| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Jan 17, 2025 | 70A55 | VermilionDistrict 5 | 5.312 miles of pavement rehab - designed overlay resurfacing and underdrains, ramp repair 0.4 mile east of US 150-IL 1 at Tilton to the Indiana State Line. | — | Executed | Open Road Paving Company LLC $32,255,503 · | ||
| Jan 17, 2025 | 70D78 | ChampaignDistrict 5 | Bridge deck overlay and other repairs to SN 010-0208. | — | Executed | Stark Excavating, Inc. $894,984 · | ||
| Jan 17, 2025 | 70G85 | McLeanDistrict 5 | Dynamic Message Signs at various locations in Bloomington/Normal. | — | Executed | Bodine Electric of Decatur $2,995,164 · | ||
| Jan 17, 2025 | 70H37 | VariousDistrict 5 | 567.5 miles of spraying; approximately 2004 acres on State ROW along US 51 and interstate routes including interchanges in Champaign, DeWitt, McLean, Piatt, and Vermilion Counties. | — | Executed | The Daltons Inc. $188,719 · | ||
| Mar 7, 2025 | 70D55 | McLeanDistrict 5 | 10.76 miles of pavement rehab - Designed Overlay Resurfacing (INT-3rd), underdrains, patching, paving and low speed weigh in motion scale from 0.3 mile west of TR 90 (725 E Rd) south of Carlock to I-55 north of Normal (including ramps and Carlock weigh stations). | — | Executed | Rowe Construction, a div of UCM, Inc. $36,874,418 · | ||
| Mar 7, 2025 | 70F98 | EdgarDistrict 5 | HMA surface removal and resurfacing at various locations along US 150 mainline and shoulder pavement from 125' west of Lower Terre Haute Rd in Paris ,IL to a point approximately 0.3 mile west of CNRL Railroad including the Sulphur Springs Rd and Court St intersection. 2.531 miles gross length. | — | Executed | Evergreen Roadworks, LLC $6,670,718 · | ||
| Mar 7, 2025 | 70G42 | DeWittPiattVermilionDistrict 5 | Constructing push walls and slabs at the IDOT Maintenance Facilities of Clinton, Monticello, and Fithian within Dewitt, Vermilion, and Piatt Counties. | — | Executed | Big O Services, LLC $289,172 · | ||
| Mar 7, 2025 | 70G76 | VariousDistrict 5 | Bridge deck sealing of 109 structures in DeWitt, Piatt, and McLean Counties. | — | Executed | All States Painting, Inc. $188,013 · | ||
| Mar 7, 2025 | 70H32 | VermilionDistrict 5 | 1.14 miles of SMART overlay on US 136 from 0.1 mile west of Lynch Spur in Danville to Indiana State Line. | — | Executed | Cross Construction, Inc. $717,409 · | ||
| Mar 7, 2025 | 70H33 | ChampaignDistrict 5 | 6.15 miles of microsurfacing 2 pass, 0.8 mile south of Washington St in Urbana to Madison St in Philo. | — | Executed | A. C. Pavement Striping Co. $997,903 · | ||
| Mar 7, 2025 | 70H45 | McLeanDistrict 5 | Bridge deck repairs to SN's 057-0127, 057-0132, and 057-0161 in McLean County. | — | Executed | Stark Excavating, Inc. $958,366 · | ||
| Mar 7, 2025 | 70H52 | PiattDistrict 5 | 2.756 miles of Crack and Joint Sealing from Dewitt/Piatt Co Line to 1 mile E of 900E Rd W of Mansfield. | — | Executed | Complete Asphalt Service Co. $32,351 · | ||
| Mar 7, 2025 | 70H53 | DeWittDistrict 5 | 3.069 miles of Smart Resurfacing on US 51 from Tributary Long Point Creek to south of Main Street north of Clinton and north of Heritage Rd to north of Texas Church Rd south of Clinton. | — | Executed | Illinois Valley Paving, a div of UCM, Inc. $1,171,692 · | ||
| Mar 7, 2025 | 70H55 | ChampaignDistrict 5 | 0.063 mile PCC pavement patching under ICRR in Rantoul. | — | Executed | G. M. Sipes Construction, Inc. $344,184 · | ||
| Mar 7, 2025 | 91628 | McLeanDistrict 5 | Sidewalk construction and replacement, traffic improvements at various locations in Colfax. | — | Executed | Phoenix Corporation of the Quad Cities $314,690 · | ||
| Mar 7, 2025 | 91640 | McLeanDistrict 5 | Construction of an 3.9 mile Shared-use Path and parking lot along US 66 in the Village of McLean. | — | Executed | Rowe Construction, a div of UCM, Inc. $3,355,065 · | ||
| Mar 7, 2025 | 91644 | McLeanDistrict 5 | HMA Resurfacing, Widening, Curb and Gutter, and Shoulder Rumble Strips on PJ Keller Highway (CH 8) from lake Bloomington Spillway to I-55 Overpass. | — | Executed | Rowe Construction, a div of UCM, Inc. $3,188,964 · | ||
| Apr 25, 2025 | 46945 | DouglasDistrict 5 | HMA resurfacing of roadway and parking areas, striping of parking areas, culvert replacements, sign replacements, aggregate resurfacing of camp sites and hunting lots, guardrail replacement, dump station reconstruction, site lighting replacements, installation of electric vehicle charging stations, and other miscellaneous improvement items at the Walnut Point State Park (IDNR) in Douglas County. 5.1 miles gross length. | — | Executed | Feutz Contractors, Inc. $3,572,604 · | ||
| Apr 25, 2025 | 70991 | ChampaignDistrict 5 | 3.038 miles of standard overlay with ADA improvements and traffic signal modernization from Springfield Ave in Champaign to Curtis Rd in Savoy. | — | Executed | Cross Construction, Inc. $14,499,778 · | ||
| Apr 25, 2025 | 70G71 | VermilionDistrict 5 | Bridge deck overlay and other repairs to SN's 092-0058 and 092-0196. | — | Executed | Sangamo Construction Company $1,634,866 · | ||
| Apr 25, 2025 | 70H36 | ChampaignDistrict 5 | Traffic signal modernization and ADA improvements at the intersection of FAP 709 (US 136) with Murray Rd in Rantoul Township. | — | Executed | Champaign Signal and Lighting Co. a division of Evergreen Roadworks, LLC $647,450 · | ||
| Apr 25, 2025 | 70H39 | McLeanDistrict 5 | 1.62 miles SMART overlay project, NB and SB ramps at Towanda Interchange. | — | Executed | Rowe Construction, a div of UCM, Inc. $1,012,723 · | ||
| Apr 25, 2025 | 70H42 | ChampaignDistrict 5 | 9.72 miles of patching from Piatt County Line to Duncan Rd and ramps at Prairieview Rd in Mahomet. | — | Executed | Kinney Contractors, Inc. $829,326 · | ||
| Apr 25, 2025 | 70H43 | ChampaignVermilionDistrict 5 | Bridge deck overlay at Saline Branch Ditch east of Leverette; at Fountain Creek 0.2 mi south 4300 North north of East Lynn. | — | Executed | Stark Excavating, Inc. $349,587 · | ||
| Apr 25, 2025 | 70H47 | VariousDistrict 5 | Bridge Painting of 4 Structure locations on various routes in Mclean, Douglas, Dewitt and Piatt Counties. | — | Executed | Three Star Painting, Inc. $402,640 · | ||
| Apr 25, 2025 | 70H50 | DeWittDistrict 5 | Bridge deck repairs, IL-54 over Salt Creek SN 020-0020. | — | Executed | Freesen, a div of UCM, Inc. $517,733 · | ||
| Apr 25, 2025 | 70H54 | ChampaignDistrict 5 | Patching FAI 57 (I 57) at the I-72 interchange in Champaign, 1.705 miles gross. | — | Executed | Beniach Construction Co., Inc. $445,307 · | ||
| Apr 25, 2025 | 70H56 | PiattDistrict 5 | 3.81 miles of microsurfacing joint repair 1 mile east of 900E Rd to 1.3 miles west of Champaign County Line. | — | Executed | Beniach Construction Co., Inc. $345,053 · | ||
| Apr 25, 2025 | 91650 | VermilionDistrict 5 | HMA shoulders with rumble strips on Perrysville Road from Brewer Road to the Indiana State Line. | — | Executed | Cross Construction, Inc. $1,720,330 · | ||
| Apr 25, 2025 | 91654 | VermilionDistrict 5 | Sidewalk replacement along Jefferson Street and Walnut Street in Westville. | — | Executed | SNC Construction, Inc. $273,470 · | ||
| Jun 13, 2025 | 70E30 | EdgarDistrict 5 | Parking improvement at Paris D5 Headquarters. | — | Executed | McCarthy Improvement Company $1,111,995 · | ||
| Jun 13, 2025 | 70H64 | VariousDistrict 5 | On-call lighting repairs in the District West field areas consisting of DeWitt, McLean, and Piatt Counties. | — | Executed | |||
| Jun 13, 2025 | 70H65 | VariousDistrict 5 | East Field area lighting repairs in Champaign, Vermilion, Edgar, and Douglas Counties. | — | Executed | Champaign Signal and Lighting Co. a division of Evergreen Roadworks, LLC $354,350 · | ||
| Jun 13, 2025 | 70H67 | VariousDistrict 5 | District-wide on-call tree removal. | — | Executed | CSD Environmental Services, Inc. $182,500 · | ||
| Jun 13, 2025 | 91631 | EdgarDistrict 5 | Construction of a three-span steel beam structure with concrete deck to carry CH 16 over Flemington Tributary in Edgar County. Includes HMA approach pavement and traffic barrier terminals. | — | Executed | Big O Services, LLC $1,648,370 · | ||
| Jun 13, 2025 | 91657 | DeWittDistrict 5 | Guardrail improvements at various locations in DeWitt County | — | Executed | Lovewell Fencing, Inc. $1,235,769 · | ||
| Jun 13, 2025 | 91756 | McLeanDistrict 5 | Roadway reconstruction and new multi-use path on West College Avenue from West of the Norfolk Southern Railroad to White Oak Street in Normal. | — | Executed | Rowe Construction, a div of UCM, Inc. $1,506,116 · | ||
| Aug 1, 2025 | 70024 | PiattDistrict 5 | Remove and construct superstructures on SN 074-0069 (EB) and SN 074-0070 (WB) carrying FAI 72 over the Norfolk Southern Railway to rehabilitate the structures and replace approach pavements. | — | Executed | Stark Excavating, Inc. $8,849,135 · | ||
| Aug 1, 2025 | 91653 | McLeanDistrict 5 | Reconstruction and re-alignment of Hamilton Road from west of Bunn Street to existing Hamilton Road at Commerce Parkway, and reconstruction of Rhodes Lane from Hamilton Road to Morrissey Drive in Bloomington. | — | Executed | Rowe Construction, a div of UCM, Inc. $16,110,130 · | ||
| Sep 19, 2025 | 70C33 | McLeanDistrict 5 | 0.88 miles of drainage improvements at the intersection of and along US 136 and IL 54, 2.0 miles SW of Bellflower. | — | Executed | Phoenix Corporation of the Quad Cities $1,043,581 · | ||
| Sep 19, 2025 | 70D66 | VermilionDistrict 5 | Staged removaland replacement of dual structures (SN's 092-001 and 092-002) on I-74 at Stony Creek. | — | Executed | Stark Excavating, Inc. $7,049,795 · | ||
| Sep 19, 2025 | 70F21 | McLeanDistrict 5 | 3P Policy, Designed Overlay, ADA improvements, curb and gutter, and traffic signal replacement on IL 9 from west of Towanda Ave to Carnahan Dr east of Bloomington; and on Hershey Rd from Lamon Dr to Castleton Dr in Bloomington. Gross length of 2.189 mi. | — | Executed | Rowe Construction, a div of UCM, Inc. $23,522,450 · | ||
| Sep 19, 2025 | 70H51 | McLeanDistrict 5 | Replacing light towers and poles with aluminum poles and LED lighting on US 51 from I-74 to Filbert Rd. | — | Executed | Champaign Signal and Lighting Co. a division of Evergreen Roadworks, LLC $869,829 · | ||
| Nov 7, 2025 | 70F19 | McLeanDistrict 5 | Mill, patch and resurface FAP 693 (ILL 9) from Hinshaw Avenue to Center Street in Bloomington, IL._Approximately 1.291 miles. | — | Executed | Rowe Construction, a div of UCM, Inc. $8,303,728 · | ||
| Jan 16, 2026 | 70E65 | PiattDistrict 5 | Bridge deck overlay IL-32 over the Sangamon River 4.3 miles south of Cisco (SN 074-3171). | — | Executed | Sangamo Construction Company $1,304,781 · | ||
| Jan 16, 2026 | 70F93 | McLeanDistrict 5 | Bridge deck overlay at Mackinaw River 2 miles southwest of Lexington and at Turkey Creek 1.5 miles southwest of Lexington on I-55. | — | Executed | Stark Excavating, Inc. $6,136,985 · | ||
| Jan 16, 2026 | 70H59 | ChampaignDistrict 5 | Bridge Painting of 7 Structures on FAI 74 / (I-74) in Champaign County. | — | Executed | ERA-Valdivia Contractors, Inc. $2,340,051 · | ||
| Jan 16, 2026 | 70H79 | McLeanDistrict 5 | 88.7 miles of Litter removal along interstate right-of-ways in McLean County. | — | Executed | Thor General Contracting LLC $70,676 · | ||
| Jan 16, 2026 | 70H80 | ChampaignDistrict 5 | 75.3 miles of Litter removal along interstate right-of-ways in Champaign County. | — | Executed | Thor General Contracting LLC $60,155 · | ||
| Jan 16, 2026 | 70H84 | VariousDistrict 5 | 567.5 miles of weed spraying; approximately 2,004 acres on state ROW along US 51 and interstate routes including interchanges in Champaign, Dewitt, McLean, Piatt, and Vermilion Counties. | — | Executed | ALLEN CHASE ENTERPRISES INC. $149,012 · | ||
| Jan 16, 2026 | 91642 | ChampaignDistrict 5 | Pavement reconstruction, shared-use path, and traffic signal modernization on Mattis Avenue from Windsor Drive to Curtis Road in Champaign. | — | Executed | William Charles Construction Company, LLC $8,453,514 · | ||
| Feb 27, 2026 | 70D72 | McLeanDistrict 5 | Culvert replacement at ditch 0.4 mile south of US 136 in Heyworth. | — | Executed | Stark Excavating, Inc. $684,610 · | ||
| Feb 27, 2026 | 70F37 | McLeanDistrict 5 | Bridge deck overlay and other repairs to SN 057-0163, SN 057-0164 over Money Creek, and 057-0162 over I-55. 487.42 gross feet. | — | Executed | Stark Excavating, Inc. $7,331,185 · | ||
| Feb 27, 2026 | 70F77 | McLeanDistrict 5 | Remove and construct bridge decks on two structures SN 057-0154 (SB) and 057-0155 (NB) carrying FAI 55 over US 136 in McLean County. | — | Executed | Stark Excavating, Inc. $6,845,494 · | ||
| Feb 27, 2026 | 70H61 | ChampaignDistrict 5 | Bridge beam replacement and pier repair to S.N. 010-0220 at Salt Fork River 1 milew north of St. Joseph. | — | Executed | Stark Excavating, Inc. $414,045 · | ||
| Feb 27, 2026 | 70H62 | DouglasEdgarDistrict 5 | Bridge deck repairs to S.N. 021-0049 and S.N. 023-0026 carrying FAP 820 (IL-130) and FAP 836 IL-49 in Douglas and Edgar Counties. | — | Executed | Sangamo Construction Company $926,892 · | ||
| Feb 27, 2026 | 70H66 | McLeanDistrict 5 | Bridge deck sealing of 63 structures in McLean County. | — | Executed | M & M Concrete, Inc. $149,515 · | ||
| Feb 27, 2026 | 70H81 | ChampaignDistrict 5 | 2.11 miles of median cable improvements on I-74 from 0.3 miles west of County Rd 2500E to Market St in Ogden. | — | Executed | COLLINS & HERMANN, INC. $501,796 · | ||
| Feb 27, 2026 | 91660 | McLeanDistrict 5 | Resurfacing, aggregate shoulders and guardrail improvement on CH 7 from IL 165 to IL 9. | — | Executed | Rowe Construction, a div of UCM, Inc. $2,213,052 · | ||
| Apr 24, 2026 | 70574 | McLeanDistrict 5 | Remove and replace existing structure SN 057-0077 on FAP 693 IL. 9 with proposed SN 057-2043. This project is located over a stream, 8.8 mile east of ILL 165, beginning at Station 1646+93.90 and ending at Station 1647+47.10. | — | Executed | Stark Excavating, Inc. $786,020 · | ||
| Apr 24, 2026 | 70E14 | McLeanDistrict 5 | SMART/Standard Overlay resurfacing project on FAI-74 from 0.4 mi E of US 51 Bus S of Bloomington to CH 36 (700 N Rd) at Downs. Approximately 7.08 miles. | — | Executed | Rowe Construction, a div of UCM, Inc. $14,480,725 · | ||
| Apr 24, 2026 | 70E82 | McLeanDistrict 5 | Standard Overlay on IL 9 from Tazwell Co Line to IL 122. Approximately 7.155 miles gross length. | — | Executed | Rowe Construction, a div of UCM, Inc. $5,132,498 · | ||
| Apr 24, 2026 | 70F20 | McLeanDistrict 5 | Remove and reconstruct FAP 693 (ILL 9, US 150) from east of Main St Ave to Towanda Avenue in Bloomington, IL. Approximately 1.231 miles gross length. | — | Executed | Stark Excavating, Inc. $15,389,316 · | ||
| Apr 24, 2026 | 70H82 | McLeanDistrict 5 | 0.01 mi patching FAI 39 (I-39) ramps at Hudson Interchange. | — | Executed | Stark Excavating, Inc. $476,214 · | ||
| Apr 24, 2026 | 70H85 | McLeanDistrict 5 | 2.19 Miles of Patching from Fox Creek Road to N of Washington St. in Bloomington. | — | Executed | Kinney Contractors, Inc. $1,233,555 · | ||
| Apr 24, 2026 | 70H87 | PiattDistrict 5 | 9.178 Miles of Mircosurfacing Joint Repair on I-72 from Bridge St in Monticello to Piatt/Champaign Co Line. | — | Executed | Beniach Construction Co., Inc. $389,851 · | ||
| Apr 24, 2026 | 91652 | VermilionDistrict 5 | Replace the bridge carrying TR 13 over Whiskey Creek Branch located 2 miles southeast of Rankin. | — | Executed | Big O Services, LLC $413,282 · | ||
| Jun 12, 2026 | 70794 | McLeanDistrict 5 | 4.99 miles of pavement rehab Designed_Overlay Resurfacing (INT-4th), Pipe Underdrains, 1.8 miles south of Shirley to I-55/74 Interchange southwest of Bloomington. | — | Executed | Rowe Construction, a div of UCM, Inc. $20,217,017 · | ||
| Jun 12, 2026 | 70D62 | EdgarDistrict 5 | Replacement of SN 023-0014 with SN 023-0036 over the DandEI Railroad 0.3 miles west of the DandEI Railroad to 0.1 miles east of North 1800th St east of Paris. This requires roadway profile change on the eastern and western approaches to raise the grade of the bridge. | — | Executed | William Charles Construction Company, LLC $7,986,429 · | ||
| Jun 12, 2026 | 70F48 | McLeanDistrict 5 | Paving and parking lot improvements at three (3) McLean County IDOT storage facilities located in Bloomington, Leroy, and Towanda. The work includes paving over existing HMA and aggregate surfaces, painting dedicated parking stalls, and any other work necessary to complete the project. | — | Executed | H. J. Eppel & Co. $763,289 · | ||
| Jun 12, 2026 | 70H72 | VermilionDistrict 5 | Wing wall repair at Kickapoo Pond 0.2 mi west of Skykine Dr. west of Tilton. | — | Executed | MYS, Incorporated $267,850 · | ||
| Jun 12, 2026 | 70H86 | ChampaignDistrict 5 | 1.18 miles of patching and chip seal A-1 (Fog Seal), Ford Harris Rd to Hensley Rd north of Champaign. | — | Executed | Cross Construction, Inc. $526,225 · | ||
| Jun 12, 2026 | 70J03 | McLeanPiattDistrict 5 | Bridge painting of two structures on I-55 and I-72 in McLean and Piatt Counties. SN's 057-0177 and 074-0058. | — | Executed | Civil Coatings and Construction Inc. $396,171 · | ||
| Jul 31, 2026 | 46951 | VermilionDistrict 5 | Resurfacing of internal park roads and parking areas with an HMA surface; culvert replacement; sidewalk construction; drainage improvements; and associated work at the Kickapoo State Recreation Area in Vermilion County. Approximately 1.741 miles gross length. | — | Executed | Feutz Contractors, Inc. $4,107,350 · | ||
| Jul 31, 2026 | 70G29 | ChampaignDistrict 5 | 0.72 mile of sanitary sewer at Illini Prairie Rest Areas. | — | Executed | Stark Excavating, Inc. $3,219,237 · | ||
| Jul 31, 2026 | 70J06 | VariousDistrict 5 | District wide on-call guardrail and fence repairs. | — | Executed | COLLINS & HERMANN, INC. $1,317,046 · | ||
| Jul 31, 2026 | 70J08 | ChampaignDouglasDistrict 5 | Tree removal at various locations along I 74 and I 57 | — | Executed | Thor General Contracting LLC $87,478 · | ||
| Jul 31, 2026 | 91669 | EdgarDistrict 5 | HMA resurfacing of CH 4 from southeast of the city of Paris to E. 575th Rd. in Edgar County. | — | Executed | Evergreen Roadworks, LLC $2,189,996 · | ||
| Sep 18, 2026 | 70J35 | VariousDistrict 5 | Districtwide installation, maintenance, and removal of Smart Work Zone technology throughout District 5. | — | Executed | ROADSAFE TRAFFIC SYSTEMS, INC. $350,000 · | ||
| Sep 18, 2026 | 70J42 | VariousDistrict 5 | Removal and disposal of trees on state maintained routes within District 5. | — | Awarded | |||
| — | 5-09415-0000 5094150000 | District 5 | I-74 | Reconstruction - Bridges Bridge Replacement Carlock Rd 1.4 Mi E of Woodford Co Line | $7,000,000 | Planned | ||
| — | 5-34570-0100 5345700100 | District 5 | Old Us 66 | Reconstruction - Bridges Bridge Replacement Stream 0.3 Mi N of E 2200th N Rd 2.3 Mi S of Lexington | $2,500,000 | Planned | ||
| — | 5-36080-0000 5360800000 | District 5 | Morrisey AveUS-150 | Reconstruction - Pavement Reconstruction, ADA Improvements Oakland Ave to 0.1 mi N of E Lincoln St in Bloomington | $6,200,000 | Planned | ||
| — | 5-36080-0100 5360800100 | District 5 | Morrisey AveUS-150 | Rehabilitation - Pavement Standard Overlay, ADA Improvements 0.1 mi N of E Lincoln St to Veterans Pkwy in Bloomington | $5,100,000 | Planned | ||
| — | 5-50010-0000 5500100000 | District 5 | US-45 | Reconstruction - Bridges Bridge Replacement Upper Salt Creek 0.7 Mi S of Ludlow | $2,000,000 | Planned | ||
| — | 5-50050-0000 5500500000 | District 5 | I-57 | Reconstruction - Bridges Bridge Replacement At Kirby Ave (Overhead) W of Champaign | $15,000,000 | Planned | ||
| — | 5-50090-0000 5500900000 | District 5 | IL-9 | Preservation - Bridges Bridge Deck Overlay 2 mi E of Rankin; 3.5 mi E of Rankin; 0.5 mi E of East Lynn | $1,500,000 | Planned | ||
| — | 5-51690-0000 5516900000 | District 5 | IL-133IL-16US-150 | Rehabilitation - Pavement Designed Overlay, ADA Improvements, Bikeway ILL 16 to Lower Terre Haute Rd in Paris | $5,500,000 | Planned | ||
| — | 5-52780-0000 5527800000 | District 5 | I-74 | Rehabilitation - Bridges Bridge Widening At Perrysville Rd & Bowman Ave (Overhead) in Danville | $5,000,000 | Planned | ||
| — | 5-52780-0400 5527800400 | District 5 | Bowman Ave | Miscellaneous Improvement Bridge Removal/Demolition At Texas Ave in Danville | $9,000,000 | Planned | ||
| — | 5-52890-0000 5528900000 | District 5 | I-57 | Reconstruction - Bridges Bridge Replacement At CR 2500N (Overhead) W of Thomasboro | $4,000,000 | Planned | ||
| — | 5-52948-0000 5529480000 | District 5 | I-74 | Reconstruction - Bridges Bridge Replacement At TR 102 (Overhead) 2.1 Mi NE of Muncie; At CH 11 (Overhead) 0.5 mi N of Muncie; At TR 34 B (Overhead) 0.3 mi N of Fithian | $15,000,000 | Planned | ||
| — | 5-52952-0000 5529520000 | District 5 | US-51 | Preservation - Bridges Bridge Deck Overlay At Kickapoo Creek 1 mi N of US 136 & Over US 136 at Heyworth | $6,000,000 | Planned | ||
| — | 5-52963-0000 5529630000 | District 5 | IL-165 | Rehabilitation - Pavement Standard Overlay ILL 9 to Cooksville WCL | $4,500,000 | Planned | ||
| — | 5-52964-0000 5529640000 | District 5 | IL-165 | Rehabilitation - Pavement Standard Overlay 0.2 Mi E of Colfax ECL to Ford Co Line | $4,600,000 | Planned | ||
| — | 5-52981-0000 5529810000 | District 5 | St Joseph Rd | Rehabilitation - Pavement Designed Overlay, ADA Improvements St Joseph SCL to Main St in Sidney | $5,000,000 | Planned | ||
| — | 5-52985-0000 5529850000 | District 5 | US-150 | Rehabilitation - Pavement Scour Mitigation Hemlock St in Leroy to Dewitt Co Line | $5,700,000 | Planned | ||
| — | 5-53007-0000 5530070000 | District 5 | Division StIL-47US-150 | Rehabilitation - Pavement Designed Overlay, ADA Improvements Eastwood Dr in Mahomet to ILL 10 | $4,500,000 | Planned | ||
| — | 5-53007-0100 5530070100 | District 5 | Division StIL-47 | Reconstruction - Bridges Culvert Replacement At Camp Creek 1.1 mi N of I-72 | $750,000 | Planned | ||
| — | 5-53007-0400 5530070400 | District 5 | Division StIL-47US-150 | Rehabilitation - Pavement Utility Adjustment Eastwood Dr in Mahomet to ILL 10 | $50,000 | Planned |
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.