| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$20,000.00 |
$20,000.00 |
$28,543.01 |
$175,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 22,366 | CY |
$7.00 |
$6.00 |
$7.14 |
$8.29 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 43,126 | CY |
$8.50 |
$8.50 |
$7.14 |
$7.17 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$30,000.00 |
$27,750.00 |
$45,888.71 |
$75,000.00 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 10,810 | LF |
$2.00 |
$1.24 |
$2.70 |
$1.34 |
| 6 | 221(F) 0100 |
TEMPORARY SILT DIKE | 1,056 | LF |
$10.00 |
$5.88 |
$7.68 |
$3.70 |
| 7 | 221(G) 0153 |
TEMPORARY ROCK FILTER DAM TYPE 4 | 4 | CY |
$500.00 |
$125.00 |
$135.34 |
$192.01 |
| 8 | 230(A) 2806 |
SOLID SLAB SODDING | 66,610 | SY |
$1.50 |
$1.23 |
$1.64 |
$1.30 |
| 9 | 233(A) 2817 |
VEGETATIVE MULCHING | 14 | AC |
$450.00 |
$185.00 |
$517.17 |
$214.65 |
| 10 | 241 2832 |
MOWING | 28 | AC |
$60.00 |
$48.00 |
$71.79 |
$15.00 |
| 11 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 6,554 | CY |
$42.00 |
$27.00 |
$45.35 |
$45.00 |
| 12 | 307(K) 4300 |
STABILIZED SUBGRADE | 38,330 | SY |
$4.00 |
$5.70 |
$6.15 |
$4.69 |
| 13 | 325 5271 |
SEPARATOR FABRIC | 36,988 | SY |
$1.00 |
$1.35 |
$1.16 |
$1.25 |
| 14 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 5,511 | TON |
$18.00 |
$18.00 |
$22.03 |
$22.11 |
| 15 | 408 5774 |
PRIME COAT | 21,830 | GAL |
$5.00 |
$7.38 |
$5.95 |
$2.50 |
| 16 | 409(A) 4242 |
FABRIC REINFORCEMENT | 13,804 | SY |
$9.00 |
$2.28 |
$0.9500 |
$1.49 |
| 17 | 409(B) 4268 |
BITUMINOUS BINDER | 2,762 | GAL |
$5.00 |
$3.42 |
$5.49 |
$3.47 |
| 18 | 411(B) 5940 |
SUPERPAVE, TYPE S3(PG 70-28 OK) | 3,650 | TON |
$86.00 |
$88.51 |
$96.59 |
$91.65 |
| 19 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 10,748 | TON |
$80.00 |
$79.23 |
$85.89 |
$77.62 |
| 20 | 411(C) 5955 |
SUPERPAVE, TYPE S4(PG 70-28 OK) | 2,434 | TON |
$95.00 |
$104.06 |
$112.14 |
$105.00 |
| 21 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 2,510 | TON |
$92.00 |
$92.53 |
$90.11 |
$91.67 |
| 22 | 412 5267 |
COLD MILLING PAVEMENT | 11,190 | SY |
$2.50 |
$3.10 |
$2.43 |
$2.19 |
| 23 | 413(B) 4863 |
RUMBLE STRIP-METHOD HMA-CYC | 16,309 | LF |
$0.5000 |
$0.1600 |
$0.1900 |
$0.1900 |
| 24 | 509(D) 0325 |
CLASS C CONCRETE | 44 | CY |
$300.00 |
$400.00 |
$298.13 |
$465.69 |
| 25 | 601(A) 0297 |
TYPE I PLAIN RIPRAP | 494 | TON |
$50.00 |
$28.50 |
$44.48 |
$44.63 |
| 26 | 613(A) 0491 |
18" R.C.PIPE CLASS III | 54 | LF |
$60.00 |
$46.00 |
$83.97 |
$50.11 |
| 27 | 613(A) 0492 |
24" R.C.PIPE CLASS III | 128 | LF |
$65.00 |
$60.00 |
$96.03 |
$72.04 |
| 28 | 613(B) 0689 |
18" CORR. GALV. STEEL PIPE | 374 | LF |
$28.00 |
$40.00 |
$51.07 |
$29.52 |
| 29 | 613(B) 0690 |
24" CORR. GALV. STEEL PIPE | 46 | LF |
$30.00 |
$50.00 |
$70.68 |
$44.62 |
| 30 | 613(H) 0450 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 500 | LF |
$20.00 |
$30.00 |
$22.05 |
$4.96 |
| 31 | 613(M) 7186 |
TYPE A4 CULVERT END TREATMENT | 10 | EA |
$950.00 |
$1,100.00 |
$966.62 |
$1,392.32 |
| 32 | 613(M) 7187 |
TYPE B4 CULVERT END TREATMENT | 6 | EA |
$1,100.00 |
$1,250.00 |
$1,148.76 |
$1,740.40 |
| 33 | 613(V) 1180 |
TRENCH EXCAVATION | 265 | CY |
$12.00 |
$4.50 |
$2.43 |
$15.80 |
| 34 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$20,000.00 |
$2,500.00 |
$8,155.75 |
$28,088.36 |
| 35 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 13,723 | SY |
$3.00 |
$2.50 |
$1.73 |
$1.64 |
| 36 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 1,925 | LF |
$4.00 |
$4.00 |
$8.52 |
$2.96 |
| 37 | 619(C) 0924 |
SAWING PAVEMENT | 11,705 | LF |
$3.50 |
$3.50 |
$3.29 |
$0.9000 |
| 38 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 1,887.5 | LF |
$17.00 |
$16.50 |
$28.78 |
$19.14 |
| 39 | 623(G) 8590 |
GUARDRAIL END TREATMENT (31") | 8 | EA |
$2,300.00 |
$2,250.00 |
$2,786.63 |
$2,436.55 |
| 40 | 623(I) 8700 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 8 | EA |
$1,700.00 |
$1,550.00 |
$2,591.93 |
$1,943.44 |
| 41 | 624(A) 4281 |
FENCE-STYLE WWF | 2,252 | LF |
$7.00 |
$7.00 |
$7.76 |
$8.70 |
| 42 | 624(B) 4468 |
GATES-STYLE WWF (4.5'HIGH X 20'LONG) | 1 | EA |
$15.00 |
$1,000.00 |
$1,955.52 |
$986.22 |
| 43 | 624(C) 4459 |
FENCE-STYLE SWF (5 BARBED WIRE) | 1,972 | LF |
$6.00 |
$7.00 |
$7.33 |
$8.70 |
| 44 | 853 9069 |
GUARDRAIL DELINEATORS(TYPE 2, CODE 1) | 60 | EA |
$12.00 |
$10.00 |
$13.99 |
$13.92 |
| 45 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 90 | CY |
$25.00 |
$37.00 |
$21.92 |
$19.93 |
| 46 | 501(G) 6309 |
CLSM BACKFILL | 200 | CY |
$90.00 |
$130.00 |
$175.20 |
$157.09 |
| 47 | 503(A) 1313 |
PRESTRESSED CONCRETE BEAMS (TYPE IV) | 498.33 | LF |
$220.00 |
$300.00 |
$247.14 |
$358.44 |
| 48 | 504(A) 1304 |
APPROACH SLAB | 224.8 | SY |
$180.00 |
$190.00 |
$189.79 |
$204.72 |
| 49 | 504(B) 1305 |
SAW-CUT GROOVING | 660.1 | SY |
$4.00 |
$4.00 |
$4.87 |
$4.64 |
| 50 | 504(D) 6245 |
CONCRETE RAIL (TR4) | 297 | LF |
$68.00 |
$88.00 |
$68.78 |
$94.70 |
| 51 | 506(A) 1322 |
STRUCTURAL STEEL | 150 | LB |
$2.90 |
$8.00 |
$2.41 |
$3.19 |
| 52 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 10 | EA |
$500.00 |
$515.00 |
$217.06 |
$549.52 |
| 53 | 509(A) 1326 |
CLASS AA CONCRETE | 156.2 | CY |
$420.00 |
$550.00 |
$621.25 |
$516.47 |
| 54 | 509(B) 1328 |
CLASS A CONCRETE | 60.2 | CY |
$500.00 |
$550.00 |
$710.18 |
$835.37 |
| 55 | 509(D) 1331 |
CLASS C CONCRETE | 10 | CY |
$425.00 |
$875.00 |
$486.45 |
$927.17 |
| 56 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 45,770 | LB |
$1.25 |
$1.00 |
$1.05 |
$1.20 |
| 57 | 513(B) 6019 |
CLASS B BRIDGE DECK REPAIR | 30 | SY |
$185.00 |
$250.00 |
$378.11 |
$290.07 |
| 58 | 513(C) 6020 |
CLASS C BRIDGE DECK REPAIR | 30 | SY |
$315.00 |
$350.00 |
$489.47 |
$464.11 |
| 59 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 440 | LF |
$30.00 |
$35.00 |
$34.78 |
$57.06 |
| 60 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 440 | LF |
$25.00 |
$30.00 |
$27.14 |
$8.55 |
| 61 | 514(K) 6260 |
(PL)PILOT HOLES | 280 | LF |
$120.00 |
$135.00 |
$193.19 |
$204.74 |
| 62 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 63 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 444 | SY |
$4.00 |
$3.65 |
$4.44 |
$4.23 |
| 64 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 390 | TON |
$30.00 |
$35.00 |
$45.80 |
$47.39 |
| 65 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 95 | TON |
$35.00 |
$40.00 |
$30.42 |
$34.60 |
| 66 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 84 | LF |
$25.00 |
$35.00 |
$23.77 |
$25.18 |
| 67 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 60 | LF |
$24.00 |
$35.00 |
$17.20 |
$25.50 |
| 68 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$40,000.00 |
$20,000.00 |
$23,845.39 |
$19,144.34 |
| 69 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 80 | CY |
$25.00 |
$40.00 |
$21.92 |
$22.43 |
| 70 | 501(G) 6309 |
CLSM BACKFILL | 164 | CY |
$90.00 |
$130.00 |
$175.20 |
$157.09 |
| 71 | 503(A) 1312 |
PRESTRESSED CONCRETE BEAMS (TYPE III) | 920 | LF |
$180.00 |
$250.00 |
$207.50 |
$295.28 |
| 72 | 504(A) 1304 |
APPROACH SLAB | 224.8 | SY |
$180.00 |
$200.00 |
$189.79 |
$204.72 |
| 73 | 504(B) 1305 |
SAW-CUT GROOVING | 1,037.9 | SY |
$4.00 |
$4.00 |
$4.87 |
$4.64 |
| 74 | 504(D) 6245 |
CONCRETE RAIL (TR4) | 467 | LF |
$68.00 |
$95.00 |
$68.78 |
$93.55 |
| 75 | 506(A) 1322 |
STRUCTURAL STEEL | 1,050 | LB |
$2.90 |
$3.00 |
$2.31 |
$3.19 |
| 76 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 10 | EA |
$500.00 |
$500.00 |
$212.19 |
$549.52 |
| 77 | 507(B) 6174 |
STAINLESS STEEL EXPANSION BEARING ASSEMBLY | 20 | EA |
$2,000.00 |
$1,850.00 |
$1,493.25 |
$1,971.47 |
| 78 | 507(C) 6282 |
ELASTOMERIC BEARING PADS | 20 | EA |
$500.00 |
$550.00 |
$233.28 |
$677.62 |
| 79 | 509(A) 1326 |
CLASS AA CONCRETE | 247.6 | CY |
$420.00 |
$500.00 |
$605.34 |
$569.31 |
| 80 | 509(B) 1328 |
CLASS A CONCRETE | 115.2 | CY |
$500.00 |
$500.00 |
$713.70 |
$730.33 |
| 81 | 509(D) 1331 |
CLASS C CONCRETE | 10 | CY |
$425.00 |
$850.00 |
$486.45 |
$927.17 |
| 82 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 88,960 | LB |
$1.25 |
$1.00 |
$1.05 |
$1.20 |
| 83 | 513(B) 6019 |
CLASS B BRIDGE DECK REPAIR | 75 | SY |
$185.00 |
$250.00 |
$378.11 |
$382.55 |
| 84 | 513(C) 6020 |
CLASS C BRIDGE DECK REPAIR | 75 | SY |
$315.00 |
$350.00 |
$489.47 |
$649.99 |
| 85 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 371 | LF |
$30.00 |
$34.00 |
$31.34 |
$48.49 |
| 86 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 371 | LF |
$25.00 |
$24.50 |
$28.34 |
$10.14 |
| 87 | 514(K) 6260 |
(PL)PILOT HOLES | 259 | LF |
$120.00 |
$135.00 |
$196.28 |
$205.56 |
| 88 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 89 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 798 | SY |
$4.00 |
$3.65 |
$4.44 |
$4.23 |
| 90 | 516(A) 6094 |
DRILLED SHAFTS 48" DIAMETER | 116 | LF |
$650.00 |
$925.00 |
$594.44 |
$1,003.34 |
| 91 | 516(C) 6200 |
CROSSHOLE SONIC LOGGING | 1 | EA |
$1,500.00 |
$2,500.00 |
$3,032.97 |
$1,508.34 |
| 92 | 523(A) 6550 |
SEALER CRACK PREPARATION | 163 | LF |
$4.00 |
$4.00 |
$4.87 |
$4.64 |
| 93 | 523(B) 6560 |
SEALER RESIN | 1.8 | GAL |
$80.00 |
$100.00 |
$121.68 |
$116.03 |
| 94 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 1,584 | TON |
$30.00 |
$35.00 |
$45.80 |
$47.39 |
| 95 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 310 | TON |
$35.00 |
$32.00 |
$30.42 |
$34.60 |
| 96 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 84 | LF |
$25.00 |
$35.00 |
$23.77 |
$25.18 |
| 97 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 60 | LF |
$24.00 |
$35.00 |
$17.20 |
$25.50 |
| 98 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$50,000.00 |
$40,000.00 |
$27,116.09 |
$45,000.00 |
| 99 | 857(A) 8839 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) | 66,080 | LF |
$0.3000 |
$0.0600 |
$0.0700 |
$0.0700 |
| 100 | 857(C) 8851 |
REMOVABLE PAVEMENT MARKING TAPE(4" WIDE) | 800 | LF |
$0.5000 |
$1.00 |
$1.22 |
$1.16 |
| 101 | 857(E) 8881 |
(PL)CONSTRUCTION ZONE PAVEMENT MARKERS | 2,000 | EA |
$0.5000 |
$0.4000 |
$0.4900 |
$0.4600 |
| 102 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 25,900 | LF |
$0.6000 |
$0.1500 |
$0.1800 |
$0.1700 |
| 103 | 876(A) 8482 |
(PL)TRUCK MOUNTED ATTENUATOR | 70 | SD |
$50.00 |
$50.00 |
$60.84 |
$58.01 |
| 104 | 877(B) 8484 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 600 | LF |
$25.00 |
$25.00 |
$21.88 |
$23.50 |
| 105 | 877(C) 8486 |
RELOCATION OF PORTABLE LONGITUDINAL BARRIER | 600 | LF |
$5.00 |
$4.00 |
$6.16 |
$23.50 |
| 106 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 7,830 | SD |
$0.0800 |
$0.1500 |
$0.1800 |
$0.1700 |
| 107 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 2,220 | SD |
$0.0800 |
$2.00 |
$2.43 |
$2.32 |
| 108 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 6,060 | SD |
$0.0800 |
$1.00 |
$1.22 |
$1.16 |
| 109 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 4,920 | SD |
$1.25 |
$0.2500 |
$0.3000 |
$0.2900 |
| 110 | 880(C) 8848 |
WING BARRICADES | 840 | SD |
$5.00 |
$2.00 |
$2.43 |
$2.32 |
| 111 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 11,400 | SD |
$0.1000 |
$1.00 |
$1.22 |
$1.16 |
| 112 | 880(F) 8878 |
DRUMS | 15,610 | SD |
$0.1000 |
$0.1000 |
$0.1200 |
$0.1200 |
| 113 | 880(G) 8884 |
TUBE CHANNELIZERS | 8,610 | SD |
$0.3000 |
$0.1000 |
$0.1200 |
$0.1200 |
| 114 | 880(G) 8890 |
CHANNELIZER CONES | 5,760 | SD |
$0.1500 |
$0.1000 |
$0.1200 |
$0.1200 |
| 115 | 880(I) 8902 |
FLAGGER | 140 | SD |
$200.00 |
$250.00 |
$656.50 |
$350.00 |
| 116 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 420 | SD |
$12.00 |
$10.00 |
$12.17 |
$11.60 |
| 117 | 805(A) 8724 |
(PL)REMOVAL OF EXISTING SIGNS | 24 | EA |
$30.00 |
$25.00 |
$30.42 |
$29.01 |
| 118 | 805(D) 8756 |
(PL)REMOVE & RESET EXISTING SIGNS | 2 | EA |
$150.00 |
$200.00 |
$243.38 |
$232.06 |
| 119 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 127.04 | SF |
$15.00 |
$12.00 |
$14.60 |
$13.92 |
| 120 | 851(C) 8330 |
2 1/2" SQUARE TUBE POST | 254 | LF |
$8.00 |
$10.00 |
$12.17 |
$11.60 |
| 121 | 855(A) 8812 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 35,460 | LF |
$0.7000 |
$0.3800 |
$0.4600 |
$0.4400 |
| 122 | 855(A) 8825 |
TRAFFIC STRIPE(PLASTIC)(24" WIDE) | 45 | LF |
$12.00 |
$15.00 |
$18.25 |
$17.40 |
| 123 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$50,000.00 |
$18,500.00 |
$54,757.76 |
$45,000.00 |
| 124 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$5,000.00 |
$3,042.16 |
$3,500.00 |
| 125 | 640(A) 1398 |
FIELD OFFICE | 1 | EA |
$8,000.00 |
$6,000.00 |
$3,042.16 |
$5,221.18 |
| 126 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$250,000.00 |
$267,000.00 |
$229,416.50 |
$205,000.00 |