| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Apr 25, 2025 | 78A99 | SalineDistrict 9 | 5.5 miles of resurfacing on IL 13 from Lindale Road to the Gallatin County line. | — | Executed | E. T. Simonds Construction Company $2,299,898 · | ||
| Apr 25, 2025 | 78B07 | AlexanderDistrict 9 | 4.7 miles of resurfacing on IL 3 from Twente Crossing Road, 1.5 miles north of Olive Branch, to the UP Railroad in Thebes. | — | Executed | E. T. Simonds Construction Company $1,463,916 · | ||
| Apr 25, 2025 | 78B08 | JeffersonDistrict 9 | 3.5 miles of HMA resurfacing on IL 37 from County Road 1500N outside of Mt. Vernon to SN 041-0039 carrying IL 37 over the Norfolk Southern Railroad. | — | Executed | E. T. Simonds Construction Company $2,371,499 · | ||
| Apr 25, 2025 | 78B09 | GallatinSalineWhiteDistrict 9 | 2.4 miles of HMA removal, pavement overlay, shoulder work and guardrail improvements on US 45 beginning 0.7 miles southwest of the Saline/Gallatin County line and proceeding northeast 2.4 miles. | — | Executed | E. T. Simonds Construction Company $1,208,977 · | ||
| Apr 25, 2025 | 78B10 | WilliamsonDistrict 9 | 1.5 miles of resurfacing and patching on Moellers Road from IL 13 to Pittsburg Road. | — | Executed | Samron Midwest Contracting, Inc. $526,107 · | ||
| Apr 25, 2025 | 78B11 | JeffersonDistrict 9 | 0.8 miles of resurfacing on IL 15 in Mt. Vernon. | — | Executed | E. T. Simonds Construction Company $963,345 · | ||
| Apr 25, 2025 | 78B12 | WilliamsonDistrict 9 | 3.2 miles of HMA surface removal, HMA surfacing and patching on Old IL 13 from the east city limits of Carterville to IL 148. | — | Executed | E. T. Simonds Construction Company $974,757 · | ||
| Apr 25, 2025 | 78B14 | FranklinDistrict 9 | 5.7 miles of HMA surface removal, resurfacing, patching and shoulder work on IL 184 from IL 14 in Mulkeytown to IL 149 north of Royalton. | — | Executed | E. T. Simonds Construction Company $1,642,992 · | ||
| Apr 25, 2025 | 78B15 | HardinDistrict 9 | 15.1 miles of milling and resurfacing on IL 146 from the Pope County line to IL 1. | — | Executed | Samron Midwest Contracting, Inc. $2,988,051 · | ||
| Apr 25, 2025 | 78B17 | AlexanderPulaskiDistrict 9 | Patching on I-57 from the Mississippi River Bridge near Cairo to 1 mile north of Mounds Road interchange in both lanes (13.3 miles) and from 1 mile north of Mounds Road interchange to Pulaski Road. | — | Executed | Kinney Contractors, Inc. $1,168,552 · | ||
| Apr 25, 2025 | 78B25 | PerryDistrict 9 | 6.5 miles of patching on US 51 from IL 154 to 2.5 miles south of the Washington County line. | — | Executed | E. T. Simonds Construction Company $521,745 · | ||
| Apr 25, 2025 | 99727 | JacksonDistrict 9 | HMA resurfacing on South Wall Street from East park Street to East Main Street in Carbondale. Includes; ADA improvements and Storm Sewers. | — | Executed | Samron Midwest Contracting, Inc. $1,596,208 · | ||
| Jun 13, 2025 | 78399 | SalineDistrict 9 | Replacement of 3 structures: 1) SN 083-7000 carrying IL 34 over a creek 1.5 miles east of Franklin County; 2) SN 083-7001 carrying IL 34 over a creek 2.4 miles east of Franklin County; 3) SN 083-7022 carrying IL 145/34 over a creek 3.2 miles south of US 45. | — | Executed | Samron Midwest Contracting, Inc. $797,387 · | ||
| Jun 13, 2025 | 78786 | FranklinDistrict 9 | 2.3 miles of resurfacing on IL 154 from IL 37 to Fitzgerrell Park Road. Also includes replacement of SN 028-0052 over Rend Lake and construction of a multi-use path. | — | Executed | E. T. Simonds Construction Company $20,462,811 · | ||
| Jun 13, 2025 | 78831 | WilliamsonDistrict 9 | Replacement of SN 100-0053 carrying Stiritz Road (TR 23) over I-57, approximately 0.6 miles west of IL 37. | — | Executed | E. T. Simonds Construction Company $4,956,078 · | ||
| Jun 13, 2025 | 78943 | FranklinDistrict 9 | 10.5 miles of milling, patching and resurfacing on IL 14 from IL 37 in Benton to west of Happy Row Road in Macedonia. | — | Executed | E. T. Simonds Construction Company $5,779,645 · | ||
| Jun 13, 2025 | 78985 | JacksonDistrict 9 | Slope repair on SN 039-0075 carrying IL 13 over the Big Muddy River, east of IL 127 in Murphysboro. | — | Executed | Samron Midwest Contracting, Inc. $11,674,263 · | ||
| Jun 13, 2025 | 78A15 | UnionDistrict 9 | Culvert replacement (SN 091-7057) on Old US 51 west of Locust Street in Cobden. | — | Executed | Sierra Bravo Contractors, LLC $793,569 · | ||
| Jun 13, 2025 | 78A25 | JohnsonDistrict 9 | 0.6 miles of pavement patching, HMA resurfacing and ADA ramp improvements on IL 146 from 0.1 miles west of 11th Street to US 45 in Vienna. | — | Executed | Samron Midwest Contracting, Inc. $686,026 · | ||
| Jun 13, 2025 | 78A33 | WilliamsonDistrict 9 | Signal modifications, pedestrian crossings and sidewalks at the intersection of IL 13 and Halfway Road in Marion. | — | Executed | Brown Electric, Inc. $1,056,436 · | ||
| Jun 13, 2025 | 78A39 | GallatinWhiteDistrict 9 | Intersection reconstruction at the intersection of IL 1 and IL 141 near Omaha. | — | Executed | Samron Midwest Contracting, Inc. $1,697,173 · | ||
| Jun 13, 2025 | 78A72 | JeffersonDistrict 9 | 9.2 miles of patching and resurfacing on IL 15 from the Washington County line to 0.4 miles west of the Mt. Vernon west city limits. | — | Executed | E. T. Simonds Construction Company $2,283,905 · | ||
| Jun 13, 2025 | 78A78 | JacksonUnionDistrict 9 | Joint reconstruction with strip seal and modular seal on SN 039-0048 carrying IL3 over a railroad in Jackson County and joint reconstruction with strip seals on SN 091-0031carrying IL3 over the Big Muddy River in Union County. | — | Executed | E. T. Simonds Construction Company $968,450 · | ||
| Jun 13, 2025 | 78A92 | UnionDistrict 9 | Earth and furnished excavation and placement of stone riprap to repair existing slopes along Old US 51, 0.7 miles northwest of Coben. | — | Executed | Samron Midwest Contracting, Inc. $92,263 · | ||
| Jun 13, 2025 | 78A96 | JohnsonDistrict 9 | Bridge joint repair on SN 044-0033 carrying Eagle Point Road over I-24. | — | Executed | C-Hill Civil Contractors, Inc. $108,746 · | ||
| Jun 13, 2025 | 78A97 | JacksonDistrict 9 | Aggregate shoulders, earth and furnished excavation, stone riprap, pipe underdrains and erosion control blanket to repair existing slopes along IL 149 at SN 039-7036, 0.4 miles west of the Williamson County line west of Hurst. | — | Executed | Sierra Bravo Contractors, LLC $170,723 · | ||
| Jun 13, 2025 | 78B03 | JacksonDistrict 9 | Replacing 615' of pavement and shoulders on westbound IL 13 at Watson Road. | — | Executed | Samron Midwest Contracting, Inc. $1,041,511 · | ||
| Jun 13, 2025 | 78B04 | JacksonDistrict 9 | Patching on US 51 in Carbondale from Willow Street to Grand Avenue and on Mill Street from South Normal Avenue to South Illinois Avenue. | — | Executed | E. T. Simonds Construction Company $543,043 · | ||
| Jun 13, 2025 | 78B05 | JacksonDistrict 9 | Signal grounding at multiple locations on IL 149 and IL 13 in Murphysboro and Carbondale. | — | Executed | Gerstner Electric, Inc. $116,085 · | ||
| Jun 13, 2025 | 78B06 | SalineDistrict 9 | Signal replacement at the intersection of US 45 and Poplar Street in Harrisburg. | — | Executed | Brown Electric, Inc. $493,996 · | ||
| Jun 13, 2025 | 78B13 | WhiteDistrict 9 | 12.3 miles of resurfacing on US 45 from IL 14 to the Wayne County line as well as ADA upgrades in Enfield and Mill Shoals. | — | Executed | Howell Paving, Inc. $7,158,886 · | ||
| Jun 13, 2025 | 78B21 | PulaskiUnionDistrict 9 | 9.3 miles of tree removal on I-57 from the IL 146 interchange to the Perks Road overpass. | — | Executed | Sierra Bravo Contractors, LLC $880,649 · | ||
| Jun 13, 2025 | 78B22 | JacksonDistrict 9 | 0.85 miles of overlay and pavement patching on Airport Road from IL 13 to 1 mile north of IL 13, northwest of Carbondale. | — | Executed | E. T. Simonds Construction Company $297,405 · | ||
| Jun 13, 2025 | 78B31 | WilliamsonDistrict 9 | 1.1miles of pavement patching and resurfacing on IL 37 from 0.1 miles north of 18th Street to south of 4th Street in Johnston City. | — | Executed | E. T. Simonds Construction Company $685,210 · | ||
| Jun 13, 2025 | 78B32 | AlexanderDistrict 9 | 3.25 miles of pavement patching and partial structure removal on US 51 beginning 0.29 miles south of New Cross Street and proceeding south for 3.25 miles. | — | Executed | E. T. Simonds Construction Company $832,728 · | ||
| Jun 13, 2025 | 78B40 | VariousDistrict 9 | Electrical repair and/or maintenance on various routes throughout District 9. | — | Active | F. W. Electric, Inc. $230,826 · | ||
| Jun 13, 2025 | 99747 | FranklinDistrict 9 | Construction of stamped Concrete Sidewalk, street lighting system, Curb and gutter on IL 149 in West Frankfort. | — | Rejected | |||
| Jun 13, 2025 | 99750 | SalineDistrict 9 | Construction of a Roundabout at Small Street and Veterans Drive in Harrisburg. Includes PCC pavement, sidewalks, drainage, signing and lighting. | — | Executed | E. T. Simonds Construction Company $1,463,163 · | ||
| Jun 13, 2025 | 99751 | AlexanderDistrict 9 | Resurfacing on Ullin Road from IL 127 to the Pulaski County line. | — | Executed | E. T. Simonds Construction Company $742,951 · | ||
| Jun 13, 2025 | 99752 | PerryDistrict 9 | Replace the bridge carrying White Walnut Road over White Walnut Creek, 1.7 miles north of IL 154. | — | Executed | C-Hill Civil Contractors, Inc. $455,888 · | ||
| Jun 13, 2025 | 99753 | GallatinDistrict 9 | Resurfacing on Pounds Hallow Road from IL 1 to the Hardin County Line. | — | Executed | Samron Midwest Contracting, Inc. $741,652 · | ||
| Jun 13, 2025 | 99754 | PopeDistrict 9 | HMA overlay with aggregate shoulds on Bay City Road from west of Climer Road to Jones Orchard Road. | — | Executed | E. T. Simonds Construction Company $966,973 · | ||
| Jun 13, 2025 | 99756 | WilliamsonDistrict 9 | HMA Overlay with Aggregate Wedge Shoulders on Power Plant Road from County Club Road to McKinny Chapel Road. | — | Executed | E. T. Simonds Construction Company $660,852 · | ||
| Aug 1, 2025 | 78916 | WilliamsonDistrict 9 | Signal modifications, railroad interconnects and fiber optic installation on IL 37 from IL 13 to Boyton Street in Marion. | — | Executed | Gerstner Electric, Inc. $1,302,315 · | ||
| Aug 1, 2025 | 78A74 | JohnsonWilliamsonDistrict 9 | 9.5 miles of resurfacing on IL 166 from 0.1 miles south of Tune Road to US 45. Also includes ADA improvements in Creal Springs. | — | Executed | E. T. Simonds Construction Company $3,949,325 · | ||
| Aug 1, 2025 | 78B39 | VariousDistrict 9 | Repairing or replacing damaged guardrail, barrier terminals, impact attenuators, cable median barrier and fence on a work order basis throughout District 9. | — | Executed | COLLINS & HERMANN, INC. $1,540,098 · | ||
| Aug 1, 2025 | 78B73 | JohnsonDistrict 9 | Patching on IL 37 from Hunter Street to Carter Street in Cypress. | — | Executed | Samron Midwest Contracting, Inc. $106,695 · | ||
| Aug 1, 2025 | 99284 | WilliamsonDistrict 9 | Extend Ritter Road north to Grand Avenue in Herrin. | — | Executed | Samron Midwest Contracting, Inc. $2,069,759 · | ||
| Aug 1, 2025 | 99760 | WilliamsonDistrict 9 | Construction of a PCC multi-use path from the RIDES Mass Transit Center and VA Hospital along Main Street and Halfway Road in Marion. | — | Executed | Samron Midwest Contracting, Inc. $2,142,142 · | ||
| Sep 19, 2025 | 78789 | GallatinWhiteDistrict 9 | Shoulder widening, culvert replacement and culvert extensions on US 45 / IL 141 from south of TR400N to 0.1 miles south of IL 141. Project also includes pavement removal and replacement at the intersection of US 45 and IL 141. | — | Executed | Sierra Bravo Contractors, LLC $5,191,314 · | ||
| Sep 19, 2025 | 78793 | PulaskiDistrict 9 | Removal and replacement of the existing single span bridge (SN 077-0023) carrying IL 169 over Kitchel Slough, west of Karnak. | — | Executed | E. T. Simonds Construction Company $2,356,816 · | ||
| Sep 19, 2025 | 78B70 | JeffersonDistrict 9 | 1.2 miles of pavement patching on I-64 ramps at Exit 89. | — | Executed | Samron Midwest Contracting, Inc. $145,862 · | ||
| Sep 19, 2025 | 99745 | MassacDistrict 9 | Construct a 12'x 6' precast box culvert to carry Country Club Road over an unnamed creek one mile northwest of Metropolis. Includes PCC pavement and Guardrail. | — | Executed | Samron Midwest Contracting, Inc. $255,588 · | ||
| Sep 19, 2025 | 99749 | PerryDistrict 9 | Intersection reconstruction and replace the bridge carrying Greens Mark Road over Six Mile Creek, one mile west of US 51. | — | Executed | Samron Midwest Contracting, Inc. $2,286,217 · | ||
| Nov 7, 2025 | 78209 | WilliamsonDistrict 9 | Replacement of SN 100-0031 carrying IL 166 over Sugar Creek at the east corporate limits of Creal Springs. | — | Executed | Samron Midwest Contracting, Inc. $2,526,591 · | ||
| Nov 7, 2025 | 78813 | PerryDistrict 9 | 1.6 miles of milling, resurfacing, shoulder work, culvert replacement and patching on IL 14 from US 51 in DuQuoin to Old Route 14. | — | Executed | Samron Midwest Contracting, Inc. $2,731,937 · | ||
| Nov 7, 2025 | 78994 | FranklinDistrict 9 | Adjustment of a sanitary sewer forced main and the repair of two eroded downstream channels at I-57 Northbound Rend Lake Rest Area. | — | Executed | Samron Midwest Contracting, Inc. $124,571 · | ||
| Nov 7, 2025 | 78B23 | FranklinDistrict 9 | Replacement of SN 028-7049 on IL 14, 1 mile east of Benton. | — | Executed | Samron Midwest Contracting, Inc. $758,456 · | ||
| Nov 7, 2025 | 78B42 | UnionDistrict 9 | Installation of culvert liners at various locations along I-57 in District 9 (SN 091-7066, 091-7071, 091-7072, 091-7073 and 091-7077). | — | Executed | Samron Midwest Contracting, Inc. $1,423,409 · | ||
| Nov 7, 2025 | 78B54 | JacksonDistrict 9 | Resurfacing Sweets Drive from Reed Station Road to 0.5 miles west of Reed Station Road in Carbondale. | — | Executed | E. T. Simonds Construction Company $175,469 · | ||
| Nov 7, 2025 | 78B64 | VariousDistrict 9 | Bridge deck concrete sealing on various bridges in Alexander, Johnson, Massac, Pulaski and Union Counties. | — | Executed | M & M Concrete, Inc. $396,418 · | ||
| Nov 7, 2025 | 78B74 | WilliamsonDistrict 9 | Patching on IL 166 from IL 13 to Tune Road east of Marion. | — | Executed | E. T. Simonds Construction Company $118,588 · | ||
| Nov 7, 2025 | 78B82 | VariousDistrict 9 | Painting structures on various routes in various counties: 3 in Johnson County, 7 in Union County and 2 in Williamson County. | — | Executed | Eagle Painting & Maintenance Company, Inc. $2,044,033 · | ||
| Jan 16, 2026 | 78937 | JacksonDistrict 9 | Replacement of SN 039-0052 carrying US 51 over CN, IC Railroad, approximately 2.6 miles north of Desoto. | — | Executed | E. T. Simonds Construction Company $4,810,447 · | ||
| Jan 16, 2026 | 78969 | GallatinDistrict 9 | Bridge replacement on IL 13 over North Fork Saline River east of Equality. (SN 030-0015) | — | Executed | Samron Midwest Contracting, Inc. $5,635,125 · | ||
| Jan 16, 2026 | 78A09 | FranklinDistrict 9 | Drainage culvert removal and replacement on IL 148 south of 9th Street in the City of Christopher. | — | Executed | Samron Midwest Contracting, Inc. $957,763 · | ||
| Jan 16, 2026 | 78A79 | WhiteDistrict 9 | 0.6 miles of pavement, shoulder and median replacement on IL 1 at the I-64 interchange. | — | Executed | E. T. Simonds Construction Company $5,633,260 · | ||
| Jan 16, 2026 | 78B51 | GallatinDistrict 9 | 1.6 miles of resurfacing on Old Shawneetown Road / Washington Street from IL 13 to Main Street in Old Shawneetown and 0.2 miles of resurfacing on Shawneetown Road from IL 13 to Washington Street in Old Shawneetown. | — | Executed | Samron Midwest Contracting, Inc. $1,017,362 · | ||
| Jan 16, 2026 | 78B53 | PerryDistrict 9 | 6.8 miles of resurfacing and ADA ramp improvements on US 51 from 0.2 miles north of IL 154 to Raven Road. | — | Executed | E. T. Simonds Construction Company $2,709,114 · | ||
| Jan 16, 2026 | 78B63 | UnionDistrict 9 | 0.6 miles of HMA removal, pavement overlay, patching and shoulder work on Old US 51 from IL 146 to US 51. | — | Executed | E. T. Simonds Construction Company $448,302 · | ||
| Jan 16, 2026 | 78B75 | FranklinDistrict 9 | Patching on IL 37 from IL 154 to IL 14 in Benton. | — | Executed | E. T. Simonds Construction Company $576,537 · | ||
| Jan 16, 2026 | 78B78 | FranklinDistrict 9 | HMA overlay and joint repairs on SN 028-0050 and SN 028-0051 carrying IL 154 over Rend Lake. | — | Executed | Samron Midwest Contracting, Inc. $212,882 · | ||
| Jan 16, 2026 | 78B81 | VariousDistrict 9 | 14.5 miles of tree pruning on IL 145 and IL 34 south of Harrisburg. | — | Executed | Mosley Construction 1, LLC $984,650 · | ||
| Jan 16, 2026 | 78B84 | JeffersonDistrict 9 | Crack and joint sealing on I-57 from south of the north I-64 tri-level interchange to the Marion County line. | — | Executed | Complete Asphalt Service Co. $85,172 · | ||
| Jan 16, 2026 | 78B92 | FranklinDistrict 9 | 1.4 miles of slope stabilization with riprap along the IL 154 causeway over Rend Lake from Rend City Road to Fitzgerald Park Road. | — | Executed | Samron Midwest Contracting, Inc. $197,197 · | ||
| Jan 16, 2026 | 78B95 | JeffersonDistrict 9 | 1.9 miles of high-tension median cable guardrail at 3 locations on I-57 near the Dix interchange. | — | Executed | COLLINS & HERMANN, INC. $846,520 · | ||
| Jan 16, 2026 | 78C00 | VariousDistrict 9 | Weed spraying for Johnson grass along I-57 at various locations in various counties. | — | Executed | ALLEN CHASE ENTERPRISES INC. $199,890 · | ||
| Jan 16, 2026 | 78C01 | VariousDistrict 9 | Weed spraying for broadleaf weeds along I-24, I-57 and I-64 at various locations in various counties. | — | Executed | ALLEN CHASE ENTERPRISES INC. $194,172 · | ||
| Jan 16, 2026 | 78C03 | SalineDistrict 9 | Replacement of SN 083-7080 carrying Old IL 13 over an unnamed creek, 4.6 miles west of Harrisburg. | — | Executed | Sierra Bravo Contractors, LLC $449,516 · | ||
| Jan 16, 2026 | 99718 | JacksonDistrict 9 | HMA resurfacing and widening of W. Pleasant Hill Road from Union Hill Road to McLaufferty Road in Carbondale. Includes; HMA Shoulders, PCC driveways, and culverts. | — | Executed | Samron Midwest Contracting, Inc. $1,171,867 · | ||
| Jan 16, 2026 | 99742 | AlexanderDistrict 9 | Construct a four-span steel beam structure with concrete deck to carry Grapevine Trail over clear Creek, 1/2 miles east of McClure. | — | Executed | Samron Midwest Contracting, Inc. $6,077,049 · | ||
| Jan 16, 2026 | 99758 | UnionDistrict 9 | Resurfacing on Lake Road from IL 127 to West Cross Street. | — | Executed | E. T. Simonds Construction Company $1,599,584 · | ||
| Jan 16, 2026 | 99762 | JeffersonDistrict 9 | HMA Resurfacing on North Pumphouse Lane from North Tolle Lane to George Street northeast of Mount Vernon. | — | Executed | E. T. Simonds Construction Company $287,612 · | ||
| Jan 16, 2026 | 99763 | JacksonDistrict 9 | Construction of PCC multi-use trail from E. Grand Street to Lewis Lane in Carbondale. Includes; ADS Ramps, light pole relocation, and storm sewers. | — | Executed | Samron Midwest Contracting, Inc. $1,263,057 · | ||
| Feb 27, 2026 | 78967 | JacksonDistrict 9 | Replacement of SN 039-0026 carrying IL 3 over Worthen Bayou, 1.2 miles south of IL 149. | — | Executed | E. T. Simonds Construction Company $3,594,116 · | ||
| Feb 27, 2026 | 78A87 | FranklinDistrict 9 | Signal modifications, pedestrian crossings and sidewalks at the intersection of IL 14 and Central Street in West City. | — | Executed | F. W. Electric, Inc. $543,064 · | ||
| Feb 27, 2026 | 78B00 | JacksonDistrict 9 | Signal modifications on IL 13 in Carbondale from Glenview Drive to McKinney Avenue. | — | Executed | Gerstner Electric, Inc. $2,170,000 · | ||
| Feb 27, 2026 | 78B34 | JeffersonDistrict 9 | Bridge deck overlay on 3 sets of dual bridges on I-64: 1) approximately 2 miles east of IL 142, 2) at the Belle Rive interchange, 3) approximately 0.6 miles east of IL 37. (SN 041-0087, 041-0088, 041-0071, 041-0072, 041-0080, and 041-0081) | — | Executed | E. T. Simonds Construction Company $5,793,218 · | ||
| Feb 27, 2026 | 78B37 | WhiteDistrict 9 | Bridge deck overlay and repairs on IL 14 over Fox River Slough, 5 miles east of Crossville. (SN 097-0032) | — | Executed | E. T. Simonds Construction Company $600,818 · | ||
| Feb 27, 2026 | 78B38 | JacksonDistrict 9 | Bridge deck overlay s at 3 locations: 1) US 51 over Little Crab Orchard Creek, 2 miles north of Carbondale; 2) US 51 over Big Muddy River, 1.8 miles south of DeSoto; 3) IL 149 over Beaucoup Creek, 3.3 miles west of DeSoto. (SN 039-0063, 039-0064, 039-0065). | — | Executed | Samron Midwest Contracting, Inc. $1,494,455 · | ||
| Feb 27, 2026 | 78B52 | JeffersonDistrict 9 | Resurfacing on IL 37 from IL 15 to the north Mount Vernon city limits and on IL 37 from the Northfolk and Southern Railroad (SN 041-0039), 3.5 miles south of Dix, to the Marion County line. | — | Executed | E. T. Simonds Construction Company $4,988,975 · | ||
| Feb 27, 2026 | 78B58 | WilliamsonDistrict 9 | 1.9 miles of patching and resurfacing on IL 148 from 0.8 miles south of the Franklin County line to 17th Street, north of Herrin. | — | Executed | Samron Midwest Contracting, Inc. $744,591 · | ||
| Feb 27, 2026 | 78B83 | FranklinSalineDistrict 9 | Building demolition and site cleanup at 3 locations in West City, Benton and Harrisburg. | — | Executed | Samron Midwest Contracting, Inc. $338,886 · | ||
| Feb 27, 2026 | 78B91 | JacksonUnionDistrict 9 | Traffic signal modernization at 2 intersections: IL 13 and Reed Station Road; IL 146 and US 51. | — | Executed | F. W. Electric, Inc. $404,654 · | ||
| Feb 27, 2026 | 99757 | WilliamsonDistrict 9 | Construction of a roundabout intersection at Cambria Road and Cardinal Road/ Grand Avenue intersection. Work includes PCC pavement, curb and gutter, drainage improvements, lighting and other required work. , Construction of a roundabout intersection at Cambria Road and Cardinal Road/Grand Avenue intersection. Work includes PCC pavement, curb and gutter, drainage improvements, lighting and other required work. | — | Executed | Samron Midwest Contracting, Inc. $1,715,790 · | ||
| Apr 24, 2026 | 78495 | JeffersonDistrict 9 | Replacement of existing box culverts (SN 041-7065 and 041-7066) carrying IL 15 over unnamed ditches near Panzier Lane. | — | Executed | Samron Midwest Contracting, Inc. $663,975 · | ||
| Apr 24, 2026 | 78A24 | UnionDistrict 9 | Slope repair near the intersection of IL 127 and Chestnut Street in Alto Pass. | — | Executed | Samron Midwest Contracting, Inc. $654,437 · | ||
| Apr 24, 2026 | 78B36 | FranklinDistrict 9 | Joint replacement, repairs and overlay on SN 028-0020 carrying IL 14 over the Big Muddy River, east of Buckner. | — | Executed | E. T. Simonds Construction Company $1,755,135 · | ||
| Apr 24, 2026 | 78B45 | AlexanderDistrict 9 | Bridge work at 2 locations on IL 127: 1) Joint reconstruction/elimination and HMA overlay on SN 002-0033; 2) HMA overlay on SN 002-0035. | — | Executed | Samron Midwest Contracting, Inc. $664,632 · | ||
| Apr 24, 2026 | 78B46 | HamiltonDistrict 9 | Bridge deck overlay with partial and full depth patching on SN 033-0041 carrying IL 142 over Blue Creek and SN 033-0043 carrying IL 142 over Big Creek. | — | Executed | E. T. Simonds Construction Company $376,010 · |
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.