BRIDGE AND APPROACHES US -59: OVER RUSSELL CREEK AND ELM CREEK , 1.30 MILES SOUTH OF THE KANSAS STATE LINE . PROJECT LENGTH = 1.561 MILES

Let date
Thursday, September 18, 2014
Contract
140259
J/P numbers
23126(04)
District
Division 8
County
Craig
Highway
Limits
BRIDGE AND APPROACHES US -59: OVER RUSSELL CREEK AND ELM CREEK , 1.30 MILES SOUTH OF THE KANSAS STATE LINE . PROJECT LENGTH = 1.561 MILES
Project number
STPY-118B(067)SS

Bidders 3

#ContractorTotal bidvs estimatevs low
EEEngineer's estimate$5,309,782
1 B & B BRIDGE COMPANY, LLC Low bidder $5,352,913 +0.8%
2 SHERWOOD CONSTRUCTION CO., INC. $5,735,299 +8.0% +7.1%
3 GLOVER & ASSOCIATES, INC. $5,802,239 +9.3% +8.4%

Bid tab: unit prices 126 items

ExcelCSV
SeqBid codeDescriptionQtyUnitEstimate #1 B & B BRIDGE CO…#2 SHERWOOD CONSTR…#3 GLOVER & ASSOCI…
1201(A) 0102 CLEARING AND GRUBBING1LSUM $20,000.00 $20,000.00 $28,543.01 $175,000.00
2202(A) 0183 UNCLASSIFIED EXCAVATION22,366CY $7.00 $6.00 $7.14 $8.29
3202(D) 0184 UNCLASSIFIED BORROW43,126CY $8.50 $8.50 $7.14 $7.17
4205(A) 4229 TYPE A-SALVAGED TOPSOIL1LSUM $30,000.00 $27,750.00 $45,888.71 $75,000.00
5221(C) 2801 TEMPORARY SILT FENCE10,810LF $2.00 $1.24 $2.70 $1.34
6221(F) 0100 TEMPORARY SILT DIKE1,056LF $10.00 $5.88 $7.68 $3.70
7221(G) 0153 TEMPORARY ROCK FILTER DAM TYPE 44CY $500.00 $125.00 $135.34 $192.01
8230(A) 2806 SOLID SLAB SODDING66,610SY $1.50 $1.23 $1.64 $1.30
9233(A) 2817 VEGETATIVE MULCHING14AC $450.00 $185.00 $517.17 $214.65
10241 2832 MOWING28AC $60.00 $48.00 $71.79 $15.00
11303(A) 2100 AGGREGATE BASE TYPE A6,554CY $42.00 $27.00 $45.35 $45.00
12307(K) 4300 STABILIZED SUBGRADE38,330SY $4.00 $5.70 $6.15 $4.69
13325 5271 SEPARATOR FABRIC36,988SY $1.00 $1.35 $1.16 $1.25
14402(E) 0225 TRAFFIC BOUND SURFACE COURSE TYPE E5,511TON $18.00 $18.00 $22.03 $22.11
15408 5774 PRIME COAT21,830GAL $5.00 $7.38 $5.95 $2.50
16409(A) 4242 FABRIC REINFORCEMENT13,804SY $9.00 $2.28 $0.9500 $1.49
17409(B) 4268 BITUMINOUS BINDER2,762GAL $5.00 $3.42 $5.49 $3.47
18411(B) 5940 SUPERPAVE, TYPE S3(PG 70-28 OK)3,650TON $86.00 $88.51 $96.59 $91.65
19411(B) 5945 SUPERPAVE, TYPE S3(PG 64-22 OK)10,748TON $80.00 $79.23 $85.89 $77.62
20411(C) 5955 SUPERPAVE, TYPE S4(PG 70-28 OK)2,434TON $95.00 $104.06 $112.14 $105.00
21411(C) 5960 SUPERPAVE, TYPE S4(PG 64-22 OK)2,510TON $92.00 $92.53 $90.11 $91.67
22412 5267 COLD MILLING PAVEMENT11,190SY $2.50 $3.10 $2.43 $2.19
23413(B) 4863 RUMBLE STRIP-METHOD HMA-CYC16,309LF $0.5000 $0.1600 $0.1900 $0.1900
24509(D) 0325 CLASS C CONCRETE44CY $300.00 $400.00 $298.13 $465.69
25601(A) 0297 TYPE I PLAIN RIPRAP494TON $50.00 $28.50 $44.48 $44.63
26613(A) 0491 18" R.C.PIPE CLASS III54LF $60.00 $46.00 $83.97 $50.11
27613(A) 0492 24" R.C.PIPE CLASS III128LF $65.00 $60.00 $96.03 $72.04
28613(B) 0689 18" CORR. GALV. STEEL PIPE374LF $28.00 $40.00 $51.07 $29.52
29613(B) 0690 24" CORR. GALV. STEEL PIPE46LF $30.00 $50.00 $70.68 $44.62
30613(H) 0450 6" PERFORATED PIPE UNDERDRAIN ROUND500LF $20.00 $30.00 $22.05 $4.96
31613(M) 7186 TYPE A4 CULVERT END TREATMENT10EA $950.00 $1,100.00 $966.62 $1,392.32
32613(M) 7187 TYPE B4 CULVERT END TREATMENT6EA $1,100.00 $1,250.00 $1,148.76 $1,740.40
33613(V) 1180 TRENCH EXCAVATION265CY $12.00 $4.50 $2.43 $15.80
34619(A) 0920 REMOVAL OF STRUCTURES & OBSTRUCTIONS1LSUM $20,000.00 $2,500.00 $8,155.75 $28,088.36
35619(B) 4728 REMOVAL OF ASPHALT PAVEMENT13,723SY $3.00 $2.50 $1.73 $1.64
36619(B) 4780 REMOVAL OF GUARDRAIL1,925LF $4.00 $4.00 $8.52 $2.96
37619(C) 0924 SAWING PAVEMENT11,705LF $3.50 $3.50 $3.29 $0.9000
38623(A) 0932 BEAM GUARDRAIL W-BEAM SINGLE1,887.5LF $17.00 $16.50 $28.78 $19.14
39623(G) 8590 GUARDRAIL END TREATMENT (31")8EA $2,300.00 $2,250.00 $2,786.63 $2,436.55
40623(I) 8700 GUARDRAIL BRIDGE CONN-THRIE BEAM (31")8EA $1,700.00 $1,550.00 $2,591.93 $1,943.44
41624(A) 4281 FENCE-STYLE WWF2,252LF $7.00 $7.00 $7.76 $8.70
42624(B) 4468 GATES-STYLE WWF (4.5'HIGH X 20'LONG)1EA $15.00 $1,000.00 $1,955.52 $986.22
43624(C) 4459 FENCE-STYLE SWF (5 BARBED WIRE)1,972LF $6.00 $7.00 $7.33 $8.70
44853 9069 GUARDRAIL DELINEATORS(TYPE 2, CODE 1)60EA $12.00 $10.00 $13.99 $13.92
45501(B) 1307 SUBSTRUCTURE EXCAVATION COMMON90CY $25.00 $37.00 $21.92 $19.93
46501(G) 6309 CLSM BACKFILL200CY $90.00 $130.00 $175.20 $157.09
47503(A) 1313 PRESTRESSED CONCRETE BEAMS (TYPE IV)498.33LF $220.00 $300.00 $247.14 $358.44
48504(A) 1304 APPROACH SLAB224.8SY $180.00 $190.00 $189.79 $204.72
49504(B) 1305 SAW-CUT GROOVING660.1SY $4.00 $4.00 $4.87 $4.64
50504(D) 6245 CONCRETE RAIL (TR4)297LF $68.00 $88.00 $68.78 $94.70
51506(A) 1322 STRUCTURAL STEEL150LB $2.90 $8.00 $2.41 $3.19
52507(A) 6172 WEATHERING STEEL FIXED BEARING ASSEMBLY10EA $500.00 $515.00 $217.06 $549.52
53509(A) 1326 CLASS AA CONCRETE156.2CY $420.00 $550.00 $621.25 $516.47
54509(B) 1328 CLASS A CONCRETE60.2CY $500.00 $550.00 $710.18 $835.37
55509(D) 1331 CLASS C CONCRETE10CY $425.00 $875.00 $486.45 $927.17
56511(B) 6010 EPOXY COATED REINFORCING STEEL45,770LB $1.25 $1.00 $1.05 $1.20
57513(B) 6019 CLASS B BRIDGE DECK REPAIR30SY $185.00 $250.00 $378.11 $290.07
58513(C) 6020 CLASS C BRIDGE DECK REPAIR30SY $315.00 $350.00 $489.47 $464.11
59514(A) 6010 PILES, FURNISHED (HP 10X42)440LF $30.00 $35.00 $34.78 $57.06
60514(B) 6292 PILES, DRIVEN (HP 10X42)440LF $25.00 $30.00 $27.14 $8.55
61514(K) 6260 (PL)PILOT HOLES280LF $120.00 $135.00 $193.19 $204.74
62514(L) 6220 PILE SPLICE, H-PILE (NON-BIDDABLE)1EA $400.00 $400.00 $400.00 $400.00
63515(A) 6013 WATER REPELLENT (VISUALLY INSPECTED)444SY $4.00 $3.65 $4.44 $4.23
64601(B) 1353 TYPE I-A PLAIN RIPRAP390TON $30.00 $35.00 $45.80 $47.39
65601(C) 1355 TYPE I-A FILTER BLANKET95TON $35.00 $40.00 $30.42 $34.60
66613(H) 6204 6" PERFORATED PIPE UNDERDRAIN ROUND84LF $25.00 $35.00 $23.77 $25.18
67613(I) 6207 6" NON-PERF.PIPE UNDERDRAIN RND.60LF $24.00 $35.00 $17.20 $25.50
68619(D) 1397 REMOVAL OF EXISTING BRIDGE STRUCTURE1LSUM $40,000.00 $20,000.00 $23,845.39 $19,144.34
69501(B) 1307 SUBSTRUCTURE EXCAVATION COMMON80CY $25.00 $40.00 $21.92 $22.43
70501(G) 6309 CLSM BACKFILL164CY $90.00 $130.00 $175.20 $157.09
71503(A) 1312 PRESTRESSED CONCRETE BEAMS (TYPE III)920LF $180.00 $250.00 $207.50 $295.28
72504(A) 1304 APPROACH SLAB224.8SY $180.00 $200.00 $189.79 $204.72
73504(B) 1305 SAW-CUT GROOVING1,037.9SY $4.00 $4.00 $4.87 $4.64
74504(D) 6245 CONCRETE RAIL (TR4)467LF $68.00 $95.00 $68.78 $93.55
75506(A) 1322 STRUCTURAL STEEL1,050LB $2.90 $3.00 $2.31 $3.19
76507(A) 6172 WEATHERING STEEL FIXED BEARING ASSEMBLY10EA $500.00 $500.00 $212.19 $549.52
77507(B) 6174 STAINLESS STEEL EXPANSION BEARING ASSEMBLY20EA $2,000.00 $1,850.00 $1,493.25 $1,971.47
78507(C) 6282 ELASTOMERIC BEARING PADS20EA $500.00 $550.00 $233.28 $677.62
79509(A) 1326 CLASS AA CONCRETE247.6CY $420.00 $500.00 $605.34 $569.31
80509(B) 1328 CLASS A CONCRETE115.2CY $500.00 $500.00 $713.70 $730.33
81509(D) 1331 CLASS C CONCRETE10CY $425.00 $850.00 $486.45 $927.17
82511(B) 6010 EPOXY COATED REINFORCING STEEL88,960LB $1.25 $1.00 $1.05 $1.20
83513(B) 6019 CLASS B BRIDGE DECK REPAIR75SY $185.00 $250.00 $378.11 $382.55
84513(C) 6020 CLASS C BRIDGE DECK REPAIR75SY $315.00 $350.00 $489.47 $649.99
85514(A) 6010 PILES, FURNISHED (HP 10X42)371LF $30.00 $34.00 $31.34 $48.49
86514(B) 6292 PILES, DRIVEN (HP 10X42)371LF $25.00 $24.50 $28.34 $10.14
87514(K) 6260 (PL)PILOT HOLES259LF $120.00 $135.00 $196.28 $205.56
88514(L) 6220 PILE SPLICE, H-PILE (NON-BIDDABLE)1EA $400.00 $400.00 $400.00 $400.00
89515(A) 6013 WATER REPELLENT (VISUALLY INSPECTED)798SY $4.00 $3.65 $4.44 $4.23
90516(A) 6094 DRILLED SHAFTS 48" DIAMETER116LF $650.00 $925.00 $594.44 $1,003.34
91516(C) 6200 CROSSHOLE SONIC LOGGING1EA $1,500.00 $2,500.00 $3,032.97 $1,508.34
92523(A) 6550 SEALER CRACK PREPARATION163LF $4.00 $4.00 $4.87 $4.64
93523(B) 6560 SEALER RESIN1.8GAL $80.00 $100.00 $121.68 $116.03
94601(B) 1353 TYPE I-A PLAIN RIPRAP1,584TON $30.00 $35.00 $45.80 $47.39
95601(C) 1355 TYPE I-A FILTER BLANKET310TON $35.00 $32.00 $30.42 $34.60
96613(H) 6204 6" PERFORATED PIPE UNDERDRAIN ROUND84LF $25.00 $35.00 $23.77 $25.18
97613(I) 6207 6" NON-PERF.PIPE UNDERDRAIN RND.60LF $24.00 $35.00 $17.20 $25.50
98619(D) 1397 REMOVAL OF EXISTING BRIDGE STRUCTURE1LSUM $50,000.00 $40,000.00 $27,116.09 $45,000.00
99857(A) 8839 CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE)66,080LF $0.3000 $0.0600 $0.0700 $0.0700
100857(C) 8851 REMOVABLE PAVEMENT MARKING TAPE(4" WIDE)800LF $0.5000 $1.00 $1.22 $1.16
101857(E) 8881 (PL)CONSTRUCTION ZONE PAVEMENT MARKERS2,000EA $0.5000 $0.4000 $0.4900 $0.4600
102857(F) 8006 PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE)25,900LF $0.6000 $0.1500 $0.1800 $0.1700
103876(A) 8482 (PL)TRUCK MOUNTED ATTENUATOR70SD $50.00 $50.00 $60.84 $58.01
104877(B) 8484 DELIVER PORTABLE LONGITUDINAL BARRIER600LF $25.00 $25.00 $21.88 $23.50
105877(C) 8486 RELOCATION OF PORTABLE LONGITUDINAL BARRIER600LF $5.00 $4.00 $6.16 $23.50
106880(B) 8818 CONSTRUCTION SIGNS 0 TO 6.25 SF7,830SD $0.0800 $0.1500 $0.1800 $0.1700
107880(B) 8821 CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF2,220SD $0.0800 $2.00 $2.43 $2.32
108880(B) 8824 CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF6,060SD $0.0800 $1.00 $1.22 $1.16
109880(C) 8842 CONSTRUCTION BARRICADES(TYPE III)4,920SD $1.25 $0.2500 $0.3000 $0.2900
110880(C) 8848 WING BARRICADES840SD $5.00 $2.00 $2.43 $2.32
111880(E) 8860 WARNING LIGHTS(TYPE A)11,400SD $0.1000 $1.00 $1.22 $1.16
112880(F) 8878 DRUMS15,610SD $0.1000 $0.1000 $0.1200 $0.1200
113880(G) 8884 TUBE CHANNELIZERS8,610SD $0.3000 $0.1000 $0.1200 $0.1200
114880(G) 8890 CHANNELIZER CONES5,760SD $0.1500 $0.1000 $0.1200 $0.1200
115880(I) 8902 FLAGGER140SD $200.00 $250.00 $656.50 $350.00
116882(A) 8306 PORT.CHANGEABLE MESSAGE SIGN420SD $12.00 $10.00 $12.17 $11.60
117805(A) 8724 (PL)REMOVAL OF EXISTING SIGNS24EA $30.00 $25.00 $30.42 $29.01
118805(D) 8756 (PL)REMOVE & RESET EXISTING SIGNS2EA $150.00 $200.00 $243.38 $232.06
119850(A) 8110 SHEET ALUMINUM SIGNS127.04SF $15.00 $12.00 $14.60 $13.92
120851(C) 8330 2 1/2" SQUARE TUBE POST254LF $8.00 $10.00 $12.17 $11.60
121855(A) 8812 TRAFFIC STRIPE(PLASTIC)(4" WIDE)35,460LF $0.7000 $0.3800 $0.4600 $0.4400
122855(A) 8825 TRAFFIC STRIPE(PLASTIC)(24" WIDE)45LF $12.00 $15.00 $18.25 $17.40
123642(B) 0096 CONSTRUCTION STAKING LEVEL II1LSUM $50,000.00 $18,500.00 $54,757.76 $45,000.00
124220 2800 SWPPP DOCUMENTATION AND MANAGEMENT1LSUM $5,000.00 $5,000.00 $3,042.16 $3,500.00
125640(A) 1398 FIELD OFFICE1EA $8,000.00 $6,000.00 $3,042.16 $5,221.18
126641 1399 MOBILIZATION1LSUM $250,000.00 $267,000.00 $229,416.50 $205,000.00