| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$40,000.00 |
$40,000.00 |
$62,160.00 |
$85,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 40,508 | CY |
$4.00 |
$4.90 |
$4.80 |
$15.10 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 42,812 | CY |
$5.00 |
$5.40 |
$6.15 |
$7.73 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$20,000.00 |
$37,000.00 |
$76,540.00 |
$87,397.85 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 1,360 | LF |
$1.75 |
$1.80 |
$1.30 |
$1.15 |
| 6 | 221(D) 2803 |
TEMPORARY SEDIMENT FILTER | 4 | EA |
$180.00 |
$185.00 |
$151.00 |
$178.19 |
| 7 | 221(F) 0100 |
TEMPORARY SILT DIKE | 322 | LF |
$8.00 |
$8.25 |
$6.00 |
$9.26 |
| 8 | 221(G) 0153 |
TEMPORARY ROCK FILTER DAM TYPE 4 | 4 | CY |
$200.00 |
$205.00 |
$181.00 |
$99.28 |
| 9 | 230(A) 2806 |
SOLID SLAB SODDING | 55,747 | SY |
$1.50 |
$1.55 |
$1.20 |
$1.09 |
| 10 | 230(B) 2807 |
MULCH SODDING | 53,541 | SY |
$1.75 |
$1.80 |
$1.20 |
$1.09 |
| 11 | 232(B) 2814 |
SEEDING METHOD B | 14 | AC |
$450.00 |
$465.00 |
$553.00 |
$437.75 |
| 12 | 233(A) 2817 |
VEGETATIVE MULCHING | 14 | AC |
$450.00 |
$465.00 |
$503.00 |
$618.00 |
| 13 | 241 2832 |
MOWING | 28 | AC |
$85.00 |
$90.00 |
$75.40 |
$71.07 |
| 14 | 307(B) 4210 |
CEMENT KILN DUST | 3,554 | TON |
$52.00 |
$46.00 |
$48.15 |
$167.59 |
| 15 | 307(D) 4230 |
LIME | 772 | TON |
$150.00 |
$155.00 |
$150.00 |
$198.15 |
| 16 | 307(E) 4240 |
CEMENTITIOUS STABILIZED SUBGRADE | 83,793 | SY |
$3.00 |
$2.45 |
$1.75 |
$1.94 |
| 17 | 307(G) 4260 |
LIME PRETREATMENT | 33,647 | SY |
$2.00 |
$1.80 |
$2.00 |
$1.75 |
| 18 | 402(A) 0217 |
TRAFFIC BOUND SURFACE COURSE TYPE A | 2,053 | TON |
$23.00 |
$18.00 |
$21.00 |
$27.85 |
| 19 | 407(B) 0250 |
TACK COAT | 12,701 | GAL |
$3.50 |
$2.40 |
$4.00 |
$3.50 |
| 20 | 408 5774 |
PRIME COAT | 19,722 | GAL |
$4.50 |
$4.25 |
$5.00 |
$5.13 |
| 21 | 411(B) 5935 |
SUPERPAVE, TYPE S3(PG 76-28 OK) | 11,084 | TON |
$68.00 |
$64.00 |
$69.80 |
$80.62 |
| 22 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 31,684 | TON |
$64.00 |
$57.00 |
$61.35 |
$70.93 |
| 23 | 411(C) 5950 |
SUPERPAVE, TYPE S4(PG 76-28 OK) | 7,111 | TON |
$74.00 |
$79.50 |
$78.20 |
$86.13 |
| 24 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 2,395 | TON |
$71.00 |
$69.50 |
$75.60 |
$80.62 |
| 25 | 501(A) 0313 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 310 | CY |
$20.00 |
$17.00 |
$15.10 |
$20.60 |
| 26 | 509(A) 0319 |
CLASS AA CONCRETE | 193 | CY |
$425.00 |
$420.00 |
$402.00 |
$401.70 |
| 27 | 509(C) 0322 |
CLASS A CONCRETE, SMALL STRUCTURES | 2 | CY |
$500.00 |
$1,100.00 |
$704.00 |
$698.34 |
| 28 | 509(D) 0325 |
CLASS C CONCRETE | 511 | CY |
$200.00 |
$330.00 |
$321.50 |
$263.68 |
| 29 | 511(A) 0332 |
REINFORCING STEEL | 30,592 | LB |
$1.00 |
$1.05 |
$1.00 |
$0.8800 |
| 30 | 609(B) 0383 |
COMBINED CURB & GUTTER (6" BARRIER) | 4,875 | LF |
$18.00 |
$19.00 |
$15.70 |
$17.51 |
| 31 | 610(A) 0602 |
4" CONCRETE SIDEWALK | 817 | SY |
$40.00 |
$60.00 |
$42.90 |
$41.20 |
| 32 | 610(B) 0604 |
6" CONCRETE DRIVEWAY | 1,026 | SY |
$45.00 |
$50.00 |
$44.80 |
$51.50 |
| 33 | 611(A) 2657 |
MANHOLE (4' DIAMETER) | 9 | EA |
$2,000.00 |
$1,800.00 |
$1,760.00 |
$1,545.00 |
| 34 | 611(B) 2680 |
ADD'L.DEPTH IN MANHOLE (4' DIAMETER) | 12 | VF |
$200.00 |
$190.00 |
$131.00 |
$128.75 |
| 35 | 611(G) 5113 |
INLET CI DES. 2 (B) | 6 | EA |
$1,700.00 |
$3,500.00 |
$3,620.00 |
$3,605.00 |
| 36 | 611(G) 5121 |
INLET CI DES. 3 (B) | 2 | EA |
$2,000.00 |
$4,800.00 |
$5,025.00 |
$4,995.50 |
| 37 | 611(G) 5122 |
INLET CI DES. 3 (D) | 6 | EA |
$2,300.00 |
$5,500.00 |
$5,528.00 |
$5,665.00 |
| 38 | 611(G) 5391 |
INLET CDI RCB DES. 5 | 1 | EA |
$4,500.00 |
$3,500.00 |
$4,020.00 |
$3,605.00 |
| 39 | 611(G) 6000 |
INLET (SMD-TYPE 1) | 4 | EA |
$2,200.00 |
$2,500.00 |
$2,515.00 |
$2,266.00 |
| 40 | 611(H) 5540 |
ADD'L DEPTH IN INLET CDI RCB DES. 5 | 3 | VF |
$260.00 |
$400.00 |
$503.00 |
$515.00 |
| 41 | 611(L) 0487 |
JUNCTION BOXES | 205 | CF |
$125.00 |
$135.00 |
$35.20 |
$30.90 |
| 42 | 613(A) 0491 |
18" R.C.PIPE CLASS III | 1,406 | LF |
$45.00 |
$52.00 |
$28.10 |
$28.36 |
| 43 | 613(A) 0492 |
24" R.C.PIPE CLASS III | 542 | LF |
$60.00 |
$66.00 |
$45.20 |
$46.27 |
| 44 | 613(A) 0493 |
30" R.C.PIPE CLASS III | 204 | LF |
$76.00 |
$120.00 |
$82.39 |
$84.60 |
| 45 | 613(A) 0496 |
48" R.C.PIPE CLASS III | 56 | LF |
$110.00 |
$180.00 |
$190.00 |
$174.56 |
| 46 | 613(A) 4404 |
26" X 15" R.C.PIPE ARCH CLASS A-III | 64 | LF |
$69.00 |
$70.00 |
$84.00 |
$90.52 |
| 47 | 613(A) 4410 |
28 1/2" X 18" R.C.PIPE ARCH CLASS A-III | 54 | LF |
$70.00 |
$84.00 |
$50.00 |
$57.17 |
| 48 | 613(A) 4495 |
22" X 13" R.C.PIPE ARCH CLASS A-III | 784 | LF |
$72.00 |
$58.00 |
$95.00 |
$108.47 |
| 49 | 613(A) 4497 |
36" X 22" R.C.PIPE ARCH CLASS A-III | 60 | LF |
$80.00 |
$104.00 |
$90.00 |
$85.79 |
| 50 | 613(B) 0689 |
18" CORR. GALV. STEEL PIPE | 574 | LF |
$22.00 |
$31.00 |
$35.00 |
$49.63 |
| 51 | 613(B) 0690 |
24" CORR. GALV. STEEL PIPE | 56 | LF |
$34.00 |
$36.00 |
$44.00 |
$52.33 |
| 52 | 613(B) 0692 |
36" CORR. GALV. STEEL PIPE | 14 | LF |
$60.00 |
$64.00 |
$65.00 |
$63.15 |
| 53 | 613(B) 0694 |
48" CORR. GALV. STEEL PIPE | 136 | LF |
$58.00 |
$81.00 |
$89.00 |
$115.24 |
| 54 | 613(B) 4527 |
21" X 15" CORR. GALV. STEEL PIPE ARCH | 242 | LF |
$30.00 |
$42.00 |
$33.00 |
$50.98 |
| 55 | 613(B) 4528 |
28" X 20" CORR. GALV. STEEL PIPE ARCH | 234 | LF |
$30.00 |
$47.00 |
$43.00 |
$88.84 |
| 56 | 613(L) 4528 |
36" X 23" PREFAB. CULVERT END SECTION, ARCH | 1 | EA |
$1,000.00 |
$875.00 |
$1,600.00 |
$1,854.00 |
| 57 | 613(L) 5732 |
30" PREFAB. CULVERT END SECTION, ROUND | 2 | EA |
$1,000.00 |
$800.00 |
$1,400.00 |
$1,545.00 |
| 58 | 613(L) 5738 |
48" PREFAB. CULVERT END SECTION, ROUND | 1 | EA |
$1,300.00 |
$1,500.00 |
$2,000.00 |
$2,060.00 |
| 59 | 613(M) 7186 |
TYPE A4 CULVERT END TREATMENT | 3 | EA |
$800.00 |
$1,050.00 |
$1,100.00 |
$1,287.50 |
| 60 | 613(M) 7188 |
TYPE C4 CULVERT END TREATMENT | 1 | EA |
$1,500.00 |
$1,250.00 |
$1,300.00 |
$1,545.00 |
| 61 | 613(M) 7196 |
TYPE A6 CULVERT END TREATMENT | 56 | EA |
$900.00 |
$1,150.00 |
$1,150.00 |
$1,395.65 |
| 62 | 613(M) 7197 |
TYPE B6 CULVERT END TREATMENT | 10 | EA |
$100.00 |
$1,350.00 |
$1,310.00 |
$2,281.45 |
| 63 | 613(M) 7200 |
TYPE E6 CULVERT END TREATMENT | 2 | EA |
$1,700.00 |
$3,100.00 |
$3,050.00 |
$4,377.50 |
| 64 | 613(M) 7201 |
TYPE AA6 CULVERT END TREATMENT | 2 | EA |
$1,500.00 |
$3,600.00 |
$3,520.00 |
$2,812.93 |
| 65 | 613(M) 7202 |
TYPE BB6 CULVERT END TREATMENT | 2 | EA |
$1,720.00 |
$4,100.00 |
$4,030.00 |
$3,605.00 |
| 66 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$50,000.00 |
$44,000.00 |
$24,870.00 |
$61,351.30 |
| 67 | 619(B) 0291 |
REMOVAL OF HEADWALL | 5 | EA |
$800.00 |
$1,200.00 |
$755.00 |
$1,344.02 |
| 68 | 619(B) 4727 |
REMOVAL OF CONCRETE PAVEMENT | 1,026 | SY |
$4.00 |
$4.60 |
$6.00 |
$5.56 |
| 69 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 29,234 | SY |
$3.00 |
$2.60 |
$2.30 |
$2.27 |
| 70 | 619(B) 4763 |
REMOVAL OF CONCRETE PAVEMENT W/ASPHALT OVERLAY | 18,450 | SY |
$4.50 |
$6.50 |
$3.00 |
$7.82 |
| 71 | 619(B) 4791 |
REMOVAL OF CURB | 530 | LF |
$2.75 |
$5.00 |
$3.60 |
$8.23 |
| 72 | 619(C) 0924 |
SAWING PAVEMENT | 2,447 | LF |
$4.00 |
$3.74 |
$3.50 |
$2.06 |
| 73 | 624(A) 4281 |
FENCE-STYLE WWF | 725 | LF |
$4.00 |
$5.00 |
$9.45 |
$5.05 |
| 74 | 624(C) 4459 |
FENCE-STYLE SWF (5 BARBED WIRE) | 1,854 | LF |
$4.25 |
$4.35 |
$8.70 |
$4.38 |
| 75 | 629(A) 4958 |
MAILBOX INSTALLATION-SINGLE | 12 | EA |
$120.00 |
$104.00 |
$100.00 |
$103.00 |
| 76 | 629(B) 4959 |
MAILBOX INSTALLATION-MULTIPLE | 4 | EA |
$132.00 |
$205.00 |
$200.00 |
$206.00 |
| 77 | 629(C) 4960 |
MAILBOX | 27 | EA |
$50.00 |
$5.20 |
$5.00 |
$5.15 |
| 78 | 629(D) 4961 |
REMOVAL OF MAILBOX INSTALLATION | 16 | EA |
$20.00 |
$10.25 |
$10.00 |
$10.30 |
| 79 | 802(B) 8340 |
2" PVC SCH.40 PLASTIC CONDUIT BORED | 525 | LF |
$13.80 |
$14.00 |
$13.60 |
$14.50 |
| 80 | 802(B) 8342 |
2" PVC SCH.40 PLASTIC CONDUIT TRENCHED | 2,166 | LF |
$4.80 |
$4.20 |
$4.00 |
$4.30 |
| 81 | 803(A) 8065 |
PULL BOX(SIZE I) | 3 | EA |
$327.00 |
$275.00 |
$261.00 |
$279.29 |
| 82 | 804(A) 2915 |
STRUCTURAL CONCRETE | 9.31 | CY |
$450.00 |
$525.00 |
$505.00 |
$525.60 |
| 83 | 804(B) 2916 |
REINFORCING STEEL | 661.4 | LB |
$1.35 |
$1.55 |
$1.60 |
$1.76 |
| 84 | 805(A) 8724 |
(PL)REMOVAL OF EXISTING SIGNS | 6 | EA |
$45.00 |
$46.00 |
$50.20 |
$51.50 |
| 85 | 805(D) 8744 |
(PL)REMOVE & RESET LIGHT POLE | 12 | EA |
$7,000.00 |
$1,100.00 |
$1,035.00 |
$1,106.43 |
| 86 | 805(D) 8756 |
(PL)REMOVE & RESET EXISTING SIGNS | 7 | EA |
$165.00 |
$155.00 |
$150.00 |
$154.50 |
| 87 | 810(A) 3118 |
SERVICE POLE | 1 | EA |
$1,490.00 |
$4,200.00 |
$4,060.00 |
$4,339.77 |
| 88 | 811 8038 |
1/C NO.4 ELECTRICAL CONDUCTOR | 5,878 | LF |
$1.30 |
$1.95 |
$1.85 |
$1.99 |
| 89 | 811 8046 |
1/C NO.12 ELECTRICAL CONDUCTOR | 1,440 | LF |
$0.6000 |
$0.6000 |
$0.5800 |
$0.6200 |
| 90 | 827 8623 |
SOLID STATE FLASHER CONTROLLER(TYPE II) | 2 | EA |
$1,200.00 |
$1,600.00 |
$1,567.00 |
$1,675.76 |
| 91 | 831 8301 |
1WAY 1SEC. ADJ. SIG. HD. S-22 | 4 | EA |
$198.00 |
$270.00 |
$261.00 |
$279.29 |
| 92 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 319.8 | SF |
$14.85 |
$12.50 |
$12.00 |
$12.36 |
| 93 | 851(B) 3217 |
2 1/2"@5.79 GALV.STEEL PIPE POST | 39 | LF |
$15.50 |
$14.50 |
$14.00 |
$14.42 |
| 94 | 851(B) 3218 |
3"@7.58 GALV.STEEL PIPE POST | 90.5 | LF |
$19.80 |
$16.50 |
$16.00 |
$16.48 |
| 95 | 851(B) 3220 |
4"@10.79 GALV.STEEL PIPE POST | 29 | LF |
$41.00 |
$45.00 |
$181.00 |
$193.36 |
| 96 | 851(C) 8324 |
2" SQUARE TUBE POST | 439 | LF |
$7.25 |
$6.10 |
$6.00 |
$6.18 |
| 97 | 851(C) 8330 |
2 1/2" SQUARE TUBE POST | 17 | LF |
$9.00 |
$6.10 |
$6.00 |
$6.18 |
| 98 | 855(A) 8812 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 43,470 | LF |
$0.4000 |
$0.3700 |
$0.3600 |
$0.3700 |
| 99 | 855(A) 8814 |
TRAFFIC STRIPE(PLASTIC)(8" WIDE) | 605 | LF |
$1.05 |
$2.05 |
$2.00 |
$2.06 |
| 100 | 855(A) 8825 |
TRAFFIC STRIPE(PLASTIC)(24" WIDE) | 184 | LF |
$5.00 |
$8.20 |
$8.00 |
$8.24 |
| 101 | 855(B) 8818 |
TRAFFIC STRIPE(PLASTIC)(ARROWS) | 42 | EA |
$77.00 |
$67.00 |
$66.00 |
$67.98 |
| 102 | 857(A) 8839 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) | 46,500 | LF |
$0.1200 |
$0.0800 |
$0.0800 |
$0.0800 |
| 103 | 857(E) 8887 |
(PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-1 | 1,000 | EA |
$0.6500 |
$1.05 |
$1.00 |
$1.03 |
| 104 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 46,500 | LF |
$0.1200 |
$0.0500 |
$0.0500 |
$0.0500 |
| 105 | 880(A) 8812 |
ARROW DISPLAY(TYPE C) | 200 | SD |
$8.00 |
$1.05 |
$1.00 |
$1.03 |
| 106 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 3,200 | SD |
$0.3000 |
$1.05 |
$1.00 |
$1.03 |
| 107 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 1,600 | SD |
$0.5000 |
$2.05 |
$2.00 |
$2.06 |
| 108 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 6,200 | SD |
$2.00 |
$0.5200 |
$0.5000 |
$0.5200 |
| 109 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 4,000 | SD |
$0.3500 |
$0.2600 |
$0.2500 |
$0.2600 |
| 110 | 880(C) 8848 |
WING BARRICADES | 800 | SD |
$0.8500 |
$2.60 |
$2.50 |
$2.58 |
| 111 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 13,000 | SD |
$0.1000 |
$0.1000 |
$0.1000 |
$0.1000 |
| 112 | 880(F) 8878 |
DRUMS | 4,000 | SD |
$0.2000 |
$0.2600 |
$0.2500 |
$0.2600 |
| 113 | 880(G) 8890 |
CHANNELIZER CONES | 10,000 | SD |
$0.2200 |
$0.1500 |
$0.1500 |
$0.1500 |
| 114 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 400 | SD |
$16.00 |
$13.00 |
$12.60 |
$12.88 |
| 115 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$44,000.00 |
$30,000.00 |
$40,695.00 |
$129,936.92 |
| 116 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$2,500.00 |
$9,475.00 |
$5,150.00 |
| 117 | 640(A) 1426 |
FIELD OFFICE | 1 | EA |
$10,000.00 |
$7,500.00 |
$11,300.00 |
$41,436.74 |
| 118 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$302,000.00 |
$112,500.00 |
$253,436.65 |
$374,125.44 |
| 119 | 643 0087 |
(SP)CONTRACTORS QUALITY CONTROL | 1 | LSUM |
$20,300.00 |
$17,000.00 |
$26,395.00 |
$26,620.44 |