| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Jan 19, 2018 | 68B67 | PeoriaDistrict 4 | Resurfacing on US 24 from south of IL 9 to north of Pfeiffer Road and on IL 9 from US 24 to 0.27 miles east. | — | Executed | Advanced Asphalt Company $3,038,514 · | ||
| Jan 19, 2018 | 68D90 | VariousDistrict 4 | District wide weed spraying. | — | Executed | The Daltons Inc. $213,068 · | ||
| Jan 19, 2018 | 72K18 | LoganTazewellDistrict 4 | Bituminous surface treatment A-2 and leveling binder on Armington Road from Monroe Street in Armington to US 136 and on Old IL 121 (CR 2500 E) from US 136 to the Tazewell County line. | — | Executed | Beniach Construction Co., Inc. $353,547 · | ||
| Jan 19, 2018 | 89664 | KnoxDistrict 4 | Roadway reconstruction on FAS 393(CH4) from CH 15 to IL 17. | — | Executed | Halverson Construction Co., Inc. $4,167,747 · | ||
| Jan 19, 2018 | 89699 | KnoxDistrict 4 | Rehabilitate the bridge carrying Farnham Street over the BNSF Railroad, 0.3 mile north of East Main Street in Galesburg. | — | Executed | Sangamo Construction Company $2,191,737 · | ||
| Jan 19, 2018 | 89709 | PeoriaDistrict 4 | Reconstruction of Old Galena Road between Boy Scout Road and Cedar Hills Drive, including new traffic signals at Cedar Hills Drive. | — | Executed | R. A. Cullinan and Son, a div of UCM, Inc. $3,759,289 · | ||
| Jan 19, 2018 | 89734 | MercerDistrict 4 | Bridge replacement including minor approach roadway work on FAS 212 (CH 9) at Camp Creek, located 1.8 miles north of Joy. | — | Executed | Curnyn Construction Co. $669,974 · | ||
| Mar 9, 2018 | 68339 | KnoxWarrenDistrict 4 | 7.52 miles of resurfacing and bridge rehabilitation on US 34/IL 110 from west of Cameron Road to IL Route 164. | — | Executed | Gunther Construction, a div of UCM, Inc. $13,135,975 · | ||
| Mar 9, 2018 | 68887 | PeoriaDistrict 4 | Bridge rehabilitation to structure numbers: 072-0127, 072-0128, 072-0129, 072-0130, 072-0131 and 072-0132. | — | Executed | Stark Excavating, Inc. $11,778,628 · | ||
| Mar 9, 2018 | 68D15 | PeoriaDistrict 4 | Patching, resurfacing, ADA ramp improvements and signal upgrades on IL 40 from West Corrington Ave. to Pennsylavania Ave. in Peoria. | — | Executed | R. A. Cullinan and Son, a div of UCM, Inc. $2,429,480 · | ||
| Mar 9, 2018 | 68D16 | PeoriaTazewellDistrict 4 | Resurfacing on I-74 from Washington St. to Muller Road, from Morton Ave. to Mainstreet, from Sterling Ave. to the Union Pacific Railroad structure. Also, resurfacing on I-474 Roadway A and B in Peoria. | — | Executed | Advanced Asphalt Company $6,988,434 · | ||
| Mar 9, 2018 | 68D94 | FultonMcDonoughDistrict 4 | 26 miles of microsurfacing and cape seal at 4 locations on US 24, IL 100 and US 136. | — | Executed | A. C. Pavement Striping Co. $1,684,358 · | ||
| Mar 9, 2018 | 68E04 | PeoriaPutnamTazewellDistrict 4 | 31 miles of crack and joint sealing on US 150, IL 26 and I-155. | — | Executed | Complete Asphalt Service Co. $164,160 · | ||
| Mar 9, 2018 | 68E06 | PeoriaDistrict 4 | Landscaping along I-74 from Ellis Street in Peoria to the Illinois River. | — | Executed | Central Landscaping, LP $88,972 · | ||
| Mar 9, 2018 | 89702 | MarshallDistrict 4 | Removal and replacement of the bridge carrying CH 3 over the South Branch of Crow Creek, 1 mile south of La Rose. | — | Executed | Stark Excavating, Inc. $878,127 · | ||
| Mar 9, 2018 | 89726 | StarkDistrict 4 | Bituminous surface treatment at various locations in Stark County. | — | Executed | Pavement Maintenance Services, Inc. $333,629 · | ||
| Mar 9, 2018 | 89736 | StarkDistrict 4 | Replace the bridge carrying CH 8 over an unnamed tributary of the West Fork River, 2 miles northwest of Osceola. | — | Executed | Curnyn Construction Co. $264,241 · | ||
| Apr 27, 2018 | 46494 | VariousDistrict 4 | Placing epoxy and modified urethane pavement marking lines, letters and symbols and the removal of existing pavement markings as specified by individual work orders. | — | Executed | ROADSAFE TRAFFIC SYSTEMS, INC. $1,424,915 · | ||
| Apr 27, 2018 | 46495 | VariousDistrict 4 | Replacing damaged raised reflective pavement markers on various highways throughout Districts 4 and as directed by the Engineer. | — | Rejected | P & P Construction Co. $945,307 · | ||
| Apr 27, 2018 | 68215 | McDonoughDistrict 4 | Reconstruction of two-lane SN 055-0015 carrying IL 9 over the north fork of the LaMoine River, 2.0 miles west of Bushnell. | — | Executed | Sangamo Construction Company $2,307,568 · | ||
| Apr 27, 2018 | 68637 | HenryDistrict 4 | Remove and replace bridge SN 037-0072 carrying IL 78 over Indian Creek, 0.4 mile south of US 34 near Kewanee. | — | Executed | Halverson Construction Co., Inc. $1,809,709 · | ||
| Apr 27, 2018 | 68895 | StarkDistrict 4 | Replace bridge SN 088-0001 carrying IL 17 over Indian Creek, 0.3 mil west of Toulon. | — | Executed | Stark Excavating, Inc. $2,035,628 · | ||
| Apr 27, 2018 | 68A79 | McLeanTazewellWoodfordDistrict 4 | 10.97 miles of pavement rubblization, overlay and new pavement construction with drainage and bridge work from west of the Tazell county line near Deer Creek to east of the Carlock interchange. | — | Executed | Rowe Construction, a Division of UCM, Inc. and Advanced Asphalt Company Joint Venture $57,888,042 · | ||
| Apr 27, 2018 | 68D69 | TazewellDistrict 4 | 0.97 mile of patching, milling and resurfacing on US 24/IL 29 from Margaret Drive to north of Lasalle Boulevard in Creve Coeur. | — | Rejected | Advanced Asphalt Company $1,885,690 · | ||
| Apr 27, 2018 | 68D81 | VariousDistrict 4 | Bridge deck sealing on various structures in various counties in District 4. | — | Executed | All States Painting, Inc. $216,339 · | ||
| Apr 27, 2018 | 68E01 | MarshallMasonTazewellDistrict 4 | Wash 9 bridges over the Illinois River. | — | Executed | All States Painting, Inc. $833,300 · | ||
| Apr 27, 2018 | 68E05 | StarkTazewellDistrict 4 | Pollinator habitat restoration and preservation in Stark and Tazewell Counties. | — | Executed | CSD Environmental Services, Inc. $41,978 · | ||
| Apr 27, 2018 | 68E07 | VariousDistrict 4 | Pavement marking on various routes in various counties in District 4. | — | Executed | America's Parking ReMarking $409,091 · | ||
| Apr 27, 2018 | 68E08 | VariousDistrict 4 | Guardrail and cable guardrail repairs at various locations in District Four. | — | Executed | Northern Contracting, Inc. $667,539 · | ||
| Apr 27, 2018 | 89733 | KnoxDistrict 4 | Traffic Signal modernization at nine intersections in the City of Galesburg. | — | Executed | Oberlander Electric Co. $468,309 · | ||
| Jun 15, 2018 | 68088 | TazewellDistrict 4 | Scour mitigation to SN 090-0112 carrying Illinois Route 29 over Lost Creek, 1.5 miles south of Pekin. | — | Rejected | Lee Hood d/b/a Hood Demolition & Excavation $262,717 · | ||
| Jun 15, 2018 | 68663 | MercerDistrict 4 | Remove and replace SN 066-0006 carrying IL 17 over the Edwards River. | — | Executed | General Constructors Inc. of the Quad Cities $5,354,351 · | ||
| Jun 15, 2018 | 68825 | McDonoughDistrict 4 | 12.1 miles of partial pavement patching, cold milling, resurfacing, guardrail replacement and ADA ramp construction on IL 9 from the Hancock County line to US 67. | — | Executed | Gunther Construction, a div of UCM, Inc. $4,722,460 · | ||
| Jun 15, 2018 | 68B59 | KnoxPeoriaDistrict 4 | Guardrail removal and culvert extensions at various locations on IL 8 and US 150, culvert replacement at Location 18 on US 150. | — | Executed | Illinois Civil Contractors, Inc. $1,589,198 · | ||
| Jun 15, 2018 | 68D09 | TazewellDistrict 4 | Intersection reconstruction at US 24 and Spring Creek Road. | — | Executed | R. A. Cullinan and Son, a div of UCM, Inc. $1,212,722 · | ||
| Jun 15, 2018 | 68D61 | TazewellDistrict 4 | 550 feet of riprap slope repair and culvert lining along IL 116 from Mariner's Way to 0.5 mile south, in East Peoria. | — | Executed | Illinois Civil Contractors, Inc. $246,702 · | ||
| Jun 15, 2018 | 68E00 | TazewellDistrict 4 | Building demolition at 500 West Pearl Street in Tremont. | — | Executed | Stark Excavating, Inc. $37,009 · | ||
| Jun 15, 2018 | 68E02 | TazewellDistrict 4 | Paint 5 bridges in Tazewell County; SN 090-0104, 0105, 0106, 0107 and 090-0141. | — | Executed | Three Star Painting, Inc. $871,891 · | ||
| Jun 15, 2018 | 68E03 | PeoriaDistrict 4 | Installation of traffic signals and an eastbound left-turn lane at the intersection of US 24 and Cameron Lane (IL 9). | — | Executed | Oberlander Electric Co. $595,444 · | ||
| Jun 15, 2018 | 68E10 | TazewellWoodfordDistrict 4 | Patching on US 24 from the McClugage Bridge to Cummings Lane, and on IL 116 from the Upper Spring Bay to Lourdes (CH 19). | — | Rejected | |||
| Jun 15, 2018 | 68E15 | PeoriaDistrict 4 | 2.7 miles of shoulder restoration along IL 6 from IL 40 to IL 29. | — | Rejected | |||
| Jun 15, 2018 | 68E19 | MarshallWoodfordDistrict 4 | 28.4 miles of Class A pavement patching on I-39, from the McClean County line north to 2.1 miles south of IL 17. | — | Executed | Kinney Contractors, Inc. $429,762 · | ||
| Jun 15, 2018 | 68E38 | VariousDistrict 4 | Milling centerline and edgeline rumble strips, and replacing pavement markings on various routes throughout District 4. | — | Executed | SURFACE PREPARATION TECHNOLOGIES, LLC $199,799 · | ||
| Jun 15, 2018 | 68E39 | PeoriaTazewellDistrict 4 | Installation of turn signals, luminaires, light poles, lighting controller and relocation of existing railroad interconnected traffic signal controller cabinet at various locations. | — | Executed | Laser Electric, Inc. $183,757 · | ||
| Jun 15, 2018 | 68E40 | WarrenDistrict 4 | 0.6 mile of partial width resurfacing and longitudinal joint repair on US 34 from 160th Ave. to 0.4 mile east of 165th Ave. near Kirkwood. | — | Executed | Gunther Construction, a div of UCM, Inc. $146,255 · | ||
| Jun 15, 2018 | 89663 | WoodfordDistrict 4 | Resurfacing IL 117 from Eureka Avenue to Reagan Drive in the City of Eureka. | — | Executed | R. A. Cullinan and Son, a div of UCM, Inc. $150,054 · | ||
| Aug 3, 2018 | 68C49 | MarshallDistrict 4 | Insert a new box culvert into an existing box culvert carrying IL 89 over Sandy Creek, 2.6 miles south of IL 18. | — | Executed | Stark Excavating, Inc. $389,628 · | ||
| Aug 3, 2018 | 68D96 | PeoriaDistrict 4 | Construction of an HMA parking lot with fence east of the District 4 materials lab, off US 150 in Edwards. | — | Rejected | |||
| Aug 3, 2018 | 68E09 | FultonDistrict 4 | Replace 4' X 6' culvert and repair slope on IL route 97, 2.5 miles south of Cuba. | — | Executed | Lee Hood d/b/a Hood Demolition & Excavation $342,404 · | ||
| Aug 3, 2018 | 68E46 | KnoxDistrict 4 | Replace pedestrian walkway lighting and lighting fixtures at I-74 Spoon River Rest Areas in Knox County. | — | Executed | Laser Electric, Inc. $81,493 · | ||
| Aug 3, 2018 | 68E55 | MarshallDistrict 4 | Profile correction and installation of underdrains on IL 29, 0.7 mile north of Sparland. | — | Executed | Advanced Asphalt Company $297,057 · | ||
| Aug 3, 2018 | 68E56 | McDonoughSchuylerDistrict 4 | Intermittent centerline joint repair and partial depth patching on US 67 from north of Industry city limits to IL 101. | — | Rejected | Illinois Valley Paving, a div of UCM, Inc. $262,274 · | ||
| Aug 3, 2018 | 68E57 | FultonMcDonoughDistrict 4 | Partial depth patching on IL 41 from Avon city limits north to IL 9. | — | Rejected | Gunther Construction, a div of UCM, Inc. $418,027 · | ||
| Aug 3, 2018 | 68E59 | VariousDistrict 4 | Installatino of fiber cable, duct and communication vaults at various locations in District 4. | — | Executed | Oberlander Electric Co. $464,500 · | ||
| Aug 3, 2018 | 89741 | MercerDistrict 4 | Extend six reinforced concrete box culverts, construction of one concrete box culvert, and the removal and replacement of ten corrugated metal pipe culverts on Joy Road between 160th Avenue and 130th Avenue. | — | Rejected | |||
| Aug 3, 2018 | 89746 | TazewellDistrict 4 | Construction of a shared-use path along West Cruger Road from Nofsinger Road to Main Street in the City of Washington. | — | Executed | Stark Excavating, Inc. $359,285 · | ||
| Sep 21, 2018 | 68E47 | PeoriaDistrict 4 | Scour mitigation at SN 072-0034 carrying IL 90 over Prince Run. | — | Executed | Illinois Civil Contractors, Inc. $155,436 · | ||
| Sep 21, 2018 | 68E65 | TazewellDistrict 4 | Patching and joint repair on the on-ramps and off-ramps at the westbound I-74 Morton interchange. | — | Executed | G. M. Sipes Construction, Inc. $261,656 · | ||
| Nov 9, 2018 | 68185 | PeoriaDistrict 4 | Replacement of the structure carrying Farminton Road over Kickapoo Creek and reconstruction of the Farmington Road/Kickapoo Creek intersection, includes pavement improvements from west of the railroad tracks to west of Redbud Drive. | — | Executed | Stark Excavating, Inc. $10,061,876 · | ||
| Nov 9, 2018 | 68D85 | TazewellDistrict 4 | Bridge repair project, approximately 500' in length, located in the US 24/IL 116 Interchange just east of the McClugage Bridge. | — | Executed | Halverson Construction Co., Inc. $1,885,363 · | ||
| Nov 9, 2018 | 68E11 | MarshallDistrict 4 | Repair Bridge SN 062-0037 carrying IL 18 over Sandy Creek, 0.1 mile west of IL 26. | — | Executed | Stark Excavating, Inc. $523,628 · | ||
| Nov 9, 2018 | 68E17 | WoodfordDistrict 4 | Bridge repairs to SN 102-0007 carrying US Route 24 over Walnut Creek, 0.5 miles west of IL Route 117. | — | Executed | Stark Excavating, Inc. $434,382 · | ||
| Nov 9, 2018 | 68E25 | HendersonDistrict 4 | Bridge joint repoairs to SN 036-0035 carrying US Route 34 over Chinn Street. | — | Executed | Laverdiere Construction, Inc. $546,342 · | ||
| Nov 9, 2018 | 68E61 | VariousDistrict 4 | District-wide weed spraying (off Road). | — | Executed | Endrizzi Contracting, Inc $187,960 · | ||
| Nov 9, 2018 | 68E70 | VariousDistrict 4 | Repair and Maintenance of electrical facilities in District Four. | — | Executed | Laser Electric, Inc. $267,279 · | ||
| Nov 9, 2018 | 89747 | McDonoughDistrict 4 | Replace superstructure on the bridge carrying CH 26 over Hogwallow Branch, 3.5 miles east of the Hancock County Line. | — | Executed | County Contractors, Inc. $429,858 · | ||
| Jan 18, 2019 | 68A91 | FultonDistrict 4 | Resurfacing on US 24 from Maple St. in Lewistown to Little America, and on IL 97 from US 24 to North Clark Rd. | — | Executed | R. A. Cullinan and Son, a div of UCM, Inc. $3,428,793 · | ||
| Jan 18, 2019 | 68D59 | TazewellDistrict 4 | Bridge repair on Washington Street (IL 40) and the Industrial Spur (IL 40). | — | Executed | Halverson Construction Co., Inc. $3,848,556 · | ||
| Jan 18, 2019 | 68D79 | WoodfordDistrict 4 | Resurfacing I-39 from the Mclean County line to 0.25 mile north of US 24, includes repair on bridges SN 102-0058 and 102-0059. | — | Executed | Rowe Construction, a div of UCM, Inc. $13,273,213 · | ||
| Jan 18, 2019 | 68E20 | PeoriaDistrict 4 | Installation of fiber optic cable, communications equipment and CCTV for a new traffic signal system in Peoria. | — | Rejected | Oberlander Electric Co. $790,000 · | ||
| Jan 18, 2019 | 68E69 | VariousDistrict 4 | Dead tree removal throughout District 4. | — | Executed | Clean Cut Tree Service, Inc. $167,467 · | ||
| Jan 18, 2019 | 68E74 | KnoxDistrict 4 | Structural steel repairs to beams on SN 048-0065 carrying Farnham Street over US 34. | — | Executed | Halverson Construction Co., Inc. $147,930 · | ||
| Jan 18, 2019 | 68E76 | TazewellDistrict 4 | Installation and removal of guardrail, inlet adjustments and miscellaneous concrete work to separate US 150 (West Jackson Street) from the adjacent multi-use trial from Beverly Avenue to Cedar Avenue, on the northwest side of Morton | — | Executed | Illinois Civil Contractors, Inc. $149,100 · | ||
| Jan 18, 2019 | 68E78 | TazewellDistrict 4 | Install communications duct, communications vaults, fiber optic cable, CCTV cameras along US 24 and Business Route 24 in and around Washington. | — | Executed | Bodine Electric of Decatur $427,439 · | ||
| Jan 18, 2019 | 89712 | PeoriaDistrict 4 | Pavement reconstruction, PCC pavement, curb and gutter, storm sewers, PCC multi-use path, street lighting and pedestrian signals, on Dirksen Parkway from Middle Road to Airport Road. | — | Executed | R. A. Cullinan and Son, a div of UCM, Inc. $5,449,818 · | ||
| Jan 18, 2019 | 89732 | PeoriaDistrict 4 | Construction of 4' HMA shoulders with rumble strips, 2' aggregate shoulders and the reconstruction of ditches on Kickapoo-Edwards Road from Shamrock Lane to Countryside Lane. | — | Executed | R. A. Cullinan and Son, a div of UCM, Inc. $1,175,654 · | ||
| Mar 8, 2019 | 68B78 | WarrenDistrict 4 | Resurfacing on US 34/US 67/IL 100/IL 164 from 0.25 mile south of 11th Ave. to 0.9 mile east of 11th Street in Monmouth. | — | Executed | Gunther Construction, a div of UCM, Inc. $7,678,838 · | ||
| Mar 8, 2019 | 68C63 | TazewellDistrict 4 | Culvert replacement on IL 98, 0.1 mile east of Cole Hollow Rd (SN 090-1002) | — | Executed | Kinney Contractors, Inc. $734,500 · | ||
| Mar 8, 2019 | 68D10 | KnoxDistrict 4 | Replacement of a single box culvert with a double (SN-048-2008), HMA pavement, guardrail replacement, earthwork, and other collateral work necessary, located 0.6 mile west of IL-180 near Victoria. | — | Executed | Kinney Contractors, Inc. $979,988 · | ||
| Mar 8, 2019 | 68D22 | PeoriaDistrict 4 | Resurfacing, ADA improvements, traffic signal improvements, and drainage improvements along IL Rte 29 south of US Rte 150 to Abington St in Peoria. | — | Executed | Advanced Asphalt Company $1,972,818 · | ||
| Mar 8, 2019 | 68E14 | TazewellDistrict 4 | Substructure repairs to SN 090-0037 carrying US RTE 150 over Farm Creek, TWP Railroad, and Norfolk Southern Railroad. | — | Executed | Otto Baum Company, Inc. $138,518 · | ||
| Mar 8, 2019 | 68E28 | WoodfordDistrict 4 | Cold in-place recycling on IL 117 from IL 116 to Mill St in Eureka. | — | Executed | Advanced Asphalt Company $1,373,783 · | ||
| Mar 8, 2019 | 68E36 | PeoriaDistrict 4 | Bituminous surface treatment- A1 on IL Rte 91 from the Stark county line. | — | Executed | R. A. Cullinan and Son, a div of UCM, Inc. $169,369 · | ||
| Mar 8, 2019 | 68E62 | PeoriaDistrict 4 | Landscaping along I-74 from Ellis St to the Illinois River. | — | Executed | Central Landscaping, LP $122,806 · | ||
| Mar 8, 2019 | 68E63 | VariousDistrict 4 | Pavement markings throughout District 4. | — | Executed | Varsity Striping & Construction Co. $435,795 · | ||
| Mar 8, 2019 | 68E64 | VariousDistrict 4 | Guardrail repairs caused by motorists (MCHD) and cable guardrail repairs (high tensions cable barrier). | — | Executed | Northern Contracting, Inc. $682,239 · | ||
| Mar 8, 2019 | 68E66 | HendersonDistrict 4 | Crack and joint sealing on US 34 (Biggsvile Bypass) and on IL 94/IL 116 from 1425N to 0.14 mile south of 1500N. | — | Executed | Complete Asphalt Service Co. $160,990 · | ||
| Mar 8, 2019 | 68E67 | VariousDistrict 4 | Bridge deck sealing on various structures district wide. | — | Executed | M & M Concrete, Inc. $250,000 · | ||
| Mar 8, 2019 | 68E68 | MarshallMasonTazewellDistrict 4 | Bridge washing of eleven bridges over the Illinois River | — | Executed | All States Painting, Inc. $881,690 · | ||
| Mar 8, 2019 | 68E75 | TazewellDistrict 4 | Crack and joint sealing on I-155 from I-74 to the Tazewell/Logan county line. | — | Executed | Complete Asphalt Service Co. $197,480 · | ||
| Mar 8, 2019 | 68E80 | PeoriaDistrict 4 | Construction of an aggregate parking lot with fence east of District 4 materials lab off of US 150 in Edwards. | — | Executed | Otto Baum Company, Inc. $218,121 · | ||
| Mar 8, 2019 | 68E81 | TazewellDistrict 4 | Longitudinal joint repair, raised pavement markers, pavement striping on US 24 from east of College Drive to east of Cummings Lane. | — | Executed | R. A. Cullinan and Son, a div of UCM, Inc. $431,734 · | ||
| Mar 8, 2019 | 89713 | TazewellDistrict 4 | Resurfacing, sidewalks, street and pedestrian lighting, storm sewer, curb and g gutter, and pavement markings on IL 29 (Main Street) from Poplar Street to Margaret Drive in Creve Coeur. | — | Executed | Illinois Civil Contractors, Inc. $3,914,270 · | ||
| Apr 26, 2019 | 68D77 | TazewellDistrict 4 | Rehabilitation of SN 090-0047 carrying IL 29/IL 116/IL 8/US 24 over Farm Creek west of Camp Street in East Peoria. | — | Executed | Phoenix Corporation of the Quad Cities $571,771 · | ||
| Apr 26, 2019 | 68D98 | PeoriaDistrict 4 | Surfacing maintenance including pavement patching, HMA surface removal, HMA surface course, and the construction of ADA ramps at various locations on IL Rte 40. | — | Executed | R. A. Cullinan and Son, a div of UCM, Inc. $919,865 · | ||
| Apr 26, 2019 | 68E37 | TazewellDistrict 4 | Bridge painting at various locations in Taxewell County. (SN 090-0117, 0116, 0102, 0118, and 090-0119). | — | Executed | Civil Coatings and Construction Inc. $2,237,590 · | ||
| Apr 26, 2019 | 89474 | KnoxDistrict 4 | Replace the bridge carrying CH 4 over Walnut Creek, 0.5 mile west of Altona. | — | Executed | County Contractors, Inc. $699,269 · | ||
| Jun 14, 2019 | 46516 | VariousDistrict 4 | Remove and replace raised reflective pavement markers within limits shown. | — | Executed | P & P Construction Co. $571,845 · | ||
| Jun 14, 2019 | 46517 | VariousDistrict 4 | REMOVAL OF EXISTING PAVEMENT MARKINGS AND REPLACING WITH EPOXY AND MODIFIED URETHANE PAVEMENT MARKING LINES WITHIN THE LIMITS SPECIFIED ON EACH WORK ORDER. | — | Executed | ROADSAFE TRAFFIC SYSTEMS, INC. $1,098,686 · | ||
| Jun 14, 2019 | 68D45 | FultonDistrict 4 | 2400' OF SLOPE AND TOE REPAIR ALONG THE EAST SIDE OF IL 78/IL 97 N OF DICKSON MOUNDS RD. THE PROJECT ALSO INCLUDES THE RECONSTRUCTION OF THE SHOULDER AND INSTALLATION OF GUARDRAIL. | — | Executed | Illinois Civil Contractors, Inc. $865,314 · |
1–100 of 878Next ›
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.