| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Nov 7, 2025 | 46669 | VariousDistrict 6 | Removing and replacing damaged raised reflective pavement and markers and/or lenses throughout District 6. | — | Executed | |||
| Nov 7, 2025 | 46944 | WhitesideDistrict 2 | Bridge deck replacement and other brige repairs to structure SN 098-3751 in Whiteside County. | — | Executed | Martin & Company Excavating $1,029,566 · | ||
| Nov 7, 2025 | 61J54 | DuPageDistrict 1 | Extension of the west branch of DuPage River Trail from Gary's Mill Road to an existing trail within the West DuPage Woods Forest Preserve. | — | Executed | Lorig Construction Company $6,927,969 · | ||
| Nov 7, 2025 | 61J94 | CookDistrict 1 | Construct a shared-use path adjacent to Meacham Road, from IL 72 to American Lane, and adjacent to Golf Road from Meacham Road to Roosevelt Boulevard in Schaumburg. | — | Executed | A Lamp Concrete Contractors, Inc. $997,000 · | ||
| Nov 7, 2025 | 61L43 | CookDistrict 1 | HMA resurfacing on Woodfield Road from Plum Grove Road to Meacham Road in Schaumburg. Includes; HMA full depth patching, curb and gutter, sidewalks, shared use path, traffic signal modifications, and lighting. | — | Executed | K-Five Construction Corporation $5,837,039 · | ||
| Nov 7, 2025 | 61L57 | DuPageDistrict 1 | Resurfacing Stonebridge Boulevard from Sheffer Road to Indian head Road, and from Sheffer Road to Eola Road in Aurora. | — | Executed | K-Five Construction Corporation $1,786,248 · | ||
| Nov 7, 2025 | 61L73 | WillDistrict 1 | Extension of Old Renwick Road Trial from the DuPage River to West Renwick Road. | — | Executed | D. Construction, Inc. $352,856 · | ||
| Nov 7, 2025 | 61L76 | CookDistrict 1 | Resurfacing and pedestrian safety improvements at the intersection of 9th Ave. at Van Buren Street, and at Quiney Street in Maywood. | — | Executed | Davis Concrete Construction Co. $298,167 · | ||
| Nov 7, 2025 | 61L77 | CookDistrict 1 | Construct PCC Sidewalks along Center Avenue from Maple Avenue to Laurel Avenue. Includes: ADA Ramps, curb and gutter, landscaping, pavement markings and driveways. | — | Executed | Triggi Construction, Inc. $359,832 · | ||
| Nov 7, 2025 | 61L78 | DuPageDistrict 1 | Resurfacing Rober Palmer Drive from North York Street to South York Street in Elmhurst. | — | Executed | A Lamp Concrete Contractors, Inc. $1,308,888 · | ||
| Nov 7, 2025 | 61L79 | DuPageDistrict 1 | HMA resurfacing on Lambert Road from the South Village limits to IL 38 in Glen Ellyn. Includes; pavement patching, curb and gutter, sidewalks, ADA ramps, and q traffic signal maintenance. | — | Executed | K-Five Construction Corporation $1,759,309 · | ||
| Nov 7, 2025 | 61L80 | DuPageDistrict 1 | Resurfacing Riford Road from St. Harles Road to Crescent Boulevard in Glen Ellyn. | — | Executed | Schroeder Asphalt Services, Inc. $603,175 · | ||
| Nov 7, 2025 | 61L82 | CookDistrict 1 | Construction of a three-span cast-in-place RC slab bridge to carry 21st Street over Addison Creek in Broadview. Includes; full depth HMA pavement, sidewalk, curb and gutter, storm sewer, and lighting. | — | Executed | Dunnet Bay Construction Company $2,582,436 · | ||
| Nov 7, 2025 | 61L83 | LakeDistrict 1 | HMA resurfacing on Oak Spring Road from Appley Avenue to St. Mary's Road in Libertyville. Includes; pavement pathcing, ADA ramps, and signage. | — | Executed | Peter Baker & Son Co. $774,012 · | ||
| Nov 7, 2025 | 61L88 | McHenryDistrict 1 | Construct a four-span RC slabl bridge to carry Allendale Road over Nippersink C Creek. Includes HMA pavement, and guardrail. | — | Executed | Dunnet Bay Construction Company $5,134,451 · | ||
| Nov 7, 2025 | 61L92 | CookDistrict 1 | Rehabilitation of Devon Avenue from Lincoln Avenue to McCormick Boulevard in Lincolnwood. Includes; HMA resurfacing, curb and gutter, sidewalks, lighting, parkway ebhancements and water main. | — | Executed | Capitol Cement Co., Inc. $5,462,909 · | ||
| Nov 7, 2025 | 61L97 | KaneDistrict 1 | HMA resurfacing on Spruce and E. Main Street from Gilbert Street to Kenyon Road in South Elgin. Includes; curb and gutter, drainage, parkway restoration, patching, replacment of pedestrian push buttons and detector loops. | — | Executed | Everlast Blacktop Inc. $763,936 · | ||
| Nov 7, 2025 | 61L98 | CookDistrict 1 | Reconstruction and HMA resurfacing of shoenbeck Road from US 12 to Camp McDonald Road in Mount Prospect. Includes; sidewalks, ADA ramps, pedestrian signals, driveways, storm sewers, and curb and gutter. | — | Executed | PirTano Construction Co., LLC $1,778,510 · | ||
| Nov 7, 2025 | 62R51 | WillDistrict 1 | (3,400-Ft) Intersection Improvement (channelization, pavement widening, resurfacing),traffic signal Installation at railroad crossing, traffic signal modernization, Interconnect, minor lighting improvements, drainage Improvements (including new storm sewer at Monee Maintenance Yard), Location: IL 50 (Cicero Avenue) at Dralle Road, at Governors Hwy and at Monee Maintenance Yard, located withing the Villages of University Park and Monee. | — | Executed | Iroquois Paving Corporation $3,192,530 · | ||
| Nov 7, 2025 | 62R63 | CookDistrict 1 | (2,891-Ft) Bridge Replacement Project. lighting, traffic signals and ADA improvements for structure (SN 016-0834) for I-94 (Edens Expressway) at Devon Avenue (Overhead) in the City of Chicago and the Village of Lincolnwood within Cook County. | — | Executed | Dunnet Bay Construction Company $15,646,955 · | ||
| Nov 7, 2025 | 62U41 | CookDistrict 1 | (481-Ft) Bridge Replacement Project, bridge approach slab replacement for Structure Number (016-2068), lighting, traffic signal modernization, ADA improvement, resurfacing, I-290 at Keeler Avenue. | — | Executed | Lorig Construction Company $22,596,336 · | ||
| Nov 7, 2025 | 62Y00 | WillDistrict 1 | Building demolition for eleven (11) residential and/or commercial parcels and outbuildings The work consists of building demolition for eleven (11) residential and/or commercial parcels and outbuildings. Each parcel removal will include removing any structure above and below the ground, including the main building frames, attached and detached buildings, facilities, and filling of basements, removal of fences, sidewalks and driveways, utilities, and trees within the parcels' limits. Interim grading and seeding. The project located in the City of Joliet, in the vicinity of FAI Route 80 | — | Executed | C & D Recycling Services, Inc. $346,900 · | ||
| Nov 7, 2025 | 62Y33 | VariousDistrict 1 | The installing new signs, removal, relocation and repair of existing signs Project consist of the installing new signs, removal, relocation and repair of existing signs. Location of the project is in various counties in District 1. | — | Executed | ROADSAFE TRAFFIC SYSTEMS, INC. $484,900 · | ||
| Nov 7, 2025 | 62Y36 | VariousDistrict 1 | The intent of this contract is to provide prompt repair to the high-tension cable barrier median system. This work includes removing and replacing damaged high tension cable barrier system components. This work is located on various State maintained routes in Various Counties. | — | Executed | Fence Masters, Inc. $857,222 · | ||
| Nov 7, 2025 | 64U80 | HenryDistrict 2 | 9 miles of intermittent resurfacing from IL 81 to culvert #1083 .25 miles South of I-80 ramps. | — | Executed | Advanced Asphalt Company $342,730 · | ||
| Nov 7, 2025 | 64U82 | HenryDistrict 2 | 9 miles of intermittent resurfacing along Atkinson Rd. from IL 92 to Atkinson and on I-80 ramps south of Atkinson. | — | Executed | Advanced Asphalt Company $529,895 · | ||
| Nov 7, 2025 | 64U87 | HenryDistrict 2 | 16.6 miles of agg. shoulder repair from Woodhull to Galva along IL 17/ US 34, and IL 91 to Henry Co. line. | — | Executed | Phoenix Corporation of the Quad Cities $355,924 · | ||
| Nov 7, 2025 | 64U98 | WinnebagoDistrict 2 | Furnishing the structural steel and bearings for the bridge on FAP Route 525 over the Kishwaukee River in Cherry Valley Township, in Winnebago, IL. | — | Executed | Industrial Steel Construction, Inc. $2,988,100 · | ||
| Nov 7, 2025 | 64V05 | Rock IslandDistrict 2 | Bridge washing of SN 081-0011 carrying I-80 over the Mississippi River in Rock Island County. | — | Executed | Interstate Maintenance, Incorporated $138,300 · | ||
| Nov 7, 2025 | 64V06 | Rock IslandDistrict 2 | Bridge washing of SN 081-0106 carrying I-280 over the Mississippi River in Rock Island County. | — | Executed | All States Painting, Inc. $53,333 · | ||
| Nov 7, 2025 | 64V07 | CarrollRock IslandWhitesideDistrict 2 | Bridge washing of 3 structures over the Mississippi River in Carroll, Rock Island, and Whiteside Counties. | — | Executed | M & M Concrete, Inc. $112,000 · | ||
| Nov 7, 2025 | 68B60 | WarrenDistrict 4 | Rehabilitation and resurfacing of the existing pavement including vertical adjustments, curve adjustments, shoulder widening, guardrail replacement, culvert replacements and extensions, addition of turn lanes, and all other related collateral work necessary to complete the project located on US 67 (FAP 310) from south of 270th St to south of 220th St_in Monmouth. Nearly 6 mi. | — | Executed | Gunther Construction, a div of UCM, Inc. $35,946,274 · | ||
| Nov 7, 2025 | 68F45 | WoodfordDistrict 4 | Class D patching, milling and resurfacing, ADA improvements, curb and gutter removal and replacement, drainage improvements, the addition of a turn-lane, and other related collateral work on IL 117 from 600' south of Grandview Circle to Mill St in Eureka. 1.87 miles. | — | Executed | R. A. Cullinan and Son, a div of UCM, Inc. $5,074,396 · | ||
| Nov 7, 2025 | 70F19 | McLeanDistrict 5 | Mill, patch and resurface FAP 693 (ILL 9) from Hinshaw Avenue to Center Street in Bloomington, IL._Approximately 1.291 miles. | — | Executed | Rowe Construction, a div of UCM, Inc. $8,303,728 · | ||
| Nov 7, 2025 | 72508 | SangamonDistrict 6 | Tree removal and vegetation removal along I-55 from 11th Street to Stevenson Drive in Springfield. | — | Executed | Homer Tree Service, Inc. $190,542 · | ||
| Nov 7, 2025 | 72523 | CassSchuylerDistrict 6 | 1.8 miles of tree removal on US 67 / IL 100 near the Illinois River Bridge in Beardstown. | — | Executed | Freesen, a div of UCM, Inc. $765,687 · | ||
| Nov 7, 2025 | 72688 | SangamonDistrict 6 | Tree clearing and ditch grading along the IDOT access road near the Lincolnshire Subdivision, northwest of I-72 and Chatham Road in Springfield. | — | Executed | Freesen, a div of UCM, Inc. $97,470 · | ||
| Nov 7, 2025 | 72A62 | SangamonDistrict 6 | Bridge removal on I-55 / I-72, 0.1 miles south of Stevenson Drive. | — | Executed | William Charles Construction Company, LLC $1,014,537 · | ||
| Nov 7, 2025 | 74595 | CumberlandDistrict 7 | Bridge replacement on US 40 over the Embarras River, 0.5 miles east of Cumberland Road, west of Greenup. | — | Executed | Samron Midwest Contracting, Inc. $6,831,745 · | ||
| Nov 7, 2025 | 74B78 | WayneDistrict 7 | Bridge deck overlay, bridge deck repairs and approach pavement on SN 096-0010 carrying IL 15 over the Little Wabash River, 0.3 miles east of CR 2500 East. | — | Executed | C-Hill Civil Contractors, Inc. $1,592,673 · | ||
| Nov 7, 2025 | 76T66 | GreeneDistrict 8 | Structural, mechanical and electrical repairs to the Joe Page Bridge in Hardin. (SN 031-0001) | — | Rejected | Keeley & Sons, Inc. and Wissehr Electric, Inc. JV $22,242,413 · | ||
| Nov 7, 2025 | 76U47 | VariousDistrict 8 | Bridge deck sealing on various bridges in Calhoun, Greene and Jersey Counties in District 8. | — | Executed | M & M Concrete, Inc. $43,640 · | ||
| Nov 7, 2025 | 76U48 | VariousDistrict 8 | Bridge deck sealing on various bridges in Bond, Clinton, Marion, and Washington Counties in District 8. | — | Executed | All States Painting, Inc. $274,243 · | ||
| Nov 7, 2025 | 76U50 | MonroeRandolphDistrict 8 | Bridge deck sealing on various bridges in Monroe and Randolph Counties in in District 8. | — | Executed | All States Painting, Inc. $56,364 · | ||
| Nov 7, 2025 | 76U64 | VariousDistrict 8 | Litter removal - IL 100 from Norman-s Landing to US 67; US 67 from IL 100 to IL 143; I-270 from the Mississippi River to IL 3; I-70 from the Mississippi Riv River to I-55/64; I-55/64 from the Mississippi River to I-70; I-255 from the Mississippi River to IL 3. | — | Executed | The Final Connection, Inc. $76,044 · | ||
| Nov 7, 2025 | 78209 | WilliamsonDistrict 9 | Replacement of SN 100-0031 carrying IL 166 over Sugar Creek at the east corporate limits of Creal Springs. | — | Executed | Samron Midwest Contracting, Inc. $2,526,591 · | ||
| Nov 7, 2025 | 78813 | PerryDistrict 9 | 1.6 miles of milling, resurfacing, shoulder work, culvert replacement and patching on IL 14 from US 51 in DuQuoin to Old Route 14. | — | Executed | Samron Midwest Contracting, Inc. $2,731,937 · | ||
| Nov 7, 2025 | 78994 | FranklinDistrict 9 | Adjustment of a sanitary sewer forced main and the repair of two eroded downstream channels at I-57 Northbound Rend Lake Rest Area. | — | Executed | Samron Midwest Contracting, Inc. $124,571 · | ||
| Nov 7, 2025 | 78B23 | FranklinDistrict 9 | Replacement of SN 028-7049 on IL 14, 1 mile east of Benton. | — | Executed | Samron Midwest Contracting, Inc. $758,456 · | ||
| Nov 7, 2025 | 78B42 | UnionDistrict 9 | Installation of culvert liners at various locations along I-57 in District 9 (SN 091-7066, 091-7071, 091-7072, 091-7073 and 091-7077). | — | Executed | Samron Midwest Contracting, Inc. $1,423,409 · | ||
| Nov 7, 2025 | 78B54 | JacksonDistrict 9 | Resurfacing Sweets Drive from Reed Station Road to 0.5 miles west of Reed Station Road in Carbondale. | — | Executed | E. T. Simonds Construction Company $175,469 · | ||
| Nov 7, 2025 | 78B64 | VariousDistrict 9 | Bridge deck concrete sealing on various bridges in Alexander, Johnson, Massac, Pulaski and Union Counties. | — | Executed | M & M Concrete, Inc. $396,418 · | ||
| Nov 7, 2025 | 78B74 | WilliamsonDistrict 9 | Patching on IL 166 from IL 13 to Tune Road east of Marion. | — | Executed | E. T. Simonds Construction Company $118,588 · | ||
| Nov 7, 2025 | 78B82 | VariousDistrict 9 | Painting structures on various routes in various counties: 3 in Johnson County, 7 in Union County and 2 in Williamson County. | — | Executed | Eagle Painting & Maintenance Company, Inc. $2,044,033 · | ||
| Nov 7, 2025 | 80B53 | CookDistrict 1 | A full bridge painting and cleaning for the BNSF Bridges (SN 016-0020) and (SN 016-0021) over FAI 55 (Stevenso This improvement consists of a full bridge painting and cleaning for the BNSF Bridges (SN 016-0020) and (SN 016-0021) over FAI 55 (Stevenson Expressway) in the City of Chicago and Cook County. | — | Executed | Eagle Painting & Maintenance Company, Inc. $1,180,528 · | ||
| Nov 7, 2025 | 80B69 | CookDistrict 1 | Full Arterial Cleaning Cycle, Supplemental Sweeping including pickup, removal and satisfactory disposal of lim The project consists of Full Arterial Cleaning Cycle, Supplemental Sweeping including pickup, removal and satisfactory disposal of limbs, sticks, leaves, stones, dirt, weeds, debris, deceased animal carcasses, refuse, litter on various State maintained arterial routes located within the northern half of Cook County. | — | Executed | Berger Excavating Contractors, Inc. d/b/a Berger Contractors, Inc. $4,622,500 · | ||
| Nov 7, 2025 | 80B70 | DuPageDistrict 1 | Arterial Cleaning, Supplemental Sweeping shall consist of the pickup, removal and satisfactory disposal of lim The project consists of Arterial Cleaning, Supplemental Sweeping shall consist of the pickup, removal and satisfactory disposal of limbs, sticks, leaves, sand stones, dirt, weeds, debris, deceased animal carcasses, refuse, litter and any other rubbish which has accumulated on the highway areas located on various State maintained arterial routes within DuPage County. | — | Executed | Central Sweeping of Illinois, LLC $2,013,220 · | ||
| Nov 7, 2025 | 80B71 | CookDistrict 1 | Arterial Cleaning, Supplemental Sweeping shall consist of the pickup, removal and satisfactory disposal of lim This project consists of Arterial Cleaning, Supplemental Sweeping shall consist of the pickup, removal and satisfactory disposal of limbs, sticks, leaves, sand stones, dirt, weeds, debris, deceased animal carcasses, refuse, litter and any other rubbish which has accumulated on the highway areas located on various State maintained arterial routes located within southern half of Cook County. | — | Executed | Central Sweeping of Illinois, LLC $4,010,755 · | ||
| Nov 7, 2025 | 80B72 | WillDistrict 1 | Arterial Cleaning, Supplemental Sweeping shall consist of the pickup, removal and satisfactory disposal of lim This project consists of Arterial Cleaning, Supplemental Sweeping shall consist of the pickup, removal and satisfactory disposal of limbs, sticks, leaves, sand stones, dirt, weeds, debris, deceased animal carcasses, refuse, litter and any other rubbish which has accumulated on the highway areas located on various State maintained arterial routes located within the county of Will. | — | Executed | Central Sweeping of Illinois, LLC $1,303,855 · | ||
| Nov 7, 2025 | 80B73 | CookDistrict 1 | GRAFFITI REMOVAL and shall consist of removing graffiti from the surfaces on State DOT right of way located on The project consists of GRAFFITI REMOVAL and shall consist of removing graffiti from the surfaces on State DOT right of way located on the inbound and outbound mainlines and ramps of the Kennedy (I-90/94), Dan Ryan (I-90/94), Bishop Ford (I-94), the Stevenson (I-55), and I-57 Expressways in Cook County. | — | Executed | ERA-Valdivia Contractors, Inc. $1,110,000 · | ||
| Nov 7, 2025 | 85779 | WhitesideDistrict 2 | Replace the bridge carrying East 11th Street over the Illinois-Mississippi Feeder Canal and re-align the canal's parallel path, in Rock Falls. | — | Executed | Martin & Company Excavating $1,699,166 · | ||
| Nov 7, 2025 | 85783 | HenryDistrict 2 | Construction of PCC Sidewalk along Lake Street in Kewanee. Includes: storm sewer, PCC entrances, HMA pavement, and seeding. | — | Executed | Advanced Asphalt Company $535,939 · | ||
| Nov 7, 2025 | 85785 | Rock IslandDistrict 2 | Construction of a PCC shared-use path along 19th Street and 27th Street from Avenue of the Cities to 36th Avenue in Moline. Includes; curb and gutter, storm sewer, and traffic signal improvements. | — | Executed | Gensini Excavating, Inc. $5,092,254 · | ||
| Nov 7, 2025 | 87843 | DeKalbDistrict 3 | Construction of HMA multi-use trail from Old Mill Park to Pleasant Street in Sycamore. Includes a prefabricated pedestrian bridge with boardwalk and concrete approach pavement, storm sewer, and signage. | — | Executed | Martin & Company Excavating $1,580,482 · | ||
| Nov 7, 2025 | 87889 | DeKalbDistrict 3 | Construct a three-span PPC deck beam bridge to carry Pratt Road over Somonauk Creek in Sandwich. | — | Executed | D. Construction, Inc. $1,441,346 · | ||
| Nov 7, 2025 | 87890 | FordDistrict 3 | Replace the bridge carrying Clarence Road over Sugar Creek, 0.01 mile south of IL 9 | — | Executed | Tobey's Construction & Cartage, Inc. $679,036 · | ||
| Nov 7, 2025 | 87891 | FordDistrict 3 | Replace the bridge carrying Gallahue Road over an un-named stream, 0.1 mile northeast of N 1200 E Road. | — | Executed | Tobey's Construction & Cartage, Inc. $637,458 · | ||
| Nov 7, 2025 | 89832 | TazewellDistrict 4 | Guardrail replacement on various routes in Tazewell, Peoria and Woodford Counties. Includes, curb and gutter, and pedestrian railing. | — | Executed | Lovewell Fencing, Inc. $2,498,941 · | ||
| Nov 7, 2025 | 89872 | PeoriaDistrict 4 | Intersection improvements at Northmoor Road and University Street in Peoria. Includes; full-depth HMA, traffic signals, lighting, and storm sewer. | — | Executed | Otto Baum Company, Inc. $5,897,500 · | ||
| Nov 7, 2025 | 93843 | MenardDistrict 6 | Widening and HMA resurfacing of Kent Street to Ingram Street west of Athens. Includes; aggregate shoulders, and pipe culverts. | — | Executed | L. W. Rouland Trucking Service, Inc. $2,121,212 · | ||
| Nov 7, 2025 | 93846 | LoganDistrict 6 | Replace PCC deck beams on a three-span structure carrying CH 24 over Prairie Creek, 5 miles South of San Jose. | — | Executed | County Contractors, Inc. $474,620 · | ||
| Nov 7, 2025 | 93847 | PikeDistrict 6 | HMA Resurfacing on N. Monroe Street, E. Adams Street, and Madison Street in Pittsfield. Includes; watermain, sidewalk, ADA ramps, storm sewer, and Lighting. | — | Executed | Rees Construction Company of Quincy $5,451,649 · |
1–72 of 72
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.