| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$80,000.00 |
$53,000.00 |
$40,000.00 |
$46,170.00 |
$42,000.00 |
$15,500.00 |
$150,000.00 |
$150,000.00 |
$24,448.50 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 144,000 | CY |
$4.00 |
$3.50 |
$4.00 |
$4.10 |
$3.15 |
$4.00 |
$3.90 |
$3.55 |
$4.75 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 63,800 | CY |
$6.00 |
$4.50 |
$5.00 |
$5.30 |
$4.20 |
$6.10 |
$5.27 |
$4.85 |
$5.75 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$100,000.00 |
$46,000.00 |
$50,000.00 |
$133,095.00 |
$65,000.00 |
$89,000.00 |
$94,774.67 |
$88,000.00 |
$40,000.00 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 12,275 | LF |
$2.00 |
$1.43 |
$1.65 |
$1.35 |
$1.58 |
$1.60 |
$1.60 |
$1.50 |
$1.50 |
| 6 | 221(D) 2803 |
TEMPORARY SEDIMENT FILTER | 16 | EA |
$175.00 |
$79.50 |
$200.00 |
$75.75 |
$262.50 |
$180.00 |
$267.27 |
$100.00 |
$250.00 |
| 7 | 221(F) 0100 |
TEMPORARY SILT DIKE | 1,316 | LF |
$7.50 |
$6.89 |
$9.00 |
$6.60 |
$6.30 |
$8.90 |
$6.41 |
$7.25 |
$6.00 |
| 8 | 221(G) 0150 |
TEMPORARY ROCK FILTER DAM TYPE 1 | 350 | CY |
$100.00 |
$25.00 |
$60.00 |
$50.50 |
$63.00 |
$103.00 |
$64.15 |
$60.00 |
$60.00 |
| 9 | 221(G) 0152 |
TEMPORARY ROCK FILTER DAM TYPE 3 | 180 | CY |
$50.00 |
$25.00 |
$65.00 |
$50.50 |
$94.50 |
$103.00 |
$96.22 |
$50.00 |
$90.00 |
| 10 | 229 4318 |
DITCH LINER PROTECTION | 6,080 | LF |
$1.50 |
$1.65 |
$1.50 |
$1.57 |
$1.05 |
$1.45 |
$1.07 |
$1.70 |
$1.00 |
| 11 | 230(A) 2806 |
SOLID SLAB SODDING | 113,400 | SY |
$1.50 |
$1.37 |
$1.20 |
$1.30 |
$1.20 |
$1.15 |
$1.28 |
$1.40 |
$1.20 |
| 12 | 230(F) 2812 |
WATERING | 4,536 | KGAL |
$7.00 |
$6.35 |
$5.30 |
$6.00 |
$6.30 |
$5.30 |
$6.41 |
$6.50 |
$6.00 |
| 13 | 232(B) 2814 |
SEEDING METHOD B | 11 | AC |
$600.00 |
$320.00 |
$450.00 |
$303.00 |
$630.00 |
$440.00 |
$641.45 |
$350.00 |
$600.00 |
| 14 | 233(A) 2817 |
VEGETATIVE MULCHING | 32.5 | AC |
$400.00 |
$210.00 |
$450.00 |
$202.00 |
$420.00 |
$430.00 |
$427.64 |
$250.00 |
$400.00 |
| 15 | 234(A) 2824 |
FERTILIZING (10-20-10) | 10.5 | TON |
$830.00 |
$740.00 |
$400.00 |
$705.00 |
$630.00 |
$400.00 |
$641.45 |
$750.00 |
$600.00 |
| 16 | 234(A) 4406 |
FERTILIZING (0-46-0) | 2.45 | TON |
$880.00 |
$850.00 |
$400.00 |
$760.00 |
$630.00 |
$475.00 |
$494.93 |
$750.00 |
$1,000.00 |
| 17 | 241 2832 |
MOWING | 32.5 | AC |
$50.00 |
$58.50 |
$63.00 |
$56.00 |
$52.50 |
$60.00 |
$53.45 |
$55.00 |
$50.00 |
| 18 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 16,810 | CY |
$25.00 |
$21.50 |
$35.00 |
$29.05 |
$31.25 |
$37.20 |
$33.60 |
$21.00 |
$32.00 |
| 19 | 307(A) 4200 |
FLY ASH | 6,039 | TON |
$65.00 |
$60.00 |
$45.00 |
$50.00 |
$38.00 |
$60.00 |
$55.00 |
$55.00 |
$69.00 |
| 20 | 307(D) 4230 |
LIME | 325 | TON |
$120.00 |
$165.00 |
$100.00 |
$140.00 |
$146.00 |
$146.00 |
$100.00 |
$140.00 |
$100.00 |
| 21 | 307(E) 4240 |
CEMENTITIOUS STABILIZED SUBGRADE | 111,821 | SY |
$2.00 |
$1.50 |
$1.50 |
$1.40 |
$2.10 |
$2.40 |
$3.22 |
$1.25 |
$1.90 |
| 22 | 307(G) 4260 |
LIME PRETREATMENT | 22,350 | SY |
$1.50 |
$2.00 |
$1.00 |
$0.7800 |
$1.10 |
$1.50 |
$0.7200 |
$1.75 |
$1.00 |
| 23 | 325 5271 |
SEPARATOR FABRIC | 89,397 | SY |
$1.00 |
$0.7000 |
$1.10 |
$0.6500 |
$0.8000 |
$1.04 |
$1.27 |
$2.00 |
$1.00 |
| 24 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 11,647 | TON |
$18.00 |
$19.00 |
$18.00 |
$16.25 |
$15.15 |
$20.00 |
$18.48 |
$21.00 |
$20.00 |
| 25 | 407(B) 0250 |
TACK COAT | 8,450 | GAL |
$2.50 |
$2.00 |
$2.00 |
$3.00 |
$2.44 |
$2.50 |
$3.40 |
$3.25 |
$2.70 |
| 26 | 408 5774 |
PRIME COAT | 28,750 | GAL |
$3.75 |
$2.00 |
$5.00 |
$4.00 |
$4.33 |
$3.20 |
$1.50 |
$5.85 |
$4.75 |
| 27 | 409(A) 4242 |
FABRIC REINFORCEMENT | 16,660 | SY |
$2.50 |
$0.7000 |
$1.15 |
$1.20 |
$1.42 |
$0.8400 |
$1.80 |
$2.20 |
$2.15 |
| 28 | 409(B) 4268 |
BITUMINOUS BINDER | 4,165 | GAL |
$3.50 |
$2.00 |
$2.75 |
$3.50 |
$2.38 |
$2.85 |
$4.00 |
$3.30 |
$2.25 |
| 29 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 36,914 | TON |
$55.00 |
$47.00 |
$45.00 |
$45.35 |
$54.00 |
$57.00 |
$53.00 |
$62.50 |
$59.25 |
| 30 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 16,708 | TON |
$62.00 |
$52.00 |
$54.00 |
$53.60 |
$66.50 |
$64.00 |
$56.00 |
$68.60 |
$68.75 |
| 31 | 412 5267 |
COLD MILLING PAVEMENT | 57,609 | SY |
$1.75 |
$0.5000 |
$0.5000 |
$0.6500 |
$0.5500 |
$1.00 |
$1.20 |
$1.40 |
$0.6500 |
| 32 | 501(A) 0313 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 291 | CY |
$14.00 |
$10.60 |
$20.00 |
$5.05 |
$10.50 |
$5.20 |
$5.27 |
$10.00 |
$5.00 |
| 33 | 509(A) 0319 |
CLASS AA CONCRETE | 622 | CY |
$400.00 |
$295.50 |
$280.00 |
$292.90 |
$351.00 |
$300.00 |
$305.39 |
$330.00 |
$290.00 |
| 34 | 509(B) 0321 |
CLASS A CONCRETE | 375 | CY |
$400.00 |
$290.86 |
$460.00 |
$287.85 |
$402.15 |
$295.00 |
$300.12 |
$330.00 |
$285.00 |
| 35 | 509(D) 0325 |
CLASS C CONCRETE | 812 | CY |
$250.00 |
$202.50 |
$190.00 |
$202.00 |
$187.95 |
$205.00 |
$210.61 |
$205.00 |
$200.00 |
| 36 | 511(A) 0332 |
REINFORCING STEEL | 109,800 | LB |
$0.7800 |
$0.6300 |
$0.6500 |
$0.7500 |
$0.8000 |
$0.7700 |
$0.7900 |
$0.7500 |
$0.7500 |
| 37 | 601(B) 0536 |
TYPE I-A PLAIN RIPRAP | 65 | TON |
$37.25 |
$45.00 |
$55.00 |
$101.00 |
$68.25 |
$105.00 |
$105.31 |
$32.00 |
$35.00 |
| 38 | 609(B) 1524 |
2'-8" COMB. CURB & GUTTER (6" MNTBLE) | 4,504 | LF |
$21.00 |
$10.00 |
$13.00 |
$11.35 |
$11.60 |
$17.50 |
$12.86 |
$22.00 |
$12.50 |
| 39 | 610(B) 0604 |
6" CONCRETE DRIVEWAY | 631 | SY |
$50.00 |
$30.00 |
$50.00 |
$46.95 |
$45.00 |
$60.00 |
$73.71 |
$57.00 |
$50.00 |
| 40 | 611(G) 5113 |
INLET CI DES. 2 (B) | 6 | EA |
$2,300.00 |
$2,810.00 |
$2,500.00 |
$3,030.00 |
$2,047.50 |
$3,300.00 |
$4,738.73 |
$2,000.00 |
$3,500.00 |
| 41 | 611(G) 5388 |
INLET CDI RCB DES. 2 | 3 | EA |
$1,700.00 |
$2,385.00 |
$4,000.00 |
$6,060.00 |
$2,100.00 |
$2,700.00 |
$5,791.79 |
$1,500.00 |
$5,500.00 |
| 42 | 611(G) 5800 |
INLET CDI 45SK RCP DES.4 | 1 | EA |
$3,500.00 |
$2,279.00 |
$4,000.00 |
$4,040.00 |
$2,126.25 |
$2,250.00 |
$7,371.36 |
$3,500.00 |
$7,000.00 |
| 43 | 611(G) 5974 |
INLET W/SMALL JCT. BOX, CI, DES.2(D) | 1 | EA |
$2,800.00 |
$4,450.00 |
$5,600.00 |
$4,040.00 |
$3,675.00 |
$7,000.00 |
$8,424.42 |
$2,500.00 |
$5,200.00 |
| 44 | 611(G) 6002 |
INLET (SMD-TYPE 2) | 5 | EA |
$1,500.00 |
$2,332.00 |
$2,000.00 |
$2,778.00 |
$1,260.00 |
$2,300.00 |
$2,106.10 |
$1,200.00 |
$2,300.00 |
| 45 | 611(H) 5325 |
ADD'L DEPTH IN INLET CI DES. 2 | 1 | VF |
$350.00 |
$212.00 |
$150.00 |
$303.00 |
$525.00 |
$1,000.00 |
$7,371.36 |
$300.00 |
$150.00 |
| 46 | 613(A) 0491 |
18" R.C.PIPE CLASS III | 1,184 | LF |
$40.00 |
$36.50 |
$30.00 |
$35.35 |
$37.80 |
$45.00 |
$25.27 |
$23.00 |
$35.00 |
| 47 | 613(A) 0492 |
24" R.C.PIPE CLASS III | 1,059 | LF |
$55.00 |
$46.10 |
$33.00 |
$42.40 |
$43.58 |
$60.00 |
$40.02 |
$36.00 |
$45.00 |
| 48 | 613(A) 0494 |
36" R.C.PIPE CLASS III | 430 | LF |
$75.00 |
$71.55 |
$50.00 |
$70.70 |
$66.57 |
$115.00 |
$77.93 |
$72.00 |
$66.00 |
| 49 | 613(A) 4503 |
14" X 23" R.C.PIPE ELLIPTICAL CLASS HE-III | 51 | LF |
$75.00 |
$68.90 |
$75.00 |
$75.75 |
$61.16 |
$53.00 |
$40.02 |
$36.00 |
$43.00 |
| 50 | 613(A) 4505 |
24" X 38" R.C.PIPE ELLIPTICAL CLASS HE-III | 57 | LF |
$85.00 |
$78.15 |
$100.00 |
$85.85 |
$79.17 |
$101.00 |
$86.35 |
$80.00 |
$65.00 |
| 51 | 613(C) 5100 |
18" PRECOATED CORR. STEEL PIPE | 294 | LF |
$30.00 |
$35.00 |
$40.00 |
$25.25 |
$26.25 |
$32.00 |
$28.43 |
$25.00 |
$42.00 |
| 52 | 613(C) 5102 |
24" PRECOATED CORR. STEEL PIPE | 24 | LF |
$42.00 |
$38.15 |
$50.00 |
$30.30 |
$31.50 |
$37.00 |
$38.96 |
$35.00 |
$40.00 |
| 53 | 613(C) 5110 |
48" PRECOATED CORR. STEEL PIPE | 23 | LF |
$75.00 |
$47.70 |
$80.00 |
$75.75 |
$47.25 |
$85.00 |
$86.35 |
$80.00 |
$68.00 |
| 54 | 613(J) 5915 |
EDGE DRAIN CONDUIT-PERFORATED | 3,277 | LF |
$5.00 |
$5.00 |
$7.75 |
$8.10 |
$15.23 |
$6.00 |
$0.00 |
$3.50 |
$22.00 |
| 55 | 613(L) 5730 |
24" PREFAB. CULVERT END SECTION, ROUND | 5 | EA |
$900.00 |
$1,115.00 |
$600.00 |
$1,010.00 |
$761.25 |
$1,000.00 |
$579.18 |
$500.00 |
$410.00 |
| 56 | 613(L) 5734 |
36" PREFAB. CULVERT END SECTION, ROUND | 4 | EA |
$1,200.00 |
$1,399.00 |
$1,000.00 |
$1,515.00 |
$1,265.25 |
$1,600.00 |
$1,000.40 |
$900.00 |
$850.00 |
| 57 | 613(M) 7196 |
TYPE A6 CULVERT END TREATMENT | 26 | EA |
$800.00 |
$1,470.00 |
$950.00 |
$1,010.00 |
$672.00 |
$860.00 |
$1,053.05 |
$1,000.00 |
$1,000.00 |
| 58 | 613(M) 7197 |
TYPE B6 CULVERT END TREATMENT | 6 | EA |
$1,200.00 |
$1,470.00 |
$1,000.00 |
$1,212.00 |
$876.75 |
$1,100.00 |
$1,263.66 |
$1,000.00 |
$1,200.00 |
| 59 | 613(O) 5100 |
SPECIAL END SECTION OF 24" X 38" RCP ELLIPTICAL | 2 | EA |
$1,100.00 |
$1,007.00 |
$1,000.00 |
$1,870.00 |
$1,155.00 |
$1,700.00 |
$789.79 |
$700.00 |
$575.00 |
| 60 | 613(P) 0760 |
18" GALV. STEEL CULVERT END SECTION ROUND | 22 | EA |
$200.00 |
$370.00 |
$350.00 |
$303.00 |
$262.50 |
$275.00 |
$737.14 |
$225.00 |
$110.00 |
| 61 | 613(T) 1187 |
STANDARD BEDDING MATERIAL, CLASS C | 1,663 | CY |
$20.00 |
$10.45 |
$15.00 |
$35.35 |
$33.60 |
$32.50 |
$24.06 |
$35.00 |
$28.00 |
| 62 | 613(V) 1180 |
TRENCH EXCAVATION | 2,356 | CY |
$7.50 |
$3.20 |
$1.00 |
$8.10 |
$4.20 |
$6.00 |
$5.27 |
$10.00 |
$6.00 |
| 63 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$75,000.00 |
$40,000.00 |
$20,000.00 |
$63,685.00 |
$5,250.00 |
$50,000.00 |
$12,636.62 |
$50,000.00 |
$25,000.00 |
| 64 | 619(B) 0291 |
REMOVAL OF HEADWALL | 33 | EA |
$450.00 |
$265.00 |
$500.00 |
$505.00 |
$525.00 |
$500.00 |
$526.53 |
$400.00 |
$500.00 |
| 65 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 38,276 | SY |
$2.00 |
$0.7500 |
$1.50 |
$1.30 |
$1.50 |
$2.40 |
$6.50 |
$2.00 |
$2.40 |
| 66 | 619(C) 0924 |
SAWING PAVEMENT | 37,700 | LF |
$2.25 |
$1.50 |
$0.5000 |
$3.30 |
$1.90 |
$1.50 |
$4.51 |
$4.00 |
$1.75 |
| 67 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 43 | LF |
$18.00 |
$14.85 |
$26.00 |
$14.15 |
$26.25 |
$20.00 |
$26.33 |
$17.00 |
$14.00 |
| 68 | 623(G) 8571 |
GUARDRAIL END TREATMENT (GET) | 4 | EA |
$2,300.00 |
$2,120.00 |
$2,100.00 |
$2,020.00 |
$2,126.25 |
$2,100.00 |
$2,132.43 |
$2,200.00 |
$2,000.00 |
| 69 | 623(I) 8675 |
GUARDRAIL BRIDGE CONNECTION-TYPE A | 4 | EA |
$1,500.00 |
$1,569.00 |
$1,600.00 |
$1,495.00 |
$1,575.00 |
$2,100.00 |
$1,579.58 |
$1,625.00 |
$1,480.00 |
| 70 | 624(A) 4281 |
FENCE-STYLE WWF | 2,490 | LF |
$5.00 |
$4.20 |
$4.00 |
$4.00 |
$4.07 |
$4.10 |
$4.16 |
$4.26 |
$3.88 |
| 71 | 624(C) 4459 |
FENCE-STYLE SWF (5 BARBED WIRE) | 10,280 | LF |
$3.50 |
$3.15 |
$3.60 |
$3.00 |
$3.70 |
$3.10 |
$3.11 |
$3.90 |
$3.52 |
| 72 | 629(A) 4958 |
MAILBOX INSTALLATION-SINGLE | 15 | EA |
$80.00 |
$68.90 |
$65.00 |
$65.65 |
$68.25 |
$65.00 |
$69.14 |
$70.00 |
$65.00 |
| 73 | 629(B) 4959 |
MAILBOX INSTALLATION-MULTIPLE | 2 | EA |
$120.00 |
$90.10 |
$85.00 |
$85.85 |
$89.25 |
$85.00 |
$90.42 |
$90.00 |
$85.00 |
| 74 | 629(C) 4960 |
MAILBOX | 19 | EA |
$30.00 |
$26.50 |
$20.00 |
$25.25 |
$21.00 |
$25.00 |
$21.27 |
$30.00 |
$25.00 |
| 75 | 629(D) 4961 |
REMOVAL OF MAILBOX INSTALLATION | 17 | EA |
$15.00 |
$10.50 |
$10.00 |
$10.10 |
$10.50 |
$10.00 |
$10.64 |
$15.00 |
$10.00 |
| 76 | 202(A) 1301 |
UNCLASSIFIED EXCAVATION | 640 | CY |
$7.50 |
$8.50 |
$6.00 |
$10.10 |
$4.20 |
$10.00 |
$10.53 |
$8.00 |
$10.00 |
| 77 | 501(A) 1306 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 211 | CY |
$15.00 |
$10.60 |
$14.00 |
$10.10 |
$10.50 |
$10.00 |
$10.53 |
$10.00 |
$10.00 |
| 78 | 509(A) 1326 |
CLASS AA CONCRETE | 396 | CY |
$400.00 |
$291.50 |
$290.00 |
$287.85 |
$357.00 |
$290.00 |
$300.12 |
$325.00 |
$285.00 |
| 79 | 511(A) 1332 |
REINFORCING STEEL | 78,640 | LB |
$0.7800 |
$0.6000 |
$0.6500 |
$0.7600 |
$0.8400 |
$0.7700 |
$0.7900 |
$0.7500 |
$0.7500 |
| 80 | 619(B) 0291 |
REMOVAL OF HEADWALL | 2 | EA |
$2,000.00 |
$2,650.00 |
$2,500.00 |
$2,020.00 |
$3,150.00 |
$2,100.00 |
$2,106.11 |
$1,500.00 |
$2,000.00 |
| 81 | 805(A) 8722 |
(PL)REMOVAL OF EXISTING SIGNS | 1 | LSUM |
$1,000.00 |
$530.00 |
$1,000.00 |
$505.00 |
$1,050.00 |
$500.00 |
$1,063.69 |
$550.00 |
$500.00 |
| 82 | 857(A) 8839 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) | 40,500 | LF |
$0.1500 |
$0.1500 |
$0.2500 |
$0.1400 |
$0.2600 |
$0.1400 |
$0.2700 |
$0.7600 |
$0.1400 |
| 83 | 857(E) 8887 |
(PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-1 | 2,500 | EA |
$1.00 |
$0.6900 |
$1.00 |
$0.6600 |
$1.05 |
$0.6500 |
$1.06 |
$0.6700 |
$0.6500 |
| 84 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 12,000 | LF |
$0.2500 |
$0.0700 |
$0.2500 |
$0.0600 |
$0.2600 |
$0.0600 |
$0.2700 |
$0.1000 |
$0.0600 |
| 85 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 51,500 | SD |
$0.1500 |
$0.0300 |
$0.0200 |
$0.0200 |
$0.0200 |
$0.0200 |
$0.0200 |
$0.0400 |
$0.0200 |
| 86 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 24,300 | SD |
$0.5000 |
$0.1600 |
$0.0500 |
$0.1500 |
$0.0500 |
$0.1500 |
$0.0500 |
$0.1700 |
$0.1500 |
| 87 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 37,250 | SD |
$1.00 |
$0.2100 |
$0.0500 |
$0.2000 |
$0.0500 |
$0.2000 |
$0.0500 |
$0.2200 |
$0.2000 |
| 88 | 880(C) 8836 |
CONSTRUCTION BARRICADES(TYPE II) | 14,000 | SD |
$0.1500 |
$0.0300 |
$0.0500 |
$0.0200 |
$0.0500 |
$0.0200 |
$0.0500 |
$0.0400 |
$0.0200 |
| 89 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 20,000 | SD |
$0.3000 |
$0.0300 |
$0.0500 |
$0.0200 |
$0.0500 |
$0.0200 |
$0.0500 |
$0.0400 |
$0.0200 |
| 90 | 880(C) 8848 |
WING BARRICADES | 2,920 | SD |
$1.00 |
$0.0300 |
$1.00 |
$0.0200 |
$1.05 |
$0.0200 |
$1.06 |
$0.0400 |
$0.0200 |
| 91 | 880(D) 8854 |
VERTICAL PANELS | 75,000 | SD |
$0.3500 |
$0.0300 |
$0.2000 |
$0.0200 |
$0.2100 |
$0.0200 |
$0.2100 |
$0.0300 |
$0.0200 |
| 92 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 78,820 | SD |
$0.1000 |
$0.0300 |
$0.0500 |
$0.0200 |
$0.0500 |
$0.0200 |
$0.0500 |
$0.0300 |
$0.0200 |
| 93 | 880(E) 8872 |
WARNING LIGHTS(TYPE C) | 102,000 | SD |
$0.1000 |
$0.0300 |
$0.0200 |
$0.0200 |
$0.0200 |
$0.0200 |
$0.0200 |
$0.0300 |
$0.0200 |
| 94 | 880(F) 8878 |
DRUMS | 27,000 | SD |
$0.1500 |
$0.0300 |
$0.2000 |
$0.0200 |
$0.2100 |
$0.0200 |
$0.2100 |
$0.0400 |
$0.0200 |
| 95 | 880(G) 8890 |
CHANNELIZER CONES | 37,500 | SD |
$0.1500 |
$0.0300 |
$0.2000 |
$0.0200 |
$0.2100 |
$0.0200 |
$0.2100 |
$0.0400 |
$0.0200 |
| 96 | 804(A) 2915 |
STRUCTURAL CONCRETE | 1.54 | CY |
$350.00 |
$318.00 |
$400.00 |
$303.00 |
$420.00 |
$310.00 |
$425.47 |
$330.00 |
$300.00 |
| 97 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 117 | SF |
$12.00 |
$23.30 |
$12.50 |
$22.20 |
$12.60 |
$22.00 |
$12.76 |
$24.00 |
$22.00 |
| 98 | 851(C) 8327 |
2 1/4" SQUARE TUBE POST | 299 | LF |
$10.00 |
$6.90 |
$8.25 |
$6.60 |
$8.40 |
$6.50 |
$8.51 |
$7.00 |
$6.50 |
| 99 | 853 9051 |
DELINEATORS(TYPE 2, CODE 1, FLEXIBLE) | 48 | EA |
$10.00 |
$40.25 |
$36.00 |
$38.40 |
$36.75 |
$38.00 |
$37.23 |
$40.00 |
$38.00 |
| 100 | 855(A) 8812 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 117,500 | LF |
$0.4000 |
$0.2700 |
$0.3000 |
$0.2500 |
$0.2900 |
$0.2500 |
$0.3000 |
$0.5200 |
$0.2500 |
| 101 | 855(B) 8818 |
TRAFFIC STRIPE(PLASTIC)(ARROWS) | 10 | EA |
$80.00 |
$80.00 |
$100.00 |
$75.75 |
$84.00 |
$75.00 |
$85.10 |
$800.00 |
$75.00 |
| 102 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$55,000.00 |
$56,000.00 |
$60,000.00 |
$31,565.00 |
$60,000.00 |
$59,700.00 |
$75,000.00 |
$58,000.00 |
$52,400.00 |
| 103 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$6,500.00 |
$1,500.00 |
$1,000.00 |
$7,965.00 |
$4,000.00 |
$4,000.00 |
$5,000.00 |
$1,000.00 |
$6,000.00 |
| 104 | 640(A) 1426 |
FIELD OFFICE | 1 | EA |
$6,500.00 |
$1,500.00 |
$7,500.00 |
$13,225.00 |
$6,000.00 |
$7,500.00 |
$3,500.00 |
$8,000.00 |
$10,000.00 |
| 105 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$393,974.00 |
$298,000.00 |
$100,000.00 |
$207,146.18 |
$167,000.00 |
$170,000.00 |
$440,000.00 |
$250,000.00 |
$418,587.50 |