| 1 | 202(D) 0184 |
UNCLASSIFIED BORROW | 11,866 | CY |
$8.40 |
$14.00 |
$11.85 |
| 2 | 202(H) 0185 |
EARTHWORK | 1 | LSUM |
$60,000.00 |
$65,000.00 |
$72,100.00 |
| 3 | 221(C) 2801 |
TEMPORARY SILT FENCE | 6,850 | LF |
$2.00 |
$2.50 |
$1.25 |
| 4 | 221(F) 0100 |
TEMPORARY SILT DIKE | 1,806 | LF |
$10.00 |
$8.50 |
$6.40 |
| 5 | 230(A) 2806 |
SOLID SLAB SODDING | 43,185 | SY |
$2.25 |
$1.50 |
$1.25 |
| 6 | 233(A) 2817 |
VEGETATIVE MULCHING | 8.9 | AC |
$725.00 |
$375.00 |
$335.00 |
| 7 | 307(B) 4210 |
CEMENT KILN DUST | 2,191 | TON |
$65.00 |
$60.00 |
$55.50 |
| 8 | 307(E) 4240 |
CEMENTITIOUS STABILIZED SUBGRADE | 81,030 | SY |
$2.15 |
$2.50 |
$2.52 |
| 9 | 311(D) 0154 |
PROCESSING EXISTING BASE & SURFACE, METHOD D | 30,186.21 | LF |
$6.25 |
$2.00 |
$6.65 |
| 10 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 2,575 | TON |
$48.00 |
$50.00 |
$49.25 |
| 11 | 407(B) 0250 |
TACK COAT | 6,893 | GAL |
$3.20 |
$2.20 |
$3.25 |
| 12 | 408 5774 |
PRIME COAT | 28,362 | GAL |
$3.40 |
$3.20 |
$3.70 |
| 13 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 20,972 | TON |
$77.00 |
$82.00 |
$86.75 |
| 14 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 12,159 | TON |
$85.00 |
$89.00 |
$91.00 |
| 15 | 501(A) 0313 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 52 | CY |
$15.50 |
$5.00 |
$12.90 |
| 16 | 509(A) 0319 |
CLASS AA CONCRETE | 142 | CY |
$650.00 |
$400.00 |
$654.50 |
| 17 | 509(D) 0325 |
CLASS C CONCRETE | 20 | CY |
$325.00 |
$350.00 |
$380.00 |
| 18 | 511(A) 0332 |
REINFORCING STEEL | 24,624 | LB |
$0.9500 |
$0.9000 |
$0.8200 |
| 19 | 601(B) 0536 |
TYPE I-A PLAIN RIPRAP | 74 | TON |
$46.00 |
$65.00 |
$123.60 |
| 20 | 613(A) 0493 |
30" R.C.PIPE CLASS III | 122 | LF |
$86.00 |
$98.00 |
$95.95 |
| 21 | 613(A) 0494 |
36" R.C.PIPE CLASS III | 158 | LF |
$96.00 |
$138.00 |
$135.30 |
| 22 | 613(A) 0498 |
60" R.C.PIPE CLASS III | 40 | LF |
$220.00 |
$322.00 |
$316.60 |
| 23 | 613(A) 4498 |
43" X 26" R.C.PIPE ARCH CLASS A-III | 63 | LF |
$151.00 |
$237.00 |
$232.30 |
| 24 | 613(A) 4499 |
51" X 31" R.C.PIPE ARCH CLASS A-III | 62 | LF |
$177.00 |
$306.00 |
$301.00 |
| 25 | 613(B) 0691 |
30" CORR. GALV. STEEL PIPE | 128 | LF |
$34.00 |
$34.00 |
$33.40 |
| 26 | 613(B) 0692 |
36" CORR. GALV. STEEL PIPE | 250 | LF |
$43.00 |
$41.00 |
$40.00 |
| 27 | 613(B) 0693 |
42" CORR. GALV. STEEL PIPE | 126 | LF |
$48.00 |
$48.00 |
$46.55 |
| 28 | 613(B) 0694 |
48" CORR. GALV. STEEL PIPE | 368 | LF |
$58.00 |
$65.00 |
$63.86 |
| 29 | 613(B) 4528 |
28" X 20" CORR. GALV. STEEL PIPE ARCH | 156 | LF |
$35.00 |
$28.00 |
$27.60 |
| 30 | 613(B) 4529 |
35" X 24" CORR. GALV. STEEL PIPE ARCH | 110 | LF |
$48.00 |
$35.00 |
$34.40 |
| 31 | 613(B) 4530 |
42" X 29" CORR. GALV. STEEL PIPE ARCH | 406 | LF |
$63.00 |
$53.00 |
$52.00 |
| 32 | 613(B) 4531 |
49" X 33" CORR. GALV. STEEL PIPE ARCH | 120 | LF |
$70.00 |
$61.00 |
$59.70 |
| 33 | 613(L) 5732 |
30" PREFAB. CULVERT END SECTION, ROUND | 2 | EA |
$1,200.00 |
$1,125.00 |
$1,110.00 |
| 34 | 613(L) 5734 |
36" PREFAB. CULVERT END SECTION, ROUND | 2 | EA |
$1,600.00 |
$1,525.00 |
$1,500.00 |
| 35 | 613(L) 5742 |
60" PREFAB. CULVERT END SECTION, ROUND | 2 | EA |
$2,900.00 |
$3,050.00 |
$3,000.00 |
| 36 | 613(M) 7187 |
TYPE B4 CULVERT END TREATMENT | 10 | EA |
$1,080.00 |
$1,050.00 |
$1,030.00 |
| 37 | 613(M) 7188 |
TYPE C4 CULVERT END TREATMENT | 18 | EA |
$1,375.00 |
$1,260.00 |
$1,235.00 |
| 38 | 613(M) 7189 |
TYPE D4 CULVERT END TREATMENT | 10 | EA |
$1,750.00 |
$2,100.00 |
$2,060.00 |
| 39 | 613(M) 7190 |
TYPE E4 CULVERT END TREATMENT | 8 | EA |
$2,600.00 |
$3,675.00 |
$3,605.00 |
| 40 | 613(M) 7193 |
TYPE CC4 CULVERT END TREATMENT | 6 | EA |
$3,500.00 |
$4,620.00 |
$4,120.00 |
| 41 | 613(M) 7194 |
TYPE DD4 CULVERT END TREATMENT | 2 | EA |
$3,900.00 |
$4,630.00 |
$4,635.00 |
| 42 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$19,000.00 |
$50,000.00 |
$44,300.00 |
| 43 | 619(B) 4822 |
REMOVAL OF RAILROAD | 95 | LF |
$6,500.00 |
$100.00 |
$103.00 |
| 44 | 619(C) 0924 |
SAWING PAVEMENT | 195 | LF |
$2.80 |
$3.00 |
$16.00 |
| 45 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 223.24 | SF |
$36.00 |
$46.00 |
$67.00 |
| 46 | 855(A) 8812 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 31,455 | LF |
$0.5000 |
$0.5500 |
$0.6500 |
| 47 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$20,000.00 |
$45,000.00 |
$23,180.00 |
| 48 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 180 | CY |
$15.50 |
$19.00 |
$19.50 |
| 49 | 501(G) 6309 |
CLSM BACKFILL | 76 | CY |
$205.00 |
$184.00 |
$190.00 |
| 50 | 503(A) 1312 |
PRESTRESSED CONCRETE BEAMS (TYPE III) | 224 | LF |
$235.00 |
$314.00 |
$323.40 |
| 51 | 504(B) 1305 |
SAW-CUT GROOVING | 188.7 | SY |
$4.00 |
$10.60 |
$11.00 |
| 52 | 504(D) 6239 |
CONCRETE RAIL (TR3) | 211.2 | LF |
$60.00 |
$100.00 |
$103.00 |
| 53 | 506(A) 1322 |
STRUCTURAL STEEL | 510 | LB |
$3.10 |
$3.00 |
$3.10 |
| 54 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 3 | EA |
$615.00 |
$800.00 |
$824.00 |
| 55 | 507(B) 6176 |
WEATHERING STEEL EXPANSION BEARING ASSEMBLY | 3 | EA |
$615.00 |
$800.00 |
$824.00 |
| 56 | 509(A) 1326 |
CLASS AA CONCRETE | 60.1 | CY |
$615.00 |
$754.00 |
$924.40 |
| 57 | 509(B) 1328 |
CLASS A CONCRETE | 66.2 | CY |
$615.00 |
$714.00 |
$869.60 |
| 58 | 511(A) 1332 |
REINFORCING STEEL | 24,558 | LB |
$0.9500 |
$0.8000 |
$0.8200 |
| 59 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 190 | LF |
$32.50 |
$36.00 |
$37.10 |
| 60 | 514(A) 6011 |
PILES, FURNISHED (HP 12X53) | 435 | LF |
$35.75 |
$49.00 |
$50.45 |
| 61 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 190 | LF |
$15.50 |
$19.00 |
$19.55 |
| 62 | 514(B) 6294 |
PILES, DRIVEN (HP 12X53) | 435 | LF |
$15.50 |
$19.00 |
$19.55 |
| 63 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
| 64 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 744 | TON |
$46.00 |
$67.00 |
$69.00 |
| 65 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 248 | TON |
$46.00 |
$57.00 |
$58.70 |
| 66 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 52 | LF |
$51.00 |
$12.00 |
$12.35 |
| 67 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 30 | LF |
$51.00 |
$12.00 |
$12.35 |
| 68 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$6,000.00 |
$12,620.00 |
$2,695.00 |
| 69 | 623(F) 4446 |
GUARDRAIL ANCHOR UNIT (TYPE A) | 4 | EA |
$1,600.00 |
$1,320.00 |
$1,560.00 |
| 70 | 623(F) 5686 |
GUARDRAIL ANCHOR UNIT (TYPE D-BF) | 4 | EA |
$1,325.00 |
$2,020.00 |
$1,390.00 |
| 71 | 202(A) 1301 |
UNCLASSIFIED EXCAVATION | 700 | CY |
$7.50 |
$9.00 |
$9.25 |
| 72 | 501(A) 1306 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 187 | CY |
$15.50 |
$5.00 |
$9.25 |
| 73 | 509(A) 1326 |
CLASS AA CONCRETE | 388.4 | CY |
$300.00 |
$370.96 |
$449.00 |
| 74 | 511(A) 1332 |
REINFORCING STEEL | 64,557 | LB |
$0.9500 |
$0.9000 |
$0.8200 |
| 75 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 70 | TON |
$46.00 |
$56.00 |
$72.00 |
| 76 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 24 | TON |
$46.00 |
$44.00 |
$60.70 |
| 77 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$4,000.00 |
$5,000.00 |
$2,060.00 |
| 78 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 180 | CY |
$15.50 |
$19.00 |
$19.55 |
| 79 | 501(G) 6309 |
CLSM BACKFILL | 76 | CY |
$205.00 |
$184.00 |
$189.00 |
| 80 | 503(A) 1312 |
PRESTRESSED CONCRETE BEAMS (TYPE III) | 224 | LF |
$235.00 |
$314.00 |
$323.00 |
| 81 | 504(B) 1305 |
SAW-CUT GROOVING | 188.7 | SY |
$4.00 |
$10.60 |
$11.00 |
| 82 | 504(D) 6239 |
CONCRETE RAIL (TR3) | 211.2 | LF |
$60.00 |
$100.00 |
$103.00 |
| 83 | 506(A) 1322 |
STRUCTURAL STEEL | 510 | LB |
$3.10 |
$3.00 |
$3.05 |
| 84 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 3 | EA |
$615.00 |
$800.00 |
$824.00 |
| 85 | 507(B) 6176 |
WEATHERING STEEL EXPANSION BEARING ASSEMBLY | 3 | EA |
$615.00 |
$800.00 |
$824.00 |
| 86 | 509(A) 1326 |
CLASS AA CONCRETE | 60.1 | CY |
$615.00 |
$754.00 |
$924.40 |
| 87 | 509(B) 1328 |
CLASS A CONCRETE | 66.2 | CY |
$615.00 |
$714.00 |
$870.00 |
| 88 | 511(A) 1332 |
REINFORCING STEEL | 24,558 | LB |
$0.9500 |
$0.8000 |
$0.8200 |
| 89 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 154 | LF |
$32.50 |
$40.00 |
$41.20 |
| 90 | 514(A) 6011 |
PILES, FURNISHED (HP 12X53) | 345 | LF |
$35.75 |
$50.00 |
$51.50 |
| 91 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 154 | LF |
$15.50 |
$19.00 |
$19.55 |
| 92 | 514(B) 6294 |
PILES, DRIVEN (HP 12X53) | 345 | LF |
$15.50 |
$19.00 |
$19.55 |
| 93 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
| 94 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 1,349 | TON |
$46.00 |
$67.00 |
$69.00 |
| 95 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 450 | TON |
$46.00 |
$57.00 |
$58.70 |
| 96 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 52 | LF |
$51.00 |
$12.00 |
$12.35 |
| 97 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 30 | LF |
$51.00 |
$12.00 |
$12.35 |
| 98 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$10,000.00 |
$13,600.00 |
$3,700.00 |
| 99 | 623(F) 4446 |
GUARDRAIL ANCHOR UNIT (TYPE A) | 4 | EA |
$1,600.00 |
$1,320.00 |
$1,560.00 |
| 100 | 623(F) 5686 |
GUARDRAIL ANCHOR UNIT (TYPE D-BF) | 4 | EA |
$1,325.00 |
$2,020.00 |
$1,390.00 |
| 101 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$60,000.00 |
$60,000.00 |
$96,000.00 |
| 102 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$17,000.00 |
$22,000.00 |
$48,000.00 |
| 103 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$200,000.00 |
$289,000.00 |
$227,000.00 |