| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$15,575.00 |
$24,000.00 |
$40,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 7,287 | CY |
$7.00 |
$8.50 |
$8.00 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 5,543 | CY |
$8.00 |
$14.00 |
$9.00 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$20,000.00 |
$15,000.00 |
$35,000.00 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 710 | LF |
$3.00 |
$1.65 |
$4.00 |
| 6 | 221(D) 2803 |
TEMPORARY SEDIMENT FILTER | 6 | EA |
$175.00 |
$310.00 |
$350.00 |
| 7 | 221(F) 0100 |
TEMPORARY SILT DIKE | 330 | LF |
$9.00 |
$10.50 |
$11.00 |
| 8 | 221(G) 0150 |
TEMPORARY ROCK FILTER DAM TYPE 1 | 150 | CY |
$100.00 |
$105.00 |
$110.00 |
| 9 | 221(H) 0450 |
(PL)TEMPORARY INLET SEDIMENT FILTER | 8 | EA |
$155.00 |
$315.00 |
$350.00 |
| 10 | 230(A) 2806 |
SOLID SLAB SODDING | 10,932 | SY |
$2.00 |
$1.65 |
$2.50 |
| 11 | 233(A) 2817 |
VEGETATIVE MULCHING | 2.7 | AC |
$500.00 |
$500.00 |
$750.00 |
| 12 | 241 2832 |
MOWING | 6.8 | AC |
$80.00 |
$115.00 |
$100.00 |
| 13 | 307(D) 4230 |
LIME | 299 | TON |
$160.00 |
$195.00 |
$165.00 |
| 14 | 307(H) 4270 |
LIME STABILIZED SUBGRADE | 12,320 | SY |
$3.00 |
$4.00 |
$9.00 |
| 15 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 92 | TON |
$40.00 |
$42.00 |
$75.00 |
| 16 | 407(B) 0250 |
TACK COAT | 4,434 | GAL |
$3.50 |
$3.30 |
$2.25 |
| 17 | 408 5774 |
PRIME COAT | 4,462 | GAL |
$5.00 |
$5.50 |
$3.50 |
| 18 | 411(B) 5940 |
SUPERPAVE, TYPE S3(PG 70-28 OK) | 873 | TON |
$95.00 |
$110.00 |
$105.00 |
| 19 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 3,849 | TON |
$80.00 |
$94.00 |
$95.00 |
| 20 | 411(C) 5955 |
SUPERPAVE, TYPE S4(PG 70-28 OK) | 1,039 | TON |
$100.00 |
$120.00 |
$110.00 |
| 21 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 398 | TON |
$110.00 |
$120.00 |
$105.00 |
| 22 | 412 5267 |
COLD MILLING PAVEMENT | 5,510 | SY |
$5.00 |
$5.00 |
$10.00 |
| 23 | 509(D) 0325 |
CLASS C CONCRETE | 27 | CY |
$300.00 |
$335.00 |
$350.00 |
| 24 | 601(A) 0297 |
TYPE I PLAIN RIPRAP | 158 | TON |
$35.00 |
$50.00 |
$50.00 |
| 25 | 611(G) 5704 |
INLET CDI RCP DES. 1 | 1 | EA |
$2,800.00 |
$2,200.00 |
$3,100.00 |
| 26 | 611(G) 5705 |
INLET CDI RCP DES. 2 | 1 | EA |
$3,000.00 |
$2,500.00 |
$3,250.00 |
| 27 | 611(G) 6002 |
INLET (SMD-TYPE 2) | 3 | EA |
$2,600.00 |
$2,750.00 |
$2,500.00 |
| 28 | 613(A) 0491 |
18" R.C.PIPE CLASS III | 407 | LF |
$50.00 |
$65.00 |
$50.00 |
| 29 | 613(A) 0492 |
24" R.C.PIPE CLASS III | 340 | LF |
$65.00 |
$90.00 |
$65.00 |
| 30 | 613(B) 0688 |
12" CORR. GALV. STEEL PIPE | 44 | LF |
$20.00 |
$30.00 |
$20.00 |
| 31 | 613(B) 0689 |
18" CORR. GALV. STEEL PIPE | 110 | LF |
$25.00 |
$32.00 |
$25.00 |
| 32 | 613(B) 0690 |
24" CORR. GALV. STEEL PIPE | 3 | LF |
$35.00 |
$165.00 |
$35.00 |
| 33 | 613(M) 7186 |
TYPE A4 CULVERT END TREATMENT | 2 | EA |
$1,600.00 |
$1,175.00 |
$920.00 |
| 34 | 613(M) 7187 |
TYPE B4 CULVERT END TREATMENT | 3 | EA |
$1,800.00 |
$1,235.00 |
$995.00 |
| 35 | 613(M) 7196 |
TYPE A6 CULVERT END TREATMENT | 7 | EA |
$1,800.00 |
$1,370.00 |
$1,050.00 |
| 36 | 613(M) 7197 |
TYPE B6 CULVERT END TREATMENT | 1 | EA |
$2,000.00 |
$1,570.00 |
$1,230.00 |
| 37 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$15,000.00 |
$28,000.00 |
$35,000.00 |
| 38 | 619(B) 4727 |
REMOVAL OF CONCRETE PAVEMENT | 673 | SY |
$15.00 |
$6.00 |
$20.00 |
| 39 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 3,954 | SY |
$5.00 |
$4.00 |
$13.00 |
| 40 | 619(B) 4767 |
REMOVAL OF ASPHALT DRIVEWAY | 1,550 | SY |
$3.50 |
$3.58 |
$13.00 |
| 41 | 619(C) 0924 |
SAWING PAVEMENT | 692 | LF |
$3.50 |
$4.50 |
$3.50 |
| 42 | 629(A) 4958 |
MAILBOX INSTALLATION-SINGLE | 2 | EA |
$90.00 |
$105.26 |
$85.00 |
| 43 | 629(C) 4960 |
MAILBOX | 2 | EA |
$35.00 |
$68.42 |
$50.00 |
| 44 | 202(A) 1301 |
UNCLASSIFIED EXCAVATION | 3,590 | CY |
$10.00 |
$8.50 |
$5.00 |
| 45 | 501(A) 1306 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 428 | CY |
$20.00 |
$30.00 |
$20.00 |
| 46 | 509(A) 1326 |
CLASS AA CONCRETE | 950.3 | CY |
$400.00 |
$430.00 |
$306.00 |
| 47 | 511(A) 1332 |
REINFORCING STEEL | 193,770 | LB |
$1.50 |
$0.8500 |
$0.7500 |
| 48 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$35,000.00 |
$6,800.00 |
$30,000.00 |
| 49 | 804(A) 2915 |
STRUCTURAL CONCRETE | 3 | CY |
$530.00 |
$210.00 |
$200.00 |
| 50 | 804(B) 2916 |
REINFORCING STEEL | 168 | LB |
$2.00 |
$2.10 |
$2.00 |
| 51 | 805(A) 8700 |
REMOVAL OF SIGN FOOTING | 22 | EA |
$100.00 |
$200.00 |
$50.00 |
| 52 | 805(D) 8756 |
(PL)REMOVE & RESET EXISTING SIGNS | 17 | EA |
$150.00 |
$55.00 |
$50.00 |
| 53 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 25 | SF |
$17.50 |
$21.05 |
$15.00 |
| 54 | 851(B) 3216 |
2"@3.65 GALV.STEEL PIPE POST | 217 | LF |
$17.00 |
$11.00 |
$10.00 |
| 55 | 851(B) 3217 |
2 1/2"@5.79 GALV.STEEL PIPE POST | 101 | LF |
$19.50 |
$11.00 |
$10.00 |
| 56 | 855(A) 8812 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 8,171 | LF |
$0.9000 |
$0.7900 |
$0.7500 |
| 57 | 855(A) 8825 |
TRAFFIC STRIPE(PLASTIC)(24" WIDE) | 62 | LF |
$8.00 |
$5.26 |
$5.00 |
| 58 | 857(A) 8839 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) | 9,420 | LF |
$0.2000 |
$0.1500 |
$0.1400 |
| 59 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 800 | LF |
$0.8000 |
$0.5800 |
$0.5500 |
| 60 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 6,400 | SD |
$0.2000 |
$0.1100 |
$0.1000 |
| 61 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 2,240 | SD |
$0.5000 |
$0.8900 |
$0.8500 |
| 62 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 2,240 | SD |
$1.90 |
$1.05 |
$1.00 |
| 63 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 1,600 | SD |
$0.6000 |
$1.05 |
$1.00 |
| 64 | 880(C) 8848 |
WING BARRICADES | 640 | SD |
$1.30 |
$2.10 |
$2.00 |
| 65 | 880(D) 8854 |
VERTICAL PANELS | 7,360 | SD |
$0.2000 |
$0.1600 |
$0.1500 |
| 66 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 4,160 | SD |
$0.4000 |
$0.1100 |
$0.1000 |
| 67 | 880(F) 8878 |
DRUMS | 7,840 | SD |
$0.2000 |
$0.2600 |
$0.2500 |
| 68 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$30,000.00 |
$14,500.00 |
$30,000.00 |
| 69 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$4,500.00 |
$2,185.00 |
$30,000.00 |
| 70 | 620(C) 5910 |
CONTRACTOR HEALTH SAFETY PLAN | 1 | LSUM |
$5,000.00 |
$4,000.00 |
$3,000.00 |
| 71 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$116,914.90 |
$124,000.00 |
$122,500.00 |