| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$30,000.00 |
$278,899.00 |
$50,000.00 |
$125,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 91,189 | CY |
$4.10 |
$7.00 |
$9.50 |
$7.50 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 11,197 | CY |
$7.60 |
$4.75 |
$8.25 |
$0.5000 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$15,000.00 |
$224,053.00 |
$48,500.00 |
$48,000.00 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 27,896 | LF |
$1.50 |
$1.45 |
$1.08 |
$1.29 |
| 6 | 221(F) 0100 |
TEMPORARY SILT DIKE | 5,310 | LF |
$8.00 |
$7.65 |
$6.45 |
$6.75 |
| 7 | 221(G) 0150 |
TEMPORARY ROCK FILTER DAM TYPE 1 | 481 | CY |
$100.00 |
$52.50 |
$85.80 |
$145.06 |
| 8 | 229 4318 |
DITCH LINER PROTECTION | 608 | LF |
$1.30 |
$2.60 |
$2.45 |
$2.30 |
| 9 | 230(A) 2806 |
SOLID SLAB SODDING | 174,302 | SY |
$1.00 |
$1.20 |
$1.15 |
$1.28 |
| 10 | 232(B) 2814 |
SEEDING METHOD B | 36 | AC |
$390.00 |
$500.00 |
$475.00 |
$486.00 |
| 11 | 233(A) 2817 |
VEGETATIVE MULCHING | 36 | AC |
$350.00 |
$552.00 |
$525.00 |
$529.39 |
| 12 | 241 2832 |
MOWING | 36 | AC |
$100.00 |
$121.00 |
$115.00 |
$90.04 |
| 13 | 307(K) 4300 |
STABILIZED SUBGRADE | 85,018 | SY |
$4.00 |
$5.10 |
$5.50 |
$6.14 |
| 14 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 7,213 | TON |
$20.00 |
$19.25 |
$24.00 |
$38.81 |
| 15 | 407(B) 0250 |
TACK COAT | 11,208 | GAL |
$3.00 |
$3.00 |
$3.00 |
$2.60 |
| 16 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 17,734 | TON |
$70.00 |
$64.95 |
$73.00 |
$70.40 |
| 17 | 411(C) 5955 |
SUPERPAVE, TYPE S4(PG 70-28 OK) | 8,867 | TON |
$85.00 |
$80.35 |
$80.00 |
$86.73 |
| 18 | 412 5267 |
COLD MILLING PAVEMENT | 286 | SY |
$14.00 |
$13.55 |
$20.00 |
$11.93 |
| 19 | 501(A) 0313 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 143 | CY |
$13.00 |
$10.50 |
$18.00 |
$19.22 |
| 20 | 509(A) 0319 |
CLASS AA CONCRETE | 535 | CY |
$300.00 |
$299.25 |
$550.00 |
$671.53 |
| 21 | 509(D) 0325 |
CLASS C CONCRETE | 78 | CY |
$270.00 |
$262.50 |
$300.00 |
$283.18 |
| 22 | 511(A) 0332 |
REINFORCING STEEL | 79,308 | LB |
$1.00 |
$0.9500 |
$1.00 |
$0.6300 |
| 23 | 601(B) 0536 |
TYPE I-A PLAIN RIPRAP | 1,815 | TON |
$30.00 |
$42.00 |
$40.00 |
$57.17 |
| 24 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 578 | TON |
$30.00 |
$42.00 |
$35.00 |
$46.54 |
| 25 | 610(B) 0604 |
6" CONCRETE DRIVEWAY | 240 | SY |
$55.00 |
$96.55 |
$60.00 |
$68.43 |
| 26 | 613(A) 0491 |
18" R.C.PIPE CLASS III | 87 | LF |
$60.00 |
$81.90 |
$60.00 |
$40.14 |
| 27 | 613(A) 0492 |
24" R.C.PIPE CLASS III | 723 | LF |
$70.00 |
$112.35 |
$70.00 |
$55.74 |
| 28 | 613(A) 0493 |
30" R.C.PIPE CLASS III | 194 | LF |
$80.00 |
$157.50 |
$80.00 |
$67.60 |
| 29 | 613(A) 0494 |
36" R.C.PIPE CLASS III | 72 | LF |
$90.00 |
$220.50 |
$105.00 |
$85.83 |
| 30 | 613(B) 0689 |
18" CORR. GALV. STEEL PIPE | 2,845 | LF |
$20.00 |
$21.00 |
$32.50 |
$41.49 |
| 31 | 613(B) 0690 |
24" CORR. GALV. STEEL PIPE | 397 | LF |
$25.00 |
$26.25 |
$36.00 |
$41.08 |
| 32 | 613(B) 0691 |
30" CORR. GALV. STEEL PIPE | 398 | LF |
$45.00 |
$32.55 |
$55.00 |
$59.83 |
| 33 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 500 | LF |
$30.00 |
$10.50 |
$18.00 |
$14.02 |
| 34 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 50 | LF |
$25.00 |
$10.50 |
$25.00 |
$18.22 |
| 35 | 613(M) 7186 |
TYPE A4 CULVERT END TREATMENT | 114 | EA |
$900.00 |
$787.50 |
$975.00 |
$893.27 |
| 36 | 613(M) 7187 |
TYPE B4 CULVERT END TREATMENT | 30 | EA |
$980.00 |
$840.00 |
$1,200.00 |
$897.51 |
| 37 | 613(M) 7188 |
TYPE C4 CULVERT END TREATMENT | 18 | EA |
$1,400.00 |
$945.00 |
$1,600.00 |
$901.75 |
| 38 | 613(M) 7189 |
TYPE D4 CULVERT END TREATMENT | 2 | EA |
$2,000.00 |
$1,050.00 |
$1,850.00 |
$905.98 |
| 39 | 613(M) 7192 |
TYPE BB4 CULVERT END TREATMENT | 2 | EA |
$1,600.00 |
$1,575.00 |
$2,250.00 |
$911.64 |
| 40 | 613(M) 7193 |
TYPE CC4 CULVERT END TREATMENT | 2 | EA |
$3,000.00 |
$2,100.00 |
$2,800.00 |
$920.11 |
| 41 | 613(R) 1185 |
STANDARD BEDDING MATERIAL, CLASS A | 673 | CY |
$30.00 |
$1.00 |
$45.00 |
$122.21 |
| 42 | 613(V) 1180 |
TRENCH EXCAVATION | 817 | CY |
$7.50 |
$1.00 |
$12.50 |
$10.29 |
| 43 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$10,000.00 |
$100,000.00 |
$25,000.00 |
$18,765.94 |
| 44 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 63,526 | SY |
$2.00 |
$0.9000 |
$2.00 |
$1.03 |
| 45 | 619(B) 4766 |
REMOVAL OF CONCRETE DRIVEWAY | 297 | SY |
$8.00 |
$5.30 |
$4.00 |
$6.66 |
| 46 | 619(B) 4767 |
REMOVAL OF ASPHALT DRIVEWAY | 3,763 | SY |
$3.00 |
$3.60 |
$2.50 |
$4.77 |
| 47 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 700 | LF |
$20.00 |
$16.28 |
$18.00 |
$16.81 |
| 48 | 623(G) 8590 |
GUARDRAIL END TREATMENT (31") | 8 | EA |
$2,500.00 |
$2,047.50 |
$2,250.00 |
$2,115.38 |
| 49 | 623(I) 8700 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 8 | EA |
$2,000.00 |
$1,522.50 |
$1,750.00 |
$1,572.98 |
| 50 | 629(A) 4958 |
MAILBOX INSTALLATION-SINGLE | 34 | EA |
$80.00 |
$84.00 |
$100.00 |
$86.79 |
| 51 | 629(C) 4960 |
MAILBOX | 34 | EA |
$30.00 |
$21.00 |
$85.00 |
$21.70 |
| 52 | 629(D) 4961 |
REMOVAL OF MAILBOX INSTALLATION | 34 | EA |
$15.00 |
$10.50 |
$50.00 |
$10.85 |
| 53 | 221(C) 2801 |
TEMPORARY SILT FENCE | 7,200 | LF |
$1.50 |
$1.13 |
$2.25 |
$2.17 |
| 54 | 232(A) 2813 |
SEEDING METHOD A | 1.5 | AC |
$730.00 |
$2,100.00 |
$550.00 |
$1,301.77 |
| 55 | 616(A) 6500 |
DUCTILE IRON FITTINGS | 5,000 | LB |
$4.00 |
$3.68 |
$2.50 |
$0.0100 |
| 56 | 616(B) 5221 |
4" POLYVINYL CHLORIDE (PVC) PIPE | 995 | LF |
$10.00 |
$11.55 |
$16.00 |
$19.53 |
| 57 | 616(B) 5223 |
6" POLYVINYL CHLORIDE (PVC) PIPE | 6,170 | LF |
$30.00 |
$16.80 |
$20.00 |
$21.70 |
| 58 | 616(D) 0768 |
2" COMB.AIR RELEASE ASSEMBLY AND VAULT | 5 | EA |
$1,800.00 |
$3,675.00 |
$3,000.00 |
$1,301.77 |
| 59 | 616(D) 0770 |
1" BLOW OFF VALVE & VAULT | 2 | EA |
$1,800.00 |
$3,360.00 |
$2,000.00 |
$542.41 |
| 60 | 616(D) 1060 |
4" GATE VALVE | 3 | EA |
$150.00 |
$1,050.00 |
$950.00 |
$542.41 |
| 61 | 616(D) 1070 |
6" GATE VALVE | 7 | EA |
$375.00 |
$1,260.00 |
$1,000.00 |
$867.85 |
| 62 | 616(F) 5948 |
METER INSTALLATION 3/4" | 23 | EA |
$1,000.00 |
$367.50 |
$900.00 |
$271.20 |
| 63 | 616(G) 1192 |
FIRE HYDRANTS | 1 | EA |
$3,500.00 |
$3,780.00 |
$4,000.00 |
$3,796.84 |
| 64 | 616(I) 0125 |
12" STEEL CASING | 180 | LF |
$200.00 |
$47.25 |
$85.00 |
$32.54 |
| 65 | 616(J) 0125 |
BORE AND JACK 12" CASING | 305 | LF |
$525.00 |
$200.00 |
$175.00 |
$313.71 |
| 66 | 616(N) 0090 |
SERVICE CONNECTION (SHORT) | 16 | EA |
$1,500.00 |
$577.50 |
$1,600.00 |
$271.20 |
| 67 | 616(N) 0092 |
SERVICE CONNECTION (LONG) | 7 | EA |
$3,000.00 |
$1,260.00 |
$2,000.00 |
$542.41 |
| 68 | 619(B) 5949 |
REMOVAL OF FIRE HYDRANT | 1 | EA |
$500.00 |
$6,300.00 |
$500.00 |
$271.20 |
| 69 | 619(B) 7200 |
REMOVE WATER METER AND METER CAN | 23 | EA |
$300.00 |
$236.25 |
$500.00 |
$108.48 |
| 70 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 100 | CY |
$15.00 |
$25.20 |
$15.00 |
$13.63 |
| 71 | 501(G) 6309 |
CLSM BACKFILL | 56 | CY |
$120.00 |
$157.50 |
$150.00 |
$119.53 |
| 72 | 503(A) 1312 |
PRESTRESSED CONCRETE BEAMS (TYPE III) | 209 | LF |
$200.00 |
$223.65 |
$221.00 |
$208.36 |
| 73 | 504(A) 1304 |
APPROACH SLAB | 115 | SY |
$220.00 |
$192.15 |
$175.00 |
$185.09 |
| 74 | 504(B) 1305 |
SAW-CUT GROOVING | 261.2 | SY |
$10.00 |
$5.00 |
$15.00 |
$4.12 |
| 75 | 504(D) 6239 |
CONCRETE RAIL (TR3) | 196.6 | LF |
$80.00 |
$109.50 |
$79.00 |
$95.91 |
| 76 | 506(A) 1322 |
STRUCTURAL STEEL | 100 | LB |
$4.00 |
$4.00 |
$2.25 |
$4.82 |
| 77 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 6 | EA |
$750.00 |
$735.00 |
$825.00 |
$256.10 |
| 78 | 509(A) 1326 |
CLASS AA CONCRETE | 74.9 | CY |
$600.00 |
$735.00 |
$665.00 |
$727.77 |
| 79 | 509(B) 1328 |
CLASS A CONCRETE | 39.2 | CY |
$700.00 |
$735.00 |
$715.00 |
$699.71 |
| 80 | 509(D) 1331 |
CLASS C CONCRETE | 10.6 | CY |
$400.00 |
$640.50 |
$300.00 |
$784.17 |
| 81 | 511(A) 1332 |
REINFORCING STEEL | 19,060 | LB |
$1.00 |
$1.26 |
$0.9800 |
$1.25 |
| 82 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 336 | LF |
$30.00 |
$45.15 |
$45.00 |
$30.55 |
| 83 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 336 | LF |
$15.00 |
$13.65 |
$15.00 |
$35.98 |
| 84 | 525(A) 0100 |
(SP)NEST PREVENTION - NETTING | 1 | LSUM |
$4,000.00 |
$6,930.00 |
$10,000.00 |
$4,000.00 |
| 85 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 1,450 | TON |
$40.00 |
$43.31 |
$35.00 |
$57.17 |
| 86 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 435 | TON |
$30.00 |
$34.07 |
$30.00 |
$46.54 |
| 87 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 52 | LF |
$30.00 |
$42.25 |
$25.00 |
$13.52 |
| 88 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 36 | LF |
$25.00 |
$31.50 |
$15.00 |
$13.85 |
| 89 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$25,000.00 |
$47,250.00 |
$7,250.00 |
$6,789.61 |
| 90 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 90 | CY |
$15.00 |
$25.20 |
$15.00 |
$14.48 |
| 91 | 501(G) 6309 |
CLSM BACKFILL | 64 | CY |
$120.00 |
$158.55 |
$150.00 |
$142.08 |
| 92 | 503(A) 1312 |
PRESTRESSED CONCRETE BEAMS (TYPE III) | 756.01 | LF |
$200.00 |
$258.30 |
$250.00 |
$231.50 |
| 93 | 504(A) 1304 |
APPROACH SLAB | 129 | SY |
$220.00 |
$192.00 |
$182.00 |
$186.68 |
| 94 | 504(B) 1305 |
SAW-CUT GROOVING | 647.2 | SY |
$10.00 |
$5.00 |
$12.00 |
$4.12 |
| 95 | 504(E) 6190 |
42" F-SHAPED PARAPET | 463 | LF |
$120.00 |
$120.75 |
$95.00 |
$136.13 |
| 96 | 506(A) 1322 |
STRUCTURAL STEEL | 1,300 | LB |
$3.00 |
$4.00 |
$2.25 |
$3.19 |
| 97 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 8 | EA |
$750.00 |
$671.50 |
$800.00 |
$312.64 |
| 98 | 507(B) 6176 |
WEATHERING STEEL EXPANSION BEARING ASSEMBLY | 16 | EA |
$1,000.00 |
$1,579.20 |
$800.00 |
$1,034.96 |
| 99 | 507(C) 6282 |
ELASTOMERIC BEARING PADS | 16 | EA |
$500.00 |
$761.25 |
$500.00 |
$312.72 |
| 100 | 509(A) 1326 |
CLASS AA CONCRETE | 174.7 | CY |
$600.00 |
$688.80 |
$665.00 |
$664.08 |
| 101 | 509(B) 1328 |
CLASS A CONCRETE | 178.2 | CY |
$700.00 |
$672.00 |
$750.00 |
$720.05 |
| 102 | 509(D) 1331 |
CLASS C CONCRETE | 15.2 | CY |
$400.00 |
$634.20 |
$300.00 |
$827.48 |
| 103 | 510(C) 6138 |
SLOPE WALL (5") | 1,920.6 | SY |
$45.00 |
$89.25 |
$65.00 |
$92.81 |
| 104 | 511(A) 1332 |
REINFORCING STEEL | 54,480 | LB |
$1.00 |
$1.26 |
$1.00 |
$1.15 |
| 105 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 640 | LF |
$30.00 |
$43.05 |
$50.00 |
$28.28 |
| 106 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 640 | LF |
$15.00 |
$15.75 |
$15.00 |
$27.64 |
| 107 | 516(A) 6096 |
DRILLED SHAFTS 60" DIAMETER | 192 | LF |
$800.00 |
$793.80 |
$690.00 |
$650.00 |
| 108 | 516(C) 6200 |
CROSSHOLE SONIC LOGGING | 4 | EA |
$1,000.00 |
$3,885.00 |
$2,500.00 |
$1,410.26 |
| 109 | 516(D) 6400 |
CSL ACCESS TUBES | 980 | LF |
$30.00 |
$15.75 |
$10.00 |
$16.10 |
| 110 | 525(A) 0100 |
(SP)NEST PREVENTION - NETTING | 1 | LSUM |
$4,000.00 |
$9,450.00 |
$10,000.00 |
$7,000.00 |
| 111 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 521 | LF |
$30.00 |
$31.50 |
$20.00 |
$15.51 |
| 112 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 60 | LF |
$25.00 |
$31.50 |
$15.00 |
$15.66 |
| 113 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$60,000.00 |
$126,000.00 |
$53,500.00 |
$67,778.00 |
| 114 | 624(E) 4294 |
FENCE-STYLE CLF (8'HIGH, CLASS A) | 379 | LF |
$50.00 |
$120.75 |
$35.00 |
$27.98 |
| 115 | 805(A) 8724 |
(PL)REMOVAL OF EXISTING SIGNS | 78 | EA |
$60.00 |
$26.25 |
$58.00 |
$27.12 |
| 116 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 484 | SF |
$16.00 |
$13.65 |
$20.00 |
$14.10 |
| 117 | 851(C) 8324 |
2" SQUARE TUBE POST | 521 | LF |
$8.00 |
$7.35 |
$8.00 |
$7.59 |
| 118 | 853 9030 |
DELINEATORS(TYPE 1, CODE 3) | 8 | EA |
$25.00 |
$23.10 |
$20.00 |
$23.87 |
| 119 | 855(A) 8812 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 113,615 | LF |
$0.5000 |
$0.3700 |
$0.6500 |
$0.3800 |
| 120 | 855(A) 8825 |
TRAFFIC STRIPE(PLASTIC)(24" WIDE) | 168 | LF |
$4.00 |
$15.75 |
$4.50 |
$16.27 |
| 121 | 104 0955 |
(SP) RAILROAD FLAGGING(NON-BIDDABLE) | 100 | DAY |
$490.00 |
$490.00 |
$490.00 |
$490.00 |
| 122 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$20,000.00 |
$12,600.00 |
$50,000.00 |
$13,017.73 |
| 123 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 520 | SD |
$15.00 |
$12.60 |
$15.00 |
$13.02 |
| 124 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$40,000.00 |
$69,000.00 |
$191,322.00 |
$211,538.15 |
| 125 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$8,000.00 |
$11,000.00 |
$10,000.00 |
$5,545.10 |
| 126 | 640(A) 1398 |
FIELD OFFICE | 1 | EA |
$10,000.00 |
$15,065.00 |
$10,000.00 |
$14,489.29 |
| 127 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$333,000.00 |
$345,820.52 |
$385,000.00 |
$370,000.00 |