| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$15,000.00 |
$15,975.00 |
$15,000.00 |
$150,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 12,078 | CY |
$7.00 |
$7.46 |
$8.55 |
$22.00 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 2,295 | CY |
$9.50 |
$9.59 |
$11.25 |
$30.00 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$12,000.00 |
$15,655.50 |
$14,000.00 |
$30,000.00 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 1,520 | LF |
$2.00 |
$1.26 |
$1.36 |
$1.80 |
| 6 | 221(D) 2803 |
TEMPORARY SEDIMENT FILTER | 1 | EA |
$225.00 |
$133.13 |
$172.50 |
$1,000.00 |
| 7 | 221(F) 0100 |
TEMPORARY SILT DIKE | 336 | LF |
$8.35 |
$6.84 |
$7.50 |
$8.00 |
| 8 | 221(G) 0151 |
TEMPORARY ROCK FILTER DAM TYPE 2 | 15 | CY |
$90.00 |
$94.79 |
$90.00 |
$110.00 |
| 9 | 229 4318 |
DITCH LINER PROTECTION | 53.14 | LF |
$1.60 |
$1.36 |
$2.00 |
$20.00 |
| 10 | 230(A) 2806 |
SOLID SLAB SODDING | 26,136 | SY |
$1.70 |
$1.42 |
$1.53 |
$2.00 |
| 11 | 233(A) 2817 |
VEGETATIVE MULCHING | 5.4 | AC |
$450.00 |
$422.81 |
$300.00 |
$500.00 |
| 12 | 241 2832 |
MOWING | 10.8 | AC |
$90.00 |
$93.72 |
$100.00 |
$100.00 |
| 13 | 303(A) 2200 |
(SP)AGGREGATE BASE TYPE A, PLANT MIXED | 1,057.1 | CY |
$60.00 |
$95.85 |
$103.50 |
$110.00 |
| 14 | 307(K) 4300 |
STABILIZED SUBGRADE | 11,593 | SY |
$6.55 |
$7.46 |
$8.05 |
$11.00 |
| 15 | 325 5271 |
SEPARATOR FABRIC | 5,169 | SY |
$1.20 |
$1.60 |
$1.73 |
$2.00 |
| 16 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 435.3 | TON |
$25.75 |
$47.92 |
$41.57 |
$45.00 |
| 17 | 407(B) 0250 |
TACK COAT | 1,480 | GAL |
$4.00 |
$4.79 |
$5.00 |
$6.00 |
| 18 | 408 5774 |
PRIME COAT | 6,275 | GAL |
$5.00 |
$6.39 |
$6.90 |
$8.00 |
| 19 | 411(B) 5940 |
SUPERPAVE, TYPE S3(PG 70-28 OK) | 711.6 | TON |
$84.00 |
$101.18 |
$109.25 |
$110.00 |
| 20 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 2,741.1 | TON |
$80.00 |
$90.53 |
$97.75 |
$105.00 |
| 21 | 411(C) 5955 |
SUPERPAVE, TYPE S4(PG 70-28 OK) | 801.7 | TON |
$99.00 |
$106.50 |
$115.00 |
$115.00 |
| 22 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 1,032.1 | TON |
$95.00 |
$103.30 |
$111.55 |
$112.00 |
| 23 | 412 5267 |
COLD MILLING PAVEMENT | 322 | SY |
$4.60 |
$21.30 |
$30.00 |
$25.00 |
| 24 | 501(G) 6309 |
CLSM BACKFILL | 23.8 | CY |
$220.00 |
$148.75 |
$192.50 |
$150.00 |
| 25 | 509(D) 0325 |
CLASS C CONCRETE | 12.9 | CY |
$332.00 |
$394.02 |
$515.00 |
$400.00 |
| 26 | 601(A) 0297 |
TYPE I PLAIN RIPRAP | 26.5 | TON |
$40.00 |
$51.31 |
$75.56 |
$50.00 |
| 27 | 611(G) 6002 |
INLET (SMD-TYPE 2) | 1 | EA |
$2,140.00 |
$2,279.10 |
$4,000.00 |
$5,000.00 |
| 28 | 613(A) 0492 |
24" R.C.PIPE CLASS III | 115.37 | LF |
$73.00 |
$77.74 |
$95.00 |
$80.00 |
| 29 | 613(B) 0689 |
18" CORR. GALV. STEEL PIPE | 128 | LF |
$24.00 |
$22.37 |
$28.00 |
$65.00 |
| 30 | 613(B) 0698 |
72" CORR. GALV. STEEL PIPE | 260 | LF |
$120.00 |
$87.33 |
$110.00 |
$200.00 |
| 31 | 613(H) 0450 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 190 | LF |
$20.00 |
$11.72 |
$28.00 |
$20.00 |
| 32 | 613(I) 1096 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 65 | LF |
$21.00 |
$10.12 |
$35.00 |
$20.00 |
| 33 | 613(M) 7196 |
TYPE A6 CULVERT END TREATMENT | 4 | EA |
$1,120.00 |
$1,192.80 |
$1,400.00 |
$1,000.00 |
| 34 | 613(N) 7501 |
TYPE B4 SLOPED CONCRETE END SECTION | 1 | EA |
$1,175.00 |
$1,251.38 |
$2,050.00 |
$3,500.00 |
| 35 | 613(Q) 5946 |
OUTLET LATERAL HEADWALL | 2 | EA |
$800.00 |
$852.00 |
$500.00 |
$4,500.00 |
| 36 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$9,500.00 |
$22,365.00 |
$8,500.00 |
$75,000.00 |
| 37 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 12,374 | SY |
$4.75 |
$3.20 |
$4.35 |
$6.00 |
| 38 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 1,020 | LF |
$4.50 |
$3.20 |
$3.00 |
$3.00 |
| 39 | 619(C) 0924 |
SAWING PAVEMENT | 2,577 | LF |
$4.50 |
$6.39 |
$4.50 |
$5.00 |
| 40 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 650 | LF |
$17.00 |
$17.57 |
$18.40 |
$20.00 |
| 41 | 623(G) 8590 |
GUARDRAIL END TREATMENT (31") | 4 | EA |
$2,500.00 |
$1,938.30 |
$2,350.00 |
$2,400.00 |
| 42 | 623(I) 8700 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 4 | EA |
$2,400.00 |
$1,437.75 |
$1,675.00 |
$1,800.00 |
| 43 | 624(C) 4459 |
FENCE-STYLE SWF (5 BARBED WIRE) | 924 | LF |
$4.65 |
$11.77 |
$13.80 |
$14.00 |
| 44 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 86 | CY |
$20.00 |
$21.96 |
$12.00 |
$25.00 |
| 45 | 501(G) 6309 |
CLSM BACKFILL | 180 | CY |
$175.00 |
$134.28 |
$185.00 |
$150.00 |
| 46 | 503(A) 1312 |
PRESTRESSED CONCRETE BEAMS (TYPE III) | 995 | LF |
$230.00 |
$202.99 |
$208.00 |
$240.00 |
| 47 | 504(A) 1304 |
APPROACH SLAB | 246.4 | SY |
$200.00 |
$216.69 |
$222.50 |
$180.00 |
| 48 | 504(B) 1305 |
SAW-CUT GROOVING | 1,215.1 | SY |
$5.00 |
$3.73 |
$4.60 |
$5.00 |
| 49 | 504(D) 6245 |
CONCRETE RAIL (TR4) | 497 | LF |
$90.00 |
$99.11 |
$91.00 |
$100.00 |
| 50 | 506(A) 1322 |
STRUCTURAL STEEL | 1,083 | LB |
$3.00 |
$3.35 |
$3.00 |
$3.00 |
| 51 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 10 | EA |
$1,000.00 |
$323.47 |
$573.00 |
$800.00 |
| 52 | 507(B) 6174 |
STAINLESS STEEL EXPANSION BEARING ASSEMBLY | 20 | EA |
$2,000.00 |
$1,335.03 |
$1,500.00 |
$1,800.00 |
| 53 | 507(C) 6282 |
ELASTOMERIC BEARING PADS | 20 | EA |
$500.00 |
$198.49 |
$733.00 |
$400.00 |
| 54 | 509(A) 1326 |
CLASS AA CONCRETE | 288 | CY |
$600.00 |
$554.95 |
$662.50 |
$480.00 |
| 55 | 509(B) 1328 |
CLASS A CONCRETE | 144.6 | CY |
$600.00 |
$672.06 |
$687.50 |
$530.00 |
| 56 | 509(D) 1331 |
CLASS C CONCRETE | 13.1 | CY |
$295.00 |
$516.06 |
$575.00 |
$350.00 |
| 57 | 511(A) 1332 |
REINFORCING STEEL | 540 | LB |
$0.9000 |
$1.06 |
$1.80 |
$1.00 |
| 58 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 88,122 | LB |
$1.10 |
$1.08 |
$1.08 |
$1.50 |
| 59 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 568 | LF |
$40.00 |
$35.69 |
$32.90 |
$30.00 |
| 60 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 568 | LF |
$20.00 |
$20.20 |
$14.10 |
$35.00 |
| 61 | 514(K) 6260 |
(PL)PILOT HOLES | 256 | LF |
$120.00 |
$41.54 |
$110.00 |
$80.00 |
| 62 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 63 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 916 | SY |
$5.00 |
$3.20 |
$4.03 |
$6.00 |
| 64 | 516(A) 6096 |
DRILLED SHAFTS 60" DIAMETER | 139 | LF |
$900.00 |
$752.11 |
$985.00 |
$840.00 |
| 65 | 516(C) 6200 |
CROSSHOLE SONIC LOGGING | 1 | EA |
$5,000.00 |
$1,917.00 |
$4,500.00 |
$5,000.00 |
| 66 | 523(A) 6550 |
SEALER CRACK PREPARATION | 171 | LF |
$5.00 |
$4.26 |
$5.75 |
$6.00 |
| 67 | 523(B) 6560 |
SEALER RESIN | 1 | GAL |
$150.00 |
$127.80 |
$115.00 |
$200.00 |
| 68 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 2,162 | TON |
$45.00 |
$51.29 |
$48.43 |
$50.00 |
| 69 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 344 | TON |
$40.00 |
$36.26 |
$40.91 |
$40.00 |
| 70 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 92 | LF |
$30.00 |
$32.09 |
$30.00 |
$20.00 |
| 71 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 90 | LF |
$30.00 |
$32.36 |
$30.00 |
$20.00 |
| 72 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$40,000.00 |
$119,334.71 |
$35,000.00 |
$100,000.00 |
| 73 | 413(B) 4863 |
RUMBLE STRIP-METHOD HMA-CYC | 1,710 | LF |
$0.5000 |
$2.02 |
$2.20 |
$2.50 |
| 74 | 805(D) 8756 |
(PL)REMOVE & RESET EXISTING SIGNS | 2 | EA |
$250.00 |
$106.50 |
$150.00 |
$150.00 |
| 75 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 24 | SF |
$20.00 |
$21.30 |
$28.75 |
$25.00 |
| 76 | 851(C) 8327 |
2 1/4" SQUARE TUBE POST | 56 | LF |
$12.00 |
$6.39 |
$10.00 |
$7.00 |
| 77 | 853 9069 |
GUARDRAIL DELINEATORS(TYPE 2, CODE 1) | 18 | EA |
$11.00 |
$12.78 |
$15.00 |
$15.00 |
| 78 | 855(A) 8812 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 4,519 | LF |
$0.6000 |
$1.22 |
$1.35 |
$1.50 |
| 79 | 857(A) 8839 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) | 8,800 | LF |
$0.1500 |
$0.1100 |
$0.1400 |
$0.1200 |
| 80 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 2,920 | LF |
$0.3000 |
$0.2700 |
$0.3200 |
$0.3000 |
| 81 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 2,160 | SD |
$0.3000 |
$0.5300 |
$0.6500 |
$0.6000 |
| 82 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 2,520 | SD |
$0.9000 |
$0.2700 |
$0.3200 |
$0.3000 |
| 83 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 2,880 | SD |
$1.00 |
$0.5300 |
$0.6500 |
$0.6000 |
| 84 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 1,440 | SD |
$0.4000 |
$0.2700 |
$0.3200 |
$0.4000 |
| 85 | 880(C) 8848 |
WING BARRICADES | 720 | SD |
$0.6000 |
$1.07 |
$1.15 |
$1.30 |
| 86 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 2,880 | SD |
$0.3000 |
$2.66 |
$3.00 |
$3.00 |
| 87 | 880(F) 8878 |
DRUMS | 3,060 | SD |
$0.3000 |
$0.0500 |
$0.0800 |
$0.0800 |
| 88 | 880(G) 8890 |
CHANNELIZER CONES | 8,640 | SD |
$0.3000 |
$0.0500 |
$0.0800 |
$0.0800 |
| 89 | 880(L) 8911 |
TRAFFIC SURVEILLANCE, POLICE | 320 | HOUR |
$60.00 |
$63.90 |
$80.00 |
$65.00 |
| 90 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 360 | SD |
$20.00 |
$5.33 |
$8.00 |
$8.00 |
| 91 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$20,000.00 |
$26,145.75 |
$17,000.00 |
$30,000.00 |
| 92 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$4,066.14 |
$7,250.00 |
$3,500.00 |
| 93 | 640(A) 1398 |
FIELD OFFICE | 1 | EA |
$7,000.00 |
$6,435.00 |
$9,250.00 |
$30,000.00 |
| 94 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$130,000.00 |
$150,432.64 |
$125,000.00 |
$175,000.00 |