.00 |
$3,158.49 |
$959.46 |
$2,145.00 |
| 257 | 523(A) 6550 |
SEALER CRACK PREPARATION | 492 | LF |
$4.00 |
$3.40 |
$3.20 |
$3.00 |
| 258 | 523(B) 6560 |
SEALER RESIN | 3.3 | GAL |
$100.00 |
$113.33 |
$106.61 |
$100.00 |
| 259 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 280 | TON |
$37.00 |
$47.38 |
$38.86 |
$53.56 |
| 260 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 40 | TON |
$35.00 |
$36.85 |
$32.07 |
$41.33 |
| 261 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 84 | LF |
$30.00 |
$21.06 |
$31.72 |
$28.59 |
| 262 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 40 | LF |
$25.00 |
$21.06 |
$32.06 |
$34.34 |
| 263 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$182,000.00 |
$157,924.40 |
$153,193.16 |
$450,000.00 |
| 264 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 80 | CY |
$21.00 |
$71.58 |
$19.10 |
$31.30 |
| 265 | 501(G) 6309 |
CLSM BACKFILL | 137 | CY |
$130.00 |
$143.17 |
$117.54 |
$155.06 |
| 266 | 504(A) 1304 |
APPROACH SLAB | 182.4 | SY |
$190.00 |
$178.97 |
$195.04 |
$179.91 |
| 267 | 504(B) 1305 |
SAW-CUT GROOVING | 487.9 | SY |
$4.00 |
$4.53 |
$4.26 |
$4.00 |
| 268 | 504(E) 6190 |
42" F-SHAPED PARAPET | 261 | LF |
$80.00 |
$77.55 |
$86.48 |
$114.00 |
| 269 | 506(A) 4050 |
STRUCTURAL STEEL M270 GRADE 50W | 116,900 | LB |
$2.20 |
$2.09 |
$1.56 |
$1.94 |
| 270 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 10 | EA |
$900.00 |
$596.55 |
$246.51 |
$726.60 |
| 271 | 509(A) 1326 |
CLASS AA CONCRETE | 127.6 | CY |
$450.00 |
$715.87 |
$559.67 |
$759.37 |
| 272 | 509(B) 1328 |
CLASS A CONCRETE | 47.4 | CY |
$525.00 |
$1,193.11 |
$713.73 |
$855.93 |
| 273 | 509(D) 1331 |
CLASS C CONCRETE | 11.6 | CY |
$400.00 |
$686.03 |
$355.16 |
$912.82 |
| 274 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 29,120 | LB |
$1.10 |
$1.19 |
$1.02 |
$0.9900 |
| 275 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 864 | LF |
$38.00 |
$41.76 |
$24.36 |
$31.95 |
| 276 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 864 | LF |
$18.00 |
$11.93 |
$27.24 |
$7.04 |
| 277 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 278 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 315 | SY |
$4.00 |
$3.97 |
$3.73 |
$3.50 |
| 279 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 84 | LF |
$30.00 |
$23.86 |
$31.72 |
$28.59 |
| 280 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 22 | LF |
$25.00 |
$23.86 |
$32.06 |
$34.51 |
| 281 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$40,000.00 |
$29,827.69 |
$46,803.03 |
$56,350.00 |
| 282 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 80 | CY |
$21.00 |
$71.58 |
$19.10 |
$31.30 |
| 283 | 501(G) 6309 |
CLSM BACKFILL | 137 | CY |
$130.00 |
$143.17 |
$117.54 |
$155.06 |
| 284 | 504(A) 1304 |
APPROACH SLAB | 182.4 | SY |
$190.00 |
$178.97 |
$195.04 |
$176.89 |
| 285 | 504(B) 1305 |
SAW-CUT GROOVING | 487.9 | SY |
$4.00 |
$4.53 |
$4.26 |
$4.00 |
| 286 | 504(E) 6190 |
42" F-SHAPED PARAPET | 261 | LF |
$80.00 |
$77.55 |
$86.48 |
$114.00 |
| 287 | 506(A) 4050 |
STRUCTURAL STEEL M270 GRADE 50W | 116,900 | LB |
$2.20 |
$2.27 |
$1.56 |
$1.94 |
| 288 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 10 | EA |
$900.00 |
$596.55 |
$246.51 |
$726.60 |
| 289 | 509(A) 1326 |
CLASS AA CONCRETE | 127.6 | CY |
$450.00 |
$715.87 |
$559.67 |
$751.00 |
| 290 | 509(B) 1328 |
CLASS A CONCRETE | 47.4 | CY |
$525.00 |
$1,193.11 |
$713.73 |
$856.04 |
| 291 | 509(D) 1331 |
CLASS C CONCRETE | 11.6 | CY |
$400.00 |
$686.03 |
$355.16 |
$912.82 |
| 292 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 29,120 | LB |
$1.10 |
$1.49 |
$1.02 |
$0.9900 |
| 293 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 864 | LF |
$38.00 |
$41.76 |
$24.36 |
$31.95 |
| 294 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 864 | LF |
$18.00 |
$11.93 |
$27.24 |
$7.04 |
| 295 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 296 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 315 | SY |
$4.00 |
$3.97 |
$3.73 |
$3.50 |
| 297 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 84 | LF |
$30.00 |
$23.86 |
$31.72 |
$28.59 |
| 298 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 22 | LF |
$25.00 |
$23.86 |
$32.06 |
$34.51 |
| 299 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$40,000.00 |
$59,655.37 |
$46,803.03 |
$200,000.00 |
| 300 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 80 | CY |
$21.00 |
$14.85 |
$19.10 |
$31.30 |
| 301 | 501(G) 6309 |
CLSM BACKFILL | 121.8 | CY |
$130.00 |
$154.01 |
$117.54 |
$155.06 |
| 302 | 504(A) 1304 |
APPROACH SLAB | 182.4 | SY |
$190.00 |
$193.53 |
$195.04 |
$179.91 |
| 303 | 504(B) 1305 |
SAW-CUT GROOVING | 709.7 | SY |
$4.00 |
$4.53 |
$4.26 |
$4.00 |
| 304 | 504(E) 6190 |
42" F-SHAPED PARAPET | 381 | LF |
$80.00 |
$75.94 |
$86.48 |
$114.00 |
| 305 | 506(A) 4050 |
STRUCTURAL STEEL M270 GRADE 50W | 81,270 | LB |
$2.80 |
$1.53 |
$1.92 |
$1.94 |
| 306 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 10 | EA |
$900.00 |
$211.83 |
$246.51 |
$720.24 |
| 307 | 507(B) 6174 |
STAINLESS STEEL EXPANSION BEARING ASSEMBLY | 20 | EA |
$2,200.00 |
$1,187.45 |
$895.36 |
$1,677.03 |
| 308 | 507(C) 6282 |
ELASTOMERIC BEARING PADS | 20 | EA |
$465.00 |
$191.51 |
$218.70 |
$311.92 |
| 309 | 509(A) 1326 |
CLASS AA CONCRETE | 182.9 | CY |
$450.00 |
$711.90 |
$595.93 |
$794.28 |
| 310 | 509(B) 1328 |
CLASS A CONCRETE | 101.4 | CY |
$525.00 |
$640.94 |
$740.36 |
$648.30 |
| 311 | 509(D) 1331 |
CLASS C CONCRETE | 9.9 | CY |
$400.00 |
$309.51 |
$355.16 |
$1,042.05 |
| 312 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 57,960 | LB |
$1.10 |
$0.9300 |
$1.02 |
$0.9900 |
| 313 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 648 | LF |
$38.00 |
$23.49 |
$24.31 |
$31.95 |
| 314 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 648 | LF |
$18.00 |
$17.84 |
$27.24 |
$5.75 |
| 315 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 316 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 553 | SY |
$4.00 |
$3.97 |
$3.73 |
$3.50 |
| 317 | 516(A) 6094 |
DRILLED SHAFTS 48" DIAMETER | 240 | LF |
$750.00 |
$555.91 |
$647.94 |
$799.86 |
| 318 | 516(C) 6200 |
CROSSHOLE SONIC LOGGING | 2 | EA |
$1,500.00 |
$2,736.77 |
$959.46 |
$2,145.00 |
| 319 | 523(A) 6550 |
SEALER CRACK PREPARATION | 304 | LF |
$4.00 |
$3.40 |
$3.20 |
$3.00 |
| 320 | 523(B) 6560 |
SEALER RESIN | 2.1 | GAL |
$100.00 |
$113.33 |
$106.61 |
$100.00 |
| 321 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 84 | LF |
$30.00 |
$20.52 |
$31.72 |
$28.59 |
| 322 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 22 | LF |
$25.00 |
$10.91 |
$32.06 |
$34.51 |
| 323 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$60,000.00 |
$49,749.04 |
$52,194.68 |
$77,350.00 |
| 324 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 80 | CY |
$21.00 |
$14.85 |
$19.10 |
$31.30 |
| 325 | 501(G) 6309 |
CLSM BACKFILL | 121.8 | CY |
$130.00 |
$154.01 |
$117.54 |
$155.06 |
| 326 | 504(A) 1304 |
APPROACH SLAB | 182.4 | SY |
$190.00 |
$193.53 |
$195.04 |
$176.89 |
| 327 | 504(B) 1305 |
SAW-CUT GROOVING | 709.7 | SY |
$4.00 |
$4.53 |
$4.26 |
$4.00 |
| 328 | 504(E) 6190 |
42" F-SHAPED PARAPET | 381 | LF |
$80.00 |
$75.94 |
$86.48 |
$114.00 |
| 329 | 506(A) 4050 |
STRUCTURAL STEEL M270 GRADE 50W | 81,270 | LB |
$2.80 |
$1.53 |
$1.92 |
$1.94 |
| 330 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 10 | EA |
$900.00 |
$211.83 |
$246.51 |
$720.24 |
| 331 | 507(B) 6174 |
STAINLESS STEEL EXPANSION BEARING ASSEMBLY | 20 | EA |
$2,200.00 |
$1,187.45 |
$895.36 |
$1,677.03 |
| 332 | 507(C) 6282 |
ELASTOMERIC BEARING PADS | 20 | EA |
$465.00 |
$191.51 |
$218.70 |
$311.92 |
| 333 | 509(A) 1326 |
CLASS AA CONCRETE | 182.9 | CY |
$450.00 |
$711.90 |
$595.93 |
$801.43 |
| 334 | 509(B) 1328 |
CLASS A CONCRETE | 101.4 | CY |
$525.00 |
$640.94 |
$740.36 |
$648.30 |
| 335 | 509(D) 1331 |
CLASS C CONCRETE | 9.9 | CY |
$400.00 |
$309.51 |
$355.16 |
$1,042.05 |
| 336 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 57,960 | LB |
$1.10 |
$0.9300 |
$1.02 |
$0.9900 |
| 337 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 648 | LF |
$38.00 |
$23.49 |
$24.31 |
$31.95 |
| 338 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 648 | LF |
$18.00 |
$17.84 |
$27.24 |
$7.04 |
| 339 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 340 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 553 | SY |
$4.00 |
$3.97 |
$3.73 |
$3.50 |
| 341 | 516(A) 6094 |
DRILLED SHAFTS 48" DIAMETER | 252 | LF |
$750.00 |
$555.91 |
$625.64 |
$783.23 |
| 342 | 516(C) 6200 |
CROSSHOLE SONIC LOGGING | 2 | EA |
$1,500.00 |
$2,736.77 |
$959.46 |
$2,145.00 |
| 343 | 523(A) 6550 |
SEALER CRACK PREPARATION | 304 | LF |
$4.00 |
$3.40 |
$3.20 |
$3.00 |
| 344 | 523(B) 6560 |
SEALER RESIN | 2.1 | GAL |
$100.00 |
$113.33 |
$106.61 |
$100.00 |
| 345 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 84 | LF |
$30.00 |
$20.52 |
$31.72 |
$28.59 |
| 346 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 22 | LF |
$25.00 |
$10.91 |
$32.06 |
$34.51 |
| 347 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$45,000.00 |
$39,745.20 |
$52,194.68 |
$285,000.00 |
| 348 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 80 | CY |
$21.00 |
$14.85 |
$19.10 |
$31.30 |
| 349 | 501(G) 6309 |
CLSM BACKFILL | 129.6 | CY |
$130.00 |
$154.01 |
$117.54 |
$155.06 |
| 350 | 504(A) 1304 |
APPROACH SLAB | 182.4 | SY |
$190.00 |
$193.53 |
$195.04 |
$179.91 |
| 351 | 504(B) 1305 |
SAW-CUT GROOVING | 879.6 | SY |
$4.00 |
$4.53 |
$4.26 |
$4.00 |
| 352 | 504(E) 6190 |
42" F-SHAPED PARAPET | 471 | LF |
$80.00 |
$75.94 |
$86.49 |
$114.00 |
| 353 | 506(A) 4050 |
STRUCTURAL STEEL M270 GRADE 50W | 146,190 | LB |
$2.20 |
$1.53 |
$1.65 |
$1.94 |
| 354 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 10 | EA |
$900.00 |
$211.83 |
$246.51 |
$759.41 |
| 355 | 507(B) 6174 |
STAINLESS STEEL EXPANSION BEARING ASSEMBLY | 20 | EA |
$2,200.00 |
$1,187.45 |
$1,066.94 |
$1,893.40 |
| 356 | 507(C) 6282 |
ELASTOMERIC BEARING PADS | 20 | EA |
$465.00 |
$191.51 |
$218.70 |
$311.92 |
| 357 | 509(A) 1326 |
CLASS AA CONCRETE | 232 | CY |
$450.00 |
$711.90 |
$607.96 |
$781.88 |
| 358 | 509(B) 1328 |
CLASS A CONCRETE | 101.8 | CY |
$525.00 |
$640.94 |
$738.34 |
$706.28 |
| 359 | 509(D) 1331 |
CLASS C CONCRETE | 10.4 | CY |
$400.00 |
$309.51 |
$355.16 |
$984.32 |
| 360 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 68,930 | LB |
$1.10 |
$0.9300 |
$1.02 |
$0.9900 |
| 361 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 812 | LF |
$38.00 |
$23.49 |
$24.25 |
$32.15 |
| 362 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 812 | LF |
$18.00 |
$17.84 |
$27.24 |
$7.04 |
| 363 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 364 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 664 | SY |
$4.00 |
$3.97 |
$3.73 |
$3.50 |
| 365 | 516(A) 6094 |
DRILLED SHAFTS 48" DIAMETER | 252 | LF |
$750.00 |
$555.91 |
$627.66 |
$768.17 |
| 366 | 516(C) 6200 |
CROSSHOLE SONIC LOGGING | 2 | EA |
$1,500.00 |
$2,736.77 |
$959.46 |
$2,145.00 |
| 367 | 523(A) 6550 |
SEALER CRACK PREPARATION | 304 | LF |
$4.00 |
$3.40 |
$3.20 |
$3.00 |
| 368 | 523(B) 6560 |
SEALER RESIN | 2.1 | GAL |
$100.00 |
$113.33 |
$106.61 |
$100.00 |
| 369 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 84 | LF |
$30.00 |
$20.52 |
$31.72 |
$28.59 |
| 370 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 22 | LF |
$25.00 |
$10.91 |
$32.06 |
$34.51 |
| 371 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$70,000.00 |
$79,403.88 |
$62,977.97 |
$90,350.00 |
| 372 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 80 | CY |
$21.00 |
$14.85 |
$19.10 |
$31.30 |
| 373 | 501(G) 6309 |
CLSM BACKFILL | 129.6 | CY |
$130.00 |
$154.01 |
$117.54 |
$155.06 |
| 374 | 504(A) 1304 |
APPROACH SLAB | 182.4 | SY |
$190.00 |
$193.53 |
$195.04 |
$176.89 |
| 375 | 504(B) 1305 |
SAW-CUT GROOVING | 879.6 | SY |
$4.00 |
$4.53 |
$4.26 |
$4.00 |
| 376 | 504(E) 6190 |
42" F-SHAPED PARAPET | 471 | LF |
$80.00 |
$75.94 |
$86.49 |
$114.00 |
| 377 | 506(A) 4050 |
STRUCTURAL STEEL M270 GRADE 50W | 146,190 | LB |
$2.20 |
$1.53 |
$1.65 |
$1.94 |
| 378 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 10 | EA |
$900.00 |
$211.83 |
$246.51 |
$759.41 |
| 379 | 507(B) 6174 |
STAINLESS STEEL EXPANSION BEARING ASSEMBLY | 20 | EA |
$2,200.00 |
$1,187.45 |
$1,066.94 |
$1,893.40 |
| 380 | 507(C) 6282 |
ELASTOMERIC BEARING PADS | 20 | EA |
$465.00 |
$191.51 |
$218.70 |
$311.92 |
| 381 | 509(A) 1326 |
CLASS AA CONCRETE | 232 | CY |
$450.00 |
$711.90 |
$587.87 |
$773.52 |
| 382 | 509(B) 1328 |
CLASS A CONCRETE | 101.8 | CY |
$525.00 |
$640.94 |
$738.34 |
$706.28 |
| 383 | 509(D) 1331 |
CLASS C CONCRETE | 10.4 | CY |
$400.00 |
$309.51 |
$355.16 |
$984.32 |
| 384 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 68,930 | LB |
$1.10 |
$0.9300 |
$1.02 |
$0.9900 |
| 385 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 826 | LF |
$38.00 |
$23.49 |
$24.32 |
$31.61 |
| 386 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 826 | LF |
$18.00 |
$17.84 |
$27.24 |
$7.04 |
| 387 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 388 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 664 | SY |
$4.00 |
$3.97 |
$3.73 |
$3.50 |
| 389 | 516(A) 6094 |
DRILLED SHAFTS 48" DIAMETER | 260 | LF |
$750.00 |
$555.91 |
$618.47 |
$778.23 |
| 390 | 516(C) 6200 |
CROSSHOLE SONIC LOGGING | 2 | EA |
$1,500.00 |
$2,736.77 |
$959.46 |
$2,145.00 |
| 391 | 523(A) 6550 |
SEALER CRACK PREPARATION | 304 | LF |
$4.00 |
$3.40 |
$3.20 |
$3.00 |
| 392 | 523(B) 6560 |
SEALER RESIN | 2.1 | GAL |
$100.00 |
$113.33 |
$106.61 |
$100.00 |
| 393 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 84 | LF |
$30.00 |
$20.52 |
$31.72 |
$28.59 |
| 394 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 22 | LF |
$25.00 |
$10.91 |
$32.06 |
$34.51 |
| 395 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$65,000.00 |
$75,087.31 |
$62,977.97 |
$287,000.00 |
| 396 | 857(A) 8839 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) | 47,200 | LF |
$0.1300 |
$0.2000 |
$0.1900 |
$0.1800 |
| 397 | 857(E) 8887 |
(PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-1 | 3,000 | EA |
$0.5000 |
$1.13 |
$1.07 |
$1.00 |
| 398 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 17,350 | LF |
$0.1600 |
$0.1100 |
$0.1100 |
$0.1000 |
| 399 | 876(A) 8482 |
(PL)TRUCK MOUNTED ATTENUATOR | 1,740 | SD |
$15.50 |
$2.27 |
$2.13 |
$2.00 |
| 400 | 877(B) 8484 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 16,200 | LF |
$20.00 |
$12.99 |
$32.00 |
$28.50 |
| 401 | 877(C) 8486 |
RELOCATION OF PORTABLE LONGITUDINAL BARRIER | 16,200 | LF |
$3.50 |
$4.38 |
$0.9500 |
$2.60 |
| 402 | 878(B) 8487 |
MODULAR GLARE SCREEN (TEMPORARY) | 54,520 | SD |
$0.0900 |
$0.0600 |
$0.0500 |
$0.0500 |
| 403 | 880(A) 8812 |
ARROW DISPLAY(TYPE C) | 1,160 | SD |
$6.60 |
$20.40 |
$24.00 |
$18.00 |
| 404 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 17,400 | SD |
$0.3000 |
$0.4000 |
$0.3700 |
$0.3500 |
| 405 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 17,400 | SD |
$0.6000 |
$1.70 |
$2.25 |
$1.50 |
| 406 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 29,000 | SD |
$1.50 |
$0.5700 |
$0.5300 |
$0.5000 |
| 407 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 20,300 | SD |
$0.8500 |
$0.1700 |
$0.1600 |
$0.1500 |
| 408 | 880(C) 8848 |
WING BARRICADES | 2,320 | SD |
$1.00 |
$2.27 |
$2.65 |
$2.00 |
| 409 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 58,000 | SD |
$1.00 |
$0.0900 |
$0.0900 |
$0.0800 |
| 410 | 880(F) 8878 |
DRUMS | 87,000 | SD |
$0.1700 |
$0.1100 |
$0.1100 |
$0.1000 |
| 411 | 880(G) 8890 |
CHANNELIZER CONES | 116,000 | SD |
$0.2300 |
$0.1100 |
$0.1100 |
$0.1000 |
| 412 | 880(L) 8911 |
TRAFFIC SURVEILLANCE, POLICE | 300 | HOUR |
$60.00 |
$79.33 |
$66.25 |
$65.00 |
| 413 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 3,564 | SD |
$13.00 |
$5.67 |
$5.33 |
$5.00 |
| 414 | 413(D) 4869 |
RUMBLE STRIP METHOD PCC-CYC | 45,000 | LF |
$0.8500 |
$0.4100 |
$0.3200 |
$0.3000 |
| 415 | 804(A) 2915 |
STRUCTURAL CONCRETE | 0.46 | CY |
$520.00 |
$283.31 |
$266.26 |
$250.00 |
| 416 | 804(B) 2916 |
REINFORCING STEEL | 64 | LB |
$1.60 |
$2.27 |
$2.13 |
$2.00 |
| 417 | 805(A) 8724 |
(PL)REMOVAL OF EXISTING SIGNS | 4 | EA |
$60.00 |
$113.33 |
$106.50 |
$100.00 |
| 418 | 805(D) 8756 |
(PL)REMOVE & RESET EXISTING SIGNS | 46 | EA |
$149.00 |
$169.99 |
$159.75 |
$150.00 |
| 419 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 85.75 | SF |
$17.00 |
$17.00 |
$15.98 |
$15.00 |
| 420 | 851(B) 3218 |
3"@7.58 GALV.STEEL PIPE POST | 64 | LF |
$20.00 |
$17.00 |
$15.98 |
$15.00 |
| 421 | 851(C) 8330 |
2 1/2" SQUARE TUBE POST | 97.5 | LF |
$7.50 |
$11.33 |
$10.65 |
$10.00 |
| 422 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 81,880 | LF |
$0.5000 |
$0.4300 |
$0.4000 |
$0.3800 |
| 423 | 856(B) 8860 |
TRAFFIC STRIPE(MULTI-POLY.)(ARROWS) | 9 | EA |
$158.00 |
$113.33 |
$106.50 |
$100.00 |
| 424 | 509(A) 0319 |
CLASS AA CONCRETE | 145.08 | CY |
$450.00 |
$820.47 |
$233.74 |
$400.00 |
| 425 | 628(B) 5125 |
HIGH-TENSION CABLE BARRIER(TL-4) | 9,405 | LF |
$8.70 |
$7.82 |
$18.00 |
$11.30 |
| 426 | 628(C) 5110 |
END ANCHORS | 20 | EA |
$1,650.00 |
$5,274.43 |
$2,400.00 |
$2,000.00 |
| 427 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$80,000.00 |
$77,428.57 |
$165,000.00 |
$136,000.00 |
| 428 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$10,000.00 |
$2,833.10 |
$1,500.00 |
$2,350.00 |
| 429 | 640(A) 1426 |
FIELD OFFICE | 1 | EA |
$15,000.00 |
$8,499.29 |
$24,000.00 |
$30,000.00 |
| 430 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$1,177,000.00 |
|
|
|