| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$20,000.00 |
$15,000.00 |
$33,964.00 |
$9,970.57 |
$230,000.00 |
$129,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 43,526 | CY |
$10.00 |
$7.75 |
$4.01 |
$5.23 |
$6.50 |
$4.10 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 87,664 | CY |
$10.00 |
$6.99 |
$7.75 |
$5.23 |
$8.00 |
$6.33 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$40,000.00 |
$28,995.25 |
$28,484.73 |
$48,309.09 |
$25,000.00 |
$83,000.00 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 8,781 | LF |
$2.00 |
$1.95 |
$1.29 |
$1.96 |
$1.30 |
$1.29 |
| 6 | 221(D) 2803 |
TEMPORARY SEDIMENT FILTER | 6 | EA |
$225.00 |
$1,000.00 |
$149.00 |
$217.66 |
$150.00 |
$215.00 |
| 7 | 221(F) 0100 |
TEMPORARY SILT DIKE | 770 | LF |
$6.00 |
$8.00 |
$6.95 |
$9.79 |
$7.10 |
$6.68 |
| 8 | 230(A) 2806 |
SOLID SLAB SODDING | 54,375 | SY |
$3.00 |
$1.35 |
$1.10 |
$1.43 |
$1.15 |
$1.13 |
| 9 | 232(A) 2813 |
SEEDING METHOD A | 10 | AC |
$1,000.00 |
$225.00 |
$199.00 |
$257.92 |
$205.00 |
$533.00 |
| 10 | 233(A) 2817 |
VEGETATIVE MULCHING | 10 | AC |
$350.00 |
$225.00 |
$199.00 |
$257.92 |
$205.00 |
$315.00 |
| 11 | 241 2832 |
MOWING | 41 | AC |
$50.00 |
$11.00 |
$49.00 |
$63.51 |
$50.00 |
$44.00 |
| 12 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 4,976 | CY |
$35.00 |
$44.00 |
$44.50 |
$47.33 |
$53.00 |
$39.60 |
| 13 | 307(K) 4300 |
STABILIZED SUBGRADE | 34,409 | SY |
$6.00 |
$6.00 |
$6.57 |
$7.21 |
$6.00 |
$7.37 |
| 14 | 325 5271 |
SEPARATOR FABRIC | 28,055 | SY |
$1.50 |
$0.9800 |
$1.12 |
$1.28 |
$1.10 |
$0.9000 |
| 15 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 2,433 | TON |
$27.00 |
$21.95 |
$18.68 |
$22.69 |
$27.00 |
$21.00 |
| 16 | 407(B) 0250 |
TACK COAT | 3,689 | GAL |
$3.00 |
$2.00 |
$2.70 |
$6.00 |
$2.75 |
$2.95 |
| 17 | 408 5774 |
PRIME COAT | 18,627 | GAL |
$4.00 |
$2.00 |
$6.16 |
$6.75 |
$6.20 |
$6.73 |
| 18 | 411(B) 5940 |
SUPERPAVE, TYPE S3(PG 70-28 OK) | 3,762 | TON |
$80.00 |
$65.13 |
$72.00 |
$92.90 |
$75.00 |
$83.91 |
| 19 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 4,965 | TON |
$75.00 |
$64.92 |
$63.30 |
$76.34 |
$65.00 |
$69.18 |
| 20 | 411(C) 5955 |
SUPERPAVE, TYPE S4(PG 70-28 OK) | 2,566 | TON |
$90.00 |
$80.00 |
$82.30 |
$106.36 |
$85.00 |
$89.94 |
| 21 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 805 | TON |
$80.00 |
$79.82 |
$68.10 |
$87.04 |
$71.00 |
$74.40 |
| 22 | 509(D) 0325 |
CLASS C CONCRETE | 747 | CY |
$350.00 |
$225.00 |
$350.00 |
$264.80 |
$200.00 |
$380.00 |
| 23 | 613(A) 0491 |
18" R.C.PIPE CLASS III | 48 | LF |
$65.00 |
$60.00 |
$31.41 |
$48.35 |
$40.00 |
$71.70 |
| 24 | 613(A) 0492 |
24" R.C.PIPE CLASS III | 126 | LF |
$75.00 |
$55.00 |
$43.74 |
$55.78 |
$45.00 |
$82.40 |
| 25 | 613(B) 0690 |
24" CORR. GALV. STEEL PIPE | 74 | LF |
$35.00 |
$29.97 |
$29.80 |
$48.07 |
$36.00 |
$69.40 |
| 26 | 613(L) 5726 |
18" PREFAB. CULVERT END SECTION, ROUND | 2 | EA |
$650.00 |
$1,523.97 |
$779.12 |
$586.58 |
$600.00 |
$383.00 |
| 27 | 613(L) 5730 |
24" PREFAB. CULVERT END SECTION, ROUND | 4 | EA |
$1,000.00 |
$1,500.00 |
$890.04 |
$699.56 |
$775.00 |
$492.00 |
| 28 | 613(P) 0761 |
24" GALV. STEEL CULVERT END SECTION ROUND | 4 | EA |
$350.00 |
$300.00 |
$291.06 |
$186.34 |
$235.00 |
$464.00 |
| 29 | 613(T) 1187 |
STANDARD BEDDING MATERIAL, CLASS C | 57 | CY |
$35.00 |
$39.98 |
$42.61 |
$67.50 |
$57.00 |
$41.20 |
| 30 | 613(V) 1180 |
TRENCH EXCAVATION | 238 | CY |
$12.00 |
$20.00 |
$9.36 |
$7.78 |
$15.00 |
$6.90 |
| 31 | 613(W) 4498 |
18" JACKED CONDUIT | 54 | LF |
$300.00 |
$400.00 |
$153.24 |
$605.34 |
$485.00 |
$545.00 |
| 32 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$10,000.00 |
$33,226.42 |
$1,419.46 |
$12,617.02 |
$10,000.00 |
$11,000.00 |
| 33 | 619(B) 4725 |
REMOVAL OF FENCE | 8,515 | LF |
$3.00 |
$1.00 |
$1.50 |
$1.62 |
$1.00 |
$1.28 |
| 34 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 19,078 | SY |
$5.00 |
$1.70 |
$2.97 |
$2.67 |
$4.50 |
$1.15 |
| 35 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 2,377 | LF |
$3.00 |
$4.00 |
$1.00 |
$4.09 |
$2.75 |
$3.00 |
| 36 | 619(C) 0924 |
SAWING PAVEMENT | 2,640 | LF |
$3.50 |
$1.00 |
$3.00 |
$3.43 |
$3.50 |
$5.80 |
| 37 | 623 0100 |
(PL)GUARDRAIL CURBING | 4 | EA |
$850.00 |
$400.00 |
$2,000.00 |
$2,426.81 |
$1,325.00 |
$1,100.00 |
| 38 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 400 | LF |
$20.00 |
$20.00 |
$17.00 |
$22.03 |
$17.50 |
$16.45 |
| 39 | 623(G) 8590 |
GUARDRAIL END TREATMENT (31") | 4 | EA |
$4,000.00 |
$2,400.00 |
$2,050.00 |
$2,656.97 |
$2,300.00 |
$2,600.00 |
| 40 | 623(I) 8700 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 4 | EA |
$2,000.00 |
$2,200.00 |
$1,695.00 |
$2,196.86 |
$3,100.00 |
$1,885.00 |
| 41 | 624(C) 4458 |
FENCE-STYLE SWF (4 BARBED WIRE) | 1,874 | LF |
$5.00 |
$5.00 |
$3.20 |
$4.99 |
$3.35 |
$3.50 |
| 42 | 624(C) 4459 |
FENCE-STYLE SWF (5 BARBED WIRE) | 6,762 | LF |
$5.00 |
$5.00 |
$3.45 |
$5.83 |
$3.60 |
$3.77 |
| 43 | 104 0955 |
(SP) RAILROAD FLAGGING(NON-BIDDABLE) | 80 | DAY |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 44 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 270 | CY |
$20.00 |
$16.36 |
$30.00 |
$16.42 |
$60.00 |
$63.55 |
| 45 | 501(G) 6309 |
CLSM BACKFILL | 316 | CY |
$350.00 |
$135.35 |
$150.00 |
$133.30 |
$150.00 |
$133.20 |
| 46 | 504(A) 1304 |
APPROACH SLAB | 427.8 | SY |
$180.00 |
$155.24 |
$200.00 |
$170.80 |
$155.00 |
$142.00 |
| 47 | 504(B) 1305 |
SAW-CUT GROOVING | 1,344.9 | SY |
$4.25 |
$4.00 |
$4.00 |
$5.18 |
$4.15 |
$3.80 |
| 48 | 504(C) 6250 |
SEALED EXPANSION JOINT | 53.2 | LF |
$300.00 |
$295.87 |
$275.00 |
$337.28 |
$335.00 |
$190.00 |
| 49 | 504(D) 6245 |
CONCRETE RAIL (TR4) | 690.3 | LF |
$80.00 |
$68.99 |
$85.00 |
$78.86 |
$65.00 |
$109.00 |
| 50 | 506(A) 1322 |
STRUCTURAL STEEL | 314,890 | LB |
$1.95 |
$1.90 |
$2.10 |
$1.84 |
$2.10 |
$1.90 |
| 51 | 507(A) 6170 |
STAINLESS STEEL FIXED BEARING ASSEMBLY | 10 | EA |
$3,000.00 |
$2,011.97 |
$1,300.00 |
$1,559.77 |
$2,000.00 |
$1,320.00 |
| 52 | 507(B) 6174 |
STAINLESS STEEL EXPANSION BEARING ASSEMBLY | 20 | EA |
$2,500.00 |
$2,011.97 |
$1,300.00 |
$1,635.69 |
$2,000.00 |
$1,380.00 |
| 53 | 509(A) 1326 |
CLASS AA CONCRETE | 279 | CY |
$450.00 |
$694.01 |
$816.57 |
$711.15 |
$500.00 |
$768.00 |
| 54 | 509(B) 1328 |
CLASS A CONCRETE | 270.6 | CY |
$500.00 |
$482.07 |
$816.57 |
$611.64 |
$650.00 |
$840.00 |
| 55 | 510(C) 6138 |
SLOPE WALL (5") | 1,400 | SY |
$70.00 |
$97.34 |
$115.00 |
$101.57 |
$95.00 |
$82.70 |
| 56 | 511(A) 1332 |
REINFORCING STEEL | 1,350 | LB |
$1.00 |
$1.01 |
$1.00 |
$1.45 |
$1.20 |
$0.9100 |
| 57 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 126,000 | LB |
$1.00 |
$0.9600 |
$0.9000 |
$1.06 |
$1.30 |
$0.8900 |
| 58 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 191 | LF |
$30.00 |
$40.20 |
$34.00 |
$32.55 |
$28.00 |
$23.20 |
| 59 | 514(A) 6011 |
PILES, FURNISHED (HP 12X53) | 407 | LF |
$40.00 |
$46.05 |
$44.00 |
$27.85 |
$35.00 |
$29.30 |
| 60 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 191 | LF |
$15.00 |
$6.15 |
$24.00 |
$81.98 |
$15.00 |
$117.00 |
| 61 | 514(B) 6294 |
PILES, DRIVEN (HP 12X53) | 407 | LF |
$15.00 |
$6.15 |
$34.00 |
$55.33 |
$16.00 |
$132.00 |
| 62 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 63 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 869 | SY |
$4.50 |
$3.65 |
$3.65 |
$4.73 |
$3.75 |
$3.83 |
| 64 | 516(A) 6098 |
DRILLED SHAFTS 72" DIAMETER | 96 | LF |
$700.00 |
$1,682.45 |
$1,000.00 |
$1,305.60 |
$2,750.00 |
$998.00 |
| 65 | 516(C) 6200 |
CROSSHOLE SONIC LOGGING | 4 | EA |
$1,500.00 |
$1,250.00 |
$1,000.00 |
$3,856.54 |
$2,000.00 |
$1,100.00 |
| 66 | 523(A) 6550 |
SEALER CRACK PREPARATION | 52.2 | LF |
$5.50 |
$5.00 |
$5.00 |
$6.48 |
$5.20 |
$5.46 |
| 67 | 523(B) 6560 |
SEALER RESIN | 1 | GAL |
$100.00 |
$150.00 |
$150.00 |
$194.41 |
$156.00 |
$219.00 |
| 68 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 332 | LF |
$20.00 |
$20.41 |
$35.00 |
$25.40 |
$18.00 |
$16.46 |
| 69 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 80 | LF |
$25.00 |
$19.82 |
$35.00 |
$12.48 |
$18.00 |
$16.40 |
| 70 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$18,000.00 |
$68,101.86 |
$130,000.00 |
$52,171.99 |
$50,000.00 |
$315,000.00 |
| 71 | 624(E) 4294 |
FENCE-STYLE CLF (8'HIGH, CLASS A) | 192 | LF |
$120.00 |
$134.21 |
$122.50 |
$194.41 |
$58.00 |
$134.00 |
| 72 | 805(A) 8724 |
(PL)REMOVAL OF EXISTING SIGNS | 19 | EA |
$50.00 |
$26.00 |
$25.00 |
$32.40 |
$26.00 |
$27.61 |
| 73 | 805(D) 8756 |
(PL)REMOVE & RESET EXISTING SIGNS | 5 | EA |
$150.00 |
$212.00 |
$100.00 |
$129.61 |
$104.00 |
$110.00 |
| 74 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 107.25 | SF |
$15.00 |
$16.00 |
$14.00 |
$18.15 |
$14.50 |
$15.46 |
| 75 | 851(B) 3217 |
2 1/2"@5.79 GALV.STEEL PIPE POST | 136 | LF |
$15.00 |
$16.00 |
$20.00 |
$25.92 |
$20.50 |
$22.07 |
| 76 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 22,016 | LF |
$0.5000 |
$0.7500 |
$0.4500 |
$0.5800 |
$0.4700 |
$0.5000 |
| 77 | 856(A) 8555 |
TRAFFIC STRIPE(MULTI-POLY.)(24" WIDE) | 26 | LF |
$15.00 |
$11.00 |
$20.00 |
$25.92 |
$20.75 |
$22.07 |
| 78 | 857(A) 8839 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) | 2,650 | LF |
$0.2000 |
$0.6500 |
$0.2500 |
$0.3200 |
$0.2600 |
$0.2800 |
| 79 | 857(C) 8851 |
REMOVABLE PAVEMENT MARKING TAPE(4" WIDE) | 566 | LF |
$0.7500 |
$1.11 |
$1.00 |
$1.30 |
$1.05 |
$1.10 |
| 80 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 916 | LF |
$0.2000 |
$0.5000 |
$1.00 |
$1.30 |
$1.05 |
$1.10 |
| 81 | 870(A) 8485 |
SAND FILLED IMPACT ATTENUATION MODULE | 285 | SD |
$1.50 |
$3.30 |
$7.00 |
$9.72 |
$7.75 |
$8.28 |
| 82 | 877(B) 8484 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 3,500 | LF |
$25.00 |
$15.00 |
$16.00 |
$19.11 |
$20.00 |
$25.11 |
| 83 | 877(C) 8486 |
RELOCATION OF PORTABLE LONGITUDINAL BARRIER | 2,550 | LF |
$4.00 |
$7.75 |
$3.50 |
$3.81 |
$2.00 |
$3.86 |
| 84 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 8,900 | SD |
$0.4000 |
$0.1500 |
$0.1000 |
$0.1300 |
$0.1100 |
$0.1100 |
| 85 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 1,855 | SD |
$1.10 |
$3.00 |
$3.00 |
$3.89 |
$3.10 |
$3.31 |
| 86 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 3,440 | SD |
$1.10 |
$3.00 |
$1.00 |
$1.30 |
$1.05 |
$1.10 |
| 87 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 385 | SD |
$0.7500 |
$2.00 |
$4.00 |
$5.18 |
$4.50 |
$4.41 |
| 88 | 880(C) 8848 |
WING BARRICADES | 980 | SD |
$1.50 |
$1.55 |
$1.00 |
$1.30 |
$1.05 |
$1.10 |
| 89 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 2,730 | SD |
$0.2000 |
$0.5500 |
$1.00 |
$1.30 |
$1.05 |
$1.10 |
| 90 | 880(F) 8878 |
DRUMS | 13,415 | SD |
$0.1500 |
$0.5500 |
$0.1000 |
$0.1300 |
$0.1200 |
$0.1100 |
| 91 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$20,000.00 |
$35,000.00 |
$12,000.00 |
$44,692.33 |
$24,000.00 |
$49,484.00 |
| 92 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$1,500.00 |
$3,000.00 |
$3,240.20 |
$2,096.00 |
$16,400.00 |
| 93 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$295,350.00 |
$252,348.00 |
$207,100.00 |
$210,746.17 |
$290,000.00 |
$245,000.00 |